CONSTRUCTION DOCUMENTS USMAN AWADALLAH
STUDENT: USMAN AWADALLAH CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
Bisan Urban Natural Park, Anyang Resort, South Korea
SAMI RINTALA
ELEMENT HOUSE KEY PLAN
1
SECTIONAL ISOMETRIC THROUGH PRIMARY LIVING SPACE
SEAL
REVISION
2
DESIGN
MM/DD/YY
ELEMENT HOUSE ISOMETRIC VIEW
Sheet List Sheet Number A000 A100 A101 A200 A300 A400 A500 A501 A600 A700 A701 A800
Sheet Name COVER SHEET FLOOR PLANS FLOOR PLANS AND PLAN CALLOUTS FINISH PLANS AND REFLECTIVE CEILING PLANS POWER PLANS BUILDING SECTIONS EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS INTERIOR ELEVATIONS DETAILS AND TYPICAL WALL SECTIONS DETAILS AND TYPICAL WALL SECTIONS DOOR,PATITION, LIGHTING AND WINDOW LEGENDS AND SCHEDULES
Project Status
COVER SHEET Issue Date SCALE:
A000
2 A400 20' - 5"
10' - 11"
9' - 6"
12 A700 TO FACE OF FINISHED WALL 2 A400
1C 30' - 4" 9' - 11"
3
20' - 5"
A
A701
10' - 0"
1
UP
2
11 A700
A701
LIVING RM. A600
UP 1
1
1A
2
1
1
1
A400
A400
A600
1 1
2
A400
3' - 0"
LOUNGE
4 3
2
B
WALL BELOW
10' - 8"
A701
A400
A
5
2
3' - 7"
DN
A
A
KEY PLAN
30' - 4" 20' - 4" TO FACE OF FINISHED WALL
1F
BASEMENT ROOF BELOW
SEAL
1' - 0"
1F
4' - 1"
1
10' - 0"
4
A600 6
15' - 5"
6
7
STUDENT: USMAN AWADALLAH CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
A
5
Bisan Urban Natural Park, Anyang Resort, South Korea
A600
SAMI RINTALA
7
ELEMENT HOUSE
A701
20' - 0"
20' - 0"
3' - 0"
11
A
20' - 0"
11
2
A B
3
3' - 0"
A701
30' - 1"
7 A700
A
2
2 TO FACE OF FINISHED WALL
A701
3 A101
8 A700
1
10' - 2"
STUDY
1' - 0"
4' - 1"
2 A400
2 A400
1
FIRST FLOOR PLAN 1/4" = 1'-0"
2
SECOND FLOOR PLAN 1/4" = 1'-0"
REVISION
DESIGN
MM/DD/YY
Project Status
FLOOR PLANS Issue Date SCALE: 1/4" = 1'-0"
A100
2 A400 10' - 10"
2 10' - 10"
A400
1' - 0"
4' - 2"
1' - 0"
4' - 2"
1F 10' - 0"
1F
18' - 9"
0' - 8"
B
1D
9
5
BEDROOM D
4
4 A101
10' - 0"
8
4' - 3"
B
A600
BATHROOM
10' - 0"
10 D
30' - 1"
12
9' - 11"
DN
0' - 9"
30' - 1"
1E
4' - 3"
TO FACE OF FINISHED WALL
B 18' - 10"
10' - 2"
18' - 10"
1
20' - 4"
2 A400 20' - 4"
STUDENT: CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
A400
Bisan Urban Natural Park, Anyang Resort, South Korea
1 A400
SAMI RINTALA
1 A400
ELEMENT HOUSE
1 A400
KEY PLAN
1
THIRD FLOOR PLAN 1/4" = 1'-0"
ROOF PLAN 1/4" = 1'-0"
2
2 A400
TO FACE OF FINISHED WALL 4' - 11"
SEAL
3' - 0"
1' - 4"
5' - 1"
12
10' - 1"
10 0' - 3"
1' - 8"
0' - 6"
2' - 6"
1' - 7"
A600
8
REVISION
DESIGN
MM/DD/YY
8' 9- 9"
3' - 6"
5' - 4"
2' - 6"
1' - 8"
1' - 4"
11' - 11"
3' - 8"
0' - 6"
3' - 6"
5' - 0"
4" CONTINUOS PANEL FINISHED WOOD FLOOR
Project Status
9' - 5"
3
CALLOUT OF STUDY 1/2" = 1'-0"
4
CALLOUT OF BATHROOM 1/2" = 1'-0"
8' - 10"
FLOOR PLANS AND PLAN CALLOUTS Issue Date SCALE:
As indicated
A101
1/2" STAINLESS STEEL 6" CHERRY WOOD CONTINUOUS FINISH FLOOR PANEL
UP
1/2" POLISHED STEEL PLATE POLISHED STEEL STAIRS
GRAVEL
UP
CONCRETE DN
A500
1/2" CORTEN STEEL
9' - 8"
FINISH PLAN 2 1/4" = 1'-0"
9' - 6"
4" CONTINUOUS WOOD PANEL CEILING
STUDENT: CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
2
Bisan Urban Natural Park, Anyang Resort, South Korea
FINISHED FLOOR PLAN 1/4" = 1'-0"
SAMI RINTALA
1
ELEMENT HOUSE
1
SEAL
4" CONTINUOUS WOOD PANEL CEILING
10' - 1"
10' - 1"
KEY PLAN
5' - 1"
3' - 6"
STAIR BELOW
17' - 8"
4' - 3"
9' - 4"
4' - 11"
4' - 11"
8' - 8"
28' - 10"
8' - 11"
5' - 4"
8' - 10"
1/4" CORTEN STEEL PANEL
REVISION
DESIGN
MM/DD/YY
18' - 9"
8' - 11"
8' - 11"
8' - 4"
10' - 0"
Project Status
FINISH PLANS AND REFLECTIVE CEILING PLANS Issue Date SCALE: 1/4" = 1'-0" 19' - 2"
3
SECOND FLOOR RCP 1/4" = 1'-0"
4
THIRD FLOOR RCP 1/4" = 1'-0"
A200
D
D
S
RCLT
D
RCLT
UP
WP
B D
D
D
WP
WP
LEVEL 1 ELECTRICAL PLAN 1/4" = 1'-0"
STUDENT: USMAN AWADALLAH CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
3
LEVEL 2 ELECTRICAL PLAN 1/4" = 1'-0"
SAMI RINTALA
2
ELEMENT HOUSE
BASEMENT ELECTRICAL PLAN 1/4" = 1'-0"
KEY PLAN
SEAL
ELECTRICAL PLAN LEGEND
B
D
DOOR BELL DIMMER SWITCH
D
DN
SWITCH
S
CEILING MOUNTED LIGHT
S
WALL MOUNTED LIGHT
WP
1
Bisan Urban Natural Park, Anyang Resort, South Korea
D
WP
REVISION
DESIGN
MM/DD/YY
WATER PROOF WALL MOUNTED LIGHT
D
RECESSED LIGHTING RCLT
DUPLEX OUTLET
Project Status
WP
WATER PROOF DUPLEX OUTLET
POWER PLANS Issue Date SCALE: 1/4" = 1'-0"
ELECTRICAL PLAN LEVEL 3 4 1/4" = 1'-0"
A300
5
Basement
2
1
A400
A400
1'-0" 1/2"
ROOF PLAN 30' - 0"
ROOF PLAN 30' - 0"
1 A700
1E 4'X4' SAFETY GLASS SKYLIGHT
2 A700
1F 1'-0"
THIRD FLOOR RCP 21' - 0"
1/2"
THIRD FLOOR RCP 21' - 0"
5 1/2" BATT INSULATION
1C
21' - 3"
2 A701 22' - 1"
SECOND FLOOR RCP 10' - 0"
5 A700
FOUNDATION -4' - 0"
20" REINFORCED CONCRETE FOOTING
FOUNDATION -4' - 0"
20" CONCRETE FOOTING
STUDENT: CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
10" CONCRETE FOUNDATION WALL
Bisan Urban Natural Park, Anyang Resort, South Korea
CONCRETE FOUNDATION WALL
GRADE
4' - 0"
FIRST FLOOR PLAN 0' - 0"
GRADE
SAMI RINTALA
2X6 CAP PLATE
10 A700
6' - 4"
1/2" CORTEN STEEL
A701
ELEMENT HOUSE
3 A700 1
2X6 WOOD STUDWALL
SECOND FLOOR RCP 10' - 0"
3' - 1"
10' - 3"
4" CONTINUOUS FINISHED WOOD PANELS
6' - 4"
6 A700
4 A700
KEY PLAN
Basement -12' - 0"
Basement -12' - 0" SEAL
2
LONG SECTION THROUGH PRIMARY SPACE 1 1/4" = 1'-0"
A400
1
CROSS SECTION THROUGH PRIMARY SPACE 2 1/4" = 1'-0"
A400
REVISION
DESIGN
MM/DD/YY
Project Status
BUILDING SECTIONS Issue Date SCALE: 1/4" = 1'-0"
A400
2
1
A400
A400
1'-0" 1/2"
ROOF PLAN 30' - 0"
ROOF PLAN 30' - 0" 4" FINISHED CONTINUOS FINISHED WOOD 1E
1/2"CONTINUOUS FINISHED WOOD PANELS 1F 1F 1'-0" 1/2"
THIRD FLOOR RCP 21' - 0"
THIRD FLOOR RCP 21' - 0"
1/2"CONTINUOUS FINISHED WOOD PANELS
1/2"
SECOND FLOOR RCP 10' - 0"
SECOND FLOOR RCP 10' - 0"
1/2" CORTEN STEEL
1 A701
1F
FIRST FLOOR PLAN 0' - 0"
FIRST FLOOR PLAN 0' - 0"
STUDENT: CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
1'-0"
ELEMENT HOUSE
A701
Bisan Urban Natural Park, Anyang Resort, South Korea
1C
SAMI RINTALA
2
5' - 0"
1/2" CORTEN STEEL
4" FINISHED CONTINUOS FINISHED WOOD
KEY PLAN
FOUNDATION -4' - 0"
FOUNDATION -4' - 0"
SEAL
Basement -12' - 0"
1
NORTH ELEVATION 1/4" = 1'-0"
Basement -12' - 0"
3
WEST ELEVATION 1/4" = 1'-0"
REVISION
2
1
A400
A400
DESIGN
MM/DD/YY
Project Status
EXTERIOR ELEVATIONS Issue Date SCALE: 1/4" = 1'-0"
A500
1 A400 2 A400
1'-0" 1/2"
5' - 0"
ROOF PLAN 30' - 0"
0' - 2"
10' - 4"
1D
1D
2' - 0"
1F
1F 1'-0" 4'x4' SKYLIGHT
1/2"
THIRD FLOOR RCP 21' - 0"
12' - 3"
SECOND FLOOR RCP 10' - 0"
1'-0" 5/8"
GRADE
1 1A
9' - 5"
9' - 3"
4" CONTINUOUS WOOD PANELS
1F 1F
FIRST FLOOR PLAN 0' - 0"
FIRST FLOOR PLAN 0' - 0"
FOUNDATION -4' - 0"
FOUNDATION -4' - 0"
STUDENT: CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
22' - 1"
SECOND FLOOR RCP 10' - 0"
Bisan Urban Natural Park, Anyang Resort, South Korea
1/2" CORTEN STEEL
SAMI RINTALA
1/2" CORTEN STEEL
THIRD FLOOR RCP 21' - 0"
ELEMENT HOUSE
4" CONTINUOUS FINISHED WOOD PANELS
ROOF PLAN 30' - 0"
KEY PLAN
SEAL
2
Basement -12' - 0"
1
EAST ELEVATION 1/4" = 1'-0"
A400
2
1
Basement -12' - 0"
SOUTH ELEVATION 1/4" = 1'-0" REVISION
DESIGN
MM/DD/YY
A400
Project Status
EXTERIOR ELEVATIONS Issue Date SCALE: 1/4" = 1'-0"
A501
OPEN RISER POLISHED STEEL STAIR
3' - 10"
CORTEN STEEL
16" DIAMETER WALL MOUNTED LIGHT
3
INTERIOR ELEVATION OF LOUNGE ENTRANCE 1 1/4" = 1'-0"
2
3' - 5"
5' - 4"
2
1" DIAMETER METAL RAILING
6' - 4"
6' - 4"
INTERIOR ELEVATION OF LOUNGE 1/4" = 1'-0"
GRANITE SINK TOP
INTERIOR ELEVATION OF STEEL STAIRCASE 4 1/4" = 1'-0"
INTERIOR ELEVATION AT SECOND LEVEL 1/4" = 1'-0" 11
FIRST FLOOR THROUGH STAIR 1/4" = 1'-0"
5
3' - 7"
KEY PLAN
INTERIOR ELEVATION OF FIRST TO SECOND FLOOR 7 1/4" = 1'-0"
INTERIOR ELEVATION OF LIVING ROOM 6 1/4" = 1'-0"
Elevation 2 - b 1/4" = 1'-0"
2
6' - 4"
5' - 8"
5' - 8"
6' - 4"
0' - 3"
6' - 4"
9' - 3"
6' - 4"
1' - 4"
1' - 4"
1" DIAMETER METAL RAILING
STUDENT: CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
0' - 8"
CORTEN STEEL
SAMI RINTALA
ELEMENT HOUSE
CORTEN STEEL
Bisan Urban Natural Park, Anyang Resort, South Korea
9' - 8"
SAFETY GLASS
6' - 4"
SEAL
4" CONTINUOUS HORIZONTAL WOOD PANELS CEILING MOUNTED LIGHTING 4" CONTINUOUS WOOD PANELS 7'X4' HAND CRAFTED WOOD FRAME BED
WINDOW BEYOND
4" CONTINUOUS WOOD PANELS
1D
REVISION
1" DIAMETER METAL RAILING
4" CONTINUOUS WOOD PANELS
INTERIOR ELEVATION OF BEDROOM FACING WINDOW 8 1/4" = 1'-0"
MM/DD/YY
3' - 0"
1D 7'X4' HAND CRAFTED WOOD FRAME BED
DESIGN
6' - 2"
SAFETY GLASS
7' - 3"
STAINLESS STEEL FRAME
STAINLESS STEEL RANGE
3' - 0"
3' - 11"
CORTEN STEEL
9
INTERIOR ELEVATION OF BEDROOM 1/4" = 1'-0"
10
INTERIOR ELEVATION AT THIRD FLOOR 1/4" = 1'-0"
THIRD FLOOR THROUGH STAIR INTERIOR ELEVATION 12 1/4" = 1'-0"
Project Status
INTERIOR ELEVATIONS Issue Date SCALE: 1/4" = 1'-0"
A600
6" WOOD SHINGLES
1/2" CONTINUOUS FINISHED WOOD PANELS 8" BATT INSULATION
6" BATT INSULATION
1/2" PLYWOOD SHEATHING
2"X10" FRIEZE BLOCK
(2) 2"X10" RIM JOIST WITH 3" BATT INSULATION
6" CONTINUOUS FINISHED WOOD PANELS
1/2" PLYWOOD SHEATHING
2"X6" DOUBLE CAP PLATE
2"X10" SILL PLATE 1/2"" CONTINUOUS FINISHED WOOD PANELS
1" METAL SPACERS AT 4' O.C
1/2 METAL SPACERS (2) 2"X10" DOUBLE RIM JOIST
1" METAL SPACERS 1/2" CORTEN STEEL
8" BATT INSULATION
(2) 2"X10" DOUBLE CAP PLATE
1/2" PLYWOOD SHEATHING
1/2" CORTEN STEEL
1
LEVEL 3 SKYLIGHT SECTION DETAIL 1" = 1'-0"
1/2" PLYWOOD SHEATHING
1/2" PLYWOOD SHEATHING
1/2" CORTEN STEEL 6" CONTINUOUS FINISHED WOOD PANELS
6" BATT INSULATION
2
LEVEL 2 TO LEVEL 3 CONNECTION SECTION DETAIL 3 1 1/2" = 1'-0"
ROOF SECTION DETAIL 1 1/2" = 1'-0"
1/2" CORTEN STEEL
4
(3) 2"x6" WOOD STUDS
LEVEL 2 END SECTION DETAIL 1 1/2" = 1'-0"
1" METAL SPACERS
(2) 2"x6" WOOD STUDS 1/2" METAL SPACERS 6" BATT INSULATION 1/2" CORTEN STEEL
1/2" CORTEN STEEL
6" BATT INSULATION
1" METAL SPACER (2) 2"x6" WOOD STUDS
(2) 2"X6" DOUBLE CAP PLATE
1/2" CORTEN STEEL PANELS
6" METAL KICK PLATE 3' - 11"
1" METAL SPACERS
6" BATT INSULATION
5
MID LEVEL 1 WALL SECTION DETAIL 1 1/2" = 1'-0"
6
EXTERIOR WOOD WALL SECTIONDETAIL 1 1/2" = 1'-0"
7
LEVEL 1 CORTEN STEEL PLAN DETAIL 1 1/2" = 1'-0"
STUDENT: CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
1/2" X 6" CONTINUOUS FINISHED WOOD PANELS
Bisan Urban Natural Park, Anyang Resort, South Korea
2"X6" STUDS AT 16" O.C.
SAMI RINTALA
1/2" PLYWOOD SHEATHING
ELEMENT HOUSE
1/2" PLYWOOD SHEATHING
KEY PLAN
6" CONTINUOUS FINISH WOOD PANELS
1/2" CORTEN STEEL SEAL (2) 2"X6" WOOD STUDS
6" BATT INSULATION 4" CONCRETE FLOOR 3" GRAVEL 2"X6" SILL PLATE
8
LEVEL 1 ENTRY PLAN DETAIL 1 1/2" = 1'-0"
1" RIGID INSULATION 10" REINFORCED CONCRETE FOUNDATION WALL REVISION
0' - 6"
1' - 0"
10" REINFORCED CONCRETE FOUNDATION WALL
6" BATT INSULATION
1/2" PLYWOOD SHEATHING
Project Status (3) 2"X6" WOOD STUDS
GRAVEL FILL 12"X24" REINFORCED CONCRETE FOOTING
1/2" CONTINUOUS 6" HORIZONTAL FINISHED WOOD PANELS
4" PVC DRAINAGE PIPE (2) 2"X6" WOOD STUDS
STEEL VERTICAL REINFORCING BAR STEEL REINFORCING BARS
1" METAL SPACERS
6" BATT INSULATION
BASEMENT WALL CORNER PLAN DETAIL 1 1/2" = 1'-0"
LEVEL 1 FOUNDATION DETAIL 10 1" = 1'-0"
DETAILS AND TYPICAL WALL SECTIONS Issue Date SCALE:
1/2" PLYWOOD SHEAATHING
9
MM/DD/YY
1" METAL SPACERS 1/2" CORTEN STEEL
12"X24" REINFORCED CONCRETE FOOTING
1" RIGID INSULATION
DESIGN
WOOD FINISH MEETS CORTEN STEEL PLAN DETAIL 11 1 1/2" = 1'-0"
LEVEL 2 WINDOW FRAMING PLAN DETAILS 12 1 1/2" = 1'-0"
As indicated
A700
POLISHED STEEL CARRIAGE 8.5" STEEL CHANNEL
1' - 0"
1/2" POLISHED STEEL PLATE TREAD
0' - 11"
1/2" POLISHED STEEL PLATE
0' - 11"
1' - 0"
0' - 11"
1/2" POLISHED STEEL PLATE
0' - 11"
2' - 1"
1' - 0"
CORTEN STEEL BEYOND
8 1/2"X3" STEEL CHANNEL
0' - 11"
6" REINFORCED CONCRETE
STUDENT: CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
Bisan Urban Natural Park, Anyang Resort, South Korea
TOP OF STAIR AT LANDING SECTION DETAIL 2 1 1/2" = 1'-0"
SAMI RINTALA
BOTTOM OF STEEL STAIR CONDITION SECTION DETAIL 1 1 1/2" = 1'-0"
1' - 0"
ELEMENT HOUSE
2" GRAVEL
0' - 11"
STEEL BOLT
KEY PLAN
SEAL
REVISION
DESIGN
MM/DD/YY
Project Status
DETAILS AND TYPICAL WALL SECTIONS Issue Date SCALE: 1 1/2" = 1'-0"
A701
4' - 0"
4' - 0"
9' - 0"
5' - 0"
3' - 10"
TYPE 1A
8' - 10"
4' - 1" TYPE D
3' - 5"
4' - 1"
4' - 1"
4' - 1"
TYPE B
TYPE E 9' - 0"
4' - 11"
4' - 1"
4' - 1"
5' - 0"
3' - 4"
4' - 10"
1" METAL SPACERS
1/2" CORTEN STEEL
6" BATT INSULATION
Window Schedule WINDOW TYPE 1A 1C 1D 1D 1E 1E 1G
TYPE A
Width 4' - 0" 5' - 0" 8' - 6" 8' - 6" 4' - 0" 4' - 0" 3' - 6"
Height 4' - 0" 5' - 0" 2' - 0" 5' - 0" 4' - 0" 4' - 0" 9' - 0"
Frame
Remarks
Stainless Steel Stainless Steel Stainless Steel Cherry Cherry Cherry Cherry
6" WOOD STUDWALL
1/2" METAL SPACERS
1/2" PLYWOOD SHEATHING
FIXED WINDOW FIXED WINDOW FIXED SKYLIGHT FIXED SKYLIGHT FIXED SKYLIGHT FIXED SKYLIGHT FIXED WINDOW
6" WOOD STUDWALL
1/2" PLYWOOD SHEATHING
TYPE B 6" HORIZONTAL CONTINOUS WOOD PANELS
6" BATT INSULATION
STUDENT: CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
WINDOW LEGEND 1/2" = 1'-0"
Bisan Urban Natural Park, Anyang Resort, South Korea
TYPE F
SAMI RINTALA
TYPE F
ELEMENT HOUSE
TYPE C
KEY PLAN
#5 REINFORCING BARS @ 1/16" O.C
3' - 0"
TYPE C
SEAL
6' - 6" 10" REINFORCED CONCRETE FOUNDATION WALL
6' - 0"
1" RIGID INSULATION
1/2" SAFETY GLASS
1/2" SAFETY GLASS
4" WOOD STUDWALL
1/2" PLYWOOD SHEATHING
.5" STAINLESS STEEL DOOR SADDLE
7' - 3"
1.5" CORTEN STEEL FRAME
6" HORIZONTAL CONTINOUS WOOD PANELS
6' - 8"
9' - 0"
9' - 3"
TYPE D .5" STAINLESS STEEL DOOR SADDLE
6" BATT INSULATION
REVISION
DESIGN
MM/DD/YY
1.5" CORTEN STEEL FRAME
PARTITION TYPE LEGEND 1/2" = 1'-0"
TYPE 2
Project Status EQ
3' - 0" 3' - 6"
TYPE 1 DOOR LEGEND 1/2" = 1'-0"
EQ
2' - 4" EQ
TYPE 2
0' - 8"
2' - 4" EQ
DOOR,PATITION, LIGHTING AND WINDOW Issue Date SCALE: 1/2" = 1'-0" LEGENDS AND SCHEDULES
A800