TODAY @ noon
“ Town
Hall Meeting” ROOM 201
K EILLIN partnership
1908
1900
Richardson Memorial Hall built for Medical School The building is named for Dr. Tobias G. Richardson, Dean of the Medical Department from 1865-1885.
1910
1920
1930
1940
1950
1960
1970
1908-1963 MEDICAL SCHOOL OCCUPIES RMH
ARCH
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
BUILDING TIME LINE
1980
1990
2000
2010
2020
1964
1900
1910
1920
1930
1940
1950
1960
Architecture School shares RMH Freshmen studios occupy room 401, while the remainder of the architecture school stays next door at Stanley Thomas Hall. RMH is shared with various other departments during this transition period.
1970
1908-1963 MEDICAL SCHOOL OCCUPIES RMH ARTS & SCIENCES ARCH
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
BUILDING TIME LINE
1980
1990
2000
2010
2020
1972
1900
1910
1920
1930
1940
1950
1960
1970
1980
Architecture School officially moves in to RMH Louis Kahn gives inaugural lecture to architecture students in former anatomical theater.
1990
2000
2010
1908-1963 MEDICAL SCHOOL OCCUPIES RMH ARTS & SCIENCES ARCH
1972 - PRESENT ARCHITECTURE SCHOOL OCCUPIES RMH
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
BUILDING TIME LINE
2020
1986
1900
1910
1920
1930
1940
1950
1960
1970
1980
RENOVATION following fire in Amphitheater Attic space renovated for fifth floor studios. Fourth and fifth levels connected with skylight. Third floor administration entrance created.
1990
2000
2010
1908-1963 MEDICAL SCHOOL OCCUPIES RMH ARTS & SCIENCES ARCH
1972 - PRESENT ARCHITECTURE SCHOOL OCCUPIES RMH
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
BUILDING TIME LINE
2020
1999 1995 1900
1910
1920
1930
1940
1950
1960
RENOVATION Fire safety improvements Upgrade of room 204
RENOVATION Slide library Special Projects room
1970
1980
1990
2000
2010
1908-1963 MEDICAL SCHOOL OCCUPIES RMH ARTS & SCIENCES ARCH
1972 - PRESENT ARCHITECTURE SCHOOL OCCUPIES RMH
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
BUILDING TIME LINE
2020
2001
1900
1910
1920
1930
1940
1950
1960
1970
RENOVATION Central HVAC on fourth and fifth floors. New studio furnishings
1980
1990
2000
2010
1908-1963 MEDICAL SCHOOL OCCUPIES RMH ARTS & SCIENCES ARCH
1972 - PRESENT ARCHITECTURE SCHOOL OCCUPIES RMH
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
BUILDING TIME LINE
2020
2010
1900
1910
1920
1930
1940
1950
1960
1970
1980
RENOVATION Dean Schwartz commissions current design of new computer labs, teaching spaces and faculty corridor.
1990
2000
2010
1908-1963 MEDICAL SCHOOL OCCUPIES RMH ARTS & SCIENCES ARCH
1972 - PRESENT ARCHITECTURE SCHOOL OCCUPIES RMH
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
BUILDING TIME LINE
2020
ROOM 404
STUDIO
STUDIO
TCC
RM 405
O
OFFICE
O
EXISTING 4TH FLOOR EXISTING OFFICES, TEACHING SPACE AND CITY CENTER TO BE RELOCATED
MECH MECH SHOP
MECH
CL
RM 101
EXISTING GROUND FLOOR
MECH
CAFETERIA
COMPUTER LAB
KITCH
EXISTING COMPUTER LAB WITH NON-COMPLIANT BUILDING EGRESS TO BE RELOCATED
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
objectives 1 RELOCATE COMPUTER LAB TO STUDIO LEVEL
objectives 1 RELOCATE COMPUTER LAB TO STUDIO LEVEL ...integrate computer lab into studios ...foster studio culture and stimulate learning environment ...provide a more secure computer lab ...improve quality of lab space
objectives 1 RELOCATE COMPUTER LAB TO STUDIO LEVEL ...integrate computer lab into studios ...foster studio culture and stimulate learning environment ...provide a more secure computer lab ...improve quality of lab space
2 RELOCATE 4TH FLOOR OFFICES TO GROUND LEVEL
objectives 1 RELOCATE COMPUTER LAB TO STUDIO LEVEL ...integrate computer lab into studios ...foster studio culture and stimulate learning environment ...provide a more secure computer lab ...improve quality of lab space
2 RELOCATE 4TH FLOOR OFFICES TO GROUND LEVEL ...create a centralized faculty corridor ...encourage discourse between faculty and student visitors ...connect new faculty corridor with building circulation
objectives 1 RELOCATE COMPUTER LAB TO STUDIO LEVEL ...integrate computer lab into studios ...foster studio culture and stimulate learning environment ...provide a more secure computer lab ...improve quality of lab space
2 RELOCATE 4TH FLOOR OFFICES TO GROUND LEVEL ...create a centralized faculty corridor ...encourage discourse between faculty and student visitors ...connect new faculty corridor with building circulation
3 PROVIDE NEW TEACHING SPACES ON 4TH FLOOR
objectives 1 RELOCATE COMPUTER LAB TO STUDIO LEVEL ...integrate computer lab into studios ...foster studio culture and stimulate learning environment ...provide a more secure computer lab ...improve quality of lab space
2 RELOCATE 4TH FLOOR OFFICES TO GROUND LEVEL ...create a centralized faculty corridor ...encourage discourse between faculty and student visitors ...connect new faculty corridor with building circulation
3 PROVIDE NEW TEACHING SPACES ON 4TH FLOOR ...create flexible classrooms ...enhance central hallway as teaching space ...reclaim building core as public zone
MECH MECH
MECH
SHOP
RM 101
MECH
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
CAFETERIA
COMPUTER LAB
KITCH
EXISTING GROUND FLOOR
16 JANUARY 2010
LOUNGE AREA
MECH MECH
MECH 6
SHOP
RM 101
MECH
CAFETERIA
1
2
3
4
5
KITCH SIX NEW OFFICES
NEW EXIT DOOR
WIDENED CORRIDOR TO CELEBRATE NATURAL LIGHT AND VIEW NEW FLOOR AND WALL SURFACE TO CONNECT FACULTY HALL / DISPLAY
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
PROPOSED GROUND FLOOR EXTENSION
16 JANUARY 2010
FACULTY LOUNGE AREA
MECH MECH
MECH 6
SHOP
RM 101
MECH
CAFETERIA
1
2
3
4
5
KITCH SIX NEW OFFICES
NEW EXIT DOOR
WIDENED CORRIDOR TO CELEBRATE NATURAL LIGHT AND VIEW
CODE COMPLIANT EGRESS SIX NEW FACULTY OFFICES CONTINUOUS GALLERY WALL ALONG OFFICES LIGHT AND VIEW AT CORRIDOR’S END FACULTY LOUNGE AREA REUSE EXISTING OPENING FOR NEW DOOR FOCUS ON NEW LAYER, AWAY FROM CEILING DUCTS NEW SURFACE ALLOWS FOR CONDUITS FOR LIGHTING AND INTEGRATED SIGNAGE
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
PROPOSED GROUND FLOOR EXTENSION
NEW FLOOR AND WALL SURFACE TO CONNECT FACULTY HALL / DISPLAY
16 JANUARY 2010
IN INITIAL PLANNING STUDIES,
6 SCHEMES FOR LABS AND CLASSROOMS WERE EXPLORED ...
ROOM 404
STUDIO
STUDIO
TCC
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
RM 405
O
OFFICE
EXISTING FOURTH FLOOR
O
COMPUTER LAB 1 606 nsf, 16 work stations circulation btwn two pods
COMPUTER LAB 2 606 nsf, 16 work stations circulation btwn two pods
CLASSRMS/ CRIT SPACE 993 nsf
PROS
SCHEME 1
UNIT PROGRAM SF
LABS INTEGRATED WITH STUDIOS BI-SYMMETRICAL VOLUMES IN SPIRIT OF RMH MAXIMUM GAINED CRIT SPACES
COMPUTER LABS
311 gsf 303 nsf
CONS
STUDIO ACCESS ONLY THROUGH LABS, NO SECURITY DOUBLE WIRING FOR TWO LABS CIRCULATION DIVIDES LABS INTO PODS 30 STUDIO DESKS LOST
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
SCHEME 1 : CLOSE TWINS
CRIT SPACES
303 nsf x 4 pods 732 gsf per lab including center aisle
1,025 gsf 993 nsf
NEW SF
EXISTG SF
GAIN/LOSS
1,212 sf 32 work stations
776 sf 26 work stations
+ 436 sf + 6 work stations
315 sf RM 405
+ 678 sf
993 sf
STUDIO SPACE 2,372 sf per studio 4,744 sf 6,210 sf
- 1,466 sf - 30 studio desks
16 JANUARY 2010
COMPUTER LAB 1 496 nsf, 24 work stations
COMPUTER LAB 2 496 nsf, 24 work stations
CLASSRMS/ CRIT SPACE 993 nsf
PROS
LABS INTEGRATED WITH STUDIOS BI-SYMMETRICAL VOLUMES IN SPIRIT OF RMH MAXIMUM GAINED WORK STATIONS AND CRIT SPACES SECURE LOCATION OF LABS WITHIN STUDIOS
CONS
MINIMAL PRESENCE OF LAB DESIGN DOUBLE WIRING FOR TWO LABS 30 STUDIO DESKS LOST
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
SCHEME 2 : DISTANT TWINS
SCHEME 2
UNIT PROGRAM SF
COMPUTER LABS
523 gsf 496 nsf
CRIT SPACES
1,025 gsf 993 nsf
NEW SF
EXISTG SF
GAIN/LOSS
992 sf
776 sf 26 work stations
+ 216 sf + 22 work stations
993 sf
315 sf RM 405
+ 678 sf
48 work stations
STUDIO SPACE 2,581 sf per studio 5,162 sf 6,210 sf
- 1,048 sf - 30 studio desks
16 JANUARY 2010
COMPUTER LAB 1 1,131 nsf, 40 work stations
CLASSRMS/ CRIT SPACE 993 nsf
PROS
LABS INTEGRATED WITH STUDIOS SINGLE WING OF WIRING MAXIMUM GAINED CRIT SPACES MAXIMUM INTEGRATION OF LAB TO STUDIO
CONS
WINDOW WALL OBSTRUCTED DISRUPTED STUDIO CONFIGURATION 39 STUDIO DESKS LOST
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
SCHEME 3 : SINGLE LOADED
SCHEME 3
UNIT PROGRAM SF
COMPUTER LABS
1,179 gsf 1,131 nsf
CRIT SPACES
1,025 gsf 993 nsf
NEW SF
EXISTG SF
GAIN/LOSS
1,131 sf
776 sf 26 work stations
+ 355 sf + 14 work stations
993 sf
315 sf RM 405
+ 678 sf
40 work stations
STUDIO SPACE 1,926 sf + 3,105 5,162 sf 6,210 sf
- 1,179 sf - 39 studio desks
16 JANUARY 2010
COMPUTER LAB 1 463 nsf, 16 work stations
COMPUTER LAB 2 463 nsf, 16 work stations
CLASSRMS/ CRIT SPACE 993 nsf
PROS
LABS INTEGRATED WITHIN STUDIOS AXIAL VOLUMES DIAGONALLY LINKED BY CORRIDOR MAXIMUM GAINED CRIT SPACES SECURE LOCATION OF LABS WITHIN STUDIOS
CONS
DOUBLE WIRING FOR TWO LABS DISRUPTIVE STUDIO CONFIGURATION 36 STUDIO DESKS LOST
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
SCHEME 4 : SPLIT SIBLINGS
SCHEME 4
UNIT PROGRAM SF
COMPUTER LABS
486 gsf 463 nsf x 2
CRIT SPACES
1,025 gsf 993 nsf
NEW SF
EXISTG SF
GAIN/LOSS
926 sf
776 sf 26 work stations
+ 150 sf + 6 work stations
993 sf
315 sf RM 405
+ 678 sf
32 work stations
STUDIO SPACE 2,618 sf per studio 5,236 sf 6,210 sf
- 974 sf - 36 studio desks
16 JANUARY 2010
COMPUTER LAB 1 491 nsf, 24 work stations
COMPUTER LAB 2 463 nsf, 24 work stations
8 8
8
8
8
8
CLASSRMS/ CRIT SPACE 493 nsf
PROS
2 TYPES OF LABS - CENTRAL AND STUDIO LAB SHARED WIRING FOR LABS w/ADJACENCY TO ROUTER VISIBILITY OF COMPUTER LAB GAINED CRIT SPACE ACTIVATION OF CENTRAL SPACE
CONS
DISRUPTIVE STUDIO CONFIGURATION 18 STUDIO DESKS LOST
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
SCHEME 5A : FIRST COUSINS
SCHEME 5A
UNIT PROGRAM SF
COMPUTER LABS
511 gsf + 486 gsf 491 nsf + 463 gsf
CRIT SPACES
513 gsf 493 nsf
NEW SF
EXISTG SF
GAIN/LOSS
954 sf 48 work stations
776 sf 26 work stations
+ 178 sf + 22 work stations
493 sf
315 sf RM 405
+ 178 sf
STUDIO SPACE 2,618 sf + 3,105 sf 5,723 sf 6,210 sf
- 387 sf - 18 studio desks
16 JANUARY 2010
COMPUTER LAB 1 552 nsf, 24 work stations
COMPUTER LAB 2 463 nsf, 24 work stations
8
8
8
CLASSRM/ CRIT SPACE 2 214 nsf
PROS
2 TYPES OF LABS - CENTRAL AND STUDIO LAB VISIBILITY OF COMPUTER LAB GAINED CRIT SPACE ACTIVATION OF CENTRAL SPACE
CONS
DISRUPTIVE STUDIO CONFIGURATION 18 STUDIO DESKS LOST SMALL CRIT SPACES
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
8
8
CLASSRM/ CRIT SPACE 1 214 nsf
K EILLIN partnership
8
SCHEME 5B
UNIT PROGRAM SF
COMPUTER LABS
570 gsf + 486 gsf 552 nsf + 463 gsf
CRIT SPACES
229 gsf x 2 214 nsf x 2
NEW SF
EXISTG SF
GAIN/LOSS
1,015 sf 48 work stations
776 sf 26 work stations
+ 239 sf + 22 work stations
428 sf
315 sf RM 405
+ 113 sf
STUDIO SPACE 2,618 sf + 3,105 sf 5,723 sf 6,210 sf
SCHEME 5B : SECOND COUSINS
- 387 sf - 18 studio desks
16 JANUARY 2010
4
4 20 4
4
FLEXIBLE CRIT SPACE +/- 650 nsf
COMPUTER LAB 767 nsf, 32 work stations
PROS
CENTRAL COMPUTER LAB ACTIVATION OF CENTRAL SPACE VISIBILITY OF COMPUTER LAB with DONOR POTENTIAL NO DISRUPTION OF STUDIOS MINIMUM AMOUNT OF CONSTRUCTION FLEXIBLE CRIT SPACES POTENTIAL GALLERY / EXHIBITION HALL
CONS
SCHEME 6 COMPUTER LAB
CRIT SPACES STUDIO SPACE
UNIT PROGRAM SF 804 gsf 767 gsf
flexible 3,105 sf x 2
NEW SF
EXISTG SF
GAIN/LOSS
767 sf
776 sf 26 work stations
- 9 sf + 6 work stations
flexible
315 sf RM 405
N/A
32 work stations
6,210 sf
6,210 sf
NO CHANGE
ENCLOSED CLASSROOM SPACE LOST NO DIRECT INTEGRATION WITH STUDIOS
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
SCHEME 6 : CENTER SINGLE
16 JANUARY 2010
AFTER A CLIENT MEETING WITH DEAN SCHWARTZ,
3 LAB + 3 CORE CONFIGURATIONS WERE IDENTIFIED...
4
4 20 4
4
COMPUTER LAB 767 nsf, 32 work stations
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
SCHEME
3
20 JANUARY 2010 RESOURCES MEETING
FLEXIBLE REVIEW SPACE +/- 650 nsf
4
4 20 4
4
COMPUTER LAB 767 nsf, 32 work stations
PROS
ACTIVATION OF CENTRAL CORE WITH LAB SINGLE LAB WITH DONOR POTENTIAL VISIBILITY OF NEW LAB FROM EXTERIOR NO DISRUPTION OF STUDIOS MINIMUM CONSTRUCTION WITH FOCUSED DESIGN DEFINED REVIEW SPACE IN HALLWAY POTENTIAL GALLERY / EXHIBITION SPACE
CONS
ENCLOSED CLASSROOM SPACE LOST NO DIRECT INTEGRATION WITH STUDIOS
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
SCHEME 6 COMPUTER LAB
SCHEME
3
CRIT SPACE
UNIT PROGRAM SF 804 gsf 767 gsf
767 sf 32 work stations
flexible
NEW SF
flexible
EXISTG SF 776 sf 26 work stations
315 sf RM 405
GAIN/LOSS - 9 sf + 6 work stations N/A
20 JANUARY 2010 RESOURCES MEETING
COMPUTER LAB 1 24 work stations (496 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
COMPUTER LAB 2 24 work stations (496 nsf)
LAB SCHEME
2
20 JANUARY 2010 RESOURCES MEETING
COMPUTER LAB 1 24 work stations (496 nsf)
COMPUTER LAB 2 24 work stations (496 nsf)
PROS
SECURE LABS INTEGRATED WITHIN STUDIOS MAXIMUM TEACHING SPACES GAINED IN CORE
CONS
DOUBLE WIRING FOR TWO LABS DISRUPTIVE STUDIO CONFIGURATION 30 STUDIO DESKS LOST
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
LAB SCHEME
SCHEME 2
UNIT PROGRAM SF
COMPUTER LABS
523 gsf 496 nsf
NEW SF
EXISTG SF
GAIN/LOSS
992 sf
776 sf
+ 216 sf + 22 work stations
48 work stations
26 work stations
STUDIO SPACE 2,581 sf per studio 5,162 sf 6,210 sf
2
- 1,048 sf - 30 studio desks
20 JANUARY 2010 RESOURCES MEETING
COMPUTER LAB 1 16 work stations (413 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
COMPUTER LAB 2 16 work stations (413 nsf)
LAB SCHEME
1
20 JANUARY 2010 RESOURCES MEETING
COMPUTER LAB 1 16 work stations (413 nsf)
COMPUTER LAB 2 16 work stations (413 nsf)
PROS
SECURE LABS INTEGRATED WITHIN STUDIOS MAXIMUM TEACHING SPACES GAINED IN CORE
CONS
DOUBLE WIRING FOR TWO LABS DISRUPTIVE STUDIO CONFIGURATION 30 STUDIO DESKS LOST
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
LAB SCHEME
SCHEME 1
UNIT PROGRAM SF
COMPUTER LABS
486 gsf 413 nsf x 2
NEW SF
826 sf 32 work stations
EXISTG SF
776 sf 26 work stations
STUDIO SPACE 2,671 sf per studio 5,342 sf 6,210 sf
1
GAIN/LOSS
+ 50 sf + 6 work stations - 868 sf - 30 studio desks
20 JANUARY 2010 RESOURCES MEETING
20-SEAT CLASSRM (271 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
35-SEAT CLASSRM (553 nsf)
CORE SCHEME
14-SEAT SEMINAR (271 nsf)
a
20 JANUARY 2010 RESOURCES MEETING
REVIEW / EXHIBITION flexible (324 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
CORE SCHEME
a
20 JANUARY 2010 RESOURCES MEETING
REVIEW / EXHIBITION flexible (324 nsf)
20-SEAT CLASSRM (271 nsf)
35-SEAT CLASSRM (553 nsf)
14-SEAT SEMINAR (271 nsf)
SCHEME a
PROS
MAXIMUM TEACHING SPACES GAINED DEFINED REVIEW / EXHIBITION SPACE IN HALL
CONS
COMPUTER LABS IN STUDIO SPACE STUDIO DESKS LOST
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
CORE SCHEME
a
UNIT PROGRAM SF
NEW SF
EXISTG SF
GAIN/LOSS
CLASSROOM 1 284 gsf x 2 271 nsf x 2 542 sf CLASSROOM 2 578 gsf 553 nsf 553 sf
315 sf RM 405 + 780 sf
REVIEW / EXHIBIT
162 sf
324 nsf
324 sf
+ 162 sf
20 JANUARY 2010 RESOURCES MEETING
49-SEAT CLASSRM (687 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
CORE SCHEME
b
20 JANUARY 2010 RESOURCES MEETING
REVIEW / EXHIBIT SPACE (279 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
REVIEW / EXHIBIT SPACE (279 nsf)
CORE SCHEME
b
20 JANUARY 2010 RESOURCES MEETING
REVIEW / EXHIBIT SPACE (279 nsf)
49-SEAT CLASSRM (687 nsf)
REVIEW / EXHIBIT SPACE (279 nsf)
PROS
SCHEME a
MAXIMUM TEACHING SPACES GAINED OPEN REVIEW / EXHIBIT SPACES AT STAIR AXIS
CONS
COMPUTER LABS IN STUDIO SPACE STUDIO DESKS LOST
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
CORE SCHEME
b
UNIT PROGRAM SF
LARGE CLASSROOM
725 gsf 687 nsf
REVIEW / EXHIBIT
279 nsf x 2
NEW SF
EXISTG SF
GAIN/LOSS
687 sf
315 sf RM 405
+ 372 sf
558 sf
162 sf
+ 396 sf
20 JANUARY 2010 RESOURCES MEETING
35-SEAT CLASSRM (492 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
35-SEAT CLASSRM (492 nsf)
CORE SCHEME
c
20 JANUARY 2010 RESOURCES MEETING
EXHIBITION HALL flexible (418 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
CORE SCHEME
c
20 JANUARY 2010 RESOURCES MEETING
EXHIBITION HALL flexible (418 nsf)
35-SEAT CLASSRM (492 nsf)
35-SEAT CLASSRM (492 nsf)
PROS
NEW SF
EXISTG SF
GAIN/LOSS
CLASSROOMS
UNIT PROGRAM SF 512 gsf x 2 492 nsf x 2
984 sf
315 sf RM 405
+ 669 sf
EXHIBIT HALL
418 nsf
418 sf
162 sf
+ 256 sf
SCHEME C
MAXIMUM TEACHING SPACES GAINED CENTRAL EXHIBITION SPACE
CONS
COMPUTER LABS IN STUDIO SPACE STUDIO DESKS LOST
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
CORE SCHEME
c
20 JANUARY 2010 RESOURCES MEETING
POTENTIAL
CORE + LAB COMBINATIONS ...
COMPUTER LAB 1 16 work stations (413 nsf)
COMPUTER LAB 2 16 work stations (413 nsf)
REVIEW / EXHIBITION flexible (324 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
COMBINATION :
1-a
20 JANUARY 2010 RESOURCES MEETING
COMPUTER LAB 1 16 work stations (413 nsf)
COMPUTER LAB 2 16 work stations (413 nsf)
EXHIBITION HALL flexible (418 nsf)
35-SEAT CLASSRM (492 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
35-SEAT CLASSRM (492 nsf)
COMBINATION :
1-c
20 JANUARY 2010 RESOURCES MEETING
COMPUTER LAB 1 24 work stations (496 nsf)
REVIEW / EXHIBIT SPACE (279 nsf)
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
COMPUTER LAB 2 24 work stations (496 nsf)
49-SEAT CLASSRM (687 nsf)
COMBINATION :
2-b
REVIEW / EXHIBIT SPACE (279 nsf)
20 JANUARY 2010 RESOURCES MEETING
FLEXIBLE REVIEW SPACE +/- 650 nsf
4
4 20 4
4
COMPUTER LAB 767 nsf, 32 work stations
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
COMBINATION :
3
20 JANUARY 2010 RESOURCES MEETING
COMMENT SHEET name:
faculty
S C H E M E S
C O M M E N T S + S U G G E S T I O N S LAB 1
staff
student
YES NO
LAB 2
YES NO
LAB 3
YES NO
CORE A
YES NO
CORE B
YES NO
CORE C
YES NO
K EILLIN partnership
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
TOWN HALL MEETING 1 25 JANUARY 2010