5 minute read

Implementation Plan

Implementation Plan

The absence of a disaster management authority in Trondheim urges the Svartlamon community to establish an emergency disaster committee as soon as possible to take charge of community-level response actions and preparedness actions, and to coordinate with the municipal or higher level of stakeholders. The Svartlamon Disaster Committee will include representatives of Svartlamon residents, Svartlamon Residents Association, Svartlamon Housing Foundation, Svartlamon Business and Culture Foundation, representatives from Trondheim Kommune, and potentially from other stakeholders. Undoubtedly, the implementation of the response actions will involve a wide range of stakeholders. There will be one stakeholder for each response strategy in terms of responsibilities to lead the implementation.

Advertisement

The implementation plan adopts the needs-based approach. Emergency needs assessments will be implemented promisingly by the Svartlamon Disaster Committee at the first place upon the occurrence of a disaster. The assessments will lay foundation for prioritizing the planned response actions and implementation methods.

Table 7: IMPLEMENTATION PLAN

Strategies Methods Leading actor and partnership Logistics GOVERNANCE STRATEGIES

Develop disaster management partnership and committee

Short-term:

• Form the Svartlamon Disaster

Committee involving residents and onsite organizations • Establish a disaster management panel involving governmental, NGO, private and community key stakeholders

Mid-term and long-term:

• Form a disaster management authority at municipal level • Set up a ministry of disaster management at national level

Provide training about disaster management and sea level rise • Svartlamon residents • Svartlamon residents' association • Svartlamon Housing

Foundation • Trondheim Kommune • Central government

Short-term:

• Public awareness education • Specific disaster-response training • Exercises and simulations • First aid training • Community mapping

Mid-term:

• Provide municipal level regular disaster management seminars and workshops for residents • Incorporate disaster knowledge and skills in school courses for children

Long-term:

• Establish national level disaster course system • Svartlamon Disaster

Committee (newly formed)

• Svartlamon residents • NGOs • Trondheim Kommune • Consulting firms • Central government

PHYSICAL STRATEGIES

• Office space • Office supplies, e.g. stationeries • Office furniture and equipment, e.g. Electronics & communication network

• Spaces to carry out training • Teaching materials • Classroom furniture and equipment • Stationeries

Improve road infrastructure

Short term:

• Upgrade the existing shoddy roads into porous asphalt roads

Mid-term:

• Elevate the roads along with the lowlying Svartlamon area

Long-term:

• Elevate and adapt entire Svartlamon and its surrounding area • Trondheim Kommune • Construction company • Svartlamon Disaster

Committee • NGOs • Construction

Materials • Heavy freight vehicles • Civil engineering expertise • Construction equipment

Continued: IMPLEMENTATION PLAN

Strategies Methods Leading actor and partnership Logistics PHYSICAL STRATEGIES

Build shoreline protection, e.g. tide gate/sea walls

Short-term:

• Build flood gates • install sandbags

Mid-term:

• Build floodable landscape

Long-term:

• Construct sea walls and elevated boardwalk • Trondheim Kommune • Construction company • Department of Coastal affairs and Environment • Svartlamon Disaster

Committee • NGOs • Central government • Construction materials • Skilled workers • construction equipment • Civil/marine engineering techniques • Freight vehicles

Improve building materials

Improve sewage and stormwater pipe capacity

Short-term:

• Use high-strength materials to build new houses • Establish/cooperate with a foundation to support better material use • Send a technical team to guide the building construction

Mid-term:

• Use supplementary materials and techniques to strengthen the floodresistant ability of existing buildings

Long-term:

• Adapt the building typologies (e.g. floating houses) to the potential floodprone environment

Short-term:

• Regular check of sewage system to avoid blockage • Install backflow prevention at the stormwater outfall

Mid-term and long-term:

• Upgrade the sewage system to expand its capacity • Construct stormwater discharge pump station • Svartlamon residents • Svartlamon Disaster

Committee • Svartlamon residents' association • Svartlamon Housing

Foundation • Trondheim Kommune • Banks for loan/subsidy application • Construction companies • Architecture firms

• Trondheim Kommune • Construction companies • Svartlamon Disaster

Committee

Ensure power supply

Short-term:

• Equip buildings with small diesel power generators

Mid-term and long-term:

• Construct emergency power plant • Improve power transmission system • Trondheim Kommune • Generator suppliers • Construction companies • Svartlamon Disaster

Committee • Svartlamon residents • Svartlamon Residents

Association • Svartlamon Housing

Foundation • Diesel power generators • Freight vehicles • Engineering expertise

• water-resistant building material • Freight vehicles • Construction workers • Construction equipment

• Construction materials, e.g. stainless-steel pipes • Construction workers • Engineering expertise

Strategies Methods Leading actor and partnership Logistics OPERATIONAL STRATEGIES

ensure drinking water and food supply

Short-term:

• Deliver drinking water and emergency food supply with tankers

Mid-term:

• Upgrade the drinking water pipes and facilities

Long-term:

• Select backup drinking water sources safe from flooding and construct new plants

Emergency medical service and social service

Provide emergency shelter

Plan a route for evacuation

Assisted evacuation of the disabled, sick people

Continued: IMPLEMENTATION PLAN

• Svartlamon Disaster

Committee

• Trondheim Kommune (Emergency Services) • Svartlamon residents • NGOs, e.g. Trondheim Red

Cross • Water Tankers • Safe storage vessels for water and food • Available food and water storage

Short-term:

• Send ambulances with doctors, nurses, medicines and medical equipment • Send social workers and psychologists

Mid-term and long-term:

• Establish specific medical station with well-equipped medical teams and facilities

Short-term:

• prepare nearby public place (e.g. the

Svartlamon kindergarten, Svartlamon concert hall) as the emergency shelter • Prepare tents and sleeping bags

Long-term:

• Construct a well-designed special disaster shelter in surrounding high elevation area

• Use Algorithm to plan evacuation routes • Prepare helicopter evacuation route • Prepare lifeboat evacuation route • Prepare ground evacuation route • Trondheim Kommune (Health

Services)

• Nearest clinics and hospital,

Doctors and nurses • Ministry of health and care service • Svartlamon Disaster

Committee • Svartlamon residents • Svartlamon Disaster

Committee

• Residents of Svartlamon • Svartlamon Housing

Foundation • NGOs, e.g. Trondheim Red

Cross • Trondheim Kommune (Emergency Services)

• Svartlamon Disaster

Committee

• Residents of Svartlamon • Trondheim Kommune • Police Department • Fire Department • Ambulances and vehicles • Medicines and medical equipment

• Space to accommodate evacuated people • basic furniture, e.g. heaters or stoves • Water and food supply • Utilities • Sleeping bags and tents • Stimulated maps with projected data • Mapping tools • Office equipment

• Assist evacuation with ambulance, wheelchair, hand frame • improve barrier-free facilities • Provide special equipment for people with special needs • Svartlamon Disaster

Committee

• Trondheim Kommune (Emergency Services) • Police • Fire Department • Hospitals and doctors/nurses • NGOs, e.g. Trondheim Red

Cross • Residents of Svartlamon • Svartlamon Housing

Foundation • Ambulances and specialized rescue vehicles • Life jackets • Communications equipment • Medical equipment

This article is from: