Western Quad Update OU
Western Quad Update
Work on the New Sports Centre by the Leicester pitches began in March and great progress has been made in the last few months.The images on this page begin with the drawings prepared by the School’s architects and show how construction has moved on over the Summer, leading up to a CGI image of how it should look in the Autumn of 2010. Any OUs wishing to follow progress over the next few months can see a live link to the construction site on the Uppingham School website (www.uppingham.co.uk).
September 2009 September 2009
June 2009
September 2009 August 2009
September 2009
Be Remembered at Uppingham The New Sports Centre is the biggest project to happen at Uppingham in many decades and we are offering OUs, parents, staff and friends of the School an opportunity to have their name, or that of a loved one, commemorated at the site. Outside the Sports Centre will be an OU Terrace, ideal for watching the 1st XV, and each paving stone in this area will be available for engraving. Similarly more than 100 trees used to landscape the area around the pitches and a number of benches will be made available to those who wish remember a loved one. If you would like to ‘sponsor’ a paver, tree or bench, please contact the OU Office by email (foundation@uppingham.co.uk) or telephone 01572 820 617
31