PORTFOLIO SELECTED PROFESIONAL AND ACADEMIC WORKS
2017
PORTFOLIO SELECTED PROFESIONAL AND ACADEMIC WORKS
2017
NGUYEN HUY TUNG architect
PROFILE Name
:
Nguyen Huy Tung
Date of birth :
07 Dec 1989
Gender :
Male
Nationality :
Vietnamese
Address :
No.08 - Alley 159 LamDu BoDe - LongBien - Hanoi
Email :
huytung712@gmail.com
Website :
https://www.behance.net/pix3d
Phone :
0163 848 0879
NGUYEN HUY TUNG My name is Nguyen Huy Tung.I am an design architect.I graduated from Hanoi Architecttural University from 2015. I really believe that my six years studies and four years in international architecture office should be of interest to environment working like your office I have the strong conviction to contribute to your study department providing my architecture skills,rigorous and proactive character and fresh ideas. Given my goals and future desired career focus, an architect senior position at your office would be an excellent opportunity to get familiar with your approach, gain new experiences and skills, expand my knowledge and extend my professional network. So after 10 years studying and practicing in the same time, I tried to practice day by day and I recognized that architecture is the good way for me to discover the world and in the end of the day, it is the best way to discover myself From 2012-2014 I worked at AHL Architect& Associated . From that time , I started and practiced to reseach about the renovation, transfomation and refurbishment building and I did some architecture project about this topic From 2015 - 2016 .I started to work full time at Group8asia office in Hanoi mainly for the architecture competition. Because Group8 is a international office so I have a good chance to work and to improve in the international ambient. In that time, I start to work concept phase for the competition in several project.And I learned alot from the team.After several competition I had experience mostly in Asia complex project including projects in Vietnam, Singapore, Korea where speed project architecture is very imported ,both in producing drawing and making 3d image architecture. I was involved in project of different context and scales, range from small house in Hanoi to a big master plan study in Singapore. I learned a lot about conceptual study to finalize drawings which required very high professional level. From 2018, I started to work as an concept leader team in SieuChungKy JSC that I have collected for the job and I am trying to make more influence for our project here. In that time i started to reseach and study detail tecnical to improve my knowlege in process design from concept to real From 2020 to present I changed to work by collaborating some projects with several other architectural design consulting firms. Since then, I have worked on the overall project, to improve my work skills in the design process, working collaboratively with consultants and local architects partners.By that way, I can improve and complete my ability in wide range of work. So with my knowledge learned during this time and with my formation and experience in Vietnam, I would be able to adapt to a constantly changing work environment, and get along with people with different culture back-ground I am aware that I am applying for an architect senior position in your office is a very successful and reputable that has a lot to offer, but will also be a demanding organization. I deeply believe that my competencies can meet your expectations. Working with you would be a challenge that motivates me to learn and work independently to achieve results that I am responsible for. I am result oriented, independent and proactive. I am looking forward to the opportunity to discuss about my proposal with you at your earliest convenience.
EDUCATION 2009 - 2015
Hanoi Architecture Univeristy ( HAU)
EXPERIENCE 2018 - present
Sieu Chung Ky JSC| architect | Hanoi Sapa Paddy Field | Sapa - LaoCai| Geleximco Office | interior design| Hanoi| Vietnam security cyber center| interior design| Hanoi| PhuongDong hospital| interior design| Hanoi| 175 hospital| interior design |HoChiMinh city| MIK home gallery| Hanoi| Adamas hotel| Nhatrang| NgoiSao Tam Dao hotel|renovation|Vinh Phuc| FPT Tower| Hanoi| FPT University|interior design| Hanoi|
Collaboration | architect | Hanoi
2017
OB beer house | Linh Dam | Hanoi |with Concept Warehouse|completed Khuat Duy Tien mix-use| Thanh Xuan | Hanoi |with Arep|underconstruction Dong Hoi housing| Dong Hoi | Quang Binh|with Studio13 architects|completed Moc Chau homstay|Moc Chau|with Neo Studio|underconstruction The tea pub| Lo Su |Hanoi|with NOA design works |completed Son La park|Son La|with NOA design works|underconstruction Vital Fitness|Hanoi|with VNRES |completed Ho Tay fog island|Hanoi|personal project| competition
2015 - 2017
Group8asia architecture & urban planning| architect | Hanoi Green vertical city|Hanoi| competition |1st prize| Green urban park|Hanoi| competition |1st prize| Seoul green dot|Seoul|republic of Korea| competition |3rd prize| Hanoia house| 38 Hang Dao| Hanoi | completed Jakob factory|Ho Chi Minh city | underconstruction Green delta|Sengkang|Singapore| competition 3 boulevard gardens|Tampines north|Singapore|competition Sheraton Saigon|Ho Chi Minh city | completed The Alps|Singapore |underconstruction The River Cliff|Hochiminh city |competition Somerset West Point|Tayho,Hanoi | completed Hoa Lac hi-teck park|Hanoi | underconstruction Openasia headquadters|Hanoi | underconstruction Mega Life|Seoul| republic of Korea | competition
2012 - 2014
AHL architect & associates| intern architect | Hanoi 5x20 VPH|Van Phu,Ha Dong,Hanoi|completed 7x7 House|Hanoi| completed Hoang Lam Office|Da Nang|completed Truong Dinh Office|Hanoi| completed Truong Dinh Office|Hanoi| completed Lai Chau Villa|Laichau|completed XanhVilla|Laichau|completed
SKILL software
languages hobbies
Autocad :*****| 3Dsmax-Vray-Corona : ***** Photoshop :***** Lumion :***** Model making :****
Revit : *** Sketchup : **** Indesign (layout) : ***** Ilustrator :**** Pack Office : ****
Vietnames ( mother touge) | English ( basic)
photograph|sketching| music|cinema|traveling|reading book|
EXPERIENCE
SEOUL GREEN DOT 2016
GREEN VERTICAL CITY 2016
GREEN DELTA 2016
3 BOULEVARD GADER 2016
GREEN URBAN PARK 2016
MEGA LIFE 2015
HOALAC HI-TECH PARK 2015-2016
THE ALPS 2015-2019
THE RIVER CLIFF 2015-2016
HANOIA HOUSE 2016
SHERATON SAIGON 2015-2016
OPENASIA HEADQUATERS 2015-2016
JAKOB SAIGON 2015-2016
KHUAT DUY TIEN MIX-USE 2017
VITAL FITNESS 2016
SOMERSET WEST POINT 2016
OB BEER HOUSE 2017
MOC CHAU HOMESTAY 2017
SONLA PARK 2016-2017
DONG HOI HOUSE 2017
S
THESE ARE THE PROJECT I WORKED AT GROUP8ASIA,SCK AS AN ARCHITECT.I N THE COMPETITION PHASE, MAIN MY TASK IN DRAWING LAYOUT,3D AND STUDY CONCEPT
SEOUL GREEN DOT location :seoul, republic of korea context : group8asia architect, architect - 3D visualization type of commission: international competition program:promenade, public spaces & creative facilities status: competition project date: 2016
GREEN VERTICAL CITY location :hanoi context : group8asia architect, architect - 3D visualization type of commission: international competition program:mix-use, public spaces status: competition project date: 2016
GREEN DELTA location :sengkang, singapore context : group8asia architect, architect - 3D visualization type of commission: international competition program:mix-use, public spaces & creative facilities status: competition project date: 2016
3 BOULEVARD GARDENS
location :tampines north, singapore context : group8asia architect, architect - 3D visualization type of commission: international competition program:mix-use, public spaces & creative facilities status: competition project date: 2016
GREEN URBAN PARK location :namtuliem, hanoi context : group8asia architect, architect - 3D visualization type of commission: international competition program:promenade, public spaces & creative facilities status: competition project date: 2016
MEGA LIFE location :seoul, republic of korea context : group8asia architect, architect - 3D visualization type of commission: international competition program:promenade, public spaces & creative facilities status: competition project date: 2015
HOA LAC HI-TECK PARK location :hanoi, vietnam context : group8asia architect, architect - 3D visualization type of commission: private commission program:landscape status: on-going project date: 2015-2016
THE ALPS location :singapore context : group8asia architect, architect - 3D visualization type of commission: shortlisted competition, 1st prize site: 15’600 m2 program:condominium of 626 units & facilities status: in process project date: 2015-2019
THE RIVER CLIFF location :ho chi minh, vietnam context : group8asia architect, architect - 3D visualization type of commission: shortlisted competition site: 2 ha program:mixed use status: competition project date: 2015-2016
HANOIA HOUSE location :hanoi, vietnam context : group8asia architect, architect - 3D visualization type of commission: private commission program:shop house interior status: completed project date: 2016
Sheraton Saigon location :hochiminh,vietnam context : group8asia architect, noor architects,architect - 3D visualization type of commission: private commission program: hotel renovated status: completed project date: 2015-2016
New Openasia Headquarters in Hanoi location :le van huu,hai ba trung,hanoi, vietnam context : group8asia architect, architect - 3D visualization type of commission: private commission program:office status: underconstruction project date: 2015-2016
Jakob Saigon location :hochiminh,vietnam context : group8asia architect, architect - 3D visualization type of commission: private commission program:factory status: underconstruction project date: 2015-2016
SOMERSET WEST POINT location :tayho, hanoi context : group8asia architect, architect - 3D visualization type of commission: private program: renovation and design status: completed project date: 2015-2016
ARZIER location : Switzerland context : group8asia/ design architect type of comission : competition program : school design status : completed project date : 2016
ARZIER - LE MUIDS
CONCOURS ÉTABLISSEMENT SCOLAIRE
HANSEL & GRETEL
UN BALCON SUR LES ALPES Situé en tête du village du Muids, le site du concours s’inscrit dans la pente entre la route cantonale et le chemin de la Grange. Un ruisseau traverse la parcelle en son milieu délimitant naturellement deux zones distinctes, nord et sud. Le projet se situe dans la partie sud et par son implantation prolonge de manière naturelle l’urbanisme du village. Le préau de l’école émerge subtilement du sol naturel, créant une nouvelle horizontalité dans le paysage. Véritable belvédère, il s’ouvre généreusement sur le panorama alentour et sur les Alpes. Cet espace public, connecté au réseau viaire du village et facilement accessible, devient ainsi une nouvelle place pour le Muids. Son rôle est multiple et riche : Il accueille en premier lieu les enfants lors des récréations de l’école mais peut également se transformer en un lieu de convivialité et de partage le temps d’une fête locale ou communale. Pour des évènements sportifs d’importance liés aux salles de sport, il peut très facilement se muer en un parking occasionnel à l’instar des anciennes place villageoises. Se double rôle, fonctionnel et social lui confère in fine un rôle de repère fort pour les habitants de la commune. UNE ARCHITECTURE HARMONIEUSE Le projet tend un instaurer un dialogue subtil entre une architecture résolument contemporaine et sa relation étroite avec la morphologie villageoise située à proximité immédiate. Dans ce sens, la volumétrie s’inspire comme par mimétisme de l’image de la ‘’petite maison’’ qui appartient à l’imaginaire collectif. L’ensemble de l’école se donne à voir comme un assemblage de plusieurs maisons d’un étage, toutes singulières, compactes, abstraites, accolées et reliées l’une à l’autre, formant un tout homogène et unitaire. Ce principe ludique permet au projet de préserver le caractère villageois du site fait de volumes simples. Grâce à cela, l’homogénéité du Muids s’en trouve ainsi renforcé et garantie à l’école sa bonne intégration tant dans son environnement construit que dans le paysage. Le corps principal de l’école dialoguera avec la future annexe, située dans la partie nord du site, grâce à cette volumétrie commune. La mise en relation d’éléments classiques et contemporains produit un effet harmonieux qui respecte l‘identité du lieu. C’est également toute une culture locale qu’il est important de véhiculer au travers de formes architecturales contemporaines s’inspirant de modèles plus anciens. VUE EXTÉRIEURE SUR LE NOUVEAU COMPLEXE SCOLAIRE
Ph
ase
VillageVILLAGE
ECOLE
VILLAGE
Ph
ase
Ecole ECOLE
UNE ÉCOLE À L‘IMAGE DU VILLAGE
MORPHOLOGIE
PHASAGE
UN BALCON OUVERT SUR LA VUE
UN BALCON SUR LE PAYSAGE
TE
RR
AIN
DE
SP
ORT
SY
NTH
ET
IQ
UE
TE
RR
AIN
2È
ME
DE
ÉTA
PE
SP
ORT
ATH
LÉ
TISM
E
TE
RR
AIN
DE
SP
ORT
G
AZO
N
STA TIO
NN
EM
EN
_+
T
0.00
1È
RE
ÉTA
PE
- 2.
+
1.00
0 0.3
- 3.
ns
+
50 cè sP
EN
TR
PU
BL
IQ
UE
STA TIO
- 4.
30
NN
EM
ES
EN
PA
CE
TV
EX
ÉL
TÉ
RIEU
R
O
APE
S
M
S/
UA PE
40
ÉE
Che
m
in
de
la
Gra
ng
e
Ac cè
s Pi
éton
s 2.
Ac cè
sp
ié
to
ns
ga re
-é
PR
co le
ÉA U
EN
_+
TR
ÉE
0.00
ÉC
Ac
OLE
Ro
ié
ute
to
C
an to
na le
EN
TR
ÉE
ÉC
O LE
Ac
cè
sP
ark
ing
50
0
5
10
25m
1
2
ARZIER - LE MUIDS
CONCOURS ÉTABLISSEMENT SCOLAIRE
HANSEL & GRETEL
ÉNERGIE La production de chaleur se fera par des panneaux solaires thermiques (idéalement orientés au sudouest sur la toiture en pente des maisons) couplés à une pompe à chaleur et un stock de glace + une récupération de chaleur sur les eaux usées. En période estivale, l’installation solaire couvrira la totalité des besoins thermique du bâtiment. A mi - saison ou même en hiver, lorsque l’ensoleillement est suffisant, l’énergie solaire est captée à un niveau de température suffisant pour permettre son utilisation en direct pour le chauffage voire pour l’eau chaude sanitaire. Si le niveau de température de retour du champ de capteurs solaires n’est pas suffisant (< 20°C), l’énergie captée est dirigée vers le stock à changement de phase et vers l’évaporateur de la PAC. La pompe à chaleur élève ensuite la température, par le biais du compresseur, à celle nécessaire pour les besoins de chauffage et d’eau chaude sanitaire. Un accumulateur de chaleur latente eau/glace peut emmagasiner de la chaleur à faible température sans aucune déperdition, dans un volume très compact. L’énergie thermique (kWh) contenue dans un volume d’eau ramené de 80°C à 0°C (chaleur sensible) est égal à celui contenu dans un volume d’eau équivalent à 0°C dans lequel un changement de phase de l’eau en glace (chaleur latente) est opéré. La nuit ou quand l’ensoleillement est insuffisant, la chaleur ambiante ou la faible énergie solaire captée à un niveau de température très bas permet de limiter le prélèvement de chaleur dans l’accumulateur à changement de phase en maintenant sa température à une valeur plus élevée. En plus des gains thermiques grâce au rayonnement solaire, les capteurs sans vitrage permettent également des gains d’énergies sur l’air ambiant (vent, pluie, condensation, givre). Ces gains peuvent surtout être valorisés en hiver quand les capteurs sont également utilisés comme source froide pour la pompe à chaleur. Ils peuvent ainsi amener de la chaleur 24 h par jour, même la nuit. Le coefficient spécifique d’échange des capteurs varie entre 10 et 30 W/m2. K. Un gain de 100 à 200 W/m2 peut ainsi être atteint. Dans ce mode de fonctionnement ils sont donc utilisés comme échangeur extérieur d’une PAC air/ eau (split).Les eaux usées ont un énorme potentiel de chaleur. Elles s’évacuent usuellement à une température de 20 à 30°C. Dans un système de chauffage avec pompe à chaleur, il serait dommage de ne pas mettre à profit cette énergie gratuite. Il est surtout intéressant de valoriser cette énergie dans un bâtiment à haute performance énergétique, dans lesquels la part d’énergie pour la production d’eau chaude sanitaire représente 50% voir plus des besoins d’énergie thermique, ce qui est le cas pour cette école.
ÉLÉVATION SUD-OUEST 1:200
arz_150814_ panel layout - 2-5.indd 4
0
2
4
Limite de propriété
Limite de construction
10m
4
2
Limite de construction
0
Limite de construction
Limite de propriété
10m
Limite de construction
4
2
Limite de propriété
ÉLÉVATION NORD-EST 1:200
Limite de propriété
Limite de construction Limite de construction
Limite de construction
0
ÉLÉVATION NORD-OUEST 1:200
Limite de propriété
10m
4
2
Limite de propriété
0
Limite de propriété
ÉLÉVATION SUD-EST 1:200
Limite de construction
Limite de propriété
VUE INTÉRIEURE SUR LES ENTRÉES DU REZ SUPÉRIEUR
10m
8/14/2015 4:00:48 PM
JANUS - CONCOURS D’ARCHITECTURE - LOGEMENTS, QUARTIER DU DESERT, LAUSANNE
JANUS location : Switzerland context : group8asia/ design architect type of comission : competition program : housing design status : completed project date : 2016
ZONE D'IMPLANTATION
PARKING VELOS 101 m²
Vue du rez-de-chaussée
HALL D'ENTRÉE 30 m²
JARDIN BUANDERIE 27 m²
RUE
HALL D'ENTRÉE 38 m²
HALL D'ENTRÉE 39 m²
Urbanité / Campagne
ACTIVITÉ 339 m²
Plan rez-de-chaussée - 1:200
0
5
10
ACTIVITÉ 140 m²
HALL EXTÉRIEUR 313 m²
ACTIVITÉ 138 m²
ACTIVITÉ 510 m²
ACCES LOGEMENTS
ENTRÉE PARKING
20m
ESPACE RESIDENTIEL
ACCES LOGEMENTS
ACTIVITÉS TERTIAIRES
ACCES ACTIVITÉS TERTIAIRES
Accès
Implantation urbaine Le projet reconnaît l'alignement du chemin de Pierrefleur et propose une "forme forte" capable d'optimiser le périmètre de construction à disposition et d'offrir des réponses variées aux spécificités du lieu. Sa morphologie contribue à la structure du tissu bâti tout en affirmant l'autonomie du bâtiment projeté. Bien ancré dans la partie basse du site, il se dégage au maximum de la pente. Côté rue, sa morphologie reprend strictement la typologie linéaire caractéristique dans cette partie de la ville. A l’arrière, la présence de la nature vient enrichir la rigueur du bâtiment. Ce dernier s’infléchit afin d’exploiter au maximum la forme de la parcelle. Deux branches s’y développent et entrent en dialogue avec la pente et le paysage.
Coupe transversale - 1:200
0
5
10
20m
Profiter de la nature En limite de ville, le bâtiment se trouve dans une situation où il peut profiter à la fois d’une orientation ouest avec une vue sur un paysage urbain avec en fond le lac Léman, et à l’arrière, un aspect beaucoup plus paysager. Le projet cherche à exploiter au mieux cette dualité dans le traitement typologique des logements, mais également au rez-de-chaussée, où l’espace public se dilate à travers un passage couvert offrant un accès abrité aux logements et équipements communs. La présence de la nature à l’arrière est mise en valeur par la réalisation d’un jardin semi-privatif, véritable lieu de socialisation et de jeux à l’abri de la route. Ce lieu se veut un espace de rencontre à l’échelle du bâtiment. Les activités tertiaires occupent quant à elles l’avant du bâtiment directement en relation avec la rue. Elles s’étendent sur l’arrière et profitent d’une situation traversante pour avoir de la lumière naturelle sur deux côtés. Leur façade vitrée à l’arrière permet à la fois aux utilisateurs de profiter de la vue sur la nature et de la lumière naturelle, tout en créant une entrée attrayante et animée pour les habitants des logements.
JANUS - CONCOURS D’ARCHITECTURE - LOGEMENTS, QUARTIER DU DESERT, LAUSANNE
Vue depuis le chemin de Pierrefleur
Orientations et vues 3.5p
3.5p
3.5p 3.5p
4.5p
4.5p
5.5p 4.5p
3.5p
5.5p
2.5p 2.5p
2.5p 2.5p
4.5p
Plan type 3.5p
3.5p
3.5p
4.5p
Plan type - 1:200
0
5
10
3.5p
4.5p 4.5p
20m 4.5p
2.5p
3.5p
4.5p 3.5p
3.5p
2.5p
4.5p
Plan type alterné
LOGEMENTS 2.5
SURFACE DEMANDÉE 50 - 60 m2
SURFACE PROPOSÉE 49 m2
REPARTITION DEMANDÉE 20%
REPARTITION PROPOSÉE 22%
NB DE LOGEMENT DEMANDÉS 18 - 20
NB DE LOGEMENT PROPOSÉS 20
3.5
75 - 85 m2
92 m2
40%
38%
36 - 40
34
4.5
100 - 110 m2
105 m2
30%
31%
27 - 30
28
5.5
120 - 130 m2
146 m2
TOTAL
10%
9%
9-10
8
100%
100%
90-100
90
Répartition des appartements
Des vues panoramiques Le site offre un véritable attrait visuel sur tout son ensemble. Le bâtiment exploite au maximum vues et qualités de lumière naturelle. Le développé de façade permet de multiplier les orientations en limitant les vis-à-vis. Le projet offre ainsi des appartements aux multiples orientations dont des traversants. Les plus petits logements, mono-orientés, sont localisés au sud-ouest, bénéficiant ainsi d’une situation privilégiée.
Coupe sur jardin - 1:200
0
5
10
20m
Typologie L’étage type est composé de trois parties, chacune articulée par une cage d’escalier pour distribuer un total de quinze appartements par étage. Deux d’entre elles sont symétriques et desservent chacune six appartements. La troisième, qui se situe à l’arrière, en distribue trois. Au total, trois types de logements constituent le plan type : les logements d’angle (3.5p et 4.5p) les logements traversants (3.5p et 5.5p) et les logements mono-orientés sud-ouest (2.5p). Leur organisation est faite de telle sorte qu’une flexibilité typologique soit possible. Ainsi les petits appartements peuvent être groupés entre eux pour en former des plus grands. Certaines chambres peuvent également être attribuées à un appartement ou à un autre de façon à permettre une évolution dans le temps et la possibilité de s’adapter au marché et aux nouvelles demandes.
JANUS - CONCOURS D’ARCHITECTURE - LOGEMENTS, QUARTIER DU DESERT, LAUSANNE Caves / Abri PC 339 m2
Parking motos
Plan sous-sol -1
Caves 192 m2
Coupe longitudinale 1:200
0
5
10
Zone Techinique 149 m2
20m
Parking motos
Plan sous-sol -2
Elevation ouest - 1:200
0
5
10
20m
Une façade absorbante Le projet nie la notion d’arrière en proposant un traitement homogène des façades rayonnnant dans toutes les directions et renforçant ainsi l’unité du bâtiment. Le choix de la grille se veut en adéquation avec les programmes projetés et permet de gérer la pente irrégulière du terrain. La rigueur de la grille de façade absorbe chaque angle et trame de logements différents. Les loggias des appartements viennent apporter une certaines vibration à la façade et enrichissent la superposition des tableaux domestiques qui se déroulent derrière chaque cadre. Derrière cette grille, fenêtres et loggias s’organisent selon les besoins des appartements sans avoir à se soucier de leur implication sur la façade.
JANUS - CONCOURS D’ARCHITECTURE - LOGEMENTS, QUARTIER DU DESERT, LAUSANNE
Vue depuis le chemin de Pierrefleur
Orientations et vues 3.5p
3.5p
3.5p 3.5p
4.5p
4.5p
5.5p 4.5p
3.5p
5.5p
2.5p 2.5p
2.5p 2.5p
4.5p
Plan type 3.5p
3.5p
3.5p
4.5p
Plan type - 1:200
0
5
10
3.5p
4.5p 4.5p
20m 4.5p
2.5p
3.5p
4.5p 3.5p
3.5p
2.5p
4.5p
Plan type alterné
LOGEMENTS 2.5 3.5
SURFACE DEMANDÉE 50 - 60 m2 75 - 85 m2
SURFACE PROPOSÉE
REPARTITION DEMANDÉE
REPARTITION PROPOSÉE
NB DE LOGEMENT DEMANDÉS
NB DE LOGEMENT PROPOSÉS
49 m2
20%
22%
18 - 20
20
92 m2
40%
38%
36 - 40
34
30%
31%
27 - 30
28
10%
9%
9-10
8
100%
90-100
90
4.5
100 - 110 m2
105 m2
5.5
120 - 130 m2
146 m2
100%
TOTAL
Répartition des appartements
Des vues panoramiques Le site offre un véritable attrait visuel sur tout son ensemble. Le bâtiment exploite au maximum vues et qualités de lumière naturelle. Le développé de façade permet de multiplier les orientations en limitant les vis-à-vis. Le projet offre ainsi des appartements aux multiples orientations dont des traversants. Les plus petits logements, mono-orientés, sont localisés au sud-ouest, bénéficiant ainsi d’une situation privilégiée.
Coupe sur jardin - 1:200
0
5
10
20m
Typologie L’étage type est composé de trois parties, chacune articulée par une cage d’escalier pour distribuer un total de quinze appartements par étage. Deux d’entre elles sont symétriques et desservent chacune six appartements. La troisième, qui se situe à l’arrière, en distribue trois. Au total, trois types de logements constituent le plan type : les logements d’angle (3.5p et 4.5p) les logements traversants (3.5p et 5.5p) et les logements mono-orientés sud-ouest (2.5p). Leur organisation est faite de telle sorte qu’une flexibilité typologique soit possible. Ainsi les petits appartements peuvent être groupés entre eux pour en former des plus grands. Certaines chambres peuvent également être attribuées à un appartement ou à un autre de façon à permettre une évolution dans le temps et la possibilité de s’adapter au marché et aux nouvelles demandes.
SAPA PADDY FIELD location : Sapa - Lao Cai context : sieuchungky/ design architect type of comission : private OPTION_01 programPERSPECTIVE : hospitality status : ongoing project date : 2018
PERSPECTIVE OPTION_02
PERSPECTIVE OPTION_03 SAPA HOTEL LaoCai - VietNam
Schematic Design Presentation | 19 April 2019 1
SAPA HOTEL LaoCai - VietNam
Schematic Design Presentation | 19 April 2019 3
SAPA HOTEL LaoCai - VietNam
Schematic Design Presentation | 19 April 2019 5
PERSPECTIVE OPTION_02
SAPA HOTEL LaoCai - VietNam
Schematic Design Presentation | 19 April 2019 2
PERSPECTIVE OPTION_03
SAPA HOTEL LaoCai - VietNam
Schematic Design Presentation | 19 April 2019 4
GELEXIMCO location : 36 Hoang Cau - Hanoi context : sieuchungky/ design architect type of comission : private program : office status : ongoing project date : 2019
INTERIOR DESIGN CONCEPT STAGE
Ground lo
INTERIOR DESIGN CONCEPT STAGE
Ground lo
INTERIOR DESIGN CONCEPT STAGE
VIP meeting r
INTERIOR DESIGN CONCEPT STAGE
VIP dining r
INTERIOR DESIGN CONCEPT STAGE
Conference
PERSONAL WORKS
THESE ARE THE PROJECT I COPPERATED SERVERAL PROJECT WITH OTHER ARCHITECTURE COMPANY
Khuat Duy Tien mix-use location : khuat duy tien,thanh xuan,hanoi context : collaboration with AREP architect, architect - 3D visualization type of commission: private program: mix-use status: competition project date: 2017
OB Beer House location : linhdam,hanoi context : collaboration with Conceptwarehouse, architect - 3D visualization type of commission: private program: restaurant design status: completed project date: 2017
SonLa park location : linhdam,hanoi context : collaboration with NOA design works, architect - 3D visualization type of commission: private program: landscape design status: unconstruction project date: 2017
Vital fitness location : hoanghoatham,hanoi context : collaboration with VNRES, architect - 3D visualization type of commission: private program: interior design status: completed project date: 2017
MocChau homstay location : mocchau,sonla context : collaboration with NEO studio, architect - 3D visualization type of commission: private program: interior design status: unconstruction project date: 2017
DongHoi house location : donghoi,quangbinh context : collaboration with studio13 architects, architect - 3D visualization type of commission: private program: interior design status: completed project date: 2017
ADAMAS HOTEL location : Da Nang context : sieuchungky/ design architect type of comission : private program : hospitality status : ongoing project date : 2018
HANOI HOTEL location : Da Nang context : personal projetct | design architect type of comission : private program : hospitality status : ongoing project date : 2019
THAI NGUYEN HOTEL location :Thai Nguyen context : design architect type of comission : private program : hospitality status : ongoing project date : 2020
LONG AN SHOPHOUSE location : Long An context : personal projetct | design architect type of comission : private program : housing status : ongoing project date : 2020
THANH HOA LOW COST APARTEMT location : Thanh Hoa context : personal projetct | design architect type of comission : competition program : housing status : ongoing project date : 2020
PHỐI CẢNH MINH HỌA
BỐ CỤC TỔNG MẶT BẰNG
VỚI NHƯNG THUẬN LỢI VỀ ĐIỀU KIỆN TỰ NHIÊN CỦA VỊ TRÍ KHU ĐẤT CÙNG VỚI QUY HOACH TỔNG MẶT BẰNG CHUNG CỦA QUY HOẠCH VÙNG. HÌNH THỨC TỔ CHỨC TỔNG MẶT BẰNG - U SHAPE , ĐƯỢC TỔ HỢP BỠI 3 KHỐI ĐƠN NGUYÊN NHÀ Ở, MỖI ĐƠN NGUYÊN CÓ CHIỀU CAO 15 TẦNG MANG LẠI NHIỀU ƯU ĐIỂM CHO LOẠI HÌNH NHÀ Ở CAO TÂNG. BỐ CỤC NÀY MANG LẠI KHOẢNG SÂN CHUNG CHO 3 KHỐI ĐƠN NGUYÊN, TẠO SỰ KẾT NỐI CHUNG CHO DÂN CƯ SỐNG Ở ĐÂY, VÀ LÀ KHOẢNG ĐỆM KHÔNG GIAN TIẾP CẬN ĐẾN TỔ HỢP CÔNG TRÌNH
ĐIỀM NHÌN
ĐIỂM NHÌN LÀ MỘT TRONG NHỮNG YẾU TỐ LUÔN ĐƯỢC NHẮC ĐẾN TRONG MỌI THIẾT KẾ,MỖI VỊ TRÍ - GÓC NHÌN ĐEM LẠI NHỮNG TRẢI NGHIỆM KHÁC NHAU CHO NGƯỜI SỬ DỤNG.CỤ THỂ TRONG VIỆC TỔ CHỨC KHÔNG GIAN NHÀ Ở CAO TẦNG, VỚI BỐ CỤC HÌNH DẠNG U - SHAPE, NGƯỜI SỬ DỤNG CÓ THỂ ĐƯỢC TRẢI NGHIỆM NHIỀU GÓC NHÌN BÊN TRONG - NGOÀI CÔNG TRÌNH MỘT CÁCH TỐI ĐA
CHỨC NĂNG
TỔ HỢP NHÀ Ở CAO TẦNG BAO GỒM 3 ĐƠN NGUYÊN ( BLOCK) CHÍNH A,B,C MỖI BLOCK CÓ 15 TẦNG, TẦNG 1, TÂNG 2 LÀ KHU VỰC ĐỂ XE Ô TÔ VÀ XE MÁY, MỖI TẦNG CÓ CHIỀU CAO LÀ 4.5M, TỪ TẦNG 3 ĐẾN TẦNG 15 LÀ KHU VỰC Ở CỦA CƯ DÂN MỖI TẦNG CÓ CHIỀU CAO LÀ 3.3M VÀ 13 CĂN HỘ TÁCH BIỆT. KHU VỰC GIAO THÔNG TRỤC ĐỨNG THANG MÁY,THANG BỘ CÙNG HỆ THỐNG KĨ THUẬT CHUNG CỦA TÒA NHÀ ĐƯỢC BỐ TRÍ Ở GIỮA GIÚP NGƯỜI SỬ DỤNG TRONG CÔNG TRÌNH TIẾP CẬN THUẬN TIỆN ĐẾN TỪNG VỊ TRÍ CĂN HỘ CỦA MỖI NGƯỜI
KHÔNG GIAN XANH - BỀN VỮNG KIẾN TRÚC
TÍNH TỔNG THỂ QUY HOẠCH CHUNG CỦA KHU VỰC VỚI CÔNG TRÌNH, MỘT LẦN NỮA ĐƯỢC NHẮC LẠI BẰNG VIỆC TẠO RA KHOẢNG KHÔNG GIAN XANH - LÀ KHOẢNG ĐỆM TIẾP CẬN ĐẾN CÔNG TRÌNH.KHÔNG GIAN XANH - VỀ MẶT KIẾN TRÚC,CẢNH QUAN NGOÀI VIỆC LÀM KHÔNG GIAN CHUNG TRONG TỔ HỢP CÔNG TRÌNH - CHÚNG CÒN ĐEM LẠI NHỮN GIÁ TRỊ LIÊN KẾT CON NGƯỜI - CON NGƯỜI, CON NGƯỜI - THIÊN NHIÊN THÔNG QUA CAC HOẠT ĐỘNG TƯƠNG TÁC HÀNG NGÀY, LÀ YẾU TỐ TẤT YẾU KHÔNG THỂ THIẾU CHO SỰ BỀN VỮNG CỦA CÔNG TRÌNH.
THÔNG GIÓ - CHIẾU SÁNG TỰ NHIÊN
HƯỚNG CHÍNH CỦA KHU ĐẤT LÀ HƯỚNG CHÍNH TÂY - LÀ YẾU TỐ BẤT LỢI CHO CÔNG TRÌNH,TUY NHIÊN VỚI BỐ CỤC HÌNH U - SHAPE, ĐIỀU NÀY ĐÃ ĐƯỢC CẢI THIỆN ĐƯỢC KHÁ ĐÁNG KẾ CHO BLOCK A, BẰNG VIỆC TẬN DỤNG BÓNG ĐỔ CÔNG TRÌNH CỦA 2 BLOCK B VÀ C Ở 2 ĐẦU HỒI, VÀ TẠO KHOẢNG THÔNG GIÓ GIỮA 3 BLOCK GIẢM TẢI SỰ BỨC XẠ MẶT TRỜI MANG LẠI ĐỒNG THỜI ĐEM LẠI SỰ LƯU THÔNG KHÔNG KHÍ CHO CÔNG TRÌNH
ĐIỂM NHẤN TRONG QUY HOẠCH
SỐ TẦNG CAO 15 TÂNG - LÀ ĐIỂM NHẤN CHO QUY HOẠCH CHUNG CỦA ĐƠN VỊ Ở.MỖI VỊ TRÍ-GÓC NHÌN PHÙ HỢP CỦA TỪNG KHU VỰC CÓ THỂ THẤY RÕ ĐƯỢC TỔ HỢP CÔNG TRÌNH KHI NHÌN TỪ XA
LOGIA
LOGIA LOGIA
LOGIA
PHßNG NGñ 2
PHßNG NGñ 2
PHßNG NGñ 2
PHßNG KH¸CH
PHßNG KH¸CH
PHßNG KH¸CH
PHßNG NGñ 1
PHßNG KH¸CH
PHßNG NGñ 3
wc LOGIA BµN ¡N
LOGIA
LOGIA
BÕP
BÕP BµN ¡N
BµN ¡N
BÕP
PHßNG NGñ 2
TIÒN S¶NH
wc
PHßNG NGñ 1
PHßNG NGñ 1
PHßNG NGñ 1
TIÒN S¶NH
wc
TIÒN S¶NH
wc
BµN ¡N
WC
WC 1
TIÒN S¶NH
LOGIA BÕP
C¡N Hé §IÓN H×NH 01
C¡N Hé §IÓN H×NH 02
C¡N Hé §IÓN H×NH 03
63 M2
72.5 M2
61.5 M2
C¡N Hé §IÓN H×NH 04 82.5 M2
CÁC SƠ ĐỒ NGHIÊN CỨU KHÔNG GIAN CĂN HỘ ĐIỂN HÌNH TYPICAL ROOM DIAGRAM SƠ ĐỒ TỔ CHỨC KHÔNG GIAN MẶT BẰNG TẦNG ĐIỂN HÌNH TYPICAL PLAN FLOOR DIAGRAM
LOGIA
PHßNG NGñ 2
TẦNG 1 TẦNG 2 TẦNG 3(13 căn hộ) TẦNG 4(13 căn hộ) TẦNG 5(13 căn hộ) TẦNG 6(13 căn hộ) TẦNG 7(13 căn hộ) TẦNG 8(13 căn hộ) TẦNG 9(13 căn hộ) TẦNG 10(13 căn hộ) TẦNG 11(13 căn hộ) TẦNG 12(13 căn hộ) TẦNG 13(13 căn hộ) TẦNG 14(13 căn hộ) TẦNG 15(13 căn hộ)
LOGIA
PHßNG KH¸CH
BÕP BµN ¡N
TIÒN S¶NH
ĐƠN NGUYÊN A (169 căn hộ)
ĐƠN NGUYÊN B (169 căn hộ)
ĐƠN NGUYÊN C (169 căn hộ)
956
956
956
DIỆN TÍCH XÂY DỰNG ( m²)
wc
ĐỂ XE ĐỂ XE CƯ DÂN CƯ DÂN CƯ DÂN CƯ DÂN CƯ DÂN CƯ DÂN CƯ DÂN CƯ DÂN CƯ DÂN CƯ DÂN CƯ DÂN CƯ DÂN CƯ DÂN
956 956 931 931 931 931 931 931 931 931 931 931 931 931 931 14020
956 956 931 931 931 931 931 931 931 931 931 931 931 931 931 14020
TỔNG DIỆN TÍCH SÀN XÂY DỰNG ( m²)
PHßNG NGñ 1
42060
ĐƠN NGUYÊN A
SỐ LƯỢNG CHỖ ĐỂ XE Ô TÔ XE MÁY
ĐƠN NGUYÊN B
26 158 184
A
2
3
4
5
6
7
B
C
D
1
C
TẦNG MÁI
TẦNG 15
TẦNG 14
TẦNG 14
+42.000
+42.000
TẦNG 13
TẦNG 13
+38.700
+38.700
TẦNG 12
TẦNG 12
+35.400
+35.400
TẦNG 11
TẦNG 11
+32.100
TẦNG 10
TẦNG 10
+28.800
TẦNG 9
TẦNG 9
7
D
C B
+25.500
+25.500
TẦNG 8
TẦNG 8
+22.200
+22.200
TẦNG 7
TẦNG 7
+18.900
+18.900
TẦNG 6
TẦNG 6
+15.600
TẦNG 5
TẦNG 5
+12.300
+12.300
TẦNG 4
TẦNG 4
+9.000
+9.000
TẦNG 3
TẦNG 3
+4.500
+4.500
TẦNG 2
TẦNG 2
±0.000
±0.000
TẦNG 1
TẦNG 1
+15.600
A
+51.500
TẦNG 15
+28.800
B
6
8
TẦNG MÁI
+32.100
5
7
+48.600
+45.300
4
6
+45.300
+48.600
3
5
4
+53.500
+51.500
D
2
3
2
8 +53.500
1
26 158 184
MẶT BẰNG CĂN HỘ ĐIỂN HÌNH TYPICAL PLAN
63 M2
1
ĐƠN NGUYÊN C
26 158 184
552
TỔNG SỐ
MẶT BẰNG CĂN HỘ ĐIỂN HÌNH MÆT B»NG C¡N Hé §IÓN H×NH TYPICAL PLAN
956 956 931 931 931 931 931 931 931 931 931 931 931 931 931 14020
A
8 -0.800
MẶT BẰNG TẦNG ĐIỂN HÌNH 3-15
-0.800
MẶT BẰNG TẦNG ĐIỂN HÌNH TẦNG 3 - TẦNG 15 TYPICAL FLOOR PLAN A
B
C
1
D
3
2
2
3
4
5
6
7
6
7
8
MẶT ĐỨNG TRỤC 1-8 EVELATION 1-8
EVELATION A-D
1
5
4
MẶT ĐỨNG 1-8
ĐỨNG A - D MẶTMẶT ĐỨNG TRỤC A-D
8 1
D
2
3
4
5
6
7
8
D D
D
C
C C
C
B
B B
B
A
i=15%
1
A A
i=15%
2
3
4
5
MẶT BẰNG TẦNG 2 MẶT BẰNG TẦNG 2 2ND FLOOR PLAN
6
7
8
i=15%
1
A
i=15%
2
3
4
5
MẶT BẰNG TẦNG 1 MẶT BẰNG TẦNG 1 1ST FLOOR PLAN
6
7
8
DONG DUONG APARTMENT location : Bac Ninh context : personal projetct | design architect type of comission : privated program : housing status : completed project date : 2020
F