Stair
(RL)
(TL)
ME Faculty RL
Future Faculty RL $250,000
Visitors
$250,000
395 SF
Procedure
Wild Mammals Holding 1
53 1 SF
Future Faculty RL $250,000
ME Faculty RL Anderson
565 SF
$250,000
Rodent Rodent Holding 1 Holding 2 Plant Growth
Rodent Prep
Janitor
Cage Wash
Storage
398 SF
Testing/ Amphibians
Testing
Waste
LaBrake 190 SF
6 88 S F
ME Adv. TL Wind Tunnel $750,000 983 SF
Mechanical Aquatics/ Mammals Prep
Physics Faculty RL $150,000
Physics Adv. TL–Accelerator $1,000,000
Insect Prep
Insect Holding
Toilet/ Shower
Aquatics Holding
1 2 38 S F
Accelerator Prep
General Conference Room $350,000 609 SF
Light Well and Study Area $4,000,000 1 48 5 S F Tele.
Elec. Elec. Physics Shop
Womens Jan
Physics Adv. TL $500,000
Physics Faculty RL
677 SF
Watson
$250,000 3 63 SF
Physics Computer Lab $350,000
Physics Adv. TL Optics $500,000
668 SF
666 SF
Physics Faculty RL
Bailey Hall
Vineyard
$250,000 42 6 S F
Physics Prep
Elev. Mens
ITS
Chemistry Outreach Storage
Computer Science Server
ITS Data Room
Physics Storage
Physics Faculty RL
Physics Faculty RL
Physics Faculty RL
$250,000
$250,000
$250,000
4 66 SF
46 9 S F
478 S F
Orzel
Amanuel
Elec. RM
Observation
Vivarium Corridor
ECE/CS PASTA Computer Lab $350,000
Wild Mammals Holding 2
Maleki
0
FLOOR PLAN – LEVEL ZERO Future Lab $250,000 303 S F
Stair
MECHANICAL ENGINEERING, PHYSICS A N D A S T R O N O M Y, V I VA R I U M
Integrated Science and Engineering Complex, Union College M a y 1 9, 2 0 1 7