Vaishnavi Kolhe undergraduate Architecture portfolio

Page 1

PORTFOLIO VAISHNAVI KOLHE


With a backpack and hunger for travelling alongside infinite stories of people. I, Vaishnavi Kolhe architecture student of BRICKS, Pune. An aspiring learner who loves to explore different cultures across the world. The colors and columns, designs filled with this maddening interiors and techniques. Each wanting to tell a tale of its own filled in me this curiosity to explore the lesser known. The four years of architecture offered me numerous opportunities to fail, learn and grow. Each year with different projects requiring a new skill set to piece together and make out a flawless plan. Every challenge moulded me to be more adaptive and open to new learnings. I hereby, consider myself fit to make this shift from a learner to a professional.


PROFILE

SKILL SET SOFTWARE SKILL

Indian

autodesk autocad

14 october 1999

autodesk revit

SMEF’S Brick SchoolOf Architecture, Pune

adobe illustrator

CONTACT Plot no .63, Kalamna road Shikshak colony,Bharat nagar Nagpur

sketch up adobe photoshop adobe indeisgn lumion render ms office canva logo maker

LANGUAGE SKILL english

Vaishnavikolhe75988@gmail.com

hindi marathi

8600337969, 9359266840 OTHER SKILL EDUCATION

active listening visualisation teamwork

2019-2022 B.ARCHITECTURE (ONGOING)

SMEF’S BRICK SCHOOL OF ARCHITECTURE ,PUNE

2018-2019

B.ARCH 1STH YEAR

SMT.MANORAMABAI MUNDLE COLLEGE OF ARCHITECTURE ,NAGPUR

2015-2017 HIGHER SECONDARY (HSC) VMV COLLAGE NAGPUR

2015-2017 SECONDARY

VIDYA NIKETAN CONVENT & JUNIOR COLLEGE,NAGPUR

communication skill model making sketching creative thinking hand drafting

STUDY TOUR AND WORKSHOPS 2020

saswad,pune

(study tour) 2019 walawal,konkan (study tour) 2019 mumbai (study tour) 2018 warangal,telangana (study tour) 2


AUTOMOBILE HEADQUATERS

04.UZUMAKI HEADQUATERS

OLI RIGH ECO NIWAS

0.3 COMPETITIONS

INSTITUTE FOR LIBRAL AND VOCATIONAL EDUCATION

02. METAMORPHOSIS

BHARATSHREE REDEVLOPMEN

कुटूंब TOWERS

01.


07.INTEREST

MISCELLANEOUS

AND PASSION

WORKING DRAWINGS

06.OFFICE WORKING DRAWINGS

MYSORE LONG SPAN MULTIPLEX

05.INFOSYS MULTIPLEX

CONTENTS

4


“If you go anywhere even Ho -Malala The existing housing commun fort with a lot of uncertainties redevelopment by the Build overnment is providing v provisions. This has led to an tial communities who are wil as a tool to redevelo


paradise, you will miss your ome” Yousafzai nities have a feeling of discoms & unknowns when it comes to der. Considering this the Indian various incentives and new nincreasing number of residenlling to take self development op their communities.

6


कुटूंब TOWERS

01.

BHARATSHREE REDEVLOPMENT LOCATION:PUNE MAHARASHTRA With the world suffering from a pandemic and everyone is in lockdown where we are forced to live inside our houses it is time to rethink how our homes are designed and the idea of connecting with nature while inside our home is the base of this design. located in Pune Maharashtra the existing society want to go under redevelopment so first did a feasibility report and then proceeded with the design ELECTRICAL PANEL

WATER LEVEL LED LIGHTS 700 DEPTH

2

MAIN DRAIN

3

4

5

1000

1

TILE

B

6

RCC 300MM THK

SAND FILTER PUMP

SECTION AA' SCALE 1:50

CLORINATION

HEATER

WATER LEVEL LED LIGHTS 700 DEPTH

1000

MAIN DRAIN L18

L17

L16

L15

L13

L14

TILE L12

RCC 300MM THK

TILE ADHESIVE 12 MM GLASS MOSAIC TILES 25X25X8

SAFETY SS GRILL OVER SUMP

SECTION BB' SCALE 1:50

WATERPROOFING LAYER 15 MM

NOTES

225 thk RCC wall

1 ALL DIMENSIONS ARE IN MM 2 DO NOT SCALE THIS DRAWING

RCC SUPPORTING BEAM

Female Toilet 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS Gents Toilet

RCC BASE SLAB 200 THK

4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL AND DIMENSIONS ON SITE BEFORE STARTING WORK

118 Dia return inlet

5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE ARCHITECT IMMEDIATELY IN WRITING

PVC or rubber water bar SUMP CHANNEL

PVC pipe 100 Dia from filteration

DRAIN-OUT PIPE

6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSC PLEASE REFER CONSULTANTS' DRAWINGS

7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOU THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBI OF THE CONTRACTOR

WASH OUT SUMP DETAIL (B) DETAIL OF SCALE 1:8 JOINT CONSTRUCTION DETAIL INLET OF SUMP CHANNEL RETAINING WALL AND DETAIL OF RAMP AT GUTTER DETAIL

100 MM THK PCC BED RAFT SLAB WATER PROOFING

Ladies Changing Room+ Lockers

LANDING

RCC FLOOR SLAB

Gents Changing Room+ Lockers

SCALE 1: 5 ALL DIMENSIONS IN MM

RCC 250 MM THK SCREED 40 MM THK CONCAVE TILE 240X60 MM

RCC BASEMENT WALL 50X50 2 COAT ANGLE FILLET DUCT THROUGH WALL

3 COAT VERTICAL MASTIC ASPHALT (20MM THK)

RCC FOOTING MASTIC ASPHALT WATER PROOFING WATER PROOFING TILE 240X115 MM GRAVEL BACKFILL BRICK LINING WALL RCC 300 MM THK

Floor plan

300 THK RCC DIAPHRAGM WALL

HALF BRICK THK PROTECTION WALL RCC BASEMENT SLAB 50MM CEMENT / SAND (1:3) PROTECTION SCREED

50X50 2 COAT ANGLE FILLET

PERFORATED PIPE IN BACKFILL

DETAIL AT C

CONSTRUCTION JOINT

30MM CEMENT/ SAND GROUT

SECTION BB'

SCALE 1:4

SCALE- 1:50

DETAIL AT C SCALE 1:8

SWIMMING POOL

3 COAT HORIZONTAL ASPHALT (30MM THK)

EXTERNAL TANKING IN MASTIC ASPHALT

SIGN 1 SIGN 2

SMEF 8.2 M WIDE TWO WAY RAMP WITH 1:12 SLOPE 8.2 M WIDE TWO WAY RAMP WITH 1:12 SLOPE

BASEMENT ENTRY

8.2 M WIDE MASTIC ASPHALT WATER PROOFING GRAVEL BACKFILL

8.2 M WIDE TWO WAY RAMP WITH 1:12 SLOPE

BRICK LINING WALL 300 THK RCC DIAPHRAGM WALL PERFORATED PIPE IN BACKFILL 150 MM THK SCREED

SECTION AA' SCALE- 1:50

SIGN 1

Basment Section SIGN 2

Basement floor plan

NAME - VAISHNAVI KOLHE

P-35

SMEF'S BRICK SCHOOL OF ARCHITECTURE

YR-4TH

STA


Tower A

Tower B

Tower C

36-4 BHK

13-2.5 BHK

80-2 BHK

A

13-1.5 BHK 26-3 BHK 2 bhk cut view

1 2

China Mosaic Tiles thk 10 mm

INFINITY EDGE INFINITY DRAIN

3 WATER LEVEL

Stainless steel facing plate

4

Screed 75 mm 1

2

LED LIGHTS 700 DEPTH

5

MAIN DRAIN

3

Flexible Connection

L18

1000

INFINITY EDGE

4

Floor screed 5 50 6mm

TILE

B

RCC 250 MM THK WATER PROOFING TILE 240X115 MM

RCC 300MM THK

PUMP

SCREED 20 MM THK

SECTION AA' SCALE 1:50

UNDERWATER 3 bhk cut view LIGHT SCALE 1:8 SAND FILTER

L17

GRATING

China Mosaic Tiles thk 10 mm

ELECTRICAL PANEL

L19

WATER LEVEL

CLORINATION

HEATER

UNDERWATER STEPS Pool Details SCALE 1:10 DETAIL

WATER LEVEL

RETAINING WALL AND GUTTER DETAIL

LED LIGHTS 700 DEPTH

INFINITY EDGE DETAIL

PVC or rubber water b

SCALE 1:8

SUMP CHANNEL

100 MM THK PCC BED RAFT SLAB WATER PROOFING

CONSTR

DETAIL OF SUMP CHANNEL

DETAIL OF RAMP AT LANDING

FOR DRAINING POOL 1000

MAIN DRAIN L18

L17 WASHOUT SUMP

POOL

INLETS

FILTRATION

L16

TILE L12

L13

Area= 173.4 sq. m.

RCC 300MM THK

DECHLORINATION

SWIMMING POOL STANDARDS Water depth: If it is a private casual, relaxing pool, it may go from 1.0 m to 1.5 m deep.

MASTIC ASPHALT WATER PROOFING

The width between handrails of the pool stairs should be between 500 mm and 600 mm. Walkways and deck areas: Pools shall be completely surrounded by a deck that is at least 1.2 m in WATER CIRCULATION SAFETY SS width GRILL OVER SUMP WATERPROOFING Lighting: Underwater lighting of at least 8.35 lumen of pool water surface area, plus area lighting of LAYER 15 MM 225 thk RCC wall POOL SKIMMER FILTRATION at least 10 lumen or 6.6 W/m2 of deck area. RCC SUPPORTING BEAM Outlets: Pools shall be provided with a minimum of two drains at the deepest point. Centre-to-centre distance between drains shall not exceed 2.0 m. Drains shall not be more than 118 Dia return inlet 3.0 m away from the pool walls. The main drain may be connected to the recirculation system. INLETS PUMP CHLORINATION PVC pipeOpenings shall be covered by grating which cannot be removed without the use of Openings of the 100 Dia SCALE1:50 DRAIN-OUT PIPE from filteration grating shall be at least four times the area of the main drain pipe or have an open area. The maximum width of grate openings shall not exceed 8 mm. The velocity at outlet pipe shall not INCASE OF SPLASHING be more than 0.3 m/s. Filtration rates for various types of filters are: Medium rate filter 11 to 30 m3/m2/h

TILE ADHESIVE 12 MM GLASS MOSAIC TILES 25X25X8

L15 Size of the pool= 10.2m X 17m L14

L16 TANK

SECTION BB' SCALE 1:50

GRAVEL BACKFILL BRICK LINING WALL INFINITY EDGE

1

2 3 4 5

6

300 THK RCC DIAPHRAGM WALL PERFORATED PIPE IN BACKFILL

Female Toilet

RCC BASE SLAB 200 THK

Basment Section SECTION BB'

L15

17000

4 bhk cut view WASH OUT SUMP DETAIL (B) SCALE 1: 5 ALL DIMENSIONS IN MM

POOL

INLETS

DETAIL OF INLET SCALE 1:8

FILTRATION

GRATING

Main Drain Valve 2000 mm c/c

Ladies Changing Room+ Lockers

INFINITY EDGE

Gents Changing Room+ Lockers

SURFACE DRAIN

DECK FLOORING

Gents Toilet

ANTI SKID TILE

RCCwash 250 MM THKm2/h Minimum flow rate for filter back 30 m3/ SCREED 40 MM THK CONCAVE TILE 240X60 MM

DECHLORINATION

8.2 M WIDE TWO WAY RAMP WITH 1:12 SLOPE

LIGHT FIXTURE IP 80

8.2 M WIDE TWO WAY 50mm RAMPScreed WITH 1:12 SLOPE Waterproofing 1st Coat

RCC FOOTING WATER PROOFING TILE 240X115 MM RCC 300 MM THK

China Mosaic Tiles Waterproofinf 2nd coat

8.2 M WIDE

8.2 M WIDE TWO WAY RAMP WITH 1:12 SLOPE INFINITY EDGE

1

DETAIL AT C

L14

CONSTRUCTION JOINT

SCALE 1:4

DETAIL AT C SCALE 1:8

6

SECTION AA'

Female Toilet

SWIMMING POOL

INFINITY EDGE

2 3 4 5

SCALE- 1:50

Gents Toilet

KEY PLAN

SIGN 1

DATE

NAME

SIGN 2

EXP NO.

SUBJECT

VAISHNAVI KOLHE ABTS

SIGN 1

ROLL NO. P-35 YEAR

4th

SMEF'S BRICK SCHOOL OF ARCHITECTURE ,UNDRI,PUNE

SIGN 2

Main Drain Valve 2000 mm c/c Ladies Changing Room+ Lockers INFINITY EDGE

L13

ANTI SKID TILE

LIGHT FIXTURE IP 80

China Mosaic Tiles

50mm Screed

Waterproofinf 2nd coat

Waterproofing 1st Coat

L12 L11

KEY PLAN SIGN 1 SIGN 2

DATE

NAME

VAISHNAVI KOLHE

ElevationABTS EXP NO.

SUBJECT

SMEF'S BRICK SCHOOL OF ARCHITECTURE ,UNDRI,PUNE

ROLL NO. P-35 YEAR

4th

N

SMEF'

GRATING

Gents Changing Room+ Lockers

STAMP

STAMP

8


“Tell me and I forget, teach involve me -Benjamin

the envisions the design of `inspire’ the person who c ther visually or physically. cure and yet open and spa technologies and should a man values. Apart from th through, the campus sh “Skills, Innovat


h me and I may remember, and I learn.” n Franklin

the architectural spaces to come in contact with it eiThe campus should feel seacious, modern, with all new also inculcate positive huhe learnings that one will go hould exude the motto – tion and Pride”

10


02. METAMORPHOSIS INSTITUTE FOR LIBRAL AND VOCATIONAL EDUCATION LOCATION : UDAIPUR, RAJASTHAN

With the extreme climate of Udaipur, the challenge was to design an institution that promotes innovation and skills. As a human, we tend to learn more from each other through interaction and the campus is designed in such a way that students’ interaction with each other and faculty outside the four walls of the classroom happen by promoting an open classroom, public nodes etc.

Admin Welcome center Receptionand Waiting Workshops Academic store Toilets Workshop spillout area Dinning hall Kitchen Multi Purpose hall Cafe Exhibitaion Room Auditorium Studios Library Plan

Library

Common Room

Av Room

Site Sectio


Library Section

Common Room Section

Studios

on

Open Exhibitaion Space

Exhibitaion Room

12


ESCAPE

The concept not of an industrial s inal function, w vating tourists t for a brighter pr create a platfor along with draw ing awareness on design outline th purpose suits

T

As the name sug was to design th For which we wo the necessary ca involves back an


E.BREATH.REJUNATE

only revolves around the use structure that has lost its origwhilst it also focuses on captito learn to shape and mould romising future. the plot is to rm to showcase mixed talent wing a skyline toward spreadn endangered species through he concept of enhancing with best our design approach.

THE COCOON

ggests, the eco niwas the brief he most sustainable housing. orked in a team to design all alculations. The design process nd forth from design to calculations.

14


COMPITAION DRAWINGD


ESCAPE .BREATH . REJUVENATE OIL RIDGE

Internal view of Exhibition

Exterior view from deck Exploded view of Lodging block

Bridge view

SECTION

16



THE COCOON ECO NIWAS COMPITATION In a city of over 20 million people, space is understandably premium in Mumbai. The city has high levels of humidity. The monsoon starts in May and rains the highest in July and lasts till October. The site is located in Worli, facing the Arabian sea to the west. WFR Calculations Calculation of openable aiea (Aop ) 2 total Areaop (3BHK) = 15.35 x 2 units=30.7m 2 2 TOTAL OPENABLE AREA = 30.7m +23 m =53.7 2 m2x9 Floors =493.56 m .

Live Wall Bloque Tremodisipador Brick (Clay Brick)

Heat Reflective Paint

West Side Elevation

Roof Design Stiategies Sum of theimal iesistance foi all mateiials = 2.10 Total theimal iesistance, RT=RU+Rw+R1+R2+R3+.... = 0.17+0.04+2.10 R = 2.31 m2.K/W Theimal tiansmittance of ioof, Uioof = 1/Rt =0.43W/m2.K

Calculation of total carpet aiea (Acarpet) A carpet = no. of DUs x carpet aiea of 1 DU Dwelling units/ floor = 2(2BHK) +2(3BHK) 2 A carpet of 3BHK/floor= 2 x 100 m 2 A carpet of 2BHK/floor= 2 x 61 m 2 A carpet/floor =322m Total A carpet= No. of floors x A carpet/floor = 9 X 322 2 = 2898 m WFR= Aop/Acaipet% =483.3/2898% =16.67% WWR= A non-opaque/ A envelope=54/ 2955.36= 0.0182 RETV Calculations Foi waim and humid climatic zone a= 5.15 b= 1.31 c= 65.21 =1.156 Foi 1- Aopq = 613 Uopq = 1.08 = 5.15x (613 x 1.08 x1.156) = 3941.38 Foi 2- Anonopq = 108 Unonopq = 5.7 = 1.31x (108 x 5.7 x 1.156) = 932.24 RETV = 1/2955.36 x 6664.71 = 2.25 W/m2

18


“If one does not f one has not cha

- Ferdinan The company th quarter wants philosophy and v with their produ emulate their te vancements, va into the architect ing. The compan ple, history, socioeconomic im gion. The motto Velo


fail at times, then allenged himself”

nd Porsche hrough this headto portray their vision. In parallel ucts, they want to echnological adalues and vision ture of this buildny values its peocultural and mpacts in the reo: Vision, Values, ocity

20


04.UZUMAKI HEADQUATERS

Desipline

Innovation

Unit

Public to Private zoning

AUTOMOBILE HEADQUATERS LOCATION: PUNE MAHARAS Uzumaki headquarter sever as a centre where the creative minds gather and w for bringing out the best in motors as the name suggests Uzumaki motors are he take on the world like a tornado with its core value of discipline , Innovation,Un and sustainable.

Sustainable

Top level managment Top level managment Recreational space Research & Design Department Finance & Legal Department IT Department Administration & Managment Facility Management + Security Housekeeping Dinning space Sales & Marketing Department Entrance lobby + public spaces Basement

Ground floor Reception+ lobby+toilets store museum archive and record department

First floor HR and PR department Exhibition Media Lounge

Ground floor plan

first floor plan


SHTRA work ere to nity

SECTION

22


ADVANCED BUILDING TECHNOLOGIES SERVICES

In advanced building technology and services The challenge was to Redesign the existing structure with a focus on material and construction details. We learn new techniques and new materials and the process of selecting the material


05.INFOSYS MULTIPLEX MYSORE LONG SPAN MULTIPLEX

Underground drainage channel

Ground line Underground pit Bolt to GRPF Panels

Primary members made up of steel hollow sections

GRPF Panels

Mero ball connection Secondary members made up of steel hollow section 150 dia @1

C Shaped purlin @1000mm c/c

SECTION

Circular hollow steel section 300mm dia

Mero ball connection

Down take pipe 300mm dai GRPF Panel

Pin connection with nut and bolt Base plate attaches to rcc column Rcc column 800 x 800 mm

24


WORKING D

The brief was to make a office/ administrative block that I chose to detail my sec block d


DRAWINGS

a working drawing of an k of the previous design for cond year Pune haat admin design

26


BACK OFFICE 1

BACK OFFICE 2

G-02 FWC

MALE TOILET

BACK OFFICE 3

G-03 FWC

G-05 FWC

G-04 FWC

RECEPTION AND ENTRANCE LOBBY G-01 FWC

BACK OFFICE 2

BACK OFFICE 1 G-02 FWC

G-03 FWC

G-05 FWC

G-04 FWC

WAITING AREA RECEPTION AND ENTRANCE LOBBY

MALE TOILET

BACK OFFICE 3

FEMALE TOILET G-07 FW C

G-08 FWC

G-01 FWC JANITOR ROOM WAITING AREA CAFE

FEMALE TOILET

G-08 FWC

G-09 FWC

1

2

3 4

5 6

7

8

G-07 FW C

9 10 11

JANITOR ROOM 22 21 20 19 18 17 16 15 14 13 12 CAFE

1

G-09 FWC

2

3 4

5 6

7 8

9 10 11

22 21 20 19 18 17 16 15 14 13 12

1

GROUND FLOOR PLAN

A-103

SCALE- 1:50

1

A-103

STAFF ROOM G-13 FWC

GROUND FLOOR PLAN SCALE- 1:50

STAFF REST AND LUNCH ROOM WITH PANTRY G-12 FWC

MANAGER'S CABIN G-14 FWC

MALE TOILET G-11 FWC

FEMALE TOILET G-10 FWC 23 24 25 26 27 28 29 30 31 32 33 MEETING ROOM G-15 FWC

44 43 42 41 40 39 38 37 36 35 34


2

A-201

SECTION AA SCALE- 1:50

NOTES

1 ALL DIMENS

2 DO NOT SCA

3 THIS DRAWI ARCHITECTU

4 THE CONTR AND DIMENS

5 ANY DISCRE ARCHITECT

6 FOR DRAINA PLEASE REF

7 MODIFICATIO THE ARCHIT OF THE CON

A-504

5

A-504

5

BACK OFFICE 2

BACK OFFICE 1

5

A-503

G-02 FWC

ROOF PLAN SCALE 1:25

BACK OFFICE 3

G-03 F WC

R

G-04 F WC

ENT

RECEPTION AND ENTRANCE LOBBY G-01

F W C BALUSTER M.S.

A

A-201

WAITING AREA G-08 FWC

RAILING 10MM DIAMETER

FIXING PLATE 10MM THK NOSING CAFE G-09 FWC B

A-201

22

CHEMICAL GROUT HANDRAIL 50MM DIA

TILE 5MM THK

20MM PCC GROUT 12MM PLASTER

ARCHITECT

2

A-201

SECTION BB

SME

SCALE- 1:50

PLOT: NUMBER

BALUSTER 25MM DIA

PROJECT:

PROJE PROJE PROJE

DRG. TITLE:

LINE 1 LINE 2 LINE 3

FLOORING 35MM THK RCC SLAB 150MM THK PCC BED

SCALE: 1:25 DATE: xx/xx/xx DRAWN BY:

NAME

RCC BEAM

5

A-504

SECTION SCALE 1:25

ISSUED FOR:

PROJECT NO. DRG. NO.:

28

A


INTEREST AN

Over the year interest in sketching and forms of art .t overview of don


ND PASSION

r I develop an travelling, exploring new this is a small what I have ne.

30



31



Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.