Portfolio Architect Valentine Prouff

Page 1



School Projects 2013 | 2018 | Run-of-River | Towards a Sharing | Collective Dwelling | Climb the Cliff | La Sambre, inacessible ?

Other School Works 2014 | 2018 | Design and Shapes | Architectonique | Drawing

Personal Projects 2015 | 2018 | Prouff Project | Horeau Project





School Projects 2013 | 2018



Tubize, Belgium

| Run-of-River 2013 | 2014


Subject to many floods, the Prairie des Angles is a real seperation between the districts of the north and south in Tubize. Therefore, with the inhabitants in mind, to account for this natural disaster, the project is strucutured along two main axes. The NE / SW axis is a dyke that manages the floods to the West part. This allows a clear bassin and relaxation area in the East part. The NW / SE axis offers a boardwalk, floating and adapting to the floods. Where they meet, there is a covered and open space, which acconodates the functions of the program. The material used is stones and wood, this being as it is present at the site.

|Cross Section

| Model

| Site Plan


|Longitudinal Section 0

1,5 M

0

1,5 M

0

1,5 M

0

1,5 M

|Plan



Brussels, Belgium

| Towards a Sharing 2014 | 2015


This plot has the distinction of two roads with very different characteristics. This influenced the project which consists of a base, public space opening onto the roadway, and two built entities. On the avenue side, there are large bays and an open space building with many daytime rooms. The second building is composed of the nightime rooms, which has a much more intimate feel. These two entities are articulated around a vegetable patio with vertical and horizontal circulations. |Elevation Parc Ave

|Site Plan

|Elevation Verhaegen Street


| Longitudinal Section

| Plan R0

| R+2

| R+3

| R+4



Project without site

| Collective Dwelling 2015 | 2016


Half of the plot’s perimeter is bordered by party walls. It must accommodate a collective dwelling with this program:

2 studios (1/0) - 45m² 2 apartments (2/1) - 65m² 6 apartments (4/2) - 85m² 1 unit (5/3) - 115m²

The project follows the shape of the party wall with a large excavation in the center. The bays enable long, direct and indirect views. |Elevation

|Research Works

|Plan R0


|Section AA’

|Plan R+1

|Section BB’

|Plan R+3



Napoli, Italia

| Climb the Cliff 2016 | 2017


The volume of the project was inspired by the desire to link the historic center with the promontory of Naples by redrawing a part of this axis at the level of the cliff. The project consists of 4 concrete trays, a massive and dense material reminiscent of the robustness of the rock. In contrast, the Corten Steel roof is airy and light. wIt coats the stone ruins, which are present on site, to then become skylights.

| Middle Scale

| Site Plan


| Concept / Model with Concrete & Corten

| Realized Model


The cascading plateaux offers a view of the Bay of Naples. They each host a different function, responding to the mixed program: climbing wall, restaurant and a neighbourhood house. Those requiring a greater degree of intimacy use the rehabilitated ruins.

0

1,5 M

| Longitudinal Section



0

1,5 M

| Cross Section


0

600 M

| Plan R+3

| Atmosphere Inside



Charleroi Metropole, Belgium

| La Sambre, Inacessible ? From Charleroi to Farciennes 2017 | 2018


Scale 1

#1 Linking soft mobility networks, train stations and urban centers

This project is included in a written part, whose link is : https://issuu.com/valentineprouff/docs/me_moire_en_architecture_ valentine_ It originated in a tension noted on the site which is the inaccessibility of the river who named La Sambre. The project comes in 3 scales : - The scale of the territory, to understand the issues and show the strategic places of action. - The scale of the commune of Chatelet, to test the hypotheses of actions. - The return on the large territory, to apply these actions to other places and allow a new vision of the territory.

| Accessibility: Level +1

The inaccessibility of the Sambre is due to two major historical facts: the industrial crisis and the canalization of the river.

| Accessibility: Level 0


#2 Reconnect cities to the river

#3 Reintroducing biodiversity along the Sambre

| Impassable infrastructures: railway and highway

| Use of natural river bed

| Impassable industries

| Use of natural meanders


Scale 1

#1 This cartographic work allows to set up 3 strategies of actions: #1 Linking soft mobility networks, train stations and urban centers #2 Reconnect cities to the river #3 Reintroducing biodiversity along the Sambre


#2

#3


Scale 2 : Chatelet

| Action 1 : Connect levels 0 and +1 Creation of a path crossing the wasteland

#1 Linking soft mobility networks, train stations and urban centers

Creation of a walkway between bridge and bank

| Action 2 : Connect the two banks

Shared circulation


| New connections possible by mobilizing these 3 actions

| New Vision


Scale 2 : Chatelet

| Action 1 : Cross the highway

#2 Reconnect cities to the river

Deviation of the highway on its oversized section

The highway as a bridge

| Action 2 : Programmatic banks

Activities and leisure


| Gradients of time and financial resources

| New vision

| New vision


Scale 2 : Chatelet #3 Reintroducing biodiversity along the Sambre

| Action 1 : Reinvest the natural river bed

De-artificialized the natural bed

Re opening the bed

Re opening the bed Filter the water

| Action 2 : Reinvest the natural meander

Treat the meander as an eco system


| Gradients of time and financial resources

| New vision

| New vision


Scale 3 #1 Linking soft mobility networks, train stations and urban centers

Return to the scale of the large territory, setting up actions on the other places of the site highlighted previously.

Finally, by setting up these actions at the places announced, this allows a new reading of the territory, the Sambre becoming a structuring axis of the territory. The soft mobility is then expanded and serves the cities of the territory through a transverse and longitudinal axis to the Sambre and all the train stations.

Places of intervention : 1 - Couillet 2 - Trieux 3 - Farciennes 4 - Fariennes Nord


Action 1 Action 3 Cross 1

Action 1 Cross 2

Action 3 Cross 3

Action 1 Action 2

Cross 4


Scale 3 #2 Reconnect cities to the river The urban poles now have the opportunity to develop along the Sambre, which also allows to find relationships between banks. This responds to the wishes of the public actors (Chatelet and Farciennes) and residents to reconnect with the river. In addition, this opens up opportunities for the development of economic, commercial and recreational activities as well as a better attraction for those towns that are still struggling to recover from industrial decline. Places of intervention : 1 - Couillet Railway 2 - Couillet Wasteland 3 - Trieux 4 - Farciennes


Action 1

Cross 1

Action 2

Cross 2

Cross 3

Cross 4


Scale 3 #3 Reintroducing along the Sambre

biodiversity

The creation of ecosystem along the Sambre allows the reintroduction of aquatic and terrestrial biodiversity. Associated with non-profit organizations such as the Rivière Sambre and Affluent Contract or local initiatives such as street fishing, it is possible to raise awareness and involve the population in the management of these ecosystems. This ecological dimension is directly related to the use of a gentler mobility. Places of intervention : 1 - Charleroi 2 - Montignies S/ Sambre 3 - Couillet 4 - Farciennes


Action 1

Cross 1

Cross 2

Cross 3 Action 1 Action 2 Cross 3’

Cross 4


| Before


| After



Other School Works 2014 | 2018


| Design and Shapes

The exercise is to create a light tower from a classic geometric shape, the square. The assembly system is done only through the notches and folds.

2 notches 1 folds 480 squares


2014 | 2015


| Drawing


2013 | 2018 2014 | 2017


| Architectonique The requirements were to propose a facade from a movie, based on a triangular plan. Jean-Luc Godart’s film Bande à Part staged a complicated love story based on «Je t’aime, moi non plus». The project proposes an envelope expressing balance and imbalance; balance in the vertical lines of the bay and imbalance in the oblique lines of the facade. By observing the model from different angles, these two features are always visible simultaneously.

| Research Works


| Model

2015 | 2016



Personal Projects 2015 | 2018


| Prouff Project The project consists of a complete renovation of a one bedroom apartment (50 m²). A wide opening in the transverse wall allows an open space between the living room and the kitchen, in addition to a brighter central part of the apartment. A mezzanine was created above the kitchen and the bathroom. This creates volume with the different ceiling heights. The materials were chosen to bring brightness to the rooms; clear wood and cream paint. The red kitchen warms the mood and gives a pop side to the whole apartment.

| Plan


| Original State

| Site

Brussels, Belgium

2015 | Project


| Horeau Project The aim of this project is to elevate the roof by 1 meter. The objective is to take full advantage of the space of the first floor, previously not utelised by the roof slope. This work proposes different new facades. The goal is to harmonise the initial reinforced concrete triangular bay with the new height of the house. The project, chosen by the customer, is to put a wood cladding on the upper part, thus framing the triangular bay on the raised surface.

| Facades propositions


| Project

Versailles, France

2018



Prouff Valentine prouff.valentine@orange.fr +61 (0)4 90 25 94 67 2013 | 2018


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.