ReSiDeNcE DeSiGn PoRtFoLiO
VaSu A.R aug-2016 (batch)
jd institute of fashion technology
CoNtEnTs
1
plan drg no.1
14
powder room drg no.36
2
samart bedroom drg no.2-8 photo realistic images
13
maid room drg no.35
3
kitchen drg no.9-15 photo realistic images
12
utility area drg no.34
4
master bedroom drg no. 16-24 photo realistic images
11
bath room-3 drg no.33 photo realistic images
5
bath room-1 drg no. 25-27 photo realistic images
10
bath room-2 drg no.32
6
foyer area drg no.28 photo realistic images
9
savan bedroom drg no.31 photo realistic images
7
living area drg no.29 photo realistic images
8
dining area drg no.30 photo realistic images
1 PLAN
MAID'S ROOM
3BHK PLAN SAMART BEDROOM LIVING SPACE POWDER ROOM
TOILET KITCHEN DINING SPACE SAVAN BEDROOM
BATHROOM-1
shabs UTILITY
BALCONY
WORKING DRAWINGS
title :
FOYER
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
MASTER BEDROOM
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site : BANGALORE
3BHK PLAN
BATHROOM -2
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
DESIGNERS
WALK-IN
PLANS
BATHROOM-3
29.09.2017 drawn by: VASU
dwg no: 1
date:
BALCONY
WORKING DRAWINGS
BALCONY
2 SAMART BEDROOM
tv unit/ duco finish
UNFOLD ELEVATION
PLANS
cot with side table/ duco finish head board/ duco finish
granite flooring ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
DESIGNERS
title :
WORKING DRAWINGS
BANGALORE
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
SAMART BEDROOM
pelmet
WORKING DRAWINGS
false ceiling
27.09.2017 drawn by: VASU
dwg no: 2
date:
3360 225
450
1800
450
325
04 03
150
01
150 2250
02 400
1800
PLAN
225
25 40 25 25
19mm ply
duco finish
19mm plywood
325 25 150
DETAIL @ A
PLANS WORKING DRAWINGS
DETAIL @ B
DESIGNERS
50
DETAIL @ C
SAMART BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date:
27.09.2017
dwg no: 3 drawn by: VASU
19 mm plywood internal plywood/ 1mm laminate
650
25mm groove 19 mm plywood/ veneer finish
PLAN 12 mm groove 25mm groove
12 mm gypsum board 150
veneer
false ceiling 6mm Aluminium T-profile 19mm plywood channel veneer laminate 2050 1725
1725
19 mm plywood/ veneer finish laminate 25mm groove 650
50 mm skirting
EXTERNAL ELEVATION 150
405
loft
100
loft
hanging
280
hanging rod
hanging 1050
500
500
drawer
drawer
drawer
drawer
shelves
shelves
shelves
shelves
1095
150
365
385
1095
50 mm skirting
INTERNAL ELEVATION PLANS WORKING DRAWINGS
DESIGNERS
soft closing channel
SAMART BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date:
27.09.2017
dwg no: 4 drawn by: VASU
false ceiling
450
A 325
paint
veneer finish
750 325
325
duco finish
50
duco finish
295
duco finish
50
450
1800
25mm skirting
450
SECTION 01
dm 01
veneer finish LED strips paint
1800
B
1275
duco finish duco finish
500
150
PLANS
225
25mm groove
230 1275
SECTION 02
WORKING DRAWINGS
112
DESIGNERS
SAMART BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date:
27.09.2017
dwg no: 5 drawn by: VASU
dm 02 paint
veneer finish
SECTION 03
19mm ply/ veneer finish
pelmet 19mm ply/veneer finish
paint
43 750
150 500
19mm ply / laminate
C
SECTION 04
PLANS WORKING DRAWINGS
325
DESIGNERS
1950
25
SAMART BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date:
27.09.2017
dwg no:
6
drawn by: VASU
1550 1600 800
430
1600
2350 2100
1170
1280
1050 1430 500
800 230
200
225
607
1650
DESIGN MARKING 01
1640
525
2345
1290
600
1750
DESIGN MARKING 02
PLANS WORKING DRAWINGS
DESIGNERS
SAMART BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date:
27.09.2017
dwg no:
7
drawn by: VASU
580
1160
1160
280
dm 03
customized recessed profile light
-150 mm lvl recessed light 400
580
1160
1160
RFCP
1740 990 1500
560 870
1050
280
689
100 620 1850
1780 1430
1390
580
1950
1880
DESIGN MARKING 03 PLANS WORKING DRAWINGS
DESIGNERS
SAMART BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date:
27.09.2017
dwg no:
8
drawn by: VASU
photo realistic images
3 KITCHEN
drawer
shutter dish washer pan drawer shutter
sink unit drawer drawer
shutter shutter
drawer drawer
shutter shutter
granite flooring
BANGALORE
KITCHEN
WORKING DRAWINGS
title :
UNFOLD ELEVATION
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
lift up unit
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
shutter
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
shutter unit
dado area
DESIGNERS
dado area
magic corner
appliance unit
PLANS
shutter shutter
lift up unit
WORKING DRAWINGS
drawer
pullout
shutter
false ceiling drawn by: VASU
9
27.09.2017 dwg no:
date:
A D
B
1125
C
800
750
PLAN
200
200
granite slab granite slab
150
2
3
175
A
600
1000
1
DESIGN MARKING PLAN
PLANS WORKING DRAWINGS
DESIGNERS
KITCHEN
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title : WORKING DRAWINGS
BANGALORE
date:
27.09.2017
dwg no:
10
drawn by: VASU
600
800
600
150
false ceiling/ 12mm gypsum board
shelves
700
2100
lift up unit
shutter
shelves
appliance unit
600
B
750
shutter
50mm skirting
drawer
drawer
shutter
shutter
400
rolling shutter
lift up unit
shelves
350 350
dado area
150 540
400
600
laminate as per selection with aluminium beading and profile handle as per selection
600
925
shelves
300
350
600
ELEVATION A
300
350
700 1300
dado area
magic corner
granite slab
450
drawer
drawer
shutter
shutter
540
150 540
540
ELEVATION B
PLANS
DESIGNERS
KITCHEN
WORKING DRAWINGS ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date:
27.09.2017
dwg no:
11
drawn by: VASU
250 C
150
560
drawer
drawer
shutter
shutter
800
50mm skirting
580
ELEVATION C
580 1350
700
shutter
shutter
300
200
drawer shutter
drawer shutter
dish washer
pullout
600
500
sink unit
400 600 50mm skirting
150
340 800
pan drawer
400
laminate as per selection with aluminium beading and profile handle as per selection
340
900
ELEVATION D
PLANS
DESIGNERS
KITCHEN
WORKING DRAWINGS ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date: dwg no:
27.09.2017 12
drawn by: VASU
chimmny
D
granite slab
50 mm skirting
ELEVATION 1
100 100 300
280 490
275
600
25
ELEVATION 2
PLANS
DESIGNERS
KITCHEN
WORKING DRAWINGS ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date: dwg no:
27.09.2017 13
drawn by: VASU
E
900
ELEVATION 3 25
40
40mm granite slab 40mm granite slab 25mm groove
25 base unit
150
DETAIL @ A(2)
25
DETAIL @ B(3)
150
12
DETAIL @ C(4)
175
12 12
300 12
12
300 12
DETAIL @ D(5)
PLANS
DETAIL @ E(6)
DESIGNERS
KITCHEN
WORKING DRAWINGS ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date: dwg no:
27.09.2017 14
drawn by: VASU
150
300
50 mm recessed profile lights 900
1
2425
customized hanging lamp
LED strips 940
150 150 300
300
2600
300
300 150
fix in center
RFCP
customized hanging lamp
SECTION @ 1
-100mm drop
-150mm drop
-50mm drop
PLANS
DESIGNERS
KITCHEN
WORKING DRAWINGS ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date: dwg no:
27.09.2017 15
drawn by: VASU
KITCHEN
photo realistic images
4 MASTER BEDROOM
UNFOLD ELEVATION cot / duco finish
customized study table/ duco finish
wooden flooring
WORKING DRAWINGS
title :
BANGALORE
MASTER BEDROOM
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
wooden flooring
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
head board/ duco finish
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
DESIGNERS
side table
WORKING DRAWINGS
customized tv tunit/ duco finish false ceiling for master bedroom
PLANS
false ceiling for walk-in wardrobe
16
27.09.2017 drawn by: VASU
dwg no:
date:
BALCONY
WALK-IN WARDROBE AREA
03
475 900
375
900
02
875
01
225 225 170
1800
1800 4250
05
350
150
130
875
260 130
04
225 225
250
50
2200
375
PLAN
PLANS WORKING DRAWINGS
DESIGNERS
MASTER BEDROOM
date: dwg no:
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
27.09.2017 17
drawn by: VASU
19 mm plywood internal plywood/ 1mm laminate
650
25mm groove
PLAN
12 mm groove
950
25mm groove
12 mm gypsum board
6mm Aluminium T-profile
150 false ceiling
veneer veneer 19mm plywood channel 2825 1900
1900
laminate 25mm groove
435
laminate
1200
1800
650 50 mm skirting
EXTERNAL ELEVATION
150
580 loft
loft
hanging
hanging
hanging rod
125
1050
735
735
drawer
shelves
shelves
drawer
drawer
210
drawer
shelves
shelves
290
shelves
shelves
395
1520
1520
soft closing channel
150
50 mm skirting
50
INTERNAL ELEVATION PLANS WORKING DRAWINGS
DESIGNERS
MASTER BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date: 27.09.2017 dwg no: 18 drawn by: VASU
false ceiling/ 12mm gypsum board veneer finish LED strips
DM 01
150mm space for single curtain 225mm space for double curtain
veneer finish
DM 01 50
19mm plywood/ veneer finish 150
100
130 260 130 575
350
50 mm skirting
150
875
1800
875
SECTION 01
false ceiling/ 12mm gypsum board DM 02
veneer finish
study table
head board/ duco finish
tv unit side table/ duco finish
50 200
50 mm skirting 50
280 170
225
380
SECTION 02
PLANS WORKING DRAWINGS
DESIGNERS
MASTER BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date: 27.09.2017 dwg no: 19 drawn by: VASU
false ceiling/ 12mm gypsum board
DM 03
veneer finish
225mm space for double curtain
customized tv unit/ duco finish
450 25 200 customized study table/ duco finish
25 475
375 40
40 12 mm skirting 25
825
875 1775
25
12 mm skirting
1250
SECTION 03
false ceiling/ 12mm gypsum board DM 04
veneer finish
study table/ duco finish
2200 cot with side tables/ duco finish
tv unit / duco finish
50 mm skirting
duco finish 175 225
SECTION 04
PLANS WORKING DRAWINGS
DESIGNERS
MASTER BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date: 27.09.2017 dwg no: 20 drawn by: VASU
false ceiling/ 12mm gypsum board
veneer finish
study table/ duco finish tv unit/ duco finish
head board/ duco finish
A
130
250
SECTION 05
40
duco finish
veneer finish 20
laminate finish 20
DETAIL @ A matrix
RCC wall
RCC slab
PLANS WORKING DRAWINGS
DESIGNERS
MASTER BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
client:
SHRUVA DEV
BANGALORE
WORKING DRAWINGS
date: 27.09.2017 dwg no: 21 drawn by: VASU
745
1575
680
650 1180
1900 1150
1150 1900
1180 650
680
745 1950
1675
RFCP for master bedroom
1475 150
300
650
675 1225
575 475
300
1050
-100mm lvl
RFCP for walk-in wardrobe area -150mm lvl
PLANS WORKING DRAWINGS
DESIGNERS
MASTER BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date: 27.09.2017 dwg no: 22 drawn by: VASU
225
3125
605
1065
150
150
150 450
1500 1050
750
575
25
240
330
2785
430
700
700
DESIGN MARKING 01
1610
300
1150
2325
150 450
450
DESIGN MARKING 02
PLANS WORKING DRAWINGS
DESIGNERS
MASTER BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date: 27.09.2017 dwg no: 23 drawn by: VASU
1510
850
1110
225
150 450
1950
DESIGN MARKING 03
425
875
1750
600
50
150 450
1500 1950
DESIGN MARKING 04
PLANS WORKING DRAWINGS
DESIGNERS
MASTER BEDROOM
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
BANGALORE
WORKING DRAWINGS
date: 27.09.2017 dwg no: 24 drawn by: VASU
MASTER BEDROOM
photo realistic images
MASTER BEDROOM
photo realistic images
5 BATHROOM-1
fp
shower area shower area hf
UNFOLD ELEVATION
tiles used for flooring
WORKING DRAWINGS
BANGALORE
BATHROOM -1
title :
wc
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
shower area
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
mirror
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
DESIGNERS
wb
PLANS
hanging light
WORKING DRAWINGS
exposed grid false ceiling
28.09.2017 drawn by: VASU
dwg no: 25
date:
r
r
r
r
r
ft
r
r
r
r
r ft
note: includes 10% wastage
2" drop
start tiling here
1" drop
r
wall
note -All hts. to be measured from FFL of the respective floors -All measurements in mm. -Drawing NOT to be scaled. Written dimensions to be considered. - All tile joints at walls and niches to be straight edge as approved by architect. -All marble work to be 'V' or straight edge as approved - Grout colour to match tile and to be tested and approved on site. -All niches to be marked on site with actual tile.
PLANS
r
slope
e slop
slope
r
walls: 600mm*600mm flooring: 600mm*600mm
marble
WORKING DRAWINGS
r
r
TILE SIZE:
r
drawn by: VASU
DESIGNERS
r
niche
start tiling here
PLAN
WORKING DRAWINGS
r r
BANGALORE
start tiling here
r
r
e slop
2400
r
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
r
r
title :
start tiling here
start tiling here
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
start tiling here
start tiling here
BATHROOM-1 (TILING)
date:
225 600
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
28.09.2017
-600mm drop
dwg no: 26
exposed grid false ceiling
sp
hf
wc
title :
wb
BANGALORE
fp
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
hanging light
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
hs wu+hk
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
dv
WORKING DRAWINGS
drawn by: VASU
28.09.2017
dwg no: 27
date: os
BATHROOM -1
mirror
UNFOLD ELEVATION 500
885
300
300 dl3
rope light
tl
tube light
sb
switch board
s-dl
surface downlight
dl4 pl
DESIGNERS
LEGEND
rl
connection to light point Pendant light switch for exhaust fan 6A plug point and switch centre line of fixture
600
pp
plug point
EX
exhaust fan switch for geyser single plug for shavers
600 600 sp
500
udl dl
885 300
ELECTRICAL LAYOUT PLAN
up down lighter recessed downlight/ spot light
spk
music speaker
df
defoger
ch
chandelier
wl
embedded wall light
dm
dimmer
led
button led light
note -Drawing NOT to be scaled. Only written dimensions to be considered. -All heights are from finished floor level. -All measurements in mm. -DRAWING TO BE READ WITH LIGHTING LOCATION SHEET
WORKING DRAWINGS
dl1
PLANS
dl2
BATHROOM-1
photo realistic images
6 FOYER AREA
UNFOLD ELEVATION customized wall mounted LED light flooring
PLAN title :
WORKING DRAWINGS
BANGALORE
recessed down lighters
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
FOYER AREA
false ceiling
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
DESIGNERS
seating
PLANS
shoe rack
WORKING DRAWINGS
28.09.2017 drawn by: VASU
dwg no: 28
date:
false ceiling
FOYER AREA
photo realistic images
7 LIVING AREA
PLAN
flooring ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
title :
WORKING DRAWINGS
BANGALORE
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
LIVING AREA
wall cladding
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
false ceiling
WORKING DRAWINGS
UNFOLD ELEVATION
DESIGNERS
veneer finish
PLANS
customized chandilier 28.09.2017 drawn by: VASU
dwg no: 29
date:
LIVING AREA
photo realistic images
8 DINING AREA
UNFOLD ELEVATION PLAN
-150mm lvl
-200mm lvl
flooring granite flooring
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
customized wall cladding
title :
WORKING DRAWINGS
BANGALORE
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
DINING AREA
customized hanging lamp
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
DESIGNERS
12mm gypsum board/ false ceiling
PLANS
6mm space for single curtain
WORKING DRAWINGS
28.09.2017 drawn by: VASU
dwg no: 30
date:
false ceiling
pelmet
DINING AREA
photo realistic images
9 SAVAN BEDROOM
mirror pelmet
UNFOLD ELEVATION
PLAN cot with side table/ duco finish
granite flooring
title :
WORKING DRAWINGS
BANGALORE
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
SAVAN BEDROOM
study table
ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
wardrobe
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
DESIGNERS
shelves
PLANS
false ceiling
WORKING DRAWINGS
profile lights
28.09.2017 drawn by: VASU
dwg no: 31
date:
SAVAN BEDROOM
photo realistic images
10 BATHROOM-2
shower area shower area
UNFOLD ELEVATION
flooring
PLAN ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
shower area
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
wc
DESIGNERS
wb
PLANS
fp
WORKING DRAWINGS
title :
WORKING DRAWINGS
BANGALORE
client: SHRUVA DEV project : APARTMENT JAYANAGAR 4TH BLOCK site :
BATHROOM-2
exposed grid false ceiling
mirror
28.09.2017 drawn by: VASU
dwg no: 32
date:
11 BATHROOM-3
shower area shower area
UNFOLD ELEVATION
flooring
PLAN ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
shower area
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
wc
DESIGNERS
wb
PLANS
mirror
title :
WORKING DRAWINGS
BANGALORE
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
BATHROOM-3
-600mm false ceiling drop
WORKING DRAWINGS
exposed grid false ceiling
fp
28.09.2017 drawn by: VASU
dwg no: 33
date:
BATHROOM-3
photo realistic images
12 UTILITY AREA
shutter shutter
DESIGNERS
shutter
flooring
PLAN ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
shutter shutter
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
shutter shutter
WORKING DRAWINGS
title :
WORKING DRAWINGS
BANGALORE
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
UTILITY AREA
true ceiling
UNFOLD ELEVATION
28.09.2017 drawn by: VASU
dwg no: 34
date:
13 MAID ROOM
UNFOLD ELEVATION mirror fp
wb wc
PLAN ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
headboard with storage
shutter
title :
WORKING DRAWINGS
BANGALORE
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
MAID ROOM
drawer
WORKING DRAWINGS
DESIGNERS
shutter
drawer
PLANS
UNFOLD ELEVATION drawer
cot with storage
28.09.2017 drawn by: VASU
dwg no: 35
date:
14 POWDER ROOM
flooring
UNFOLD ELEVATION
PLAN ALL THE DIMENSIONS ARE GIVEN IN MM. . ALL MEASUREMENTS TO BE CHECKED AT SITE.
ALL DRAWINGS TO BE CO-RELATED TO OTHER DWGS, DOCUMENTS, TENDER/ SPECIFICATION, INCLUDING OTHER CONSULTANTS, SUPPLIERS, MANUFACTURERS BEFORE EXECUTION. ANY DISCREPANCY / AMBIGUITY TO BE BROUGHT TO DESIGNERS NOTICE IN WRITTING, REASONABLY IN ADVANCE.
wc DESIGNERS
wb
PLANS
mirror title :
WORKING DRAWINGS
BANGALORE
client: SHRUVA DEV project : APARTMENT site : JAYANAGAR 4TH BLOCK
POWDER ROOM
-900mm false ceiling drop
WORKING DRAWINGS
28.09.2017 drawn by: VASU
dwg no: 36
date:
exposed grid false ceiling
fp