An Focal XXI Issue 1

Page 1

Volume XXI Issue 1 FREE

18th September 2012

New Student Centre, Campus Developments Will Cost €40M Darragh Roche Editor

T

HE estimated cost of the new student centre and other campus developments will be €40m, according to the latest report from the Students’ Union. The plans include an entirely new building to house the Students’ Union’s offices, an extension to the University Arena and the development of Maguire’s pitches. The new student centre would be built onto the current CSIS (Computer Science) Building, which would be converted into part of the new centre. All SU offices, including An Focal

and ULFM, as well as administration and sabbatical officers, would be housed in the new building. However, the SU would only take up part of the building. Much of the proposed centre would be taken up with UL administration. Offices like Student Academic Administration, the Co-op Office, the Medical Centre and the International Office would sit cheek by jowl with students. In the prospective plans, images of which are published on pages 3 and 4 of today’s newspaper, the SU offices would be based on several different floors. Clubs and Societies and Class Reps would be based on the first floor, along

The Student Centre Of The Future Pages 3 & 4

with a common room, while sabbatical officers and “media workspaces”, presumably for An Focal and ULFM, would be on the second floor. The third floor would contain a games room, while the proposal includes a roof garden and balcony sitting areas on the second floor. The plans also show a three storey nightclub, bar, restaurant and live music venue. It is important to note that the plans are provisional at this stage and subject to change. In order to pay for this project, the SU will attempt to extend the student levy, currently €72 and payable by every student each academic year regardless of fees status. This will go part way

to paying for the projects, which the University will also fund. The SU has not yet announced the finer details of the proposed levy, which has to be approved by the student body. A general meeting in Week 4 will focus on the issue, with a referendum scheduled in Week 8. If the levy extension passes, a committee will be established to finalised the plans and the projects will begin in earnest. The amount of the proposed student levy has not been revealed, nor has the length of time the SU wishes to levy it for. However, the new student centre has been billed as providing for the needs of students

Welcome To Our New First Year Students! Page 17

for the next 20 years, so it is not inconceivable that the levy will have to last that long. Students’ opinions on the new student centre, Arena and pitches developments are already being sought by SU officers. The campaign is expected to begin soon and be vigorous, as nothing short of all out victory will ensure the new student centre is constructed. As of yet, there appears to be no formal voice of opposition to the plans, though some prominent students have privately expressed reservations about embarking on capital projects in the middle of a recession. See Pages 3 & 4 for more.

What US

Republicans

See

Page 5


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.