3 oidutS ngiseD larutcetihcrA 513RA
portfolio
Triny Cheng Xiao You 1001849784
Content 01 1A Triny Cheng Xiao You 1001849784 Bachelor of Science (Hons) in Architecture (July 2021) UCSI University trinycxy@gmail.com
AR315 ARCHITECTURE DESIGN STUDIO 3
1B 1C
PRECEDENT STUDY Xin Jin Zhi Museum (Creative)
FORM, SPACE & ORDER MODEL STUDY Xin Jin Zhi Museum
EXPLORATIVE DRAWINGS Manipulation of Forms
02 2A
SITE ANALYSIS + Site Demarcation
Tutored by : Mr Muhammad Shukran
USER PROFILE Dance Centre, Ipoh
Studio Lecturers : Ms. Ida Mazlan Ms. Intan Ar. Rien Tan Mr. Justin Lee
2B
SITE RESPONSE Site Model + Massing Models
03 BUSINESS INCUBATOR | ACENO
Year 2 l Semester 3 July - November
+ Design Project for Dance Centre + Design Process + Presentation Boards + Models
01 1A 1B 1C
PRECEDENT STUDY Xin Jin Zhi Museum (Creative)
FORM, SPACE & ORDER MODEL STUDY Xin Jin Zhi Museum
EXPLORATIVE DRAWINGS Manipulation of Forms
STUDY MODEL & FORM,SPACE AND ORDER DIAGRAM
EXPLORATIVE DRAWINGS PLUG-IN / EXPLORATION 1
The Model
The Zoning
The Programming
EXPLORATIVE DRAWINGS PLUG IN / EXPLORATION 2
The Model
The Zoning
The Programming
EXPLORATIVE DRAWINGS PLUG IN / EXPLORATION 3
The Model
The Zoning
The Programming
02 2A
SITE ANALYSIS + Site Demarcation
USER PROFILE Dance Centre, Ipoh
2B
SITE RESPONSE Site Model + Massing Models
DEMARCATION & SITE VIGNETTES
ELIFORP RESU
TASK 2A | PART TWO THE ONLINE INTERVIEW From our selection in nature of business in Project 1, we are to select a client in the same category to study on. In project 2B, we are to have an interview session with the chosen client to know the client and the client's business better in order to design an business incubator.
The Zoom Conversation,
1st August 2021 12:00pm
Ms. Chin Sun Sun Founder, Principal, Teacher of Dance Centre Ipoh, Perak A Classical Ballet Dance School A pleasant Zoom interview session was held with Ms. Chin Sun Sun for 20 minutes during her break time on Saturday. Ms. Chin introduced her business background and talked about her experience as an business owner. We also discussed over the existing programs and the space requirements for a dance school.
01 THE RESPONSIVE Massing Models
Site Model Scale 1:200
02
03
04
05
03
BUSINESS INCUBATOR | ACENO Performance Art Centre in Central Market A project to develop a business incubator space to further accommodate their business and to bring the client's existing program to another level. The business incubator will accommodate a communal space for activities of up to 20 users based on the needs of the business & community.
THE LOCATION
The site chosen is located on an existing carpark infront of Central Market, facing the main street Jalan Tun Tan Cheng Lock. It is considered as an ideal place for a business incubator as it is surrounded by all shoplots and famous tourist attraction buildings. An existing walkway is located between Central Market and the carpark to ease pedestrian travel from Central Market and Kasturi Walk to the existing carpark.
IDEATION + EXPLORATIVE SKETCHES
Space Design Development Sketches
Form Design Development Sketches
SI T EPL AN
SCAL E1: 200
GROUNDF L OORPL AN SCAL E1: 100
F I RSTF L OORPL AN SCAL E1: 100
SCENE1WEEKDAYSMORNI NG&NI GHT
T RANSF ORMABL ESPACES NORMALDAYS
EVENTDAYS PERF ORMANCEHAL L Dur i ngeventdays ,t her et r ac t abl e c hai r swi l l bef ol dedt ous et hes pac e asexhi bi t i onhal l .
DANCEHAL L F ol di ngdooratt heper f or manc ehal l i sc l os edt oal l owpr i v ac yt odanc er sandus er si ns i det hehal l .
Dur i ngeventdays ,t hedanc ehal l c oul dbet r ans f or medi nt oexhi bi t i on, ar tgal l er y.
SCENE2WEEKENDS( EVENT ) SUNKENCOURT YARD Dur i ngeventdays ,t hes unken c our t yar dc oul dbeus edasanopen s t age.
F OYER
Onev entdays ,per f or manc ehal l f ol di ngdoorwi l l beopenedandi tal l owsus er sf r omc our t yar dt o s eewhati shappeni ngi ns i de.
Onnor mal days ,t hef oyerac tasa wai t i ngar eaf ort heus er swhi l eon eventdaysi t ’ l l beus edas as mal l c ommuni t ys pac e( ac t i vi t i es:games , danc ebat t l es )
SECT I ONXX SCAL E1: 100
SECT I ONYY SCAL E1: 100
F RONTEL EVAT I ON SCAL E1: 100
REAREL EVAT I ON SCAL E1: 100
CONST RUCT I ONDET AI L S
L EF TEL EVAT I ON SCAL E1: 100
POL YCARBONAT ECL ADDI NGSYST E M 1. Anodi z edAl umi ni umF r ame 2. 40mmpol yc ar bonat et hr eel ayerc l addi ng. 3. Wi nds hi el di nganc hor i ngs ubs t r uc t ur e: Al umi ni umT ube
RET RACT ABL ECHAI RSYST E M( PE RF ORMANCEHAL L )
RI GHTEL EVAT I ON SCAL E1: 100
Wheni ti sf ol dedandkeptt oget her ,i ts av ess pac eandpr ovi de mor es pac est ot hei nt er i or .
SECT I ONALPERSPECT I VE
F I NALPRESENT AT I ONBOARD
3 oidutS ngiseD larutcetihcrA 513RA
THANK YOU