RICHARDSON MEMORIAL HALL
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
A Vision for the Future of Richardson Memorial Hall
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
The Team
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Project Goals and Aspirations
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Project Goals and Aspirations
reaching out and engaging the community reinforcing studio culture and collaboration integrating designing and making demonstrating creative site use and water management promoting sensitive and innovative adaptation of an historic structure serving as a model for sustainable design in hot and humid climates LEED Platinum Certification compliance with 2030 Challenge RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Engaging Students, Faculty, and Staff
The Occupancy Survey and Charrette
General Building Satisfaction:
41% Satisfied 26% Neutral 33% Dissatisfied
72% of Respondents Say Environmental Conditions Interfere With Their Work Best Feature: Daylight Inadequate Features: Information Technology, Artificial Lighting, Indoor Air Quality VERY Inadequate Features: Thermal Comfort RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Project Imperatives... Facilities: Upgrade Building Envelope Upgrade All Building Systems Address Code Deficiencies Minimize Loyola Noise Improve Information Technology Program: Increase Informal Collaboration Improve Connections To Campus Expand Fabrication Shop Maintain Unique Character
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Making Connections...
acoustic barrier
Level 5 56' - 0 1/2"
among people to New Orleans to integrate functions between the old and the new to harvest light and air RMH - CPEC PRESENTATION, JULY 14, 2011
Level 4 40' - 9 7/8"
Level 3 25' - 7 1/4"
Level 2 10' - 4 5/8"
Level 1 0' - 0"
F XFOWLE
Sustainability
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Sustainability - Site SITE
RAINWATER HARVESTING
NATIVE/ ADAPTIVE PLANTINGS
RAINWATER STORAGE GREEN ROOF
Stormwater Retention
50% increase BICYCLE STORAGE RAIN GARDEN STORM RETENTION
PERMEABLE PAVING
RMH - CPEC PRESENTATION, JULY 14, 2011
GREEN WALL
F XFOWLE
Sustainability - Energy and Carbon ENERGY DAYLIGHT HARVESTING SPRAY FOAM INSULATION
PHOTOVOLTAIC & SOLAR THERMAL PANELS GREEN ROOF
DAYLIGHT DIMMING
Energy Savings
50-60% EXTERIOR SHADING
RMH - CPEC PRESENTATION, JULY 14, 2011
NATURAL VENTILATION
CHILLED BEAMS
CEILING FANS
TRIPLE-GLAZED WINDOWS
F XFOWLE
Sustainability - Water WATER
RAINWATER HARVESTING RAINWATER STORAGE GREEN ROOF
Water Savings
75-80%
LOW FLOW FIXTURES
RAIN GARDEN STORM RETENTION RAINWATER IRRIGATION
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Sustainability - Indoor Environment and Human Well Being INDOOR AIR QUALITY DAYLIGHT HARVESTING
HUMAN WELL BEING
GREEN ROOF DAYLIGHT DIMMING
Comfort Improvement
100%
NATURAL VENTILATION
INTERIOR SHADING
CHILLED BEAMS
EXTERNAL SHADING BICYCLE STORAGE
RMH - CPEC PRESENTATION, JULY 14, 2011
LOW VOC MATERIALS
CEILING FANS
TRIPLE-GLAZED WINDOWS GREEN WALL
F XFOWLE
Sustainability RAINWATER HARVESTING
SITE ENERGY MATERIALS & RESOURCES INDOOR AIR QUALITY WATER HUMAN WELL BEING
RAINWATER STORAGE DAYLIGHT HARVESTING
PHOTOVOLTAIC & SOLAR THERMAL PANELS
SPRAY FOAM INSULATION
GREEN ROOF DAYLIGHT DIMMING BUILDING REUSE INTERIOR SHADING
NATIVE/ ADAPTIVE PLANTINGS
NATURAL VENTILATION CHILLED BEAMS
EXTERNAL SHADING
BICYCLE STORAGE
DURABLE ENCLOSURE
SITE DRAINAGE STRATEGIES
PERMEABLE PAVING
ULTRA LOW FLOW FIXTURES CEILING FANS
LOW VOC MATERIALS
TRIPLE-GLAZED WINDOWS GREEN WALL
RAIN GARDEN STORM DETENTION RAINWATER IRRIGATION
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Program
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Encouraging Informal Interaction
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Evolution of Design Education
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
East Addition
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Programmatic Achievements - Site & Ground Floor More collaborative work spaces for students.
Improved connection of building to campus.
Expanded shop and digital facilities.
Faculty more physically integrated with students.
More amenity spaces for students.
Improved egress and accessibility.
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Programmatic Achievements - Second Floor More collaborative work spaces for students.
Improved connection of building to campus.
Expanded shop and digital facilities.
Faculty more physically integrated with students.
More amenity spaces for students.
Improved egress and accessibility.
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Programmatic Achievements - Third Floor More collaborative work spaces for students.
Improved connection of building to campus.
Expanded shop and digital facilities.
Faculty more physically integrated with students.
More amenity spaces for students.
Improved egress and accessibility.
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Programmatic Achievements - Fourth Floor More collaborative work spaces for students.
Improved connection of building to campus.
Expanded shop and digital facilities.
Faculty more physically integrated with students.
More amenity spaces for students.
Improved egress and accessibility.
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Programmatic Achievements - Fifth Floor More collaborative work spaces for students.
Improved connection of building to campus.
Expanded shop and digital facilities.
Faculty more physically integrated with students.
More amenity spaces for students.
Improved egress and accessibility.
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
North Plaza
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Campus Connections
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Campus Connections
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Campus Connections
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Schedule / Cost
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
Project Phasing YEAR 1
YEAR 2
YEAR 3
YEAR 4
YEAR 5
OPTION 1 - REMAIN IN RMH DURING CONSTRUCTION fundraising design bid construction
+
relocation not required educational opportunity of proximity to construction site
-
cost premium for phasing longer construction period dust and noise issues, risk to occupants multiple moves
OPTION 2 - RELOCATE TO OFFSITE SPACE DURING CONSTRUCTION fundraising design bid construction
+
shorter construction period potential to get TSA out into community reduced risk to occupants simplified logistics for LEED submittal
RMH - CPEC PRESENTATION, JULY 14, 2011
-
cost for off-site facility rental disconnection of students fom the campus increased distance to dormitories and other classes
F XFOWLE
Concept Estimate
Renovation: 50,163 GSF @ $230 New Construction: 17,363 GSF @ $300 Site Improvements: 38,800 GSF @ $ 25
$ 11.5 M $ 5.2 M $ 1.0 M
Total Construction Cost: Total Project Cost: Construction Cost x 1.35
$ 17.7 M $ 23.9 M
Construction Cost: Includes General Conditions, OH&P, Escalation to mid-point of construction, 10% Contingecy Exclusive of soft costs, professional fees, FF&E, relocation expenses.
RMH - CPEC PRESENTATION, JULY 14, 2011
F XFOWLE
The RMH Sustainable Strategies Project will... Serve as a Demonstration Project/ Teaching Tool Transform Architectural Education Attract the Best and Brightest Talent Engage the New Orleans Community Stimulate Research and Innovation Enhance Leadership in Sustainability Position Tulane at the Leading Edge RMH - CPEC PRESENTATION, JULY 14, 2011