RICHARDSON MEMORIAL HALL
Design Development Presentation
K EILLIN partnership
Wettermark + Keiffer
Design Development of Richardson Memorial Hall will be presented. All Students, Faculty and Staff are welcome to attend. Monday, 3/22/2010, 12-12:45pm, Room 201.
ROOM 404
STUDIO
STUDIO
TCC
K EILLIN partnership
RM 405
O
OFFICE
EXISTING OFFICES, TEACHING SPACE AND CITY CENTER TO BE RELOCATED
O
Wettermark + Keiffer RICHARDSON MEMORIAL HALL RENOVATION
ALL SCHOOL PRESENTATION 22 MARCH 2010
MECH MECH SHOP
MECH
CL
RM 101
MECH
CAFETERIA
KITCH
COMPUTER LAB
EXISTING COMPUTER LAB WITH NON-COMPLIANT BUILDING EGRESS TO BE RELOCATED
Richardson Memorial Hall Upgrade Meetings + Deadlines wk
Revision 4 - 3.01.2010
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT/SUN
JAN 4
5
6
7
8
9/10
11
12
13
14
15
16/17
20 K+L present schemes to Resource Committee 27
21
22
SIX schemes to KS 23/24
28
29 KS, K+L select one scheme
30/31
5
6/7
1 2 3
18 19 MLKHoliday KS selects THREE schemes 25 26 Townhall Meeting THREE schemes presented FEB 1
2
3
8
9
10 KS, K+L presents one scheme to faculty
11
12
13/14
15 Mardi Gras Break
16 Mardi Gras Break
17
18
19
20/21
22 KS, K+L meet to discuss design direction MAR 1
23 KS, JW, K+L Coordination meeting 2 JW, K+L Coordination meeting
25
26
27/28
3
4 K+L, JW coordination mtg
5
6/7
8
9
10
11 K+L, JW coordination mtg
12
13/14
16
17
18 K+L, JW coordination mtg
19
20/21
23
24
25 K+L, JW coordination mtg
26
27/28 Spring Break
30 Spring Break
31 Spring Break
2 Spring Break
3/4 Spring Break
5 Spring Break BID, PERMIT, FIRE MARSHAL sets due 12
6
7
APR 1 Spring Break K+L, JW coordination mtg 8 K+L, JW coordination mtg
9
10/11
13
14
15 K+L, JW coordination mtg
16 K+L, JW coordination mtg
17/18
19
20
21
22 K+L, JW coordination mtg
23
24/25
29 K+L, JW coordination mtg Thesis Reviews 6 K+L, JW coordination mtg
30
MAY 1/2
CONTRACT awarded Thesis Reviews 7 Ogden Reception
Thesis Reviews 8/9
4 5 6 7 8
9
10 22 Presentation (noon) 11 DD K+L, JW present progress on
12
13
FINAL DESIGN 29 Spring Break
14
15 26
16
27 KS, K+L, JW discuss bids, budget, schedule
28
Third Year Reviews 3
4
10
11
12
13 K+L, JW coordination mtg
14
15 16
17
18
19
20
21
22/23
17
Option Studios 5 Faculty Meeting Studio Walk Through
BIDS due
18
19 WORK BEGINS
TOILET 104D E
TOILET MECHANICAL
104E E
104B E
I.T. ROOM DARK RM
104F E
114 CORRIDOR
ELEC CLOS
104F E
104E E
E
MECHANICAL
OFFICE
OFFICE
116A E
116B E
OFFICE 118
E
OFFICE 118
E
OFFICE 120
E
DATA ENTRY + ROUTER REMAIN
C
124
CORRIDOR 100C CORRIDOR E
CAFE
OFFICE
101B -
EXISTING DATA ENTRY TO BUILDING + ROUTER IN CLOSET IN RM 121.
123
OFFICE
E
125
E
OFFICE 127
OFFICE
E
129
COMPUTER LAB
E
131
OFFICE
E
131A E
FOOD PREP 101C E
IN 2001 NEW ROUTER INSTALLED IN CLOSET UNDERNEATH CENTRAL STAIR
PROPOSED Option A:
CLOSET INTEGRATED IN WALL FUR-OUT
NEW DATA ENTRY TOILET
TOILET
104D E
104D E
TOILET MECHANICAL
TOILET MECHANICAL
104E E
104B E
104E E
104B E
I.T. ROOM
I.T. ROOM DARK RM
104F E
114 CORRIDOR 104F E
ELEC CLOS 104E E
DARK RM
104F E
E
MECHANICAL
OFFICE
OFFICE
116A E
116B E
OFFICE 118
E
OFFICE 118
E
114
OFFICE 120
CORRIDOR
E
104F E
C
124
CORRIDOR
ELEC CLOS 104E E
E
MECHANICAL
OFFICE
OFFICE
116A E
116B E
OFFICE 118
E
OFFICE 118
E
OFFICE 120
E
C
124
OLD DATA ENTRY + ROUTER ABANDONED
CORRIDOR
100C -
100C -
CORRIDOR
CORRIDOR
E
E
CAFE 101B -
OFFICE 123
E
OFFICE 125
E
OFFICE 127
E
OFFICE 129
E
COMPUTER LAB 131
E
OFFICE
CAFE
131A E
101B -
FOOD PREP
FOOD PREP
101C E
101C E
OFFICE 123
E
OFFICE 125
E
OFFICE 127
E
OFFICE 129
E
COMPUTER LAB 131
E
OFFICE 131A E
PROPOSED Option B:
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
INFRASTRUCTURE - DATA ENTRY
NEW DATA ENTRY TO ROUTER AT STAIR. OLD DATA ENTRY + ROUTER AT RM 121 ABANDONED.
PROGRESS PRESENTATION 22 MARCH 2010
EXISTING
PROPOSED
EMERGENCY EXIT THROUGH COMPUTER LAB WITH CARD SWIPE ENTRY DOOR
NEW EXIT DOOR AT END OF EXTENDED CORRIDOR
TOILET
TOILET
104D E
104D E
TOILET MECHANICAL
TOILET MECHANICAL
104E E
104B E
104E E
104B E
I.T. ROOM
I.T. ROOM DARK RM
104F E
114 CORRIDOR 104F E
ELEC CLOS 104E E
E
OFFICE 116A E
MECHANICAL
OFFICE
OFFICE
116B E
118
E
OFFICE 118
E
OFFICE 120
DOOR TO COMPUTER LAB AND EXIT
DARK RM
104F E
114 CORRIDOR
E
104F E
C
124
CORRIDOR
104E E
E
MECHANICAL
OFFICE
OFFICE
116A E
116B E
OFFICE 118
E
OFFICE 118
E
OFFICE 120
E
C
124
CORRIDOR
100C -
100C -
CORRIDOR
CORRIDOR
E
E
CAFE 101B -
K EILLIN partnership
ELEC CLOS
OFFICE 123
E
OFFICE 125
E
OFFICE 127
E
OFFICE 129
E
COMPUTER LAB 131
E
OFFICE
CAFE
131A E
101B -
FOOD PREP
FOOD PREP
101C E
101C E
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
CODE COMPLIANT EGRESS
OFFICE 123
E
OFFICE 125
E
OFFICE 127
E
OFFICE 129
E
COMPUTER LAB 131
E
OFFICE 131A E
PROGRESS PRESENTATION 22 MARCH 2010
MECH MECH
MECH
SHOP
RM 101
MECH
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
CAFETERIA
COMPUTER LAB
KITCH
EXISTING GROUND FLOOR
PROGRESS PRESENTATION 22 MARCH 2010
LOUNGE AREA
MECH MECH
MECH 6
SHOP
RM 101
MECH
CAFETERIA
1
2
3
4
5
KITCH SIX NEW OFFICES
NEW EXIT DOOR
WIDENED CORRIDOR TO CELEBRATE NATURAL LIGHT AND VIEW
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROPOSED GROUND FLOOR EXTENSION
PROGRESS PRESENTATION 22 MARCH 2010
LOUNGE AREA
MECH MECH
MECH 6
SHOP
RM 101
MECH
CAFETERIA
1
2
3
4
5
KITCH SIX NEW OFFICES
NEW EXIT DOOR
WIDENED CORRIDOR TO CELEBRATE NATURAL LIGHT AND VIEW
CODE COMPLIANT EGRESS SIX NEW FACULTY OFFICES CONTINUOUS GALLERY WALL ALONG OFFICES LIGHT AND VIEW AT CORRIDOR’S END FLEXIBLE LOUNGE AREA REUSE EXISTING OPENING FOR NEW DOOR FOCUS ON NEW LAYER, AWAY FROM CEILING DUCTS NEW SURFACE ALLOWS FOR CONDUITS FOR LIGHTING AND INTEGRATED SIGNAGE
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROPOSED GROUND FLOOR EXTENSION
NEW FLOOR AND WALL SURFACE TO CONNECT FACULTY HALL / DISPLAY
PROGRESS PRESENTATION 22 MARCH 2010
OFFICE 5
OFFICE 4
OFFICE 3
OFFICE 2
OFFICE 1
LOUNGE
OFFICE 6
NEW WALL AND FLOOR SURFACE NEW DOORS TO MATCH WALL SURFACE NEW STEEL DOOR FRAMES WITH INTEGRATED PANEL FOR SIGNAGE NEW CODE-COMPLIANT BUILDING EXIT DOOR
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
LIGHTING INTEGRATED INTO WALL SURFACE
GROUND FLOOR OFFICE ELEVATION
PROGRESS PRESENTATION 22 MARCH 2010
COMMENT SHEET
“ Town
Hall Meeting”
name:
faculty
S C H E M E S
C O M M E N T S + S U G G E S T I O N S
January 25, 2010
LAB 1
staff
student
YES NO
LAB 2
YES NO
LAB 3
YES NO
CORE A
YES NO
CORE B
YES NO
CORE C Renovation proposals for Richardson Memorial Hall will be presented. All Students, Faculty and Staff are welcome to attend and fill out comment sheets!! Monday, 1/25, 12-12:45pm, Rm 201.
YES NO
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
TOWN HALL MEETING 1 25 JANUARY 2010
SUMMARY OF RESULTS
STUDENTS
FACULTY
31
7
STAFF
TOTAL
39
1
21
LAB 1 16
5
2
LAB 2 1 1
29
LAB 3 27
2
11
CORE A 10
1
25
CORE B 19 5
1
10
CORE C 2
8
SUMMARY OF RESULTS
STUDENTS
FACULTY
31
7
STAFF
TOTAL
39
1
21
LAB 1 16
5
2
LAB 2 1 1
29
LAB 3 27
2
11
CORE A 10
1
25
CORE B 19 5
1
10
CORE C 2
8
FLEXIBLE REVIEW SPACE +/- 650 nsf
SCHEME
COMPUTER LAB 767 nsf, 36 work stations
3
4
4 20 4
CORE SCHEME
4
b
REVIEW / EXHIBIT SPACE (279 nsf)
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
REVIEW / EXHIBIT SPACE (279 nsf)
PREFERRED CORE SCHEMES
PROGRESS PRESENTATION 22 MARCH 2010
AFTER CONSIDERING FACULTY AND STUDENT RESPONSES, ONE
HYBRID SCHEME WAS EXPLORED...
SCHEME
3
centralized computer lab + corridor pin-up space
hybrid scheme CRIT CLASS
CORE SCHEME
b
centralized classroom + open crit spaces
COMPUTER LAB
CRIT
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PRELIMINARY STUDIES
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PRELIMINARY STUDIES
PROGRESS PRESENTATION 22 MARCH 2010
BASE MODEL - sketches K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
BASE MODEL - SKETCHES
PROGRESS PRESENTATION 22 MARCH 2010
1'-4"
RICHARDSON MEMORIAL HALL 4TH FLOOR CORE
window
SHEET A1 MODEL DRAWINGS - oor plate 3 March 2001
13'-10"
12'-6"
0'
26'-6"
5'-3 1/2"
3'-3 1/4"
83'-2 1/4"
4'
5'
6'
stair opening
4'-8 1/4"
9'-10 3/4"
3'-1 3/4"
3'-1 3/4"
68'-7 1/4"
splice oor plate
3'
25'-8 1/4"
5'-3 1/2"
11'-4 1/8"
3'-3 1/8"
2'
12'-11 1/2"
43'-7 3/8"
WALL ELEVATION - INTERIOR ROOM 404 from corridor
1'
4th LEVEL FLOOR PLATE EXTENSION
stair opening
splice oor plate
4'-10 1/8"
1'-6"
40'-7 3/8"
3'-3 1/8"
9'-11 1/2"
STUDIO 404
26'-6"
5'-3 1/2"
STUDIO 401
5'-3 1/2"
1'-6"
8'-4 3/4"
3'-3 1/4"
STUDIO 402
63'-4 3/4"
5'-3 1/2"
9'-10 3/4"
11'-11 5/8"
SKYLIGHT
5'-3 1/2"
33'-9 3/4"
1'-6"
1/4" mdf added wall sections
33'-9 3/4"
9'-9 7/8"
13'-1 3/4"
1'-6" 13'-7"
8'-4 3/4"
9'-10 3/4"
63'-4 3/4" 12'-10 1/4"
25'-2 5/8"
14'-2 1/4"
14'-7 1/2"
25'-3 7/8"
16'-5 5/8"
4th LEVEL FLOOR PLATE (1/2" mdf) 3'-7 1/8"
6'-3 5/8"
3'-7 1/8"
splice oor plate
partial window
6'-7 1/2"
6'-3 5/8" 2'-6 3/4"
6'-8"
3'-10 1/4"
4'-0 3/4"
1'-5 1/4"
4'-0 3/4"
3'-10 1/4"
6'-8"
5'-0"
2'-8 1/8" window
window window
14'-7 5/8" 3/4" mdf walls 1/4" mdf added wall sections
window
window
35'-10 1/8"
window
2'-4 3/8"
4'-1 1/4"
5'-0"
9'-1 3/4"
1'-2"
9'-1 3/4"
4'-1 1/4"
2'-3 1/8"
1'-2"
partial window
K EILLIN partnership
6'-3 5/8"
14'-5"
BASE MODEL - drawings Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
BASE MODEL - DRAWINGS
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
BASE MODEL - fabrication Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
BASE MODEL - FABRICATION
PROGRESS PRESENTATION 22 MARCH 2010
BASE MODEL - fabrication K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
BASE MODEL - FABRICATION
PROGRESS PRESENTATION 22 MARCH 2010
BASE MODEL - design tool K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
BASE MODEL AS DESIGN TOOL
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROCESS STUDIES - VERTICALITY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROCESS STUDIES - HORIZONTALITY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROCESS STUDY MODELS
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROCESS STUDY MODELS
PROGRESS PRESENTATION 22 MARCH 2010
SCHEME
3
centralized computer lab + corridor pin-up space
hybrid scheme CRIT CLASS
CORE SCHEME
b
centralized classroom + open crit spaces
COMPUTER LAB
CRIT
OPEN GALLERY / CRIT SPACE
COMPUTER LAB
CLASSROOM
CRIT SPACE
ROOM 404
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROPOSED 4TH FLOOR PLAN
PROGRESS PRESENTATION 22 MARCH 2010
Pin-up Wall
COMPUTER LAB 23 work stations
New Exhibition Window Wall and Bench
Pin-up Wall
Print Station
Pin-up Wall
Pin-up Wall
+/- 21 seats
Projection Screen / in-up Wall
CRIT SPACE
CLASSROOM +/- 18 seats
Pin-up Wall
CRIT SPACE Pin-up Wall
ROOM 404
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROPOSED 4TH FLOOR PLAN
PROGRESS PRESENTATION 22 MARCH 2010
BENCH
CRIT SPACE
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
DEFINED CORRIDOR CRIT SPACE
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROPOSED PLAN + ELEVATION
PROGRESS PRESENTATION 22 MARCH 2010
Open Crit Space / Exhibition Gallery
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
Computer Lab Entry
ELEVATION STUDY
Classroom Entry
PROGRESS PRESENTATION 22 MARCH 2010
9’-4”
4’-6” 30” 18”
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
ELEVATION STUDY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
ELEVATION PATTERN STUDIES
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
ELEVATION STUDY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
ELEVATION STUDY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
ELEVATION STUDY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
ELEVATION STUDY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
ELEVATION STUDY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
ELEVATION STUDY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
ELEVATION STUDY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
ELEVATION STUDY
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
NEW CORRIDOR - CRIT SPACE
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
NEW CORRIDOR - CRIT SPACE
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
NEW CORRIDOR - CRIT SPACE
PROGRESS PRESENTATION 22 MARCH 2010
12'-10 3/4" 9'-4 1/4"
SECTION A
K EILLIN partnership
A Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
CLASSROOM SECTION
PROGRESS PRESENTATION 22 MARCH 2010
SECTION B
K EILLIN partnership
B Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
NEW COMPUTER LAB SECTION
PROGRESS PRESENTATION 22 MARCH 2010
SECTION C
K EILLIN partnership
C Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
NEW COMPUTER LAB SECTION
PROGRESS PRESENTATION 22 MARCH 2010
SECTION D
K EILLIN partnership
D Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
OPEN CRIT SPACE SECTION
PROGRESS PRESENTATION 22 MARCH 2010
SECTION E
K EILLIN partnership
E Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
OPEN CRIT SPACE SECTION
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
OPEN GALLERY - CRIT SPACE
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
OPEN GALLERY - CRIT SPACE
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROGRESS PRESENTATION 22 MARCH 2010
air-handling unit condensate drain HVAC duct
condensate drain
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
4th FLOOR CORE - HVAC UNITS
PROGRESS PRESENTATION 22 MARCH 2010
1 UNIT - 3 ZONES
lower mezzanine ceiling to conceal unit UNIT LOCATION A studio 401 + 402 mezzanine ceiling
UNIT LOCATION B classroom ceiling
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
4th FL CORE - MECHANICAL ROUTING OPTIONS
PROGRESS PRESENTATION 22 MARCH 2010
POD 501
F
STUDIO 505
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
A
5th FL POD - MECHANICAL ROUTING OPTIONS
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROGRESS PRESENTATION 22 MARCH 2010
STUDIO
CLASSROOM
DATA
HVAC
DATA
5TH FL
STUDIO
COMPUTER LAB
CRIT/REVIEW
STUDIO
4TH FL
HVAC AND DATA SUPPLY K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
NEW MECHANICAL AND DATA ROUTING
PROGRESS PRESENTATION 22 MARCH 2010
K EILLIN partnership
Wettermark + Keiffer
RICHARDSON MEMORIAL HALL DESIGN DEVELOPMENT
PROGRESS PRESENTATION 22 MARCH 2010
Richardson Memorial Hall Upgrade Meetings + Deadlines wk
Revision 4 - 3.01.2010
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SAT/SUN
JAN 4
5
6
7
8
9/10
11
12
13
14
15
16/17
20 K+L present schemes to Resource Committee 27
21
22
SIX schemes to KS 23/24
28
29 KS, K+L select one scheme
30/31
5
6/7
1 2 3
18 19 MLKHoliday KS selects THREE schemes 25 26 Townhall Meeting THREE schemes presented FEB 1
2
3
8
9
10 KS, K+L presents one scheme to faculty
11
12
13/14
15 Mardi Gras Break
16 Mardi Gras Break
17
18
19
20/21
22 KS, K+L meet to discuss design direction MAR 1
23 KS, JW, K+L Coordination meeting 2 JW, K+L Coordination meeting
25
26
27/28
3
4 K+L, JW coordination mtg
5
6/7
8
9
10
11 K+L, JW coordination mtg
12
13/14
16
17
18 K+L, JW coordination mtg
19
20/21
23
24
25 K+L, JW coordination mtg
26
27/28 Spring Break
30 Spring Break
31 Spring Break
2 Spring Break
3/4 Spring Break
5 Spring Break BID, PERMIT, FIRE MARSHAL sets due 12
6
7
APR 1 Spring Break K+L, JW coordination mtg 8 K+L, JW coordination mtg
9
10/11
13
14
15 K+L, JW coordination mtg
16 K+L, JW coordination mtg
17/18
19
20
21
22 K+L, JW coordination mtg
23
24/25
29 K+L, JW coordination mtg Thesis Reviews 6 K+L, JW coordination mtg
30
MAY 1/2
CONTRACT awarded Thesis Reviews 7 Ogden Reception
Thesis Reviews 8/9
4 5 6 7 8
9
10 22 Presentation (noon) 11 DD K+L, JW present progress on
12
13
FINAL DESIGN 29 Spring Break
14
15 26
16
27 KS, K+L, JW discuss bids, budget, schedule
28
Third Year Reviews 3
4
10
11
12
13 K+L, JW coordination mtg
14
15 16
17
18
19
20
21
22/23
17
Option Studios 5 Faculty Meeting Studio Walk Through
BIDS due
18
19 WORK BEGINS