TENDER WATCH
FRESH TENDERS Project
Scope of Work
Issue Date
Closing Date
Authority
Delhi Metro
Civil Works for Remodeling & Augmentation of Mukundpur Metro Depot cum Workshop including design, fabrication, supply & erection of pre-fabricated steel roof structures, roof portals, purlins, sheeting etc. and water supply, sanitary installation, drainage & site development works at Mukundpur Depot for Line 7 & Line 8 of Delhi Metro Rail Proejct (Phase IV).
26.03.2021
04.05.2021
DMRCL
Bhopal Metro
Design and Construction of Eight (8) elevated Metro Rail Stations including Viaduct portion within the stations and Transition spans on either side of the stations (AIIMS, Alkapuri, Habibganj Naka, Habibganj, M.P Nagar Zone-1, DB City Mall, Kendriya Vidyalaya and Subhash Nagar) for Bhopal Metro Rail Project.
31.03.2021
10.06.2021
MPMRCL
Delhi Metro
Expression of Interest (EOI) for establishment of National Metro Rail Knowledge Centre (NMRKC) near Vishwavidyalaya Metro Station
06.04.2021
19.05.2021
DMRCL
Navi Mumbai Metro
Design (part) and construction of balance works of Concrete & Fabricated Steel Structures, Architectural works, Plumbing and Sewerage etc. of Six Nos. of Elevated Metro Stations at Kharghar Village, Kendriya Vihar, Utsav chowk, Belpada, RBI Colony & Belapur Terminal Station for Navi Mumbai Metro Line-1.
07.04.2021
07.05.2021
Maha Metro
Delhi Metro
Design and Construction of Twin Tunnel (Up & Down Line) by Shield TBM, Cut and Cover Tunnel box and four Underground stations namely Aerocity, Mahipalpur, Vasant Kunj and Kishangarh with Entry/Exits & Connecting subways from chainage (-) 760 mt. to 5356.285 mt. of Aerocity to Tughlakabad Corridor of Phase-IV of Delhi Metro Rail Project.
13.04.2021
31.05.2021
DMRCL
Delhi Metro
Comprehensive Cleaning of Rolling Stock (Metro Trains Coaches) and House Keeping of Hostel and Depot premises at Shastri Park Train Depot of DMRC Ltd
20.04.2021
19.05.2021
DMRCL
Delhi Metro
Design, Verification, Supply, Installation, Testing and Commissioning of E and M works, Fire Detection, Fire Suppression System, EOT Crane, Compressor and VAC for Augmentation works of Ajronda and Sarita Vihar Depots of Phase-IV of Delhi MRTS
22.04.2021
01.06.2021
DMRCL
Mumbai Metro
Part Design and Construction of Balance Works of Package CA06, Elevated Viaduct and 5 Elevated Stations viz. MTNL Metro, S. G. Barve Marg, Kurla East, EEH and Chembur (excluding Architectural Finishing and Pre-Engineered Steel Roof Structure of Stations) from Chainage 46860.384m to Chainage 52729.312 of Line 2B [D.N Nagar-Mandale] of Mumbai Metro Rail Project of MMRDA.
22.04.2021
07.06.2021
MMRDA
Bangalore Metro
General Consultants for Rolling Stock, Signaling and PSD works of Reach-6, Phase-2A and Phase 2B of Bangalore Metro Rail Project
27.03.2021
21.05.2021
BMRCL
16
METRO RAIL TODAY MAY 2021
WWW.METRORAILTODAY.COM