TENDER WATCH
FRESH TENDERS Project
Scope of Work
Issue Date
Closing Date
Authority
Mumbai Metro
Design, Manufacture, Supply, Installation, Testing, and Commissioning of Telecommunication system for Main Lines and Depot of Line 4 and extension corridor (Wadala – Kasarvadavali – Gaimukh) of Mumbai Metro Rail Project
09.03.2021
18.05.2021
MMRDA
Indore Metro
Design and Construction of Elevated Viaduct between Ch.14+488 & Ch.25+415, viaduct connecting Depot leading upto interface location, Nine (9) elevated Metro Rail Stations (Gandhi Nagar, Super Corridor 6, Super Corridor 5, Super Corridor 4, Super Corridor 3, Super Corridor 2, Super Corridor 1, Bhawarsala Square and MR 10 Road) including all Civil, Structural, Roof structure, Mechanical, Electrical and Plumbing (MEP) works, Architectural finishes, Façade, Entry/Exits, FOB, Viaduct within the stations including Transition spans for Indore Metro Rail Project Yellow Line.
10.03.2021
30.04.2021
MPMRCL
Delhi Metro
Design, Supply, Installation, Testing and Commissioning of 25 kV Overhead Equipment (OHE), 33 kV Auxiliary Power Supply for elevated section of Line-7 Ext. (Maujpur to Majlispark) and Augmentation works of Mukundpur depot of Delhi Metro MRTS Phase-IV.
17.03.2021
26.04.2021
DMRCL
Bangalore Metro
Construction of 7.5 km elevated viaduct & stations of from Gottigere to Swagath Road Cross (Chainage 00.00m to 7501.818m) including Kothanur Depot entry line, road widening & allied works and 5 numbers of metro stations viz. Gottigere, Hulimavi, IIMB, JP Nagar 4th Phase, Swagath Road Cross in Reach-6 of Bangalore Metro Rail Project, Phase-2 (Balance Works).
22.03.2021
06.05.2021
BMRCL
High Speed Rail
Preparation of General Arrangement Drawings (GADs) of Crossing Bridges over Rivers/Canals/Railways and Roads (Expressway, NH , SH and Major District Roads) and GADs of proposed Stations and Maintenance Depots for Detailed Project Report (DPR) of various HSR Corridors (About 2365 kms long)
22.03.2021
15.04.2021
NHSRCL
Nashik Metro
Design, Manufacture, Supply, Testing, Commissioning of Tyre Based Electric Bus Running on OHE for Nashik Metro Neo Project
22.03.2021
05.05.2021
Maha Metro
Bangalore Metro
General Consultants for Rolling Stock, Signaling and PSD works of Reach-6, Phase-2A and Phase 2B of Bangalore Metro Rail Project
27.03.2021
21.05.2021
BMRCL
Bangalore Metro
Consultancy Services for Inspection of Manufacturing Activities Witnessing of Factory Tests First Article inspections and factory Acceptance Tests of Rolling Stock and its SubSystems for the Rolling Stock being procured for BMRCL Phase-2 Network.
26.03.2021
13.05.2021
BMRCL
Bhopal Metro
Design and Construction of Eight (8) elevated Metro Rail Stations including Viaduct portion within the stations and Transition spans on either side of the stations (AIIMS, Alkapuri, Habibganj Naka, Habibganj, M.P Nagar Zone-1, DB City Mall, Kendriya Vidyalaya and Subhash Nagar) for Bhopal Metro Rail Project
31.03.2021
10.06.2021
MPMRCL