Fall 2016
Towers Newsletter of the Associates of the University of Idaho Library
U I L i b ra r y : T h e n a n d N ow Inside this issue:
UI Library: Then & Now
1
Vandal Giving Day Before & After: First Floor Renovation
2
News from Special Collections
3
Message from the Dean
4
Fall semester 2016 has come with lots of exciting changes for the library. Most obviously, we have had the privilege of sharing the excitement of our first floor renovation with new and returning students and faculty, as well as parents, community members and alumni, many of whom remember the library in at least one of its many previous incarnations, like the 1957 library pictured above left. After spending many months providing library services in temporary quarters with a soundtrack of
jackhammers, library faculty and staff are thrilled to see how enthusiastically the changes have been greeted by students this semester. Our new cafĂŠ, furniture, service desks, study spaces, classrooms, and computer lab have been flooded around the clock with busy students looking for places to study, meet friends, or just hang out between classes. Seeing students taking advantage of the updated facilities has made us even more grateful to the supporters like you who make our services possible!
Vandal Giving Day: September 13, 2016
875 Perimeter Drive MS 2350 Moscow, ID 83844-6534
The Library participated in Vandal Giving Day to raise funds to allow us to continue moving our renovation excitement up the floors of library and it was a great success! Thanks to our Ambassadors, our donors, and the generous fund-matching provided by the Library Advisory Board, we were able to raise $22,441 from sixty-one gifts! We sincerely thank everyone who participated in this two day University-wide social
1
media fund-raising blitz! You can see the results and donors list on the Library’s Vandal Giving Day page: https://vandalsgive.uidaho.edu/giving-day/378/ department/389/donors