Dniepr Potential

Page 1

Subject of the report:

ÂŤThe role and site of the Dnieper River within the framework of the foreign trade logistics of the Black Sea RegionÂť


THE MAIN CHARACTERISTICS OF THE DNIPRO RIVER The overall length: 2201 km

1

Consists of 6 reservoirs: 2

1. The Kiev Reservoir Length:162 km

3

2. The Kaniv Reservoir Length :123km 3. The Kremenchuk reservoir Length :185km 4. The Dniprodzerzhynsk reservoir Length :114km 5. The Dnieper Reservoir (The Zaporozhye Reservoir) Length :129км 6. The Kakhovka Reservoir Length :212км

4 5 6

RIVER PORTS: 1. 2. 3. 4. 5. 6. 7.

Kiev river port Cherkasy river port Kremenchuk river port Dnepropetrovsk river port Zaporozhye river port Nikopol rivir port Kherson river port

7


THE SCOPE OF CARRIAGE BY MEANS OF RIVER TRANSPORT INFRASTRUCTURE OF UKRAINE, mn. tons* Year

158

2010

7

2009

5

2008

11

2007

15

2006

14

2005

13

2004

12

111

2003

10

106

2002

8

94

2001

7

98

2000

8

99

1995

13

140

514

155

479

127

450 462 446 393 370 357

182

1993

25

360

187

60

1990

66 75

749

480

851

490

974

473

57 0

150

225

300

375

*According to the Ukrainian State Statistics Committee

535

370

41

1985

408

281

1991

Railway

Железнодорожный

499

170

20

River

Речной

392

187

1994 1992

Automobile

Автотранспорт

433

450

525

1024 600

675

mn. tons

750

825

900

975

1050

1125


THE REDUCTION OF PROPORTION OF RIVER TRANSPORT IN INFRUSTRUCTURE OF UKRAINE 1990-2012 YEARS

1995

1990

32,8%

32,0%

64,9%

4,3%

63,7%

2005

21,5%

2000

2,3%

21,3%

River Railway Automobile

2,2%

76,3% * Based on the Ukrainian State Statistics Committee

1,7%

76,9%

2012

26,4%

1,2%

72,4%


THE SCHEME OF MAIN CARGO TRAFFICS OF IRON ORE IN UKRAINE СХЕМА ОСНОВНЫХ ГРУЗОПОТОКОВ ЖЕЛЕЗОРУДНОГО СЫРЬЯ

Identification marks :

4

The region of formation of the cargo 3

Existing cargo traffic Alternative cargo traffic involving carriage by means of river transport River port Sea port

1

1. 2. 3. 1. 4. 2. 3. 4.

Кривой Рог Запорожский ЖРК Полтавский ГОК Kriviy Rih Minings Российкие Zaporozhye Mining производители Poltava Mining Russian transit cargoes

Измаил

2


THE SCHEME OF MAIN CARGO TRAFFICS OF COAL IN UKRAINE Identification marks :

1. The region of formation of the cargo 2. Existing cargo traffic

3. Alternative cargo traffic involving carriage by means of river transport 4. River port

5. Sea port

1. 2. 3. 4.

Кривой Рог Запорожский ЖРК Полтавский ГОК Российкие производители

To Turkey, Bulgaria and Far East


Identification marks :

THE SCHEME OF MAIN CARGO TRAFFICS OF GRAINS IN UKRAINE

1.The region of formation of the cargo 2. Existing cargo traffic 3. Alternative cargo traffic involving carriage by means of river transport 4. River port 5. Sea port

1. 2. 3. 4.

Кривой Рог Запорожский ЖРК Полтавский ГОК Российкие производители


THE SCHEME OF MAIN CONTAINER CARGO TRAFFICS IN UKRAINE Identification marks:

1. The region of formation of the cargo

2. Existing cargo traffic

3. Alternative cargo traffic involving carriage by means of river transport 4. River port 5. Sea port

1. 2. 3. 4.

Кривой Рог Запорожский ЖРК Полтавский ГОК Российкие производители


CONTAINERS TRANSSHIPMENT VOLUMES BY MAIN MARKET OPERATORS 2005-2010, 1000TEUs 1250

1000

572

662

1254

11

352 256

18 610

671

250 322

368

2005

2006

4

660

710

18

2

517

370

500

894

508

1276

750

7

257

302

2009

2010

0 Odessa

2007 Mariupol

2008 Ilyichevsk


LOCATION, ANNUAL TURNOVER AND REGIONAL STRUCTURE OF CONTAINERS FLOW, 2010

35 %

DNEPROPETROVSK CONTAINER TERMINAL

ODESSA CONTAINER TERMINAL

Annual regional structure of containers flow:

ILYICHEVSK CONTAINER TERMINAL

ZAPOROZHIE CONTAINER TERMINAL

KHERSON CONTAINER TERMINAL

Annual turnover by terminals:

up to 10.000TEUs

up to 700.000TEUs

10-20.000TEUs

up to 20.000TEUs (prospect terminals)

20-30.000TEUs

up to 10.000TEUs

More then 30.000TEUs


MARKET PROSPECTS OF CONTAINER TERMINALS DEVELOPMENT  Stage 1: Development of Kherson container hub with further development of services up to Zaporozhie and Dnepropetrovsk prospect container terminals.  Undeveloped niche of containers transportation along Dnipro, container service offering alternative to existing container delivery by trucks and/or rail cars.  Opportunity to cover about 33% of regional container market (including nearby to Kherson, Zaporozhie and Dnepropetrovsk regions).  Dnepropetrovsk and Zaporozhie terminals are able to provide efficient logistics to Dnepropetrovsk, Donetsk, Zaporozhie, Poltava, Kirovograd, Sumy, Chernigov, Cherkassy and Kharkov regions. Kherson container terminal is able to provide logistics to Kherson, Nikolaev and Crimea.  Market potential of the chosen niche is about 500.000TEUs a year with a breakdown by terminals: •

Dnepropetrovsk - 50% of the niche or 250.000TEUs.

Zaporozhie – 30% of the niche or 150.000TEUs

Kherson – 20% of the niche or 100.000TEUs

 The main container flow is currently provided by trucks and can be re-oriented to the river reducing costs of containers delivery.  Container terminal-hub at Kherson will be able to provide shipment by sea-river going vessels, river going vessels or river barges providing competitive advantage VS delivery by traditional routes.  Prospective investment projects intends to cover 20% of abovementioned segment (about 100.000TEUs per year) through Dnepropetrovsk (20.000TEUs per year), Zaporozhie (20.000TEUs per year), Kherson (60.000TEUs per year) with using of current fleet .


CONCEPT OF CONTAINER TERMINAL DEVELOPMENT RIVER MOUTH CONTAINER HUB

Project parameters of the terminal: Length – 575 m Width – 105 m Depth at the berth - 7,6 m Development area – 6 ha Annual capacity – 60.000 TEUs

To Nikolaev, Odessa, Crimea, Dnepropetrovsk, Zaporozhie

Prospect container terminal - hub Railway and motor road

Dnipro river


CONCEPT OF CONTAINER TERMINAL DEVELOPMENT AT DNEPROPETROVSK RIVER PORT Highway to/from Poltava, Kharkov, Donetsk

Dnipro river Novye Kaidaki Cargo Area

Railway to/from Poltava, Kharkov, Donetsk Prospect container terminal

Amur-Gavan Cargo Area

Highway to/from Kirovograd, Krivoi Rog

Railway to/from Kirovograd, Krivoi Rog

Development area – 3.21 ha Length of the berth – 211 m Depth at the berth – 3,5 m Transportation: -railway road is connected to the railway root of Dnepropetrovsk River Port - direct access to the intercity highway Annual project capacity 20.000TEUs


CONCEPT OF CONTAINER TERMINAL DEVELOPMENT AT ZAPOROZHIE RIVER PORT

Development area – 6 ha

Highway to/from Dnepropetrovsk, Poltava, Kharkov, Donetsk

Prospect container terminal

Length of the berth – 300 m with further development up to 700 m Depth at the berth – 3,75 m Transportation: -railway road is connected to the railway root of Zaporozhie River Port - direct access to the intercity highway Annual project capacity 20.000TEUs

Zaporozhie Shipping Yard

Highway to/from Donetsk, Lugansk


MAIN ACCENTS OF CONTAINER TERMINALS DEVELOPMENT •

Target market: 

Ocean/river container lines operators

NVOCC, forwarding companies and agencies

Cargo owners

Cooperation with inland shipping companies, custom brokers for the closed cycle of the “door-to-door” services

Positioning – full logistics services complex, based on own assets

Flexibility of the agreement (time charter or slot)

Stuffing/ unstuffieng of containers

Full range of ground transportation services from the terminals to the point of destination, including railway and truck services, shorter connection VS traditional routes

Customs formalities at the river terminals

Transit opportunities to/from EU and CIS countries

ECO friendly service, reduction of CO2 imprint.


THANK YOU FOR YOUR ATTENTION!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.