CHARTER SCHOOL: SCHOOL OF ART AND DESIGN
THE PROJECT IS APPROACHED BY CREATING A SERIES OF EXPERIENCE THAT COMBINED BY A SET OF FEW SPATIAL CRITERIAS; BUT PAIR DIFFERENTLY EVERY TURN: OUTDOOR, INDOOR, PRIVATE, PUBLIC. CONCEPT IS INFLUENCED BY RECEIVED EXPERIENCE CIRCULATING AROUND THE NEIGHBORHOOD. TWO VOLUMES PROVIDE OCCUPIED SPACES, CONNECTED BY THE THIRD VOLUME SERVED AS MAJOR CIRCULATION.
1
2
Public with high density
Public with open spaces
4 Private with high density
3 Private with open spaces
circulation volumes
THE TWO MAIN MATERIALS ARE WOOD AND CONCRETE. THE FACADE SHOWCASES THE RELATIONSHIP AND INTERACTION BETWEEN THE TWO.
vertical circulation
major circulation flow
CLASSROOM ART STUDIO LIBRARY OFFICE CAF/ KITCHEN
private
public
ELEVATION (STREET VIEW) (1/8’)
GROUND FLOOR (1/8’)
LONGITUDINAL SECTION (1/8’) ONE MAJOR CIRCULATION RUNS THROUGH THE PROJECT, CONNECTING TWO LARGER VOLUMES. ALL CLASSROOMS ARE ORIENTED TOWARD THE CIRCULATION AND ALWAYS OBTAIN NATURAL LIGHT FROM TWO SIDES OF THE ROOMS.
INTERIOR OPEN SPACE/ SKYLIGHT (10.AM O
OCTOBER)
PARTIAL ELEVATION (1/4’)
2ND FLOOR (1/16’)
3RD FLOOR (1/16’)
4TH FLOOR (1/16’)
5TH FLOOR (1/16’)
ELEVATION (ALLEY VIEW) (1/8’) HALLWAY SPACE ARE DIVIDED INTO CIRCULATION, VOID AND GALLERY SPACE
SECTION B-B (1/8’)
SECTION C-C (1/8’)
VOID SPACE AND BOTH SIDE GLAZINGS HELPS THE BECOME TRANSPARENT FROM THE STREET TO PLAYGROUND.
VIEW FROM GALLERY HALL (4.PM APRIL)
ART CLASSROOMS/ PAINTING STUDIO outdoor space 32
44
indoor open space/ skylight
structure wall glazing
beams (skylight) goes down become wood panels Glazing
PAINTING SECTION DRAWING SECTION GALLERY
LOCATED ON THE FOURTH FLOOR, BOTH STUDIOS ARE DESIGNED TO OBTAIN VIEWS TOWARD INTERIOR OPEN SPACE AND OUTDOOR SPACES. (ART STUDIO, 11. AM MARCH.
TYPICAL CLASSROOM: SYSTEM OF LOUVERS IS INSTALLED TO PREVENT HEAT GAIN DUE TO MOST OF THESE CLASSES ARE ORIENTATED TOWARD THE COURTYARD WHICH MAY RECEIVE DIRECT SUNLIGHT DURING THE DAY. major circulation 25
32
Courtyard
glazing structure wall
restroom entry/ lockers
TYPICAL CLASSROOM (1PM NOVEMBER)
glazing