Urban Transport Infrastructure January 2022

Page 8

FLASHBACK 2021

YEAR 2021 FLASHBACK JAN 2021

with Ahmedabad. The estimated cost of this LRT project is Rs 6,000 and will complete in 24-36 months.

FEB 2021 Chennai Metro’s Phase 1 Extension commissioned and State Govt approves 119-km Phase 2 project

Prime Minister Modi lays foundation stone of Ahmedabad Metro Phase 2 & Surat Metro Phase 1

Prime Minister Narendra Modi on February 14, 2021 inaugurated commercial operation of Chennai Metro Rail on 9.05-km stretch Washermenpet to Wimco Nagar under Phase 1 extension. Government of Tamil Nadu has accorded approval for implementation of Rs 61,843 crore three Metro Rail corridors for a length of 118.9 km under Phase II of Chennai Metro Rail Project.

Prime Minister Narendra Modi presided over the bhoomi pujan of Surat Metro Rail Project and launched the Ahmedabad Metro Rail Project Phase-2 on January 18, 2021 via video-conferencing. Surat Metro will be completely elevated and will cover 40km with two corridors — connecting Sarthana to Dream City and Bhesan to Saroli. The Ahmedabad Metro Phase 2 will connect the city to the state capital of Gandhinagar along two corridors connecting Motera Stadium to Mahatma Mandir and GNLU to GIFT City. Prime Minister Narendra Modi inaugurates 4.1-km stretch of Kolkata Metro’s Line 1 Prime Minister Narendra Modi on February 22, 2021 flagged off the 4.1-km stretch of Kolkata Metro’s Line 1 Noapara to Dakshineswar.

Gujarat Govt approves Rs 6000 crore Dholera Light Metro Rail Project The Government of Gujarat cabinet on January 14, 2021 approved State’s first Light Metro Rail Project for Dholera City to connect Dholera Special Investment Region (SIR)

08

URBAN TRANSPORT INFRASTRUCTURE JANUARY 2022

WWW.URBANTRANSPORTNEWS.COM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.