The Refugee City

Page 1

ARCHITECTUR AL ENGINEERING GR ADUATION STUDIO P5 · TWANA GUL

THE REFUGEE CITY

REDEFINITION OF THE REFUGEE CAMPS IN KURDISTAN

I N C O R P O R AT I O N W I T H


Brief Introduction Background Research Question

OUTLINE

Field and Desk Research Video: The Journey (9:00 min) The Principles The Complementary Ecosystem Experiments with Reed and Earth Walls and Columns Framework Design In Progress Injection of A New Urban Strategy The City from Tabula Rasa Architectural Design Focus on Details Impressions Final Thoughts Discussion 2 OF 60



3.2 MILLION PEOPLE WERE DISPLACED WITHIN 2 YEARS WHICH IS 6% OF WORLDWIDE REFUGEES (51,2 M) MORE THAN 300.000 ARRIVED AUGUST 2014 IN THE CAMPS OF KURDISTAN

PHOTOGRAPH BY EPA

INTRODUCTION · BACKGROUND

4 OF 58


CAMP OR CITY? WITHIN TWO YEARS

PHOTOGRAPH BY BUSINESS INSIDER

INTRODUCTION · BACKGROUND

5 OF 58


BUY & SELL TRADE MARKETS

PHOTOGRAPH BY EPA

INTRODUCTION · BACKGROUND

6 OF 58


DAILY LIFE E.G. FOOD

PHOTOGRAPH BY KAI PFAFFENBACH/REUTERS

INTRODUCTION · BACKGROUND

7 OF 58


IDENTITY WHO ARE YOU?

PHOTOGRAPH BY JAMAL SAIDI/REUTERS

INTRODUCTION · BACKGROUND

8 OF 58


NOT A SINGLE SHELTER IS IDENTICAL KENYA

PHOTOGRAPH BY SCHALK VAN ZUYDAM

INTRODUCTION · BACKGROUND

9 OF 58


OVERALL DESIGN QUESTION

HOW TO REDEFINE KURDISTAN’S CURRENT REFUGEE CAMPS INTO AN OFF-THE-GRID (OTG) CITY USING LOCAL MATERIALS?

INTRODUCTION · RESEARCH QUESTION

10 OF 58


THEMATIC RESEARCH QUESTION

HOW TO APPLY SOLAR ENERGY, LOCAL MATERIALS AND RECYCLING METHOD(S) TO MANIFEST A SELFSUFFICIENT REFUGEE CITY?

INTRODUCTION · RESEARCH QUESTION

11 OF 58




UNHCR FAMILY TENT

USABLE

FIELD AND DESK RESEARCH · THE PRINCIPLES

UNHCR TENT MOD.2

“CARAVAN” SHELTER

FLOOR

CEMENT BLOCKS BLD.

AREA

14 OF 58


FIELD AND DESK RESEARCH · THE PRINCIPLES

15 OF 58


COMPARISON CHART BASED ON THE THREE CAMPS

SECURITY

CLIMATE RESISTANCE

FLEXIBILITY

CAMP LAYOUT

PRIVACY

ARBAT TRANSITIONAL CAMP ARBAT MAIN CAMP DARA SHAKRAN CAMP MY GOAL

FIELD AND DESK RESEARCH · THE PRINCIPLES

16 OF 58


PASSIVE SOLAR APPROACH

FIELD AND DESK RESEARCH · THE PRINCIPLES

17 OF 58


HOW MUCH PV CELLS IS REQUIRED TO LIT A SEGMENT OF THE CITY?

FIELD AND DESK RESEARCH · THE PRINCIPLES

18 OF 58


FIELD AND DESK RESEARCH · THE COMPLEMENTARY ECOSYSTEM

19 OF 58



EXPERIMENTS WITH REED AND EARTH · EARTH BLOCKS

21 OF 58


EXPERIMENTS WITH REED AND EARTH · COLUMNS

22 OF 58


FIELD AND DESK RESEARCH · WALL

23 OF 58


FIELD AND DESK RESEARCH · WALL

24 OF 58


FIELD AND DESK RESEARCH · WALL

25 OF 58


FIELD AND DESK RESEARCH · FULL WALL COMPOSITION

26 OF 58


FIELD AND DESK RESEARCH · FULL WALL COMPOSITION

27 OF 58


FIELD AND DESK RESEARCH · OUTDOOR FINISHING

28 OF 58


FIELD AND DESK RESEARCH · FRAMEWORK PROTOTYPE

29 OF 58



DESIGN IN PROGRESS · INJECTION OF A NEW URBAN STRATEGY

31 OF 58


DESIGN IN PROGRESS · INJECTION OF A NEW URBAN STRATEGY

32 OF 58


DESIGN IN PROGRESS · THE CITY FROM TABULA RASA

33 OF 58


115 25 M M

4000 MM

400 MM

DESIGN IN PROGRESS · THE CITY FROM TABULA RASA

34 OF 58


DESIGN IN PROGRESS · ARCHITECTURAL DESIGN

35 OF 58


THE MODEST

F O C U S E D T O WA R D S T H E I N S I D E

WORKING AREA REQUIRES LIGHT WINDOW DR1

56 M2

ARRANGED EVERY 2.5M

DAY TIME

DR2 WT

EXCHANGE REFUEL FRESH AIR

COOKING AREA REQUIRES LIGHT WINDOW

DRAIN OUT THE HEAT

WINDOW VIEW ON GARDEN

WIND NW

4M

WIND SW NIGHT TIME

OFFSET OF 1.5M 4M

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

WHO COMES INSIDE? WINDOW

36 OF 58


WORKING AREA REQUIRES LIGHT WINDOW DR1

56 M2

ARRANGED EVERY 2.5M

DAY TIME

DR2 WT

EXCHANGE REFUEL FRESH AIR

COOKING AREA REQUIRES LIGHT WINDOW

DRAIN OUT THE HEAT

WINDOW VIEW ON GARDEN

D

4M

WIND SW

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

NIGHT TIME

37 OF 58


WT

EXCHANGE REFUEL FRESH AIR

COOKING AREA REQUIRES LIGHT WINDOW

DRAIN OUT THE HEAT

WINDOW VIEW ON GARDEN

D

4M

WIND SW NIGHT TIME

FFSET OF 1.5M 4M

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

WHO COMES INSIDE? WINDOW

38 OF 58


THE ASSEMBLER FOCUSED ON UNITY

WORKING AREA REQUIRES LIGHT WINDOW

A

A

50 M2

COOKING AREA REQUIRES LIGHT WINDOW

DAY TIME

THIS SIDE IS GETTING WARM IN THE SUMMER. RESPONSE OF SOLAR RADIATION NO WINDOWS!

ZONE AREA FOR STORAGE

DR1

ZONE AREA FOR TOOLS

WT

WS

NIGHT TIME

ZONE AREA FOR DINNER

4-6 M ROAD

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

39 OF 58


THE REAPER

FOCUSED ON PRODUCTION

WORKING AREA REQUIRES LIGHT WINDOW

32 M2

DAY TIME

COMMUNICATE WINDOW

COOKING AREA REQUIRES LIGHT WINDOW WT

DR1

NIGHT TIME

WS

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

40 OF 58


3M

THE MODEST

WEST FACADE

THE ASSEMBLER

SOUTH FACADE

S C A L E

THE REAPER

1 : 5 0

NORTH FACADE

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

41 OF 58


3M

THE MODEST

WEST FACADE

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

42 OF 58


THE MODEST

WEST FACADE

THE ASSEMBLER

SOUTH FACADE

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

43 OF 58


THE ASSEMBLER

SOUTH FACADE

S C A L E

THE REAPER

1 : 5 0

NORTH FACADE

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

44 OF 58


A-A

SECTION OF THE ASSEMBLER

SSW 13:00 15:00 18:00

D02 20:00

SHOWER

D01 EXHAUST FASTEN & SLIDE

FRESH AIR

SEWER

KITCHEN

WORK/GATHER

+ AIR FLOW

QUADRUPLE REED LAYER

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

45 OF 58


SSW 13:00 15:00 18:00

20:00

EXHAUST FASTEN & SLIDE

FRESH AIR

SEWER

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

QUADRUPLE REED LAYER

+ AIR FLOW

46 OF 58


SHOWER

EXHAUST FRESH AIR

SEWER DESIGN IN PROGRESS · ARCHITECTURE DESIGN

KITCHEN

+ AIR FLOW 47 OF 58


D02

SHOWER

D01 EXHAUST

H AIR

R

SEWER

KITCHEN

WORK/GATHER

+ AIR FLOW

DESIGN IN PROGRESS · ARCHITECTURE DESIGN

48 OF 58


PINPOINT THE REED SUPPORT

HORIZONTAL REED

FASTEN REED POLE WITH ROBE

HORIZONTAL REED

TEMPORARY

CONNECT PB*

200 MM

USE DRLC*

250 MM

300 MM

MUD LAYER

ADD EARTH

+ PAINT

DRY TIME · 3 DAYS

OUTDOOR

270 MM

HOW TO MAKE THE REFUGEE CITY REED + EARTH WALL?

DESIGN IN PROGRESS · FOCUS ON DETAILS

49 OF 58


PINPOINT THE REED SUPPORT

FASTEN REED POLE WITH ROBE

HORIZONTAL REED

CONNECT PB*

200 MM

USE DRLC*

250 MM

HOW TO MAKE THE REFUGEE CITY R

DESIGN IN PROGRESS · FOCUS ON DETAILS

50 OF 58


HORIZONTAL REED

FASTEN REED POLE WITH ROBE

TEMPORARY

CONNECT PB*

USE DRLC*

MUD LAYER + PAINT

250 MM

300 MM

OUTDOOR

HOW TO MAKE THE REFUGEE CITY REED + EARTH WALL?

DESIGN IN PROGRESS · FOCUS ON DETAILS

51 OF 58


HORIZONTAL REED TEMPORARY

300 MM

MUD LAYER

ADD EARTH

+ PAINT

DRY TIME · 3 DAYS

OUTDOOR

270 MM

ED + EARTH WALL?

DESIGN IN PROGRESS · FOCUS ON DETAILS

52 OF 58


COLLUMN H-BRACKET 3 TYPES AVAILABLE FASTEN WITH ROPE

HOW TO CREATE THE REED COLUMNS?

DESIGN IN PROGRESS · FOCUS ON DETAILS

53 OF 58


D01 · RENDEZVOUS OF COLUMN VS. ROOF

MUD CLADDING HORIZONTAL REED BEAM COMPRESSED REED BLOCK DOUBLE REED SHEET

100-120 MM

INDOOR

OUTDOOR

110

-12 0

66°

MM

400 MM

DESIGN IN PROGRESS · FOCUS ON DETAILS

54 OF 58


D02 · ROOF TOP SUGGESTION

REED TOP ROOF BEAM FASTEN WITH ROPE HORIZONTAL BEAM SUPPORT

120 MM

SOLAR PANEL 1 X 1 M CONNECT WITH REED & ROPE

DESIGN IN PROGRESS · FOCUS ON DETAILS

55 OF 58


DESIGN IN PROGRESS · IMPRESSIONS

56 OF 58


DESIGN IN PROGRESS · IMPRESSIONS

57 OF 58


DESIGN IN PROGRESS · IMPRESSIONS

58 OF 58


FINAL THOUGHT

Develop a prototype on site to learn more about the building method and performance.

59 OF 58


THANK YOU FOR YOUR ATTENTION

DISCUSSION TIME


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.