ELECTRIC SERVICE SCHEDULE OF CHARGES
UNIT LINE EXTENSION OVERHEAD 3ph CONVERSION 3ph LINE EXTENSION 1ph LINE EXTENSION UNDERGROUND EXTENSION FEEDER SERVICES DOMESTIC PADMOUNT OVERHEAD & IU COMMERCIAL & INDUSTRIAL 3ph UNDERGROUND SERVICE CAPACITY 3ph OVERHEAD & IU SERVICE CAPACITY 1ph OVERHEAD & IU SPECIAL UTILITY THREE PHASE RESIDENTIAL (0-31KW) OH OPEN DELTA (0-31KW) OH CLOSED DELTA (31-75KW) OH OPEN DELTA (31-75KW)OH CLOSED DELTA (31-75KW) UG 3ph PADMOUNT
2024 CHARGE
per foot per foot per foot
$6.90 $25.80 $23.20
per foot per foot
$31.00 $126.75
per service per service
$8,310.00 $2,551.00
per service per panel KVA
$15,772.00 $26.50
per service per panel KVA per service per service
$13,150.00 $25.00 $2,550.00 $1,344.00
per service per service per service per service per service
$7,115.00 $10,710.00 $7,760.00 $10,785.00 $13,270.00
DIVERSION CHARGE TAMPERING CHARGE EMERGENCY SERVICES CHARGE CUST. SERV. EMERGENCY SERVICES CHARGE MINIMUM DEPOSIT DUSK TO DAWN LIGHTS DOMESTIC COMMERCIAL DEPOSIT INSTALLMENT SURCHARGE DELINQUENT CHARGE
per service per service per call per call
$1,000.00 $250.00 $250.00 $125.00
DISHONORED ABP CHARGE DISHONORED CHECK CHARGE CREDIT CARD CHARGEBACK FEE FIELD CHARGE METER TEST CHARGE DISCONNECT OR RECONNECT CHARGE AT METER AT POLE OR PULL BOX TEMPORARY SERVICE CHARGE REMOVE OBJECTS ON LINE UNDERGROUND SERVICE REPLACEMENT CHARGE OVERHEAD SERVICE REPLACEMENT CHARGE AGGREGATION CHARGE SELF-GENERATION METER CHARGE POLE ATTACHMENT (SEMIANNUAL)
per ABP return per check per charge per call per meter
$25.00 $160.00 $300.00 $15.00 $3+ 1 1/2% of past due amt. $25.00 $25.00 $25.00 $25.00 $45.00
per call per call per service per call per service per service per aggregation per service per foot
$25.00 $150.00 $650.00 $350.00 $1,000.00 $400.00 $1,000.00 $600.00 $16.00
to be effective January 1, 2024
per light per meter per meter per agreement per account