architecture 302_2 bicycle shelter
Site: Students were free to choose a site around the North Carolina State University campus or Raleigh. If the site was not on campus, transportation for the shelter would have to be considered. Objective: Create a bike rack and/or shelter that improves the quantity and quality of available bike parking in Raleigh or on campus. For the shelter students were asked to consider weather and theft protection for bikes, but also the bike shelter’s contribution to the built environment which included overall aesthetics, ease of use and space consumption. It was desired that the bike shelter provide added amenities to the community such as seating and shade. Schedule and Budget: The project needed to be complete by Monday, April 25th and needed to be on a budget of around $50 per person for the group of 8 ($400). Organization: Students were allowed to develop multiple designs individually or in small teams. At a mid- project meeting students voted on a few alternatives to mock up at full scale.
design brief
01
owner David Benson
design Mia Mulic Matt Kelly Tyler Shannon
construction 1 David Benson Sara Marley Ethan Sitver
construction 2 Michael Hobgood Scott Nelsen
project teams
02
04/01/11 DESIGN CONSTRUCTION
DESIGN RESEARCH
04/04/11
04/06/11 ADDENDUM
BID PREPARATION
04/08/11
04/11/11
04/13/11
PREPARATION OF FINAL DRAWINGS FABRICATION AND ASSEMBLY
04/15/11
04/18/11 drafts due structure complete
04/20/11
04/22/11
04/25/11
list of changes punch list
project schedule
03
design  team
01
Michael Hobgood & Tyler Shannon
02
Emily Faber & Heidi Northcutt
03
Mia Mulic & Ethan Sitver
project options
05
7’-10” ABOVE GRADE
6’-6” ABOVE GRADE
REFER TO DETAIL ON SHEET A2 FOR CONTSTRUCTION OF THIS 12’-0” MEMBER
1’-6” ABOVE GRADE
working drawings side elevation
06
working  drawings bench  elevation
07
working  drawings plan
08
TRHEADED ROD
6”x.5”x8’ OSB
BOLTED CONNECTION
6”x.5”x8’ OSB
working drawings assembly detail
09
renderings
10
renderings
11
construction team
Bike Shelter Cost Estimate Unit
Item
Price
Size
Quantity Quantity per Unit Required
Total
6.87
7/16” x 4' x 8'
4
75
128.81 128.81
9.06 8.00 0.28 0.30 1.09 1.09
1/2” x 6' - 1/2” 1/2” 1/2” 1/2”
1 1 1 1 3 2
16 1 270 270 270 270
144.96 8.00 75.60 81.00 98.10 147.15 309.56
12.10 16.98 25.97 11.97 20.91 31.90 32.85
24” x 8' 20” x 10' 1/2” x 4' x 8' 1/2” x 4' x 8' 48” x 79” 26” x 12' 12” x 12” x 1/8”
1 1 1 1 1 1 45
7 5 4 4 4 5 135
84.70 84.90 103.88 47.88 83.64 159.50 98.55 84.70
2.77 1.09 0.97 0.97 0.92
2-1/2” x 5/8” 1/4” 1/4” 1/4” 1/4” x 1/2” x 1/16”
2 2 5 5 1
24 48 96 72 48
33.24 26.16 18.62 13.97 44.16 136.15
4.00 15.00
2 x 4 x 10” -
1 1
4 1
16.00 15.00 31
Price
STR. MEMBERS Material: OSB Sheet Subtotal Hardware: #44610 Threaded Rod Loctite® #63449 Washers (Galv) #67342 Hex Nuts (Galv) #135536 Washers (Stainless) #135639 Hex Nuts (Stainless) Subtotal
ROOF + ATCHMTS. Material: #12473 Galv. Steel #12540 Alum. Flashing #HD82967 Lattice (Plastic) #HD54137 Lattice (Wood) #12779 Ondura #77000 Polycarb. #HD5189903 Vinyl Tiles Subtotal Hardware: #102893 Steel Angle (Galv.) Bolts (Stainless) Hex Nuts (Stainless) Washers (Stainless) Washers (Rubber) Subtotal
MISCELLANEOUS Material: Bench Boards (?) Cross Bracing (?) Subtotal Net Total Tax Total
690.2245 48.315715 738.54
initial bids
13
construction  photos
14
construction  photos
15
construction  photos
16
construction  photos
17
construction  photos
18
construction cost & final product
Material:
OSB Sheet 075114013444 10FT ROD <A> 611942039494 DWV PIPE<A> 032053101052 WATERSEAL <A> 075114013444 10FT ROD <A> Subtotal
0.00 6.57 6.17 44.96 6.57
23 1 3 1 9
0 0 0 0 1
0.00 6.57 18.51 44.96 52.56
0.00 0.51 1.43 3.48 4.07
0.00 - 7.08 MIKE 19.94 MATT 48.44 MATT 56.63 DAVID 132.10
0.11 0.06 4.50 20.77 7.97 20.77 7.97 7.97 7.89 7.89
12 7 1 1 3 1 3 0 3 3
0 0 0 0 0 0 0 1 6 0
1.32 0.42 4.50 20.77 23.91 20.77 23.91 -7.97 -23.67 23.67
0.10 0.03 0.35 1.61 1.85 1.61 1.85 -0.62 -1.83 1.83
1.42 MIKE 0.45 MIKE 4.85 MIA 22.38 MIA 25.76 MIA 22.38 MATT 25.76 MATT -8.59 DAVID -25.50 DAVID 25.50 TYLER 92.55
14.00 15.17 12.10 18.14 18.14
2 4 4 2.67 0.33
0 4 4 0 0
28.00 0.00 0.00 48.40 6.02
2.17 0.00 0.00 3.75 0.47
30.17 SCOTT 0.00 MIKE 0.00 MIKE 52.15 MIKE 6.49 TYLER 58.64
2.38 1.57 0.13 0.05 1.55 3.10 3.10 1.01 2.97 0.11 0.12 0.10 0.18
8 1 130 105 1 1 1 1 9 240 40 0 2
8 1 30 105 1 1 0 0 9 140 40 100 0
0.00 0.00 13.00 0.00 0.00 0.00 3.10 1.01 0.00 11.00 0.00 -10.00 0.36
0.00 0.00 1.01 0.00 0.00 0.00 0.24 0.08 0.00 0.85 0.00 -0.78 0.03
Hardware:
655554 CUTWSHR 1/4” <A> 655414 HEXNUTUSS <A> 030699080748 COMBO PACK <A> 030699080700 WASHER <A> 030699084609 HEX NUTS <A> 030699080700 WASHER <A> 030699084609 HEX NUTS <A> 030699084609 HEX NUTS <A> 764666528642 PTN4S1 <A> 764666528642 PTN4S1 <A> Subtotal
077089150032 2” WHTBRSBRSH <A> 033287139934 1/4” TIN BIT <A> 022367568252 GL EXT FLT <A> 022367568252 GL EXT FLT <A> 071514002293 TURNBUCKLE <A> 071514005331 3/16” SWG SLV <A> 071514002316 U-BOLT <A> 469890 WIRE ROPE <A> 7001 2X4X96” TOP CHOICE STUD 7001 2X4X96” TOP CHOICE STUD Subtotal
1.15 3.97 19.97 19.97 4.94 1.69 2.79 0.50 2.89 2.89
2 1 2 0 2 4 4 30 7 5
0 0 0 1 2 4 4 0 0 0
2.30 3.97 39.94 -19.97 0.00 0.00 0.00 15.00 20.23 14.45
0.18 0.31 3.10 -1.55 0.00 0.00 0.00 1.16 1.57 1.12
2.48 4.28 43.04 -21.52 0.00 0.00 0.00 16.16 21.80 15.57 53.53
Net Total Tax
387.04 30
Total
417.04
ROOF + ATTACHMENTS Material: 099137600771 UT 2.5 COR 10 <A> 12474 ROOF 2 1/2” CORR 10' GALV 12473 ROOF 2 1/2” CORR 8' GALV 12475 ROOF 2 1/2” CORR 12' GALV 12475 ROOF 2 1/2” CORR 12' GALV Subtotal Hardware: 315683 STAN 1-1/2” ZN CNR BRC 4P 43428 1/4” HEX NUT ZINC COARSE 63408 HELICAL LOCK WASHERS 63301 HEX NUTS 215897 1/4”-20-2' ALL THREAD PLAT 44584 1/4”-20-6' ALL THREAD PLA 44584 1/4”-20-6' ALL THREAD PLA 44540 1/4”-20-1' ALL THREAD PLA 315686 STAN 2-1/2” ZN CNR BRC 4P 67340 GALV HEX NUT 67343 GALV FLAT WASHER 67343 GALV FLAT WASHER 10643 USS FLAT WASHER 1” Subtotal
0.00 0.00 14.01 0.00 0.00 0.00 3.34 1.09 0.00 11.85 0.00 -10.78 0.39 19.90
DAVID DAVID DAVID DAVID DAVID DAVID SARA SARA SARA SARA SARA DAVID SARA
COST DISTRIBUTION Team Member Benson, David Hobgood, Michael Kelly, Matt Marley, Sara Mulic, Mia Nelsen, Scott Shannon, Tyler Sitver, Ethan Total
Dues
Paid Balance 31.71 -30.78 -64.40 35.46 -0.86 -27.83 4.57 52.13 417.04 417.04 0.00
52.13 20.42 52.13 82.91 52.13 116.53 52.13 16.67 52.13 52.99 52.13 79.96 52.13 47.56 52.13 0.00
Bike Shelter Cost Summary
20
r ye Bu
To ta l
Ta x
ot
al
d
bt
R
Su
et
ua
ur ne
ity
Material:
Q
Pr ic e
MISCELLANEOUS
nt
r ye Bu
To ta l
Ta x
R
Su
et
bt
ot
al
d ur ne
ity nt ua Q
Pr ic e
STRUCTURAL MEMBERS
SCOTT SCOTT SCOTT DAVID DAVID DAVID DAVID DAVID MIKE TYLER
final  product
21
final  product
22
final  product
23