\re-p -’ti-sh n\ repetition e
design works by thomas nguyen
e
2
* projects completed with studio 804 ** projects completed with the beck group
galileo’s pavilion p. 4*
constellation p. 10*
old parkland west campus p. 14**
harim iksan p. 18**
elk grove outlet mall p. 22**
shake shack p. 28**
3
galileo’s pavilion studio
804
4
located on the johnson county community college campus, the pavilion is a response to the goals of the JCCC center for sustainability combined with the need for additional classrooms at the ever-expanding college. this was a unique opportunity to create an inspired learning space which also serves as an information center for the campus and the community at large. the galileo pavilion will become a landmark for JCCC's sustainable initiatives, acting as a node from which students and the public can interact and learn of the institution's environmental integrity that extends to every corner of the campus. the building is not simply one among many, but an icon that leads the rest of the campus by example. the interior spaces function as classrooms, student lounge/coffee bar, and interactive display space. the façade of the pavilion is clad in slate panels which were reclaimed chalkboards from regional school districts. other design features include the use of passive heating and cooling systems such as thermal mass, rainwater harvesting, living wall and green roof trays in addition to active systems such as photo voltaics and a wind turbine. the galileo pavilion is studio 804's fifth LEED Platinum certified building.
overland park, ks completed july 2012
site located close to the center of campus, the site had an existing sculpture (galileo’s garden) that occupied the majority of the site. with heavy traffic around the site, the layout needed to engage the public and create spaces that are inviting.
galileo’s garden an art piece located near the heart of campus that was created
by dale eldred to commemorate galileo’s “absolution.” the sculpture measures the time and position of the sun throughout the year.
original site
5
6
active systems 1 photo voltaic panels 2 wind turbine 3 energy recovery ventilation
7
4
8
5 1
2
6 3
passive systems 4 use of direct and indirect sun 5 stack ventilation 6 thermal mass 7 rainwater collection 8 green roof 7
8
classroom view
finished lounge
9
finished classroom
southwest view
9
constellation
10
overland park, ks
LED’s and fiber optics are used to help reduce the lighting load and incorporate the same language as villareal’s art piece on campus. the fiber optics are coupled in groups of 36 strands to redistribute the light emitting from the LED. each fiber is set in a 4’ x 8’ x 1/8” steel plate that is perforated on a 4” x 6” grid, a total of 1,536 fibers are set in the lobby fixture. 64 LED bulbs, rated at 3 watts each, makes the entire lobby load 192 watts, where as if we were to use fluorescent or other LED can lights the minimum load would be 300 watts. the two vestibule have similar light fixtures, the only difference is the grid spacing is 6” x 6”, giving the light fixtures a sense of hierarchy. the vestibules fixture only uses 12 LED bulbs each, cutting the total load by 60% compared to the minimum load if LED can lights were used for the same lighting level. the vestibule light fixtures are the first in the country to use LED and fiber optics as both general and emergency lighting.
interior view of lobby fixture
11
12
vestibule emergency light
exterior view of lobby fixture
13
old parkland west campus dallas, texas 140,000 sf client: crow holdings after acquiring the historic old parkland hospital, crow holdings had a vision to develop the campus in phases as its headquarters and a class A plus office campus. the old parkland west campus is a modern architectural tribute to jeffersonian architecture. Three new buildings, parkland hall (which features a striking coppertopped dome), commonwealth hall, and oak lawn hall, sit atop an underground parking structure. a smaller pavilion building, featuring a glass dome, houses a large, underground, oval-shaped debate hall seating 200 for hosting world-class debates.
14
15
16
AA
AB
AC
AE.5
1 A8.03
_________________
K
AF
A7
AG
A6.6
A6
A1.9
2 A8.03
A2.8
A2
A1.6
A1
_________________
TYP.
Upper Roof Level 189' - 9" 1 A8.24
SIM.
2 A8.25
_________________
1 A8.25
SIM.
2 A7.19
B18
A4
K
K
17' - 5"
COL-18
B11 A6
A6
PR-EE
B11
A6
A6
A6
COL-18
A6
PR-GG
Level 4 153' - 6"
PR-M
PR-D
PR-I
Level 4 153' - 6"
PR-I
COL-4
A300F
B17
A300E
10 A9.05
_________________
17' - 5"
17' - 5"
COL-5
BR-2 PR-LL
PR-M
BR-2 B11
B11
A300D
B11
B11
B11
B11
B11
B11
B17
PR-LL
Level 3 136' - 1"
Level 3 136' - 1"
PR-NN
17' - 5"
17' - 5"
PR-K PR-Q
A200D
PR-J
PR-Z PR-Y.1
B13
B13
BR-1
Level 2 118' - 8"
COL-3 COL-6
CAST STONE MASONRY
1" BUILDING EXP. JOINT
PR-LL
B13
B13
B13
B13
B13
B13
B13
B13
Level 2 118' - 8"
PR-Z K
PR-MM
PR-Z PR-Ya
18' - 8"
BR-1 18' - 8"
PR-I
PR-DD
PR-GG
COL-4
Roof Level 170' - 11"
BR-2 PR-D
BR-2
DECORATIVE METAL RAILING
PR-D
K
PR-DD
PR-M A4
1 A8.24
_________________
PR-EE
Roof Level 170' - 11"
PR-EE PR-DD
PR-DD
A4
_________________
_________________
PR-WW
K
B18
2 A8.24
3 A8.24
_________________
PR-X
PR-WW
PR-M
4 A8.24
_________________
PR-X
PR-WW
PR-EE
5 A8.24
_________________
PR-WW
_________________
18' - 10"
_________________
18' - 10"
SIM.
_________________
17' - 5"
2 A8.24
9 A8.25
_________________
Upper Roof Level 189' - 9"
BR-1 A3a
A3a
A3a
A3a
A3a
A3a
A3a
A3a
A100E PR-A.1
Level 1 100' - 0"
Level 1 100' - 0"
CAST STONE MASONRY REF: 3/A10.16 FOR TYP. JOINT DETAIL
4 ELEVATION- AREA A SOUTH AG
1/8" = 1'-0" 2 ELEVATION- AREA A WEST
AF
AE.5
AC
1 A8.03
AB
AA
A1
_________________
SHEET CHAN
D5
1/8" = 1'-0" A1.6
A2.6
A2.8
A1.9
A5.4
A6.6
MIC STA
A7
2 A8.03
_________________
2 A8.24
_________________
1 A8.24
SIM.
2 A8.23
_________________
3 A8.23
18'-10"
_________________
PR-X
Upper Roof Level 189' - 9"
1 A8.23
_________________
_________________
4 A8.23
_________________
1 A7.19
18' - 10"
1 A8.25
_________________
SIM.
3' - 6"
Upper Roof Level 189' - 9"
_________________
ARC
COMPOSITE SLATE SHINGLES K
D9
PR-EE
Roof Level 170' - 11"
PR-EE PR-DD
B18
A4
A4
B18
A4
PR-GG
A400A
A400C
A400B
C1
BR-2
A400D
C1
A400E
A400F
CUR
# D H J K 15
PR-DD
0 0 0 0
COL-4
PR-D PR-M
PR-I PR-M
Level 4 153' - 6"
DECORATIVE METAL RAILING
Level 4 153' - 6"
K
PR-GG
BR-2
B11
B11
PR-D BR-2
B11
B17
B10
B10
B10
A300C
A300B
A300A
B10
B10
89' - 9"
17' - 5"
PR-I
PR-LL
PR-NN
C2
COL-18
PR-M
17' - 5"
BR-2
COL-17
17' - 5"
COL-18
1 A4.01
_________________
PR-EE
PR-EE PR-M
Roof Level 170' - 11" PR-DD
PR-DD
17' - 5"
PR-WW
B10
B17
Level 3 136' - 1"
Level 3 136' - 1" PR-LL
COL-3
1" EXP. JOINT
PR-K
COL-6
PR-J B13
B13
B13
PR-Z PR-Y.1
B13
PR-Z
15
Level 2 118' - 8"
A3a
A3a
18' - 8"
14' - 10 1/2"
A100R
B12
B12
A200A
13 A4.01
A200B
B12
_________________
B12
3 A10.53
B12
B12
Level 2 118' - 8"
_________________
PR-Y
5 A4.02
_________________
BR-1
A3a
Level 1 100' - 0"
3 ELEVATION- AREA A NORTH
BR-1
PR-MM
BR-1
CAST STONE MASONRY
A200C
PR-J
18' - 8"
B13
8' - 0 7/8"
BR-1
17' - 5"
17' - 5"
PR-K
CAST STONE MASONRY
A100D
1/8" = 1'-0" 1 ELEVATION- AREA A EAST
A100F
A100G
A100H
A100
A100J
A100K
A100L
A100M
Level 1 100' - 0"
1/8" = 1'-0"
166
JOB N
17
BD
BJ.7
BJ.6
BL
BL
BJ
BF
BD
2 A8.00
30'-0" T.O. Spire
30'-0" T.O. Spire
_________________
T.O. Dome 245' - 5"
T.O. Dome 245' - 5"
5 A8.27
41' - 4"
41' - 4"
_________________
5 A8.27
_________________
ZINC METAL ROOFING
PR-RR
PR-RR
1 A8.26
PR-UU
PR-UU
Area B Level 7 204' - 1" BR-4
_________________
Area B Level 7 204' - 1"
PR-L
17' - 5"
BR-4
PR-L 15
15
PR-OO
3 A8.28
_________________
B8
B8
B8
B8
B9
B9
B9
B9
Area B Level 6 186' - 8"
Area B Level 6 186' - 8"
34' - 10"
C5
C4
17' - 5"
PR-OO
B9
B9
B9
B8
Area B Level 5 169' - 3"
PR-S
B8
B9 B8
B9
B9
BR-3
B9
B8
Area B Level 5 169' - 3"
B13
B13
B13
B12
B11
B11
B11
B12
B400A
B400B
B13
B400C
B13
B13
B13
Area B Level 4 153' - 6"
PR-C
17' - 5"
B11
B12
B11
17' - 5"
Area B Level 4 153' - 6"
PR-D
B12
B10
Level 3 136' - 1"
PR-LL
15' - 9"
B13
15' - 9"
COL-1 B13
PR-B
PR-QQQ
B8
PR-E
PR-E
BR-3
B8
PR-S
145' - 5"
B9
145' - 5"
B9
PR-R
B10
B10
B10
B300C
B300B
B300D
B11
B11
B11
B11
PR-LL
Level 3 136' - 1"
PR-Q PR-VVV
B13
B13
B13
COL-22 PR-OOO
B13
Level 2 118' - 8"
PR-B PR-F
17' - 5"
COL-21
17' - 5" B13
PR-PP PR-JJJ PR-QQ PR-RR
B203A
C3
C3
C3
B202A
Level 2 118' - 8"
PR-Y COL-11
D4
D4
D4
B103A
B100C
B100A
B100B
B102A
D1
D1
D1
D1
D1
2' - 0"
Level 1 100' - 0" 7' - 0"
CAST STONE MASONRY REF. 3/A10.16 FOR TYP. JOINT DETAIL
D4
18' - 8"
18' - 8"
COL-10
D4
Level 1 100' - 0"
1 A7.22
_________________
1 A7.23
_________________
18
2 ELEVATION- AREA B TOWER/DOME @ TOLLWAY
1/8" = 1'-0" 1 ELEVATION- AREA B TOWER/DOME @ PLAZA
1/8" = 1'-0"
D4
D5
D6
D9.1
D13 D13.2CL.ND13.8 D14
13 A8.55
D21.9 D25
D26 D27
03 A8.50
_________________
_________________
T.O. DOME 159'-10 1/2"
Beck Architecture 1807 Ross Ave. Suite 500 Dallas, TX 75201 214-303-6200 214-303-6300 www.beckarchitecture.com
12'-0 1/2"
MANUFACTURED GLASS DOME SYSTEM
4
Level 5- Dome 147'-10" SPECIAL SHAPE BRICK MASONRY 4 FACE BRICK W/ FLEMISH BOND
CAST STONE MASONRY 12 A9.05
_________________
SPECIAL SHAPE BRICK MASONRY
03 A9.01
_________________
4
W3
4
W3 4
4'-2 1/2"
CAST STONE MASONRY 5
CLOCK WITH CAST STONE SURROUND CAST STONE MASONRY
06 A6.12
4
4
SPECIAL SHAPE BRICK MASONRY
FACE BRICK W/ FLEMISH BOND
7'-9"
4
Level 4- Roof 140'-1" 10'-5"
FACE BRICK W/ FLEMISH BOND
Level 3- Service 129'-8"
FACE BRICK W/ FLEMISH BOND
W2
200D 02 A9.01
_________________
2"X1/2" BAR STOCK, WITH BLUM 4529 OR EQUAL TOP RAIL
05 A9.01
_________________
15'-0"
W2a
W2
200E
2"X1/2" BAR STOCK, DECORATIVE METALWITH BLUM 4529 ORIMAGE EQUAL TOP RAILING REF RAIL
Level 2- Terrace 114'-8"
W4
W4
9 1/2"
3 3/4"
W1
W7
W1
100A
W7
5
Level 1- Plaza 98'-0"
5
5
5 02 A8.50
16'-1 11/64"
EXTENT OF CAST STONE BELOW GRADE
4
03 ELEVATION- SOUTH
1/8" = 1'-0"
D27 D26
D25 D21.9
D14 D13.8CL.ND13.2 D13
07 A8.55
01 A8.53
_________________
_________________
D9.1
D6
D5
EDWARD McGONIGAL TX. STATE REG # 17993
D4
03 A8.54
_________________
MANUFACTURED GLASS DOME SYSTEM
T.O. DOME 159'-10 1/2"
FACE BRICK W/ FLEMISH BOND
12'-0 1/2"
03 A8.53
4
4
Level 5- Dome 147'-10"
CAST STONE MASONRY
FACE BRICK W/ FLEMISH BOND
Level 4- Roof 140'-1"
4 4
4
W3
4
4
02 A8.53
W3
13 A8.55
_________________
4
11.14.14
ARCHITECT SEAL
Revision 1
CURRENT SUBMISSION: # DATE
SUBMISSION
A B 4 5
Issue for Permit Pricing Narrative Issue for Construction Revision 1
06.18.14 07.09.14 10.08.14 11.14.14
10'-5"
SPECIAL SHAPE BRICK MASONRY CAST STONE MASONRY
7'-9"
EXTENT OF CAST STONE BELOW GRADE
16'-8"
CAST STONE MASONRY CAST STONE MASONRY ?
Level 3- Service 129'-8" FACE BRICK W/ FLEMISH BOND 2"X1/2" BAR STOCK, WITH BLUM 4529 OR EQUAL TOP RAIL
200C
W9
Level 2- Terrace 114'-8"
W7
W7
CAST STONE MASONRY
16'-8"
01 A9.01
_________________
W8c
5'-6 1/4"
200A
14 A9.04
_________________
W8c
200B
5 W9
15'-0"
SPECIAL SHAPE BRICK MASONRY
SPECIAL SHAPE BRICK MASONRY
PAVILION AT OLD PARKLAND
Level 1- Plaza 98'-0"
EXTERIOR ELEVATIONS 01 ELEVATION- NORTH
1/8" = 1'-0"
168342 JOB NO.
A7.01
SHEET
19
20
harim office iksan, south korea 86,000 sf client: harim group harim group’s vision centered around a design that expressed their commitment to sustainability and care for employees and the community. the company wanted to provide green spaces throughout the building that would open to the public and easily accessed by employees. these green spaces aided in creating comfortable office environment with maximum day light. solar controlled building transparency increases sustainability as well as user comfort. the solution provided an 86,000 sf multiple outdoor green spaces and plaza are formed at various locations throughout this design. the entire façade of building was designed with varying ratio of glass/insulated wall to allow maximum natural light on south side and protect the building from cold northern exposure. the east and west façade have vertical fins to block the direct sunlight from the east and west. program spaces include an upscale employee dining area with two story tall waterwall and views to the garden and city, veterinary hospital, pharmaceutical lab, fitness facilities, open office spaces, underground parking. 21
22
dining area
23
outlet collectio 24
on at elk grove
elk grove, california 560,000 sf client: hoawrd hughes corporation a half-completed development, halted during the economic downturn, is given new life by the howard hughes corporation. the design calls for a transformation of the 100-acre development into a regional outlet center where the existing buildings will be reconfigured, creating an open-air, walkable center with multiple open green spaces, outdoor dining and a children’s play area. over 100 shops and restaurants, and a 14-screen movie theatre, the outlet collection at elk grove will provide much needed retail services to an underserved market.
25
dining area
26
paseo
27
28
canopy detail
coping detail
entry view
29
shake shack
dallas, texas 3,000 sf client: shake shack this glass box restaurant will is shake shack’s first dallas location . it sits on crescent’s property in uptown. the innovative design creates a unique atmosphere on a small lot while highlighting shake shack’s well known design standards and brandings.
entry view
30
rear view
31
A4.1 3
1
2
3
18'-6"
4
18'-0"
5
18'-0"
18'-0"
1 A5.1
_________________
17'-7 3/8"
18'-1"
1'-11 1/4"
2'-10 3/4"
3'-1 1/2"
ELECTRICAL PANEL- REF: ELECTRICAL
13 A11.6
2'-3 1/4"
_________________
A
E-8 7 EC2 08 3 0 .0 0 0 .0 0 1 3.5 0 W 9 0 .0 0 8 7 7 5 .00 ICE M AKERW / BIN
6
A3 1
A3 1
2
A10.1
E-27 EC 120 1 0 .90 0.33 7.50 W 48.00 27 49.0 0 MIXER, T HREE SPINDLE F RAPPE
(C 4.00 0.000.00 120 1 nil "!R EQU IR ED ON LY FOR ELEC TR IC SH U T-O FF VALVE!")
9 A11.4
_________________
A3 1
9 A11.3
_________________
C6 A 1
C3
E-27 EC 120 1 0 .90 0.33 7.50 W 48.00 27 49.0 0 MIXER, T HREE SPINDLE F RAPPE
3'-5"
E-27 EC 120 1 0 .90 0.33 7.50 W 48.00 27 49.0 0 MIXER, T HREE SPINDLE F RAPPE
104'-0"
2'-7 1/4" 5'-11 3/8"
A3 1
A3 1
18'-6"
C3 1
105A 7'-11"
15
L3 1
A3 1 J3 1
L6 A 1
L6 A 1
A10.1
19 CORRIDOR 103
104A
A3 A 1
17'-4 1/2" HOLD
3
A3 A 1
A10.1
13 A11.5
B
01 A8.1
_________________
_________________
1 A11.7
1
_________________
1 A11.5
_________________
1 A8.2
A4.1
_________________
2'-3 1/4"
C3 A C3 A
18'-0"
P -91-A C W H 16.0 P0-1c 40.0 D0W0.50 V 00 24.0 W0P9 26 1-A -91 .00 -AS1.5 CWIV W 000 HEL 0.0 16.0 F 00 A0U 1.5 4CE 0.0 000 0T0 W .5000 1HW A ND 91-ASIN S WIV K EL FA U CE T
1 A11.3
_________________
4 5/16"
A6 1
15'-4 3/8" 12
A10.1
17 SEATING 102
17'-7 3/8"
5'-8 1/4"
8'-9"
5'-5 3/4"
5'-1 1/2"
10'-5 1/8"
A10.1
15'-0"
18'-1"
ENTRY 101
3'-3" HOLD
1 A11.2
_________________
10'-0" HOLD
2'-10 9/16"
1
C3 A
C3 A
05 13 A11.2
_________________
9'-0 5/8"
A10.1
16
E-27 EC 120 1 0 .90 0.33 7.50 W 48.00 27 49.0 0 MIXER, T HREE SPINDLE F RAPPE
OPEN KITCHEN 108
4 L3 1
WOMEN'S RESTROOM 104
10
A3 A 1
E-27 EC 120 1 0 .90 0.33 7.50 W 48.00 27 49.0 0 MIXER, T HREE SPINDLE F RAPPE 00
C3 1
1 A11.4
_________________
P -91IW FV 0.00-42.00 2.0000 0.0002.0000F 91,99-A ,100-A P R EP TAB LE (V 0.75nil)
2'-8"
P-91 IWF V0.00 -42.00 2.00000.000 2.0000 F 91,99-A,100-A PR EP TABLE
IIIII IIIII IIIII IIIII
J6 A 1
107A
_________________
E-3 3 EC1 1 5 1 0.0 0 0 .33 6 .3 0 W 1 6.0 0 3 3 1 2 .00 CUST ARD DIPPINGCABINET
E-3 3 EC1 1 5 1 0.0 0 0 .33 6 .3 0 W 1 6.0 0 3 3 1 2 .00 CUST ARD DIPPINGCABINET
E-3 3 EC1 1 5 1 0.0 0 0 .33 6 .3 0 W 1 6.0 0 3 3 1 2 .00 CUST ARD DIPPINGCABINET
J3 1
OFFICE 110
A3 1
9 A11.7
E-9 9-A EC 11 5 1 0 .00 0.0 0 1 5 .00 C1 2 0.0 0 9 9 -A 6 5.0 0 COOL EREVAPORAT OR
E-6 5 EC1 20 1 0 .0 0 0 .3 3 1 0.0 0 W 1 6 .0 0 6 5 38 .00 FRYER BAT TERY
E-6 5 EC1 20 1 0 .0 0 0 .3 3 1 0.0 0 W 1 6 .0 0 6 5 38 .00 FRYER BAT TERY
106A
4'-7 3/4"
P-91-A CW 16.00 40.00 0.5000 W 91-A SWIVEL FAU C ET P-91-A C WH 16.0040.00 0.5000 W 91 -A SWIVE LHFAU C ET
P -91IW FV 0.00-42.00 2.0000 0.0002.0000F 91,99-A ,100-A P R EP TAB LE
( P .5 0 0 .0 0 .0 1 2 0 1 . 0 n il il)n
E-6 6 EC1 2 0 1 0.0 0 0 .00 6.0 0 F 0.0 0 6 6 0 .0 0 EXHAUST HOOD
C3 11
8'-3 3/4"
E-9 2 EC2 0 8 1 3 .00 0 .0 0 1 4 .60 W 4 8.0 0 9 2 3 .0 0 INDUCT IONRANGE
11'-6 3/4"
IIIII IIIII IIIII IIIII
IIIII IIIII IIIII IIIII
12'-2"
E-27 EC 120 1 0 .90 0.33 7.50 W 48.00 27 49.0 0 MIXER, T HREE SPINDLE F RAPPE
BELOW
J6 A
108A
0
1'-8 1/8"
_________________
7
E-42 EC 115 1 0 .00 0.7 5 2.10 W 48.00 42 13. 00 DRIN K MIXER E-28 EC 120 1 0 .90 0.33 7.50 W 48.00 28 49.0 0 MIXER, T HREE SPINDLE F RAPPE
2 A11.7
_________________
P-91-A C WH 16.0040.00 0.5000 W 91-A SWIVEL FAU C ET
ABOVE
1'-9 3/4"
P -91-A C W H 16.00 40.00 0.5000W 91-A S WIV EL FA U CE T
3 A11.7
(P 10.40 1.25 0.00 1201 nil nil)
C3 11
WALK-IN COOLER 109
8'-11 7/8"
11 MEN'S RESTROOM 106
E-25 EC 115 1 0.00 0.17 3. 00 W 48.00 2 5 5.00 BEVERA GE DISPENSER
C3 1
_________________
E-6 5 EC1 20 1 0 .0 0 0 .3 3 1 0.0 0 W 1 6 .0 0 6 5 38 .00 FRYER BAT TERY
L3 1 J3 1
A3
C3 11
E-28 EC 120 1 0 .90 0.33 7.50 W 48.00 28 49.0 0 MIXER, T HREE SPINDLE F RAPPE
E-3 3 EC1 1 5 1 0.0 0 0 .33 6 .3 0 W 1 6.0 0 3 3 1 2 .00 CUST ARD DIPPINGCABINET
2'-5 5/8"
A3
M E ASS R FILTE TER WA 82 W 0.7500 80.00 00 76. H CW 82 P-
5'-0 1/2"
00
104'-0"
00
00
E-3 3 EC1 1 5 1 0.0 0 0 .33 6 .3 0 W 1 6.0 0 3 3 1 2 .00 CUST ARD DIPPINGCABINET
A10.1
7'-7 7/8"
STORAGE 105 5'-6 1/2"
L3 1
00
3 A5.1
8'-6 3/4"
A3 1
E-7 8 EC1 20 1 0 .0 0 0 .00 18 .00 W 6 0.0 0 7 8 7 2.0 0 SODA
C3
E-3 3 EC1 1 5 1 0.0 0 0 .33 6 .3 0 W 1 6.0 0 3 3 1 2 .00 CUST ARD DIPPINGCABINET
1
P-1c D WV 24.00 26.00 1.5000 0.000 1.5000 W1 H AND SIN K
4 1/4"
P-1 C WV 26.00 24.00 0.5000 W1 H AN D SIN K
P-1c D WV 24.00 26.00 1.5000 0.000 1.5000 W1 H AND SIN K
P-1b H WV 26.00 24.00 0.5000 10.000 W1 H AND SIN KH W_TEMP=110
A6 1
5 A11.7
_________________
8
1'-5 3/8"
P -1c D W V 24.00 26.001.50000.0001.5000W 1H A ND SIN K
E-8 7 EC2 08 3 0 .0 0 0 .0 0 1 3.5 0 W 9 0 .0 0 8 7 7 5 .00 ICE M AKERW / BIN
A4.2
5'-2 1/8"
C3 11
P-91-A C WH 16.0040.00 0.5000 W 91-A SWIVEL FAU C ET
C3 11
P-84bIWFH 0.00 4.00 0.62500.000 0.6250 F84U N D ERC OU N TER DISH WASH ER
IIIII IIIII IIIII IIIII
(H 0.50 0.00 nil 140)
A3 1
P-1c D WV 24.00 26.00 1.5000 0.000 1.5000 W1 H AND SIN K
3'-10" BLY
P-91-A C WH 16.0040.00 0.5000 W 91-A SWIVEL FAU C ET
C3 11
P -91IW FV 0.00-42.00 2.0000 0.0002.0000F 91,99-A ,100-A P R EP TAB LE
(P 6.30 0.00 0.33115 1 nil nil)
C3
P-91-A C WH 16.00 P-1c 40.00 D WV0.5 24. 000 00P-91-A 26. W0 91 0-A1.5 CSWIVE 000 WH L 0. 16.00 0FAU 00 1. 40.00 C5000 ET 0. W 51 000 H AND W 91SIN -A SWIVE K L FAU C ET
2'-2 3/4"
SIGNAGE BY OTHERS
4'-1" 3 5/8"
3'-4"
A6 1
C3 1
P-91 IWF V0.00 -42.00 2.00000.000 2.0000 F 91,99-A,100-A PR EP TABLE
BACK OF HOUSE 107
INFILL CONCRETE SLAB 9'-6 1/8"
6'-9 1/8"
A3
C3
D
2'-2 1/2"
IIIII IIIII IIIII IIIII
2'-10 5/8"
IIIII IIIII IIIII IIIII
P-91 IWF V0.00 -42.00 2.00000.000 2.0000 F 91,99-A,100-A PR EP TABLE
(V 1.500 ""nil"")
C8 1
IIIII IIIII IIIII IIIII
C3 A6 1
(V 1.500 nil)
8'-7 1/8"
(V 1.500 "nil")
2'-4 1/2" 1'-11 1/4"
(V 2.00 nil)
EXTERIOR FILL BOXES FOR BULK SYSTEMS, 1FT BELOW FINISH FLOOR, BY TENANT
5'-3 1/2"
(P 10.30 0.00 0.33 1201 nil nil)
3'-3 5/8"
(H 0.50nil)
E-8 7 EC2 08 3 0 .0 0 0 .0 0 1 3.5 0 W 9 0 .0 0 8 7 7 5 .00 ICE M AKERW / BIN
E-11 5 EC1 2 0 1 0 .65 1.0 0 1 1.30 W 8 4.0 0 1 15 11 3 .0 0 F L Y T RAP
WIRE HUNG SIGNAGE BY OTHERS (INTERIOR)
C
OUTDOOR SEATING 100
3 A4.2
True North
1 FLOOR PLAN
32
Project North
1/4" = 1'-0"
custom light fixture 3 4'-6"
4'-6"
4'-6"
METAL STUD FRAMING- 3 5/8" PLYWOOD SHEATHING- 3/4"
4'-6"
4" TYP.
1/8" RECESSED LIGHT FIXTURE
CL
10" TYP.
1/8" THICK BLACKENED STEEL PLATE PLYWOOD SHEATHING- 3/4"
SINKER PINE WITH HIDDEN FASTENERS ON ALUMINUM TUBE
GYPSUM BOARD- 5/8"
8'-0 "
EQ
RECLAIMED WOOD
4 PLN DTL - TYP. CORNER JOIN
6" = 1'-0"
CL
8'-0"
RECESSED LIGHT FIXTURE
2
35.3째
B STEEL COLUMN- REF: STRUCTURAL
4"
GYPSUM BOARD- 5/8"
1"
4" TYP.
RECESSED LIGHT FIXTURE
10" TYP.
CL
EQ
35.3째
7 ENLARGED PLAN- CUSTOM LIGHT FIXTURE
1" = 1'-0" 3 PLN DTL - VIEW WIN. ABV
3" = 1'-0"
2
18 GAUGE STAINLESS STEEL PANEL
PREFABRICATED WALK-IN COOLER/FREEZER BY K.E.C.
? METAL STUD FRAMING- 3 5/8"
3"
1-1/2" x 1-1/2" 20 GAUGE CONTINUOUS ANGLE
3"
B
RECLAIMED WOOD SOUND INSULATION
PLYWOOD SHEATHING- 3/4"
3 1/8"
6 3D PERSPECTIVE- CUSTOM LIGHT FIXTURE
1/2"
3"
SINKER PINE WITH HIDDEN FASTENERS ON ALUMINUM TUBE
5/8"
RECLAIMED WOOD PLYWOOD SHEATHING- 3/4" GYPSUM BOARD- 5/8"
CL
1 11/16"
1/2"
STAINLESS STEEL CLOSURE STRIPS ATTACHED TO COOLER WALL ONLY, BY K.E.C.
B
METAL STUD FRAMING- 3 5/8" 4 A11.7
_________________
PREFABRICATED WALK-IN COOLER/FREEZER BY K.E.C.
RECESSED LIGHT FIXTURE SINKER PINE WITH HIDDEN FASTENERS ON ALUMINUM TUBE
1/8" THICK BLACKENED STEEL PLATE
PLYWOOD SHEATHING- 3/4"
METAL STUD FRAMING- 3 5/8"
6" = 1'-0" 13 SECT DTL- LIGHT FIXTURE
1/8" THICK BLACKENED STEEL PLATE
RECLAIMED WOOD
FIXTURE HANGING CONNECTION
GYPSUM BOARD- 5/8"
17 SECTION DETAIL
4 3/4"
GYPSUM BOARD ON METAL STUD FRAMING
QUARRY TILE
2 1/2"
4"
1/2" 5/8"
1 3/4"
LIGHT ATTACHMENT
2 3/4"
+ /- 2"
1"
1" 4"
1 7/8"
1.1" DIA.
1 1/2"
5/8"
GYPSUM BOARD- 5/8"
ALUMINUM TUBE 3"X2 1/2"
RECESSED LIGHT FIXTURE
3" = 1'-0"
3
FIBERGLASS REINFORCED PLASTIC
FIBERGLASS REINFORCED PLASTIC
1/2"
1 1/2"
ALUMINUM TUBE 3"X2 1/2"
1-1/2" x 1-1/2" 20 GAUGE CONTINUOUS ANGLE
2 PLN DTL - VIEW WIN. BLW
4"
HANGING WIRE SYSTEM, TBD
METAL STUD FRAMING- 6"
1/2"
6" = 1'-0" 9 PLAN DETAIL- HM JAMB
WALK-IN COOLER 109
3" = 1'-0" 5 PLAN DETAIL - INFILL WALL
3" = 1'-0" 1 PLAN DETAIL - WOOD CORNER
3" = 1'-0"
33