![](https://assets.isu.pub/document-structure/220315123132-a5e0df0307bfd0ee37e02e85a1b4750a/v1/9addff90a11fb8793b6e5a4ca04171ea.jpeg?width=720&quality=85%2C50)
1 minute read
PART 4: Feasibility of the Strategies 4.1 Actors Analysis
All the actors, decision makers and stakeholders, that could potentially be involved in the planning actions are listed and analysed based on their typology of intervention.
Advertisement