Explorations of OSB

Page 1

architecture 302_2 bicycle shelter


Site: Students were free to choose a site around the North Carolina State University campus or Raleigh. If the site was not on campus, transportation for the shelter would have to be considered. Objective: Create a bike rack and/or shelter that improves the quantity and quality of available bike parking in Raleigh or on campus. For the shelter students were asked to consider weather and theft protection for bikes, but also the bike shelter’s contribution to the built environment which included overall aesthetics, ease of use and space consumption. It was desired that the bike shelter provide added amenities to the community such as seating and shade. Schedule and Budget: The project needed to be complete by Monday, April 25th and needed to be on a budget of around $50 per person for the group of 8 ($400). Organization: Students were allowed to develop multiple designs individually or in small teams. At a mid-­ project meeting students voted on a few alternatives to mock up at full scale.

design brief

01


owner David Benson

design Mia Mulic Matt Kelly Tyler Shannon

construction 1 David Benson Sara Marley Ethan Sitver

construction 2 Michael Hobgood Scott Nelsen

project teams

02


04/01/11 DESIGN CONSTRUCTION

DESIGN RESEARCH

04/04/11

04/06/11 ADDENDUM

BID PREPARATION

04/08/11

04/11/11

04/13/11

PREPARATION OF FINAL DRAWINGS FABRICATION AND ASSEMBLY

04/15/11

04/18/11 drafts due structure complete

04/20/11

04/22/11

04/25/11

list of changes punch list

project schedule

03


design  team


01

Michael Hobgood & Tyler Shannon

02

Emily Faber & Heidi Northcutt

03

Mia Mulic & Ethan Sitver

project options

05


7’-­10” ABOVE GRADE

6’-­6” ABOVE GRADE

REFER TO DETAIL ON SHEET A2 FOR CONTSTRUCTION OF THIS 12’-­0” MEMBER

1’-­6” ABOVE GRADE

working drawings side elevation

06


working  drawings bench  elevation

07


working  drawings plan

08


TRHEADED ROD

6”x.5”x8’ OSB

BOLTED CONNECTION

6”x.5”x8’ OSB

working drawings assembly detail

09


renderings

10


renderings

11


construction team


Bike Shelter Cost Estimate Unit

Item

Price

Size

Quantity Quantity per Unit Required

Total

6.87

7/16” x 4' x 8'

4

75

128.81 128.81

9.06 8.00 0.28 0.30 1.09 1.09

1/2” x 6' -­ 1/2” 1/2” 1/2” 1/2”

1 1 1 1 3 2

16 1 270 270 270 270

144.96 8.00 75.60 81.00 98.10 147.15 309.56

12.10 16.98 25.97 11.97 20.91 31.90 32.85

24” x 8' 20” x 10' 1/2” x 4' x 8' 1/2” x 4' x 8' 48” x 79” 26” x 12' 12” x 12” x 1/8”

1 1 1 1 1 1 45

7 5 4 4 4 5 135

84.70 84.90 103.88 47.88 83.64 159.50 98.55 84.70

2.77 1.09 0.97 0.97 0.92

2-­1/2” x 5/8” 1/4” 1/4” 1/4” 1/4” x 1/2” x 1/16”

2 2 5 5 1

24 48 96 72 48

33.24 26.16 18.62 13.97 44.16 136.15

4.00 15.00

2 x 4 x 10” -­

1 1

4 1

16.00 15.00 31

Price

STR. MEMBERS Material: OSB Sheet Subtotal Hardware: #44610 Threaded Rod Loctite® #63449 Washers (Galv) #67342 Hex Nuts (Galv) #135536 Washers (Stainless) #135639 Hex Nuts (Stainless) Subtotal

ROOF + ATCHMTS. Material: #12473 Galv. Steel #12540 Alum. Flashing #HD82967 Lattice (Plastic) #HD54137 Lattice (Wood) #12779 Ondura #77000 Polycarb. #HD5189903 Vinyl Tiles Subtotal Hardware: #102893 Steel Angle (Galv.) Bolts (Stainless) Hex Nuts (Stainless) Washers (Stainless) Washers (Rubber) Subtotal

MISCELLANEOUS Material: Bench Boards (?) Cross Bracing (?) Subtotal Net Total Tax Total

690.2245 48.315715 738.54

initial bids

13


construction  photos

14


construction  photos

15


construction  photos

16


construction  photos

17


construction  photos

18


construction cost & final product


Material:

OSB Sheet 075114013444 10FT ROD <A> 611942039494 DWV PIPE<A> 032053101052 WATERSEAL <A> 075114013444 10FT ROD <A> Subtotal

0.00 6.57 6.17 44.96 6.57

23 1 3 1 9

0 0 0 0 1

0.00 6.57 18.51 44.96 52.56

0.00 0.51 1.43 3.48 4.07

0.00 -­ 7.08 MIKE 19.94 MATT 48.44 MATT 56.63 DAVID 132.10

0.11 0.06 4.50 20.77 7.97 20.77 7.97 7.97 7.89 7.89

12 7 1 1 3 1 3 0 3 3

0 0 0 0 0 0 0 1 6 0

1.32 0.42 4.50 20.77 23.91 20.77 23.91 -­7.97 -­23.67 23.67

0.10 0.03 0.35 1.61 1.85 1.61 1.85 -­0.62 -­1.83 1.83

1.42 MIKE 0.45 MIKE 4.85 MIA 22.38 MIA 25.76 MIA 22.38 MATT 25.76 MATT -­8.59 DAVID -­25.50 DAVID 25.50 TYLER 92.55

14.00 15.17 12.10 18.14 18.14

2 4 4 2.67 0.33

0 4 4 0 0

28.00 0.00 0.00 48.40 6.02

2.17 0.00 0.00 3.75 0.47

30.17 SCOTT 0.00 MIKE 0.00 MIKE 52.15 MIKE 6.49 TYLER 58.64

2.38 1.57 0.13 0.05 1.55 3.10 3.10 1.01 2.97 0.11 0.12 0.10 0.18

8 1 130 105 1 1 1 1 9 240 40 0 2

8 1 30 105 1 1 0 0 9 140 40 100 0

0.00 0.00 13.00 0.00 0.00 0.00 3.10 1.01 0.00 11.00 0.00 -­10.00 0.36

0.00 0.00 1.01 0.00 0.00 0.00 0.24 0.08 0.00 0.85 0.00 -­0.78 0.03

Hardware:

655554 CUTWSHR 1/4” <A> 655414 HEXNUTUSS <A> 030699080748 COMBO PACK <A> 030699080700 WASHER <A> 030699084609 HEX NUTS <A> 030699080700 WASHER <A> 030699084609 HEX NUTS <A> 030699084609 HEX NUTS <A> 764666528642 PTN4S1 <A> 764666528642 PTN4S1 <A> Subtotal

077089150032 2” WHTBRSBRSH <A> 033287139934 1/4” TIN BIT <A> 022367568252 GL EXT FLT <A> 022367568252 GL EXT FLT <A> 071514002293 TURNBUCKLE <A> 071514005331 3/16” SWG SLV <A> 071514002316 U-­BOLT <A> 469890 WIRE ROPE <A> 7001 2X4X96” TOP CHOICE STUD 7001 2X4X96” TOP CHOICE STUD Subtotal

1.15 3.97 19.97 19.97 4.94 1.69 2.79 0.50 2.89 2.89

2 1 2 0 2 4 4 30 7 5

0 0 0 1 2 4 4 0 0 0

2.30 3.97 39.94 -­19.97 0.00 0.00 0.00 15.00 20.23 14.45

0.18 0.31 3.10 -­1.55 0.00 0.00 0.00 1.16 1.57 1.12

2.48 4.28 43.04 -­21.52 0.00 0.00 0.00 16.16 21.80 15.57 53.53

Net Total Tax

387.04 30

Total

417.04

ROOF + ATTACHMENTS Material: 099137600771 UT 2.5 COR 10 <A> 12474 ROOF 2 1/2” CORR 10' GALV 12473 ROOF 2 1/2” CORR 8' GALV 12475 ROOF 2 1/2” CORR 12' GALV 12475 ROOF 2 1/2” CORR 12' GALV Subtotal Hardware: 315683 STAN 1-­1/2” ZN CNR BRC 4P 43428 1/4” HEX NUT ZINC COARSE 63408 HELICAL LOCK WASHERS 63301 HEX NUTS 215897 1/4”-­20-­2' ALL THREAD PLAT 44584 1/4”-­20-­6' ALL THREAD PLA 44584 1/4”-­20-­6' ALL THREAD PLA 44540 1/4”-­20-­1' ALL THREAD PLA 315686 STAN 2-­1/2” ZN CNR BRC 4P 67340 GALV HEX NUT 67343 GALV FLAT WASHER 67343 GALV FLAT WASHER 10643 USS FLAT WASHER 1” Subtotal

0.00 0.00 14.01 0.00 0.00 0.00 3.34 1.09 0.00 11.85 0.00 -­10.78 0.39 19.90

DAVID DAVID DAVID DAVID DAVID DAVID SARA SARA SARA SARA SARA DAVID SARA

COST DISTRIBUTION Team Member Benson, David Hobgood, Michael Kelly, Matt Marley, Sara Mulic, Mia Nelsen, Scott Shannon, Tyler Sitver, Ethan Total

Dues

Paid Balance 31.71 -­30.78 -­64.40 35.46 -­0.86 -­27.83 4.57 52.13 417.04 417.04 0.00

52.13 20.42 52.13 82.91 52.13 116.53 52.13 16.67 52.13 52.99 52.13 79.96 52.13 47.56 52.13 0.00

Bike Shelter Cost Summary

20

r ye Bu

To ta l

Ta x

ot

al

d

bt

R

Su

et

ua

ur ne

ity

Material:

Q

Pr ic e

MISCELLANEOUS

nt

r ye Bu

To ta l

Ta x

R

Su

et

bt

ot

al

d ur ne

ity nt ua Q

Pr ic e

STRUCTURAL MEMBERS

SCOTT SCOTT SCOTT DAVID DAVID DAVID DAVID DAVID MIKE TYLER


final  product

21


final  product

22


final  product

23