Richardson Memorial Hall Renovations

Page 1

RICHARDSON MEMORIAL HALL

Design Development Presentation

K EILLIN partnership

Wettermark + Keiffer

Design Development of Richardson Memorial Hall will be presented. All Students, Faculty and Staff are welcome to attend. Monday, 3/22/2010, 12-12:45pm, Room 201.


ROOM 404

STUDIO

STUDIO

TCC

K EILLIN partnership

RM 405

O

OFFICE

EXISTING OFFICES, TEACHING SPACE AND CITY CENTER TO BE RELOCATED

O

Wettermark + Keiffer RICHARDSON MEMORIAL HALL RENOVATION

ALL SCHOOL PRESENTATION 22 MARCH 2010

MECH MECH SHOP

MECH

CL

RM 101

MECH

CAFETERIA

KITCH

COMPUTER LAB

EXISTING COMPUTER LAB WITH NON-COMPLIANT BUILDING EGRESS TO BE RELOCATED


Richardson Memorial Hall Upgrade Meetings + Deadlines wk

Revision 4 - 3.01.2010

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

SAT/SUN

JAN 4

5

6

7

8

9/10

11

12

13

14

15

16/17

20 K+L present schemes to Resource Committee 27

21

22

SIX schemes to KS 23/24

28

29 KS, K+L select one scheme

30/31

5

6/7

1 2 3

18 19 MLKHoliday KS selects THREE schemes 25 26 Townhall Meeting THREE schemes presented FEB 1

2

3

8

9

10 KS, K+L presents one scheme to faculty

11

12

13/14

15 Mardi Gras Break

16 Mardi Gras Break

17

18

19

20/21

22 KS, K+L meet to discuss design direction MAR 1

23 KS, JW, K+L Coordination meeting 2 JW, K+L Coordination meeting

25

26

27/28

3

4 K+L, JW coordination mtg

5

6/7

8

9

10

11 K+L, JW coordination mtg

12

13/14

16

17

18 K+L, JW coordination mtg

19

20/21

23

24

25 K+L, JW coordination mtg

26

27/28 Spring Break

30 Spring Break

31 Spring Break

2 Spring Break

3/4 Spring Break

5 Spring Break BID, PERMIT, FIRE MARSHAL sets due 12

6

7

APR 1 Spring Break K+L, JW coordination mtg 8 K+L, JW coordination mtg

9

10/11

13

14

15 K+L, JW coordination mtg

16 K+L, JW coordination mtg

17/18

19

20

21

22 K+L, JW coordination mtg

23

24/25

29 K+L, JW coordination mtg Thesis Reviews 6 K+L, JW coordination mtg

30

MAY 1/2

CONTRACT awarded Thesis Reviews 7 Ogden Reception

Thesis Reviews 8/9

4 5 6 7 8

9

10 22 Presentation (noon) 11 DD K+L, JW present progress on

12

13

FINAL DESIGN 29 Spring Break

14

15 26

16

27 KS, K+L, JW discuss bids, budget, schedule

28

Third Year Reviews 3

4

10

11

12

13 K+L, JW coordination mtg

14

15 16

17

18

19

20

21

22/23

17

Option Studios 5 Faculty Meeting Studio Walk Through

BIDS due

18

19 WORK BEGINS


TOILET 104D E

TOILET MECHANICAL

104E E

104B E

I.T. ROOM DARK RM

104F E

114 CORRIDOR

ELEC CLOS

104F E

104E E

E

MECHANICAL

OFFICE

OFFICE

116A E

116B E

OFFICE 118

E

OFFICE 118

E

OFFICE 120

E

DATA ENTRY + ROUTER REMAIN

C

124

CORRIDOR 100C CORRIDOR E

CAFE

OFFICE

101B -

EXISTING DATA ENTRY TO BUILDING + ROUTER IN CLOSET IN RM 121.

123

OFFICE

E

125

E

OFFICE 127

OFFICE

E

129

COMPUTER LAB

E

131

OFFICE

E

131A E

FOOD PREP 101C E

IN 2001 NEW ROUTER INSTALLED IN CLOSET UNDERNEATH CENTRAL STAIR

PROPOSED Option A:

CLOSET INTEGRATED IN WALL FUR-OUT

NEW DATA ENTRY TOILET

TOILET

104D E

104D E

TOILET MECHANICAL

TOILET MECHANICAL

104E E

104B E

104E E

104B E

I.T. ROOM

I.T. ROOM DARK RM

104F E

114 CORRIDOR 104F E

ELEC CLOS 104E E

DARK RM

104F E

E

MECHANICAL

OFFICE

OFFICE

116A E

116B E

OFFICE 118

E

OFFICE 118

E

114

OFFICE 120

CORRIDOR

E

104F E

C

124

CORRIDOR

ELEC CLOS 104E E

E

MECHANICAL

OFFICE

OFFICE

116A E

116B E

OFFICE 118

E

OFFICE 118

E

OFFICE 120

E

C

124

OLD DATA ENTRY + ROUTER ABANDONED

CORRIDOR

100C -

100C -

CORRIDOR

CORRIDOR

E

E

CAFE 101B -

OFFICE 123

E

OFFICE 125

E

OFFICE 127

E

OFFICE 129

E

COMPUTER LAB 131

E

OFFICE

CAFE

131A E

101B -

FOOD PREP

FOOD PREP

101C E

101C E

OFFICE 123

E

OFFICE 125

E

OFFICE 127

E

OFFICE 129

E

COMPUTER LAB 131

E

OFFICE 131A E

PROPOSED Option B:

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

INFRASTRUCTURE - DATA ENTRY

NEW DATA ENTRY TO ROUTER AT STAIR. OLD DATA ENTRY + ROUTER AT RM 121 ABANDONED.

PROGRESS PRESENTATION 22 MARCH 2010


EXISTING

PROPOSED

EMERGENCY EXIT THROUGH COMPUTER LAB WITH CARD SWIPE ENTRY DOOR

NEW EXIT DOOR AT END OF EXTENDED CORRIDOR

TOILET

TOILET

104D E

104D E

TOILET MECHANICAL

TOILET MECHANICAL

104E E

104B E

104E E

104B E

I.T. ROOM

I.T. ROOM DARK RM

104F E

114 CORRIDOR 104F E

ELEC CLOS 104E E

E

OFFICE 116A E

MECHANICAL

OFFICE

OFFICE

116B E

118

E

OFFICE 118

E

OFFICE 120

DOOR TO COMPUTER LAB AND EXIT

DARK RM

104F E

114 CORRIDOR

E

104F E

C

124

CORRIDOR

104E E

E

MECHANICAL

OFFICE

OFFICE

116A E

116B E

OFFICE 118

E

OFFICE 118

E

OFFICE 120

E

C

124

CORRIDOR

100C -

100C -

CORRIDOR

CORRIDOR

E

E

CAFE 101B -

K EILLIN partnership

ELEC CLOS

OFFICE 123

E

OFFICE 125

E

OFFICE 127

E

OFFICE 129

E

COMPUTER LAB 131

E

OFFICE

CAFE

131A E

101B -

FOOD PREP

FOOD PREP

101C E

101C E

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

CODE COMPLIANT EGRESS

OFFICE 123

E

OFFICE 125

E

OFFICE 127

E

OFFICE 129

E

COMPUTER LAB 131

E

OFFICE 131A E

PROGRESS PRESENTATION 22 MARCH 2010


MECH MECH

MECH

SHOP

RM 101

MECH

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

CAFETERIA

COMPUTER LAB

KITCH

EXISTING GROUND FLOOR

PROGRESS PRESENTATION 22 MARCH 2010


LOUNGE AREA

MECH MECH

MECH 6

SHOP

RM 101

MECH

CAFETERIA

1

2

3

4

5

KITCH SIX NEW OFFICES

NEW EXIT DOOR

WIDENED CORRIDOR TO CELEBRATE NATURAL LIGHT AND VIEW

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROPOSED GROUND FLOOR EXTENSION

PROGRESS PRESENTATION 22 MARCH 2010


LOUNGE AREA

MECH MECH

MECH 6

SHOP

RM 101

MECH

CAFETERIA

1

2

3

4

5

KITCH SIX NEW OFFICES

NEW EXIT DOOR

WIDENED CORRIDOR TO CELEBRATE NATURAL LIGHT AND VIEW

CODE COMPLIANT EGRESS SIX NEW FACULTY OFFICES CONTINUOUS GALLERY WALL ALONG OFFICES LIGHT AND VIEW AT CORRIDOR’S END FLEXIBLE LOUNGE AREA REUSE EXISTING OPENING FOR NEW DOOR FOCUS ON NEW LAYER, AWAY FROM CEILING DUCTS NEW SURFACE ALLOWS FOR CONDUITS FOR LIGHTING AND INTEGRATED SIGNAGE

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROPOSED GROUND FLOOR EXTENSION

NEW FLOOR AND WALL SURFACE TO CONNECT FACULTY HALL / DISPLAY

PROGRESS PRESENTATION 22 MARCH 2010


OFFICE 5

OFFICE 4

OFFICE 3

OFFICE 2

OFFICE 1

LOUNGE

OFFICE 6

NEW WALL AND FLOOR SURFACE NEW DOORS TO MATCH WALL SURFACE NEW STEEL DOOR FRAMES WITH INTEGRATED PANEL FOR SIGNAGE NEW CODE-COMPLIANT BUILDING EXIT DOOR

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

LIGHTING INTEGRATED INTO WALL SURFACE

GROUND FLOOR OFFICE ELEVATION

PROGRESS PRESENTATION 22 MARCH 2010


COMMENT SHEET

“ Town

Hall Meeting”

name:

faculty

S C H E M E S

C O M M E N T S + S U G G E S T I O N S

January 25, 2010

LAB 1

staff

student

YES NO

LAB 2

YES NO

LAB 3

YES NO

CORE A

YES NO

CORE B

YES NO

CORE C Renovation proposals for Richardson Memorial Hall will be presented. All Students, Faculty and Staff are welcome to attend and fill out comment sheets!! Monday, 1/25, 12-12:45pm, Rm 201.

YES NO

K EILLIN partnership

RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY

TOWN HALL MEETING 1 25 JANUARY 2010


SUMMARY OF RESULTS

STUDENTS

FACULTY

31

7

STAFF

TOTAL

39

1

21

LAB 1 16

5

2

LAB 2 1 1

29

LAB 3 27

2

11

CORE A 10

1

25

CORE B 19 5

1

10

CORE C 2

8


SUMMARY OF RESULTS

STUDENTS

FACULTY

31

7

STAFF

TOTAL

39

1

21

LAB 1 16

5

2

LAB 2 1 1

29

LAB 3 27

2

11

CORE A 10

1

25

CORE B 19 5

1

10

CORE C 2

8


FLEXIBLE REVIEW SPACE +/- 650 nsf

SCHEME

COMPUTER LAB 767 nsf, 36 work stations

3

4

4 20 4

CORE SCHEME

4

b

REVIEW / EXHIBIT SPACE (279 nsf)

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

REVIEW / EXHIBIT SPACE (279 nsf)

PREFERRED CORE SCHEMES

PROGRESS PRESENTATION 22 MARCH 2010


AFTER CONSIDERING FACULTY AND STUDENT RESPONSES, ONE

HYBRID SCHEME WAS EXPLORED...


SCHEME

3

centralized computer lab + corridor pin-up space

hybrid scheme CRIT CLASS

CORE SCHEME

b

centralized classroom + open crit spaces

COMPUTER LAB

CRIT


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PRELIMINARY STUDIES

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PRELIMINARY STUDIES

PROGRESS PRESENTATION 22 MARCH 2010


BASE MODEL - sketches K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

BASE MODEL - SKETCHES

PROGRESS PRESENTATION 22 MARCH 2010


1'-4"

RICHARDSON MEMORIAL HALL 4TH FLOOR CORE

window

SHEET A1 MODEL DRAWINGS - oor plate 3 March 2001

13'-10"

12'-6"

0'

26'-6"

5'-3 1/2"

3'-3 1/4"

83'-2 1/4"

4'

5'

6'

stair opening

4'-8 1/4"

9'-10 3/4"

3'-1 3/4"

3'-1 3/4"

68'-7 1/4"

splice oor plate

3'

25'-8 1/4"

5'-3 1/2"

11'-4 1/8"

3'-3 1/8"

2'

12'-11 1/2"

43'-7 3/8"

WALL ELEVATION - INTERIOR ROOM 404 from corridor

1'

4th LEVEL FLOOR PLATE EXTENSION

stair opening

splice oor plate

4'-10 1/8"

1'-6"

40'-7 3/8"

3'-3 1/8"

9'-11 1/2"

STUDIO 404

26'-6"

5'-3 1/2"

STUDIO 401

5'-3 1/2"

1'-6"

8'-4 3/4"

3'-3 1/4"

STUDIO 402

63'-4 3/4"

5'-3 1/2"

9'-10 3/4"

11'-11 5/8"

SKYLIGHT

5'-3 1/2"

33'-9 3/4"

1'-6"

1/4" mdf added wall sections

33'-9 3/4"

9'-9 7/8"

13'-1 3/4"

1'-6" 13'-7"

8'-4 3/4"

9'-10 3/4"

63'-4 3/4" 12'-10 1/4"

25'-2 5/8"

14'-2 1/4"

14'-7 1/2"

25'-3 7/8"

16'-5 5/8"

4th LEVEL FLOOR PLATE (1/2" mdf) 3'-7 1/8"

6'-3 5/8"

3'-7 1/8"

splice oor plate

partial window

6'-7 1/2"

6'-3 5/8" 2'-6 3/4"

6'-8"

3'-10 1/4"

4'-0 3/4"

1'-5 1/4"

4'-0 3/4"

3'-10 1/4"

6'-8"

5'-0"

2'-8 1/8" window

window window

14'-7 5/8" 3/4" mdf walls 1/4" mdf added wall sections

window

window

35'-10 1/8"

window

2'-4 3/8"

4'-1 1/4"

5'-0"

9'-1 3/4"

1'-2"

9'-1 3/4"

4'-1 1/4"

2'-3 1/8"

1'-2"

partial window

K EILLIN partnership

6'-3 5/8"

14'-5"

BASE MODEL - drawings Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

BASE MODEL - DRAWINGS

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

BASE MODEL - fabrication Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

BASE MODEL - FABRICATION

PROGRESS PRESENTATION 22 MARCH 2010


BASE MODEL - fabrication K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

BASE MODEL - FABRICATION

PROGRESS PRESENTATION 22 MARCH 2010


BASE MODEL - design tool K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

BASE MODEL AS DESIGN TOOL

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROCESS STUDIES - VERTICALITY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROCESS STUDIES - HORIZONTALITY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROCESS STUDY MODELS

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROCESS STUDY MODELS

PROGRESS PRESENTATION 22 MARCH 2010


SCHEME

3

centralized computer lab + corridor pin-up space

hybrid scheme CRIT CLASS

CORE SCHEME

b

centralized classroom + open crit spaces

COMPUTER LAB

CRIT


OPEN GALLERY / CRIT SPACE

COMPUTER LAB

CLASSROOM

CRIT SPACE

ROOM 404

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROPOSED 4TH FLOOR PLAN

PROGRESS PRESENTATION 22 MARCH 2010


Pin-up Wall

COMPUTER LAB 23 work stations

New Exhibition Window Wall and Bench

Pin-up Wall

Print Station

Pin-up Wall

Pin-up Wall

+/- 21 seats

Projection Screen / in-up Wall

CRIT SPACE

CLASSROOM +/- 18 seats

Pin-up Wall

CRIT SPACE Pin-up Wall

ROOM 404

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROPOSED 4TH FLOOR PLAN

PROGRESS PRESENTATION 22 MARCH 2010


BENCH

CRIT SPACE

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

DEFINED CORRIDOR CRIT SPACE

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROPOSED PLAN + ELEVATION

PROGRESS PRESENTATION 22 MARCH 2010


Open Crit Space / Exhibition Gallery

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

Computer Lab Entry

ELEVATION STUDY

Classroom Entry

PROGRESS PRESENTATION 22 MARCH 2010


9’-4”

4’-6” 30” 18”

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

ELEVATION STUDY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

ELEVATION PATTERN STUDIES

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

ELEVATION STUDY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

ELEVATION STUDY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

ELEVATION STUDY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

ELEVATION STUDY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

ELEVATION STUDY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

ELEVATION STUDY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

ELEVATION STUDY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

ELEVATION STUDY

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

NEW CORRIDOR - CRIT SPACE

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

NEW CORRIDOR - CRIT SPACE

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

NEW CORRIDOR - CRIT SPACE

PROGRESS PRESENTATION 22 MARCH 2010


12'-10 3/4" 9'-4 1/4"

SECTION A

K EILLIN partnership

A Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

CLASSROOM SECTION

PROGRESS PRESENTATION 22 MARCH 2010


SECTION B

K EILLIN partnership

B Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

NEW COMPUTER LAB SECTION

PROGRESS PRESENTATION 22 MARCH 2010


SECTION C

K EILLIN partnership

C Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

NEW COMPUTER LAB SECTION

PROGRESS PRESENTATION 22 MARCH 2010


SECTION D

K EILLIN partnership

D Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

OPEN CRIT SPACE SECTION

PROGRESS PRESENTATION 22 MARCH 2010


SECTION E

K EILLIN partnership

E Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

OPEN CRIT SPACE SECTION

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

OPEN GALLERY - CRIT SPACE

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

OPEN GALLERY - CRIT SPACE

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROGRESS PRESENTATION 22 MARCH 2010


air-handling unit condensate drain HVAC duct

condensate drain

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

4th FLOOR CORE - HVAC UNITS

PROGRESS PRESENTATION 22 MARCH 2010


1 UNIT - 3 ZONES

lower mezzanine ceiling to conceal unit UNIT LOCATION A studio 401 + 402 mezzanine ceiling

UNIT LOCATION B classroom ceiling

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

4th FL CORE - MECHANICAL ROUTING OPTIONS

PROGRESS PRESENTATION 22 MARCH 2010


POD 501

F

STUDIO 505

K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

A

5th FL POD - MECHANICAL ROUTING OPTIONS

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROGRESS PRESENTATION 22 MARCH 2010


STUDIO

CLASSROOM

DATA

HVAC

DATA

5TH FL

STUDIO

COMPUTER LAB

CRIT/REVIEW

STUDIO

4TH FL

HVAC AND DATA SUPPLY K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

NEW MECHANICAL AND DATA ROUTING

PROGRESS PRESENTATION 22 MARCH 2010


K EILLIN partnership

Wettermark + Keiffer

RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT

PROGRESS PRESENTATION 22 MARCH 2010


Richardson Memorial Hall Upgrade Meetings + Deadlines wk

Revision 4 - 3.01.2010

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

SAT/SUN

JAN 4

5

6

7

8

9/10

11

12

13

14

15

16/17

20 K+L present schemes to Resource Committee 27

21

22

SIX schemes to KS 23/24

28

29 KS, K+L select one scheme

30/31

5

6/7

1 2 3

18 19 MLKHoliday KS selects THREE schemes 25 26 Townhall Meeting THREE schemes presented FEB 1

2

3

8

9

10 KS, K+L presents one scheme to faculty

11

12

13/14

15 Mardi Gras Break

16 Mardi Gras Break

17

18

19

20/21

22 KS, K+L meet to discuss design direction MAR 1

23 KS, JW, K+L Coordination meeting 2 JW, K+L Coordination meeting

25

26

27/28

3

4 K+L, JW coordination mtg

5

6/7

8

9

10

11 K+L, JW coordination mtg

12

13/14

16

17

18 K+L, JW coordination mtg

19

20/21

23

24

25 K+L, JW coordination mtg

26

27/28 Spring Break

30 Spring Break

31 Spring Break

2 Spring Break

3/4 Spring Break

5 Spring Break BID, PERMIT, FIRE MARSHAL sets due 12

6

7

APR 1 Spring Break K+L, JW coordination mtg 8 K+L, JW coordination mtg

9

10/11

13

14

15 K+L, JW coordination mtg

16 K+L, JW coordination mtg

17/18

19

20

21

22 K+L, JW coordination mtg

23

24/25

29 K+L, JW coordination mtg Thesis Reviews 6 K+L, JW coordination mtg

30

MAY 1/2

CONTRACT awarded Thesis Reviews 7 Ogden Reception

Thesis Reviews 8/9

4 5 6 7 8

9

10 22 Presentation (noon) 11 DD K+L, JW present progress on

12

13

FINAL DESIGN 29 Spring Break

14

15 26

16

27 KS, K+L, JW discuss bids, budget, schedule

28

Third Year Reviews 3

4

10

11

12

13 K+L, JW coordination mtg

14

15 16

17

18

19

20

21

22/23

17

Option Studios 5 Faculty Meeting Studio Walk Through

BIDS due

18

19 WORK BEGINS