![](https://static.isu.pub/fe/default-story-images/news.jpg?width=720&quality=85%2C50)
1 minute read
Appendix 3 - TT Chamber Catalyzing the Agri and Fisheries Sectors
Income Years: 2024 to 2027
Source Link: https://info.ttbizlink.gov.tt/investment-incentives/agriculture
Vehicles Rebate Recommendations July 2023
Contour banking and Contour ridging per ha.
Contour barriers per 30m of cost up to a maximum of $1,000 of cost up to a maximum of $75 of cost up to a maximum of $120 Check dams
Terrace outlets per 30m of cost up to a maximum of $200 Crops of cost up to a maximum of $6,000 of cost up to a maximum of $4,000 Cocoa/coffee establishment per of cost up to a maximum of $4,000 of cost up to a maximum of $10,000 of cost up to a maximum of $6,000
Vehicles Rebate Recommendations July 2023
Vehicles Rebate Recommendations July 2023
Alternative culture system construction 25% of cost up to a maximum of $25,000
Ponds rehabilitation 100% of cost up to a maximum of $7,000
Water pumps, hoses and accessories
50% of cost up to a maximum of $20,000
Aeration equipment 50% of cost up to a maximum of $10,000
PVC pipes, valves, fittings and accessories 25% of cost up to a maximum of $10,000
Harvesting gear and equipment etc. 25% of cost up to a maximum of $10,000
New wells, dams reservoirs pond etc. construction 25% of cost up to a maximum of $25,000
Wells and dams etc. refurbishment
Guaranteed Prices
15% of cost up to a maximum of $15,000
Cost per kilogram (kg)
Cocoa $19 per Kg
Coffee $12 per Kg
Rice:
1. Grade I 1. $2.99 per Kg
2. Grade II 2. $2.86 per Kg
3. Grade III
$2.09 per Kg
4. Rice Seed 4. $2.99 per Kg
Milk $1.50 per Kg
VII. Research and Development Facility (RDF)
Through its funding, the RDF endorses support for the successful marketplace entry of innovative and technology driven business ideas in, inter alia
Eligible companies can access funding in three (3) phases:
Phase 1: Feasibility- 70% of the total cost of the project up to TT$100,000.00;
Phase 2: Product and service development- 50% of the total cost of the project, up to TT$750,000.00;
Phase 3: Product/Service Commercialization- up to TT$150,000.00
Recommendations
Phase 1: Feasibility- 70% of the total cost of the project up to TT$200,000.00;
Phase 2: Product and service development- 75% of the total cost of the project, up to TT$750,000.00;
Phase 3: Product/Service Commercialization- up to TT$250,000.00