Jason Bywater-Lutman and Thomas Refoy-Butler from Mackenzie Elvin Law explain the legal considerations around home renos.

Advertisement

INTERVIEW NICKY ADAMS / PHOTOS SUPPLIED

QI’m thinking about renovations to my property. What are the risk areas I should be aware of?

Renovating your home can be both exciting and terrifying. What you don’t need is the added stress of legal issues when things go wrong. Read on to find out about new home building laws and how to navigate and prevent problems with future renos.

JASON: Construction can seem scary, but builders usually follow a defined process and use one of the many standard form contracts available, including a free basic construction contract released by NZ Standards. The type and value of your renovations dictate which types of contract you should use. When building, the first step is to pick your builder, get the plans and a quote, then come and see a solicitor to talk through the contract. Any contract over $30,000 must be in writing.

THOMAS: It doesn’t have to be a substantial engagement; we highlight the risk areas, which gives our clients the ability to query and clarify any points with the designer/ builder before the contract is signed. It is much better to have those discussions up front – not halfway through the project.

JASON: Most contracts are designed to make sure the builder gets paid regularly. The Construction Contracts Act protects the builder and makes it harder for you to hold money back from them. If you want to hold money back, you need a good reason and to follow a proper process, which we can help with.

THOMAS: The Construction Contracts Act is a “pay now, argue later” regime. It is important to understand that the onus is on the homeowner to articulate the grounds upon which they’re not prepared to pay for work they’re not happy with. If that’s not communicated in the right way, and promptly, the payment claim becomes valid and enforceable as a debt due, even if there are issues with the work from a homeowner’s perspective.

JASON: If a problem arises with the build, a ‘handshake deal’ to fix the problem doesn’t stop you paying for work you may not be happy with. You need to speak to your solicitor and follow the processes set out in the contract you signed and the Construction Contracts Act.

THOMAS: At the conceptual phase, when you’re looking at plans and engaging with a designer, talk to your builder about your wish list – if you can find an established working relationship between designer and builder, that’s key. When they can work harmoniously the job runs in a far more streamlined, cost-effective manner. Ideally, your contractors are not learning to work together for the first time on your project.

JASON: To avoid issues, focus on quality communication. If you or the builder change something, the best thing you can do is have a conversation about what the change is, how much it will cost and how long the change will take. You should always record these discussions in writing and share them with the other party.

THOMAS: The important point for a person building, or renovating, their home is to understand what they are agreeing to. What costs are fixed and won’t increase, what can increase and by how much are important issues that need to be grappled with and will vary from builder to builder. How long things will take to be competed and who is responsible for the costs of delays should also be clearly set out.

JASON: The builder does want to do a good job, because happy clients are their best source of referrals. Having a clear understanding of each parties’ obligations and expectations at the start of the construction process is essential.

Jason Bywater-Lutman

Thomas Refoy-Butler

MACKENZIE-ELVIN.COM

WRAP IT

Matt Batchelor and Lance Uhlmann love their toys. And they know how to look after them.

PHOTOS SUPPLIED

You’ve bought the car of your dreams. It looks amazing. But you want it in a colour that no one else has. With AutoWraps the choices are limitless. And even better, wrapping your vehicle protects the paintwork from stone chips and fading from the sun. So when it’s removed the car looks brand new again, keeping your investment in tip-top condition.

AutoWraps was set up by Matt Batchelor and Lance Uhlmann. Matt owns Tauranga’s Rutherford Signs, who’ve been in the industry since 1976. Lance has been wrapping vehicles for the last 20 years. Both are car and

HOW IT WORKS

1. The team at AutoWraps takes photos and does a full measure up. 2. Select from thousands of colours on file, bring in your own design, or the in-house graphic design team can custom design something for you. 3. You’ll see a mock-up before work starts. 4. Pick your car up from Hocking St after two to three days, all ready to go. 5. To remove the wrap or change it out is easy. The vinyl’s taken off using specialist equipment, leaving no glue residue, with perfectly-preserved paintwork underneath.

boat fanatics, so they set up AutoWraps with its own dedicated workshop on Hocking Street, Mt Maunganui, and kitted it out with the best equipment in the industry, to look after your pride-and-joy while it’s being transformed.

Lance explains how it works: “We use a self-adhesive vinyl to wrap the vehicle; small hatchbacks, supercars, boats, caravans, you name it, with a matte, gloss or satin finish. And it doesn’t have to be all over, we can do digital prints on part of the car which is a popular option for branding your business. One of my favourite jobs was a full wrap of the hull of a large fishing boat, in a matte camouflage which we designed in-house for a private owner.”

AUTOWRAPSNZ.CO.NZ

This article is from: