PORTFOLIO
vaniammcorreia@gmail.com vania.mariline (Skype) +351 920 211 923
PORTFOLIO
INDEX About me | Academic Works | Competitions
03
PORTFOLIO
ABOUT ME
Born in April 1988 (Portugal), currently finishing her master's degree in architectural studies on Faculty of Science and Technology of the University of Coimbra, D'Arq, developing her final thesis. Self-taught in photography and drawing, explores the theme of light and material textures in all its work and is principally engaged to architecture. Love to explore the conceptual as a material and the way to express "ideas". Fluent in her mother language portuguese, speaks and writes english and a bit of spanish. Smiling and amazingly good spirit, already participated in individual and group competitions and exhibitions, obtained good communication skills and team spirit by interacting with other students and professionals. She won a Second Prize in Archinews Stand Concept for the Lisbon International Fair and won an Honorable Mention in one of the most important portuguese architectural competition for a architecture's student - Secil. Good adaptation skills acquired by academic and professional practice in a variety of work environments and conditions. Being a passionate for architecture without formal restraints justify's her creative and critical mind, able to produce innovative ideas through experience gained from academic journey, traveling and, definitely, influence in her lifestyle and architecture pursue.
04
ABOUT ME
PERSONAL INFORMATION Name Identity number 18886185 Adress Mobile number
00 351 920 211 923
E-mail vaniammcorreia@gmail.com Nationality Portuguese Date of birth 04/04/1988
ACADEMIC EDUCATION Dates September 2009 - 2011 (Final Master's Thesis in development) Title of qualification awarded Master's Degree in Architecture Name and type of organization Principal subjects/skills
Department of Architecture, Faculty of Science and Technology of the University of Coimbra, Portugal Architectural Project, domain of different scales in Architecture and Urbanism
Direct control of teachers General guidance of teachers 05
Dates September 2006 - July 2009 Title of qualification awarded Bachelor Degree in Architecture Name and type of organization Final average Principal subjects/skills
Department of Architecture, Faculty of Science and Technology of the University of Coimbra, Portugal 14 (20) Architectural Project, domain of different scales in Architecture and Urbanism
Direct control of teachers General guidance of teachers Dates September 2003 - July 2006 Title of qualification awarded Fine Arts Course Name and type of organization Final average
16 ( 20)
Principal subjects/skills Geometry and Maths
TECHNICAL SKILLS CAD Autodesk AutoCAD, Advanced user- academic training, self-learning 3D modeling Graphisoft ArchiCAD, Intermediate user- self-learning graphical editing electronic publishing Microsoft Office rendering
Adobe Photoshop, Intermediate user- academic training, self-learning Adobe InDesign, Basic user- self-learning Word, Power-Point, Intermediate user- self-learning Artlantis, Intermediate user- self-learning
PORTFOLIO
CONFERENCES June 2012 Participation in debate Reencontro com a Sereia, Coimbra, Portugal Novembro 2011 Participation in the ccolloquium "Reescrever o
organized by Centro de Estudos Sociais da
October 2011 June 2011
, Coimbra, Portugal
April2011 Participation in the workshop Processos Digitais: module I- Adobe Lightroom (digital photography and developing), module II- Adobe Photoshop (editing and post-production image), module III- Adobe illustrator e adobe indesign in Departamento de Arquitectura da Universidade de Coimbra, with Eduardo Nascimento March 2011 Participation in the Workshop advanced project, doctoral program in Landscaping and Urban Ecology, 2010/2011 edition, coordinated by Carl Steinitz (Harvard University), Paulo Farinha Marques (Porto University) and Cristina June 2010 Participation in the seminar Coimbra
sobre (outros)
in Centro de Estudos Sociais da Universidade de
May 2010 Participation in the conference "Mulheres na Arquitectura", colloquium, exhibition and publication, organized by 06
September 2008 Participation in the international conference Warm-up EXD Lisboa 09
Zumthor, Buildings and Projects
COMPETITIONS May 2013 Participation in the Competition Instant House @ School, Milan, Italy June 2012 Participation in the Workshop Ideias para o Jardim da Sereia, Coimbra, Portugal January 2012 December 2011 November 2011 Participation in the Competition GO! Architecture v.03, Porto, Portugal November 2011 April 2011 April 2011 December 2010 Participation in the Competition GO! Architecture v.02, Porto, Portugal
EXHIBITION OF WORKS October 2013 Participation in the exhibition Competition Instant House @ School, Made Expo Milano Architettura Design, Italy 2012 Participation in the exhibition Go.Architecture v.03, Faculdade de Arquitectura da Universidade do Porto, Portugal May 2011 March-April 2011 Participation in the exhibition Reinventada, Nacional Machado de Castro, Coimbra, Portugal
Urbanas para a Margem do
Museu
2011 Participation in the exhibition Go.Architecture v.02, Faculdade de Arquitectura da Universidade do Porto, 2011, Portugal 2009 Participation in the exhibition
on the
organized under the discipline of Drawing II under
ABOUT ME
EXTRACURRICULAR March 2012 June 2006 Exchange/European Congress, London, England, (participating countries: Portugal, UK, Suisse, German, France, Luxemburg, Normandy, Sweden, Netherlands)
PUBLISHED WORKS 2013 http://issuu.com/vaniacorreia 2013 http://be.net/vmmcorreia 2013 http://cargocollective.com/vaniammcorreia 2013 http://www.instanthouse.it/it/vincitori/progetti?idp=23 2012 http://betatwork.wordpress.com/2012/11/26/video-reportagem-reencontro-com-a-sereia/ 2012 http://ucv.uc.pt/ucv/podcasts/universo-uc/reencontro-com-a-sereia 2012 http://sigarra.up.pt/faup/pt/noticias_geral.ver_noticia?p_nr=1249 2011 http://arquitectos.pt/?no=4040523766,197 March 2011 March 2011 http://www.archinews.pt/ARCHINEWS_STAND_CONCEPT_TEKTONICA_2011.pdf 07
AWARDS 2012 2011 2011 Fifth local Prize on the 21th Iberic Competition for Construction Solutions and Spain 2003-2009
, Coimbra, Portugal
PORTFOLIO
Heemskerk Amsterdam Oxford Hilversum Hague London Delf Ultrecht Otterlo Rotterdam Brussels Paris Bilbao
Chicago Pittsburgh
New York
Salamanca Madrid Oporto Coimbra Lisbon Seville
08
09
PORTFOLIO
ACADEMIC WORKS 10
12
20
28
28
18
34
QUIAIOS BEACH SWIMMING POOL
11
PORTFOLIO
25
location
2006-2007 . Figueira da Foz
QUIAIOS BEACH SWIMMING POOL Subject: Projecto I . Regency: Architect
12
Bandeirinha . Assistance:
sealine 0
The site is a result of the stratification of a ridge which dissolves the beach. The
50
"(...)
object is inserted into the implanted black rock, carved, and is complemented by a maritime journey that accompanies the coordinates of the ground. It is a journey of discovery between land and sea, until you reach the limit and a concrete wall to guide us, to the sound of the sea. Finally, the contemplation of the horizon and the whole beach is unveiled on a platform.
." Kenneth Frampton in Poesis and Transformation: The Architecture of
The concept prevails in a precise geometry that relates to the sea and opposes and confronts the irregularity of the natural terrain of the coast, showing the
"
project. The tower, a well of light, indicates the entrance and finishes off the entire drawing. The project develops on two levels. On the ground level is located the main entrance and pathways to the pool, to the baths and technical areas. At the top level it is a cafeteria and terrace for the entire seascape.
Alvaro Siza in 01 texts / Alvaro Siza
QUIAIOS BEACH SWIMMING POOL
13
model study
PORTFOLIO
2
8 1
coverage level
4
5
2
8 1
1 pool 2 entrance ramp 3 entrance 4 restaurant/ bar 5 terrace 6 bathhouses 7 services/engine room 8 access ramp to the beach
level floor 01 at elevation 13,5 7
6
6
3 2
14 8 1
0
10
level floor 00 at elevation 11,5
we
west elevation
s1
section 1
s2
section 2
0
10
HOUSING COMPLEX
F
E
D
C
B
A
I H
nascent elevation
J M L K
level 01
G B
construction details A zinc B thermal insulation C geotextile felt D waterproofing canvas E regularization layer F concrete G pladur ceilling H blackout I double leaf window sliding with aluminum frame J Panel sliding with eternit plates K waterproof fabric L regularization layer M metal guard
south elevation (closed)
level 00
south elevation
15
level 01
north elevation
beams and slabs study
coverage's inclination
PORTFOLIO
location 0
2009 . Coimbra
5
3
HOUSING COMPLEX
4
6 8
4
2
2
4
2
1 10
Subject: Projecto III . Assistance: Architect Nuno Gomes
I . Regency: Architect
Gigante .
The complex is located in Quinta da Portela, on the outskirts of Coimbra, away from the hustle of the city. The shape of the land is sloping and has proximity to urban construction with identified rules. Therefore, the shape and structure of the building appears in this guideline in accordance with the scale that involves. Thus, arises a volume, of regular form, a parallelepiped, from one to another end of the lot, but that is part of the characterization of the existing volumes. The building is suspended in the air on pillars, with a direct relationship with the passer and the rest of the land, with no interruption between the street-building. The program works in a module that is repeated throughout the whole, prevails an additional space in all apartments, with the possible reversal. The building is a mutant as the predominant effect of the facades is alternative and varied, depending on the experiences of each. The material used to camouflage the whole building is Eternit.
5
9 6
4
7
7
2
50
4
3
4
4
16 1
2
2
2 10
module 1 living 2 bedroom 3 additional space 4 bathroom 5 kitchen 6 laundry 7 storeroom 8 lift 9 stairs 10 balcony
TEMPORARY RESIDENCE FOR TEACHERS
e
1
2 3 5
model
module 1 entry 2 room 3 bathroom 4 kitchen 5 balcony
17
model
PORTFOLIO
location 0
50
90
2009. Coimbra
TEMPORARY RESIDENCE FOR GUEST TEACHERS Subject: Projecto III . Assistance: Architect Nuno Gomes
I . Regency: Architect
92,3
18 level
Gigante .
It was proposed the creation of a temporary residence for visiting professors at the
east elevation
University. The area is located on a top of the hill in the University of Coimbra, beside the canteen. The terrain is slightly sloping, thinking in some stabilization. As such, I created a base,
elevation
and then the volume of the residences, a parallelepiped, could land over him, controlling the levels. The program would be six bedrooms, complemented with bathroom and kitchen. Still in d3 d3
the same set would be a common room and a laundry room. The bedroom module is quite broad and complete as possible in order to be a stay of
d3 d3 d2
d1
one month to one year.
d4 d4 d4
All units are facing east and with a clear view over Coimbra. The collective room is
d1
d4
d2
facing south. The module is privileged with three skylights that illuminate the kitchen, the bathroom and the patio in order to receive always light, even indirect. d1
d2
construction details
south elevation
HOTEL & SPA
19
PORTFOLIO
sv2 sv1
sv3
location 0
side view 1
2009-2010 . Coimbra
IINTERVENTION PROPOSAL FOR MONTES CLAROS RIDGE WITH INSERTION OF AN URBAN HOTEL EQUIPMENT Subjects: Projecto IV . . Projecto Urbano . Regency: Architect Fernando. Architect Bettencourt . Architect Adelino Assistance: Architect Carlos Martins
50
20
side view 2
. side view 3
"Urban Hall" . In the urban framework of the hotel complex, the conceptualization
"Inside the block." Currently city becomes an artificial environment and
of the proposal comes from the reference of "Urban hall", an area that was timidly
disarticulated from landscape, consisting of spaces without human scale which
and innocently affirming, one of the main entrances of Coimbra, the Montes
causes imbalances of any kind to the city.
Claros ridge. This point of arrival and dispersion into the city becomes integral in
Urban green spaces are a key element in the construction of the city, able to
the intervention strategy and, to reinforce this point is proposed to introduce a
restore this balance to their users. Through the urban green spaces can be
cultural complex, a green zone for public use and a Hotel and Spa complex.
ecological continuity between the city and the surrounding landscape, are
The proposal will not only looking for integration into the urban tissue by relating
components of urban design elements, such as equipment, the intention is to
with the surrounding landscape, as it extends continuously throughout the
establish an urban model, sustained concentration of skills and diverse urban
program, creating diverse spaces, functions of leisure and entertainment, without
innovation dynamics in that public space.
losing sight of the whole concept intended: the cultural and public green.
The public spaces are always associated with buildings that confer means and are moving platforms, namely connection spaces between buildings. Therefore, we created a route, with living spaces into the interior of this block now penetrable. Were integrated, a set of volumes, that may take diverse programs that are developed as we go through a place that brings us to the end of the field.
HOTEL & SPA
hd3
hd2 hd1 detail section level
vd3
1 asphaltic concrete 60mm 2 bituminous macadam 0/25(80mm ) 3 bituminous macadam 0/40 (100mm) 4 tout-venant (150mm) 5 grass 6 prepared land for vegetation 7 granite guide 8 settlement mass(70mm) 9 concrete foundation 10 concrete layer 11 concrete plank 12 concrete plaster (100mm) 13 gravel stone (150mm) 14 granite counter guide 15 concrete drain 16 wooden deck 17wood joist 18 concrete support 19 level regulating layer
21
vd1 56
vd2 7 8 9 10
1234
10 14
7 8 15
13 4
11 8 12
4 13 12
detail section 19 18
vertical detail 1
vertical detail 2
vertical detail 3
horizontal detail 1
horizontal detail 2
horizontal detail 3
17 16
"Ramp". The ramp is designed as a route that crosses the slopes and will
"Material". One of the vital pieces for the materialization of the proposal is the
overcoming levels until you reach the top, to the contemplation of the whole. The
combination and contrast of building materials. The flooring system is clear and
multiple breaks invite you to stay and marvel the land. The ramp functions as a
simple. Whenever there is a transition into the terrain the limestone pavement
carrier levels.
transitions to concrete planks and there is understood the difference of place.
"Equipment". The top of the land is topped with a versatile pavilion and a
Besides allowing the experience of different surfaces. It is a preparation before a
cafeteria, following the guidelines of evolving, integrating into the urban design.
new landscape or feel for the new public space. Such as concrete planks
Besides the demand for leisure and relaxation visitors are invited to participate in
designed to interrupt the tour in Calouste Gulbelkian, calling public attention,
the cultural space that the infrastructure provides.
and almost calls / invites to enter / penetrate inside the block. The result is a sequence of episodic and varied public spaces arranged along the proposed intervention.
PORTFOLIO
44 4 6
9
7
8
7 43
42
level 02 rooms 0
10
se 22
south elevation
model
"Location of the Hotel." The intervention starts by implanting the Hotel program,
A basement fills the building and completes the block. This volume is directly
which is found in the back block of Avenida Calouste Gulbenkian intending to
connected with the terrain entering at elevation 124, with a difference of 40cm of
reach the urban scale. The surrounding is quite unqualified, and is marked by a
the cover platform (meeting point of several routes and connections from the
high topography, which appears as the leftover block itself, interesting to create
streets to the terrain). Here come the skylights spa, which give rhythm and gain
links and pathways, or additional programs.The hotel organizes itself from its
volume with 80cm above it.
program, the distinction public / private social / intimate. The intention is to create the social space not only dedicated to users of the hotel but also the public outside. Therefore, the solution is a tower that corresponds to the volume of the rooms, from which defines its compositional and structural modeling of the hotel, or the private part. Is based on a platform that communicates with the terrain and is where the hotel bar.
HOTEL & SPA
22
23
26
24
25
10
13 16 21
17
18
19
20 14 15
3 12 10
4
1
11
10 15
6
9
2
7
6
7
8
8
7 5
7 5
level 00 entrance 36
39
35
36
33
23
level 01
34
38
40
32 31
30
37
26
29
9
6
42 7
27
8
28
5
7
6
7
41
7
2
level -01
level -02 0
10
11 luggage room 22 squash 31 dirt cup 1 reception 12 administration 23 fitness/Gim 32 kitchen 2 foyer 13 spa 24 yoga room 33 cold zon 3 living area 34 day's pantry 4 services bathroom 14 reception and/ or bar 25 treatment room/ 15 cafeteria massage 36 storage 5 public bathroom 16 balneary, handicapped 26 laundry/ washing 37 trash 6 services lift 17 balneary, fem treatment 38 loads 7 public lift 18 balneary, masc 27 events room 39 engine room 8 Vertical pipe connection to the 19 relaxing area 28 catering room 40 access to parking chimneys on the roof 20 sauna 29 restaurant 41 boiler zone 9 environmental treatment unit 21 pool 30 cup clean 42 clothing warehouse 10 technical area
PORTFOLIO
model s1
section 1 s2
section 2
s3
section 3 0
model
10
24
HOTEL & SPA
5 6 1 2
9 3 4 7 8
vd1 12 14 8
8 7 1 13 4 6 9 5
vd2
11 6 19 23 24 25
vd3
12 13 14
26 27
20 21 22
vd4
25 28 30 29 18 33 22 32 27 4
vd5
vd6
vd7
27 32 18 17 16 4 15 31 34 13 20
vertical detail 0
1
25 1 concrete plank 2 spacer 3 concrete block 4 geotextile felt 5 thermal insulation 6 waterproofing membrane 7 regularization layer 8 level regulating layer 9 concrete 10 interior floor in stone 11 outdoor window frames 12 stone 13 laying mortar 14 soundproofing 15 drainage blanket 16 limestone cube 17 sand settlement 18 concrete plaster
section 4 0
19 granite guide 20 settlement mass 21 concrete drain 22 concrete layer 23 granite counter guide 24 asphaltic concrete 25 bituminous macadam 0/25 (80mm) 26 bituminous macadam 0/40 (100mm) 27 tout-venant 28 brick 29 air box 30 parget 31 pvc canvas 32 gravel stone 33 polymer layer 34 drain
s4
vd1
vd2
vd3
vd4
vd5
vd7 10
vd6
PORTFOLIO
elevation material aplication
elevation
room section
rs
wood brick concrete B C D
room module
A
26
A neoprene B air box C thermal insulation D pladur structure E plasterboard F waterproofing membrane G concrete plank H wood floor I wood panel J regularization layer
E
3
1
4
1 1 3
4
2 3
H G
2 F
4 5
2
5 I
J
window frames detail 0
model
0,5
TANATORIUM
27
PORTFOLIO
location 0
2010-2011 . Coimbra
50
side view
COIMBRA'S TANATORIUM AND CREMATORIUM Honorable Mention Subject: Projecto V . Regency: Architect Rui Lobo
The
28
Byrne . Assistance: Architect
is located at the top of Conchada, in Coimbra, beside the
The set works as a sequence of buildings that create an outdoor space
cemetery. The shape of the terrain and the proximity of urban construction
programmatically opposite the cemetery: on the one hand, the aridity of the
without identified rules, suggested a longitudinal organization of the building due
graves and marble floors, opposed an open green space, which emphasizes the
to a guideline that is in harmony with the dominant axis of the cemetery. On the
continuity between the vegetation of Conchada lane alignment, the grass and
other hand, small scale of involving constructions conditioned the size of build
trees of the land; on the other hand, the reference area of the cemetery that is,
volume, for the purpose of trying to consolidate the natural terrain and the
precludes a space where light and symbolic relationships are crucial: the lighting
disaggregated Conchada urban structure. In this sense must understand the
of vertical roof lights in the chapels of veiling strengthens the idea of coming to
characterization of the building as a sequence of geometrically independent
God; clearance of materials and the cycle of the seasons represented by the
volumes, but articulated with a "green" slab, which provides a moment of
organic transformation of the Magnolia interrupting the slab, the relationship with
contemplation of the entire hillside. At the same time it is assumed as a
the land. Their autonomy allows easy recognition of the place and symbolically
structuring place of this high elevation. In this integration, the chapel for
transforms the entire set (including the outside) in sacred space .
religious acts and funerals, adds depth to the field and strengthens the mass.
TANATORIUM
29
PORTFOLIO
C:\Users\rosa\Desktop\Texturas\4358847181_be7daee26e_o.jpg C:\Users\rosa\Desktop\Texturas\4358847181_be7daee26e_o.jpg C:\Users\rosa\Desktop\Texturas\4358847181_be7daee26e_o.jpg C:\Users\rosa\Desktop\Texturas\4358847181_be7daee26e_o.jpg
18
17
9
12 16
15
14
13
11
2
10
7
4
3
30 6
8
8
8
8
5
north elevation level 0, at 83m
Experience 1: INTROSPECTION. It is an experience of discovery, as it makes a grief and instrospective journey that leads us to the tanatorium. Experience 2: DISCOVERY. The marking of boxes / volumes above the green terrain frames the view of the landscape. A perpendicular ramp to the path marks the access to the program, adding depth to the terrain and reinforcing the front door. Without explaining where to take us, the dark ramp appears with a light in the background, serving as a guide. Experience 3: Contemplation + PURIFICATION. The ramp ends in a large space for contemplation of the entire landscape, and then is discovered the building, buried, thinking that refers to the ancient cave, a gift from mother nature. Then makes the purification with the light of divinity and serenity of the moment. Experience 4: DEVOTION AND DIVINE. The contact with the transcendent happens in chapels with the illumination of God's truth (light from roof lights) and monumentality of the box, with the faith and ensure the body.
0
5 1 main access ramp 2 foyer 3 reception 4 seating area 5 church 6 sacristy 7 ashes delivery room 8 velation room 9 restroom 10 administration 11 meeting room 12 bathroom 13 cold storage chamber 14 treatment room 15 crematorium 16 technique zone, chiller and environmental treatment unit 17 parking / services 18 ramp access to funeral cars
TANATORIUM
e1
elevation 1
e2
elevation 2 e3
31
elevation 3 0
10
PORTFOLIO
e4
vd3 vd5
vd2 vd1 1 geotextile felt 2 thermal insulation 3 waterproofing canvas 4 regularization layer 5 layer shape 6 concrete 7 wood floor 8 limestone 9 regularization layer 10 sand settling 11 concrete settling 12 air box 13 massive settlement 14 wooden beam 15 concrete foundation 16 prepared terrain for vegetation 17 riprap 18 travertine veneers fittings with hidden support and retention, of stainless steel 19 iron frames 20 cobble 21 gravel 22 iron guard 23 drain 24 iron bracket 25 terrain
vd4
vd6
elevation 4, scale 1:200
horizontal detail 1
horizontal detail 2
horizontal detail 3 21 1 2 3 4 5 6
16 20 1 2 3 4 5 6
horizontal detail 4 19 6 14 7
horizontal detail 5 22 16 20 1 2 3 4 5
horizontal detail 6 25 15
18 12 2 17 11 4 3 9 8
8
24 23 9 13 10 25 17 11
vertical detail 1
vertical detail 2
vertical detail 3
Constructively, the building looking for a simplicity in material that accentuates the stripping symbolic ceremony. In the chapel of religious celebrations the apparent concrete, outside and inside, fits the desire of a noble austerity and aging constructive resist the use of different requests. The floors are limestone in the foyer and circulation areas, and timber in the main areas. The chapels
intended for funerals are covered
outwardly in roman travertine, like a temple or sacred safe. Inside the concrete dominates the walls and ceiling and, a wooden floor. Iron is used in window frames, allowing aging that ennobles, noting the passage of time and scale.
vertical detail 4
vertical detail 5
vertical detail 6 construction details, scale 1:20
32
REIVENTED COIMBRA Urban Visions for Mondego'S Margins
33
intervention area . model
PORTFOLIO
2011 . Museu Nacional de Machado de Castro, Coimbra
REIVENTED COIMBRA Urban Visions for Mondego'S Margins Exhibition Organized by the Department of Architecture of FCTUC under the Cultural Week of the University of Coimbra
34
35
PORTFOLIO
COMPETITIONS 36
28
38
40
42
44
46
48
ARCHINEWS STAND CONCEPT
37
reading
computers
exhibitor of publications, magazines and books internet point
reception and point of sale
exhibition of the finalists
PORTFOLIO
level 1
elevation 1
equipment | domotic | furniture
2011 . FIL Lisbon
INSIDE SPACE - Jofebar sistem Iduna R 07.13.06
ARCHINEWS STAND CONCEPT |
Iduna R 07.13.07
2nd PLACE
computer LG M2280D screen
The space was immediately interpreted as an all constructed, a deconstructed
It is proposed the possibility of the chosen 10 panels works are recorded on
mass that generates an installation -stand- with various spaces and functions.
glass plates and exposed the models in niches integrated in the same structure.
That same concept enters the idea that deconstruction be realized with minimum
Facing the whole volume, the clippings relate to all space because they create
possible elements.
relationships and permeability. In these relationships, visual and spatial, the full
The program is organized into three major sections: the point of sale of
and empty, the concept allows you to create hierarchy of spaces and a clear
publications, a reading area and exhibition area of 10 final papers. The selling
reading of the same.
point also serves reception and / or arrival point and distribute to other areas, and you can make another route and wander randomly. From the arrangement of these modules, Iduna material, these can be appropriate in various ways, serving as a space for resting, reading, magazines and books display and viewing of the work. We chose to make a structure Jofebar for the exhibition of the 10 finalists. The lighted plan help define the altimeter proportion illumination of spaces.
of building and ensures
38
CUBE TO BE... PEREGRINES SHELTER
ground level box L
ground level box R
section L
section R
ground level box M
39
0
section M
1,2
LIVING . This box appears spatially oriented and supporting an interior space for the preparation of meals. Means a metaphysical idea of worship of fire that immediately stands for meeting and socializing. The pilgrim strengthens forces in the act of eating or being. RELAX . Related to the natural spring, where the water element prevails. This comes from rain, being filtered and collected in a small tank which binds to three taps: feet, hands and shower, facing the same space: purifier body. If rainwater missing, the pilgrim can enjoy the water source. Here the pilgrim guarantees basic hygiene or simply resting, and strengthens, refreshes your feet in a small tank so that later you can continue your way. MEDITATE . Distance is gaining prominence and importance so. Although isolated is carefully implemented so as not to obstruct but to finish of the field of view. Ends in itself and involves who discovers, still generating a vertical relationship where the other two elements are patents, land and air, an idea that the ground (for which box turns) which pilgrim chooses to tread and go it's set, not forgetting a vertical lighting guide: rests and strengthens the spirit.
PORTFOLIO
-1 -2
-3
C:\Users\fabio\Desktop\heli cubo.jpg -4
-5
model location 0
1,2
2012 . Santiago de Compostela, Spain
CUBE TO BE...
40
PEREGRINES SHELTER. A STOP ON THE WAY 5TH PLACE
Isolated of any basic supply point, the place has to do with a pilgrimage route
The object itself, due to its ephemeral or seasonal character, is not more than a
that runs along the territory. The natural spring, a chapel and a shelter for
cubic box on corten steel, open on one side whose design of the interior space is
pilgrims characterize a space to stop restoring forces.
given by plasterboard with a white finish. It should be noted that this white
Thus, the proposed project involves a single cubic object that seeks to generate responses to different programs (Living, Relax and Meditate) through a
element expands abroad in two different moments, generating or skylight or entrance inside. This gesture also aims to deconstruct the cubic volume.
deployment and distinct position for each situation. Having a neighborhood
It was also taken into account the multiple internal measure 1,20 m. With this
relationship with the pre-existence, especially with transient, always uniquely,
modulation is facilitated by the placement and assembly of plasterboard plates,
their relative position is varied over a
the thickness of the covering is absorbed by the outside measured. The module
rotation around an edge of the base.
This dynamic generates different spaces and
moments using only one
is built on wooden stakes stuck in the ground, while its own structure, metallic, is
modulated object .
versatile since it serves the corten steel box as it serves the interior plasterboard.
Not intended to compete with the existing building, but it dignifies the sense
Disassembled, will not track or trace the territory.
that complements, also brings a forth sense of unity to the place, a harmony in the composition, that, the piece, may even come to be repeated,on the scale, of route to Santiago de Compostela.
AGRAMONTE'S TANATORIUM
41
1 florist 2 coffee shop 3 administration 4 storage 5 bathroom 6 relaxation room 7 waiting room 8 antechamber 9 memorial room 10 chapel/ farewell room 11 parking hearse 12 exit the body of the chapel
PORTFOLIO
s1
location
s2 11 8
s3 12
10
9
9
9 7 6 5
2012 . Oporto
4 3
AGRAMONTE'S TANATORIUM
2
42
1
Competition Go! Architecture v.03 . 48Hours ground level 0
10
west elevation
The site is in an urban context around important landmarks of the city of Porto, as
section 1
section 3
the cemetery of Agramonte and House of Music. It's inserted in a grid that goes structuring along an axis that characterizes the city, the Avenida da Boavista. Its boundaries are well defined physically on three of its sides, opening to the street
south elevation
of Bishop Fonseca Soares. The exercise imposed the idea of creating an enclosed space, controlled, allowing cut the relationship with the exterior, with the sounds of urbanity. This leads to the principle of building, a wall that closes a space, quiet, introspective, with a square that receives nature and brings together different people. The city is the remaining elevations of the square. The wall take thickness and absorbs the Tanatorium program. Inside several spaces of different shapes are characterized by the ceiling height and openings to the outside, so as to cause different sensations according to the spatial feature that each space serves. The wall is materialized in brick, a material that comes from the earth in some way associated with the cycle of life as a symbol of the "last house" of Man.
section 2
REINVENTED MEMORY RESIDENCE FOR ARTISTS
Pelames street view
43
Souto street elevation
elevation of the square
Pelames street elevation
section 2
square view
section 1
PORTFOLIO
sleeping area
7
capa and bica tile concrete
8
granite stone 20cm 5
social area
8
wood floor plaster board
6
wooden window frame preexisting wall of granite 4
workshop
8
thermal insulation concrete
3
constructive detail
2012 . Oporto
REINVENTED MEMORY RESIDENCE FOR ARTISTS
44 public exhibition space s1 1
2
s2
1 public exhibition space 2 vertical access 3 patio 4 workshop 5 confection and snack area 6 living 7 sleeping area 8 sanitary
The problem of the Historic Center is a present reality in our cities. The
This is a building of all and for all where the only condition imposed is cited. It is
abandonment of the habitants is frequent and often caused by spatial and
also intended to be flexible, being linked to various themes: an exhibition of
typological constraints that characterize it. Thus, it is indeed appropriate to think
paintings will be immediately followed by an exhibition of carpentry for example.
of a process that, through architectural idea re-invent the historical center.
The building itself is organized vertically under this empty space and all levels
There is a sense of continuity with the historic fabric, and the block is thought as
relate to it through a central courtyard. The inner space structures are maintained
a "all". However, the level of the ground floor is withdrawn, its built mass leading
in a design that ensures continuity with the surrounding housing, both as
to an empty space to which the public slips and appropriates it.
typological and formal. As well as the existing elevation is preserved with the
It is intended that this space not live by the flows generated by the city, but
exception at ground level.
precisely the opposite. Is guaranteed a self sufficiency that is generated by
It is noteworthy that the dynamic relationship the building has with passerby, not
program, contradictorily support it. This is a temporary residence for individuals
only for its cyclical program but also the strong inclination of the streets that
who intend to create a piece that will be exposed in this void. Thus, quarterly is
surround it, on one side of the break line in elevation starts on floor and wins
designed an installation which contains everything that is relevant and represents
proportion to the slope of the street, on the other is exactly the opposite: part of
some kind of contribution to the surrounding community. The idea of the cycle
the open relationship that leverages also to draw the entrance of the building and
serves precisely to generate dynamics that resurrect these narrow streets of
loses proportion with the progress of the course.
Oporto.
(A)LINE IN SEREIA'S
45
axonometric scheme
structural scheme
(A)LINE . We propose an ephemeral character of intervention, with a political, social and
FRAME . This element is a moment of rhetoric pause at a specific point in the garden.
symbolic nature. A happening by way of land art, which marks the route planned for the
Gains body as a plane in the center, intentionally open a window which fits mentally an
metro line area of the city, opening the discussion and public interest for the subject.
axis, that organize the space. Is associated with a bank for the purpose of compelling the
The realization of this proposal, through a line of flowers, is symbolic. On the one hand uses a natural element often associated with imaginary gardens. On the other, it is a tribute to the
poet Camilo Pessanha, based on his poem "No Claustro de
Celas", which refers to the memory of the Cloister garden where, at times, dominated the Anemones, Hydrangeas and Silindras. These are the same flowers that we use in the intervention.
passerby to sit and reflect on the framework presented. It is an invitation to reflection. We want, for a moment, who wanders through the park miss the visual control that owns about this, only to have a limited framework by the small window. We believe in the possibility of this element materialized with reused wood planks, various sizes and painted red (as the need to mark the exceptional nature of the piece).
PORTFOLIO
e
2012 . Coimbra
general plan proposal
(A)LINE IN SEREIA'S Camilo Pessanha
Workshop Ideas for the Sereia's Garden
elevation
The Sereia's Garden is part of a recreational space that was once the Canons of
The proposal is based on two levels of intervention. Both reflect a desire to
St. Augustine's Monastery of Santa Cruz.
clarify the formal structure of this space and show their qualities.
More than a garden, is an example of architecture, will of some master of
Identified in the original project a multitude of events that form a total
Baroque transform a landscape built on natural territory. As regards Alexandre
harmonious, it's proposed to recover the balance of the original track, deleted
Alves Costa, all is artifice, since "monumentalization entry" to the game, the long
and restored romantic paths, to the extent possible, the original's. We want to
staircases resting levels in the tanks, the lake, the fountain. Over time, were
free up space. The course must be intentional, everything else appropriated by
drawn up by overlaying baroque other interventions demonstrated never realize
people. We understand that the multitude of trails and paths that romanticism
that the formal structure of this space, those with a sporadic layout without an
drew constitute limits embarrassing, even mentally. A path shows us a space of
overview. Romanticism created a structure of organic rambling paths and the
passage, not permanence. So, we plan this dimension of stay/stop space gain
Republic built the playground in Santa Cruz. Later, at the end of the twentieth
strength in the garden. To reinforce this appealed idea, a gesture that will gain
century, there is the built set in the east side of the garden.
strength as it repeats itself, the route that has a purposeful principle but that
This work is not to launch a fully transform, but rather small premises indicate
doesn't have a end, this leads us to a simply space by inviting its appropriation.
that, in long term will "wake up" this space. So, we identified natural features that
In the area of intervention considered achievable, we propose the materialization
we want to preserve and, more than that, raise awareness of the city for its
of two structures, different in content but converging in its purpose, awakening
existence.
the qualities of this space.
46
KINDERGARTEN(ING)
7 6
18 5
4
3
15
16
7 6 4
3
13
14
5
12
7 6 4
3
e 5
11 10
2
1
9 8
ground level
47
PORTFOLIO
e
location 0
20
elevation
2013. Italy
KINDERGARTEN(ING)
48
Competition Instant House @ School, Milan with Guilherme dos Santos
The PROJECT is divided into three phases, first, the concept is thought that a
The PUBLIC-PRIVATE program is combined into volumes integrated in the main
volume filled disintegrates and transforms the program to materialize the -
structure arranged in different areas, that is, the introduction of a courtyard is the
school; Before school, a structure is designed who originate a cube, and then are
division of spaces are connected by an interior corridor, and at the same time
introduced volumes - program; starting to work independently of this structure,
makes his distribution. The four independent volumes operate as privately
but which as a whole, formalize the equipment and all public-private spaces for
directed to children, and the other zone intended the common area, coexistence,
their operation. The IMPLANTATION is designed to adapt the school into the
the canteen even the patio and living areas, the remaining areas for services. The
environment following guidelines of adjacent buildings. The structure helps the
entire structure helps to define the entire project, making the connection of
impermeability with all the space: exterior (city) - Interior (school), and also
spaces and still creating impermeability inside the school to the outside area
functions as a vital part of the whole project since that is the thread for a program
also common. The URBAN component is also present in the composition as it is
of experiments and creating spaces. The CONCEPT is thought from the subject of
characterized by all the area adjacent to the outer-cube volume.
a
cube (magic cube), thinking with different possibilities like twists and
program variations, regardless the site. It is possible to expand the school in the long term, and even its repetition in another places, adopting a configuration of spatial variations.
PORTFOLIO vaniammcorreia@gmail.com vania.mariline (Skype) +351 920 211 923