Week 7 journal

Page 1

Constructing Journal Week 7 We went for an off campus site visit during the studio of this week. The construction site we visited stands on 587 Victoria Street, it is a 9 storeys apartment builds for students. The building is mainly built with the structure of concrete and some steel at the top part of it. It is now about 75% finished in process. We started the visit at the ground floor. The main component here is the precast panel. Water pipes are exposed at the ceiling and connect to the whole building. They are made in copper and PVT which conduct all water from roof/ toilet.

It can be seen that the wall is made up of concrete masonry unit, also called concrete block. This block is precast concrete with hollow centres to reduce the weight and improve the insulation. It is a very common material for load bearing wall which can be built with both vertical and horizontal reinforcement,


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.