MORRIS JEFF COMMUNITY SCHOOL - A FRAMEWORK FOR SCHOOL FACILITY PLANNING

Page 1

MORRIS JEFF COMMUNITY SCHOOL A FRAMEWORK FOR SCHOOL FACILITY PLANNING A Project Of

THE TULANE CITY CENTER and MORRIS JEFF COMMUNITY SCHOOL

1


2


TABLE OF CONTENTS 4

PROJECT OVERVIEW

6

FRAMEWORK

8

PROGRAM

10

SITE

14

PROGRAM DISTRIBUTION

16 PRECEDENTS / PRACTICES 22

NEXT STEPS

3


INTRODUCTION ABOUT MORRIS JEFF COMMUNITY SCHOOL In Fall 2010, Morris Jeff Community School opened its doors as one of the most racially and economically diverse openaccess public schools in the history of New Orleans. Morris Jeff Community School currently serves children in grades Pre-K to 3rd, with a heavy focus on languages, the arts and the development of the whole child. The school will grow over the next few years to serve children in all elementary grades (Pre-K to 8th). This flagship school for the city of New Orleans would not exist had it not been for the grassroots efforts and shared vision of parents, educators and community leaders in the Mid-City and St. John neighborhoods. Their vision was to create a school that reflects the diversity of the city both in the children that will attend and in the education they will receive; a school that is child-centered and focused on more than just test scores. In October 2009, this vision was realized when the school’s Type 5 charter application was approved by the Louisiana Board of Elementary and Secondary Education. The National Association of Charter School Authorizers (NACSA) called Morris Jeff’s application “one of the strongest applications they have ever reviewed”. Despite these successes, the school community has continually been forced into action on three primary issues: the school’s future site, the school’s future size, and the timeline for the design and construction of the school’s new facility. The school community now feels confident that its relationship with the RSD and project architect is collaborative and shares an overall common vision for the process.

PROJECT OVERVIEW The purpose of this project is to provide Morris Jeff Community School (MJCS) and its constituents with the necessary framework to effectively engage the Recovery School District (RSD), project architect, and Mid-City community in the school facility planning process for the Fisk-Howard site. It is important to state that this is not a design proposal, nor a substitute for the important work of the School Facilities Master Plan (SFMP) or RSD. Rather, this document simply presents background information critical to the design process to the Morris Jeff community. This pre-design information falls into three principle categories: the proposed school’s size, site, and program. Each of these areas of consideration will have major architectural implications that any design proposal for the facility must address. By encouraging a common understanding of these fundamental criteria, it is hoped that the school community will not only be able to effectively engage in the planning process, but will also be seen as a valuable partner in that process. The ultimate goal for all parties involved is to produce the best school facility possible; one that not only meets basic requirements, but takes full advantage of this historic opportunity by creating an excellent learning environment for the children of the Mid-City neighborhood and the New Orleans community in general. 4


PROJECT:

PROVIDE MORRIS JEFF COMMUNITY SCHOOL AND ITS CONSTITUENTS WITH THE NECESSARY FRAMEWORK TO EFFECTIVELY ENGAGE IN THE SCHOOL FACILITY PLANNING PROCESS

LOCATION:

MID-CITY, NEW ORLEANS (THE FORMER FISK-HOWARD ELEMENTARY SCHOOL SITE)

PARTNERS:

TULANE CITY CENTER AND MORRIS JEFF COMMUNITY SCHOOL

GOAL:

FACILITATE THE BEST FACILITY DESIGN POSSIBLE BY MAXIMIZING THE POTENTIAL RELATIONSHIPS BETWEEN MORRIS JEFF COMMUNITY SCHOOL, RECOVERY SCHOOL DISTRICT, NEIGHBORHOOD, AND PROJECT ARCHITECT

5


FRAMEWORK The diagram below shows the principal factors that will influence the design process and their relationships to one another. Each will have major architectural implications. The success of any design proposal can, in part, be measured by its ability to resolve these sets of baseline criteria into a cohesive, functional, healthy, and spatially rich environment for learning.

INTERNATIONAL BACCALAUREATE CURRICULUM

MORRIS JEFF COMMUNITY SCHOOL

Cit y

s

ne

ch

ig

hb

RSD PROGRAM REQUIREMENTS

DESIGN AND CONSTRUCTION

on

M id6

CURRENT PRACTICES IN EDUCATION PROGRAMING

oo

orh

l m is sio n &

vis

i

o o d c o m m u n it y

CODE REQUIREMENTS

EXISTING SITE CONDITIONS

NEW SCHOOL FACILITY


MORRIS JEFF COMMUNITY SCHOOL MISSION AND VISION : As stated in Morris Jeff’s Vision, a community-centered, grassroots approach to education reform has helped to transform the school into “one of the most racially and economically diverse public schools in the history of New Orleans.” The curriculum at Morris Jeff is inquirybased, encouraging the natural curiosity of children. INTERNATIONAL BACCALAUREATE CURRICULUM : Morris Jeff Community School is a candidate school for the Primary Years Programme (PYP). The school is pursuing verification as an IB World School. These are schools that share a common philosophy—a commitment to high quality, challenging, international education. The IB curriculum focuses on “the development of the whole child as an inquirer, both in the classroom and in the world outside.” (www. ibo.org) RSD PROGRAM REQUIREMENTS : As part of the recent master-planning process, the Recovery School District created a set of standards regarding educational programming and space planning. These standards specify a school model which embraces team teaching, thematic instruction and departmental organization. Space requirements regarding size and use for various program elements are also specified. CURRENT PRACTICES : Though not specifically required by code, any new school facility should reflect current standards and best practices for school facility design. Factors include: standards for day lighting, class room acoustics, and the integration of technology throughout the building. These elements generally contribute to spaces which promote student engagement and learning while creating responsible, effective building systems. EXISTING SITE CONDITIONS : The future site of the Morris Jeff Community School is located in the Mid-City neighborhood within the block bounded by Cleveland Ave., S. Rendon St., Palmyra St. and S. Lopez St. The approximately 2.27 acre site is the former site of Fisk-Howard Elementary School (now demolished). The site occupies a RD-3 zoning district with a larger scale institution to the north-east, intact residential fabric to the southeast / south-west, and the possibility of acquiring vacant property to the north-west. CODE REQUIREMENTS : As with all buildings, educational facilities are required to comply with relevant building and civic codes to ensure the safety and wellbeing of all occupants. Because of their critical function of providing a safe learning environment for the children, schools are subject to specific requirements. In combination with the available site area, these requirements have major implications on the locations of spaces within the building.

7


PROGRAM

Physical Education

The School Facilities Master Plan for Orleans Parish (SFMP) lays out standards for educational

Physical Education

programing. The plan’s ‘Educational Program Requirements’ document calls for nine general programmatic elements and specifies ideal

Admin.

adjacencies between those elements. Total square footages are listed for each space type

Admin.

along with detailed breakdowns for individual spaces within each category. (Refer to the SFMP

Cafeteria

Special Needs

specific information on each of these general

Library/ Media Center

categories. An updated version will be available for download at: http://rebuildingnolaschools. wordpress.com/technical-info/).

SFMP Building Capacity Values for the Fisk-Howared Site: Student / Program Capacity

788 students

Gross Floor Area Per Student

135 sq.ft.

Overall Building Capacity

986 occupants

Building Square Footage Total

106,757 sq.ft.

Cafeteria

Special Needs

‘Educational Program Requirements’ for more

Library/ Media Center

Core Academics Core Academics

Tech. Visual Arts

Tech.

Visual Arts

Performing Arts Performing Arts adjacency perferred secure access required adjacency perferred outdoor access secure required mainaccess entrance outdoor access

8

main entrance


RSD PROGRAM FOR 788 STUDENTS

SQ.FT.

SPACE TYPE

30,300

Core Academics

12,765

Physical Education

7,450

Food Service

4,760

Library/Media Center

4,375

Special Needs

3,430

Music/Performing Arts

2,485

Welcome/Administration

1,565

Student Services

1,450

Visual Arts

1,270

Custodial/Maintenance

850

Exploratories (Flexible Classroom)

70,700

Program Net Subtotal

36,057

Support Spaces (Services/Restrooms/Circulation, 51% of net)

106,757

Total 9


Je

ff

er

so

n

D

av

is

Pk

w

y.

SITE

10

Ca na l St .


S. Rendon St. (Possible Opportunity For Expansion / Incorporation)

Cleveland Ave. (Larger Scale, Three Story Institution)

S. Lopez St. (Intact Residential Fabric)

Palmyra St. (Intact Residential Fabric)

11


SITE ZONING REQUIREMENTS / OPPORTUNITIES WORKING VALUES: Total Site Area 98,881 sq.ft. or 2.27 acres

RD-3 ZONING REQUIREMENTS:

Parking Requirement: (in accordance with NOCZO Sec.15 table 15.A)

. St

98,881 sq. ft. (2.27 acres)

~53 spaces (~13,780 sq.ft.)

Pa

Intact Residential Fabric

30 lm

yr

8’

existing curb cuts .

40’

a

St

St

Height Restriction: (NOCZO table 4.F and 15.5.5.2)

e.

z

80,681 sq.ft.

Av

.

pe

Buildable Area: (area of setback minus site area)

d

Lo

an

Intact Residential Fabric

S.

el

32

S.

Area of Setback: 18,200 sq.ft. (usable for site circulation, play space, green space etc.)

ev

existing drop-off

on

Vacant Gym Building

Cl

1’

Vacant Lot

nd

Larger Scale Three Story Institution

Set Back: 20’ front and rear; 10’ sides (New Orleans Comprehensive Zoning Ordinances (NOCZO) Sec.4.6, See table 4.F This would require a variance. Section 13.10 of the code calls for setbacks of 25 feet. Section 4 setbacks are more in line with neighborhood.)

Re

N

0’

50’

100’

200’

SITE / EXISTING CONDITIONS

12


parking ?

10

e.

Re S.

Re S.

80,681 sq. ft. total buildable area

z

St

.

Pa

.

pe

St

Lo

a

Intact Residential Fabric Intact Residential Fabric

N

0’

50’

100’

ve

.

vic

es

performing arts shade

gym

lm

yr

a

St

.

.

existing curb cuts

10

yr

ia

ser

A

outdoor / play space

S.

Intact Residential Fabric

lm

er

d

St

20

Pa

drop off/ entry admin.

fet

an

Intact Residential Fabric

S.

ca

pr e pl -k,k ay ,& sp 1s ac t pr e ek,k ,& 1s t

20

el

z

St nd

on

existing drop-off

Av

ev

pe

d

Cl

Lo

an

ef e pa rab rk ly in no g t

el

pr

ev

.

Vacant Gym Building

Cl

.

Vacant Lot

Larger Scale Three Story Institution

co ga mm rd un nd en it on ?? y St

Larger Scale Three Story Institution

N

0’

200’

BUILDABLE AREA

50’

100’

200’

POSSIBLE 1ST FLOOR PROGRAM DIAGRAM

13


PROGRAM DISTRIBUTION One of the most significant factors determining the distribution of program in a school facility is the requirements of the Life Safety Code. For example, spaces for pre-kindergarten, kindergarten, and first grade are essentially required to be on the first floor. Second grade classrooms are required to occupy the first or second floor. Though not required by code, some other program elements, such as the gym and cafeteria, have characteristics making the first floor the most logical location for them. In combination, the specific space needs, site constraints, and code requirements have major implications for the location of spaces within the building. Furthermore, the relationship between the size of the site and estimated total square footage of the building suggests that the new building will need to be at least three stories tall. The diagram at right illustrates a possible distribution of programmatic elements across the floors of the building as well as the relationships between the available site area and the building’s footprint. This analysis suggests that maintaining enough contiguous free site area for outdoor play and green space will be an important consideration in the design process.

14

MJCS, ESTIMATED 3 STORY BUILDING AREA: Built Area Estimate: 50,501 sq.ft. Built Area + Parking

63,885 sq.ft.

Un-built Site Area (area available for site circulation, green space, play spaces, etc)

34,996 sq.ft.


3 RD FLOOR

PRE-K, K, & 1st 8,510

ST. SERV. 1,565

LIBRARY 4,760

V. ART 1,450

2nd-5th GRADES 11,420

ADMIN. 2,485

1 ST FLOOR

2 ND FLOOR

SPECIAL NEEDS 4,375

6th - 8th GRADES 10,370

FOOD SERVICE 7,450

10,000

MUSIC PERF. ARTS 3,430

SUPPORT SPACES

PHYSICAL ED. 12,765

(Services/Restrooms/Circulation) 12,442 sq.ft. per floor

30,000

20,000

ESTIMATED 3 STORY BUILDING FOOTPRINT __________________________50,105

40,000

50,000

PARKING_____13,780 OUTDOOR / GREEN SPACE_____24,996 SITE CIRC.10,000

ESTIMATED GROSS BUILDING SQUARE FOOTAGE__________________________________________________________________________________________________106,757 BUILDABLE AREA____________________________________________________________________________________________80,681 SET BACK__________18,200 SITE AREA___________________________________________________________________________________________________________________________98,881 0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

100,000

110,000

SQUARE FEET

15


CURRENT PRACTICE | inside In addition to guidelines for program adjacencies and square footage, the SFMP program requirements and specifications provide direction for creating optimum learning environments. The interior configuration of the school shapes the daily routine of students and informs the culture of the school. As such, every opportunity to enrich the spacial and functional qualities of the school interior should be seriously considered. flexible spaces provide break out areas adaptable for group meetings or performances

variation in classrooms avoids a sense of mass production hallways can act as collaboration spaces and encourage social engagement

disbursing technology and offices amongst core academic spaces maximizes access and promotes interaction

16


Flexible Spaces

Hallways as Collaborative Zones Poquoson Elementary School | VMDO

Perch and Cave-like Areas

Thoughtful Program Distribution

Kindergarten Sighartstein | Kadawittfeldarchitektur

Heritage Heights School | Marshall Tittemore

Knokke-Heist School Building | NL Architects 17


CURRENT PRACTICES | exterior Morris Jeff Community School’s new facility will be new construction on a site that is situated within an existing neighborhood fabric. This provides an opportunity and obligation for the school to connect to its surroundings and implement choices that serve to engage the community within which it exists.

environmental stewardship can be expressed both as a teaching tool and an effective site planning strategy

circulation visible from the school exterior connects students and the surrounding community

a main entry point, large lobby and language of way-finding prevent confusion for students and guests

building close to the street edge marks a relationship to the neighborhood and reduces need for fences and mowing

18


Brokaw Early Learning Center | DLR Group

Display of Movement

Language of Way Finding

Environmental Stewardship Engagement of Street

Sidwell Friends School | Kieran Timberlake

The Wheeler School | Ann Beha Architects

Evelyn Grace Academy | Zaha Hadid Architects 19


CURRENT PRACTICES | systems Passive and mechanical systems present in the school building have a huge effect on student learning and health. As such, designers consider environmental impact, indoor air quality, acoustics, energy efficiency, and material sourcing as part of the design process. (Note: All new schools built under the SFMP are required to be LEED silver.)

interior lighting conditions are most comfortable when there are various levels that can be adjusted within the classroom

maximizing day lighting while reducing glare provides good natural light for learning

non-toxic materials should be strived for both inside and outside the school building

in addition to energy efficiency, utilizing systems such as low velocity ventilation can improve health and acoustics

20


Day Lighting

Energy Efficient Systems Fossil Ridge High School | RB+B Architects

Control of Lighting

Non-Toxic Materials

Fossalunga Nursery School | Studiomas Architetti Associati

Tartu Kesklinna School Extension | Salto AB

Trevvett Elementary School | BCWH Architects 21


22


TIMELINE / NEXT STEPS 01.23.2012

architect begins work

02.09.2012 02.13.2012

community meeting #1 . schematic design kick-off, information & community input

spring.2012

community meeting #3 . design development site layout, floor plans & exterior concepts

summer.2012

community meeting #4 . design development developed floor plans & exterior elevations

fall.2012

community meeting #5 . contract documents final review of project before going out for bids

12.04.2012

advertise for bids

01.04.2013

bid date

02.04.2013

contractor begins work

07.13.2013

completion date

community meeting #2 . schematic design preliminary site layouts, vehicle access, orientation & massing

23


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.