LANDSCAPE DESIGN PORTFOLIO

Page 1

LANDSCAPE ARCHITECTURE PORTFOLIO

Siyang Zhou

Cemetery Design Memorised Place

Sep-Nov 2016

Area : 105113 m²

Cemetery Design / Memorised Place

Design Brief Location

The site for design is located in Shiling cemetery, covering an area of about 105113m². In traditional Chinese concept, death is the symbol of bad luck and terror, most tombs is made of concrete and stones which occupy large areas of mountain in China, so that to form albinism of mountain and soil hardening, the whole atmosphere is bleak and chilly. Taking Panchang knot as design elements, I make use of light and shadow to reconstruct space, bring in ecological burial to restore the ruined soil and vegetation, form a complete landscape structure, and try to endow thve tomb with a new commemoration way, which makes the people to feel a different relation of man and nature, as well as makes the tomb to be a quiet place of green tree-lined, birds habitat.

Required burial land area is more than available burial land area, burial land shortage situation intensified year by year.

Environmental Analysis

Most people visit the cemetery only in tomb-sweeping day, which explains the cemetery belongs to the low utilization of land resources.

SWOT Analysis S W

Big topographic slope, which is easy for flowing; abundant original vegetation types in mountain

People’s view has changed so as to seek more abundant forms of commemoration and more efficient use of land; The original vegetation has the potential to form rich changes of season; Take advantage of terrain to lead flow to complete water cycle so as to provide water for ecological burial.

Affected by traditional concept, single form of commemoration; Single form and high-density of burial ; Insufficient infrastructure, damaged present landscape, dignified and gloomy atmosphere.

TOSimple zoning according to road system, difficult to recognize zoning;

The fixed dignified and solemn impression of grave in the eye of the Chinese; Big dispersion is easy to cause water and soil loss.

Sichuan Province Chengdu City Chenghua Distrct
Background Research
Death Population Burial Land Area 0 20 40 60 80 100 120 140 0 100 200 300 400 500 600 700 800 900 1000
The Using Time Duration of Stay Tomb-sweeping Day Other Holiday Daily Time 0-30min 30-40min 45-60min Above 60min The site Building The site Major Road Minor Road The site Cemeteries Industrial District Funeral Home Dwelling District The site Exsiting Vegetation Figure Ground Traffic Movement Functional Uses Map Greenspace Network
B
03 04

Concept Process

We believe in the immortality of the soul, also believe that people will go to the Elysian Fields After death.

Panchang is one of the Chinese traditional signs.Chinese use it to express the Dharma loop implementation contains permanent

Era is developing continuously.

Life is a journey from birth to death, finally go backto nature, into other forms between heaven and earth.

In the terms of entire distribution, transform the Panchang knot to match the site, develop different landscape devices and infrastructure as . Tombstone and its surroundings becomes a part of enframed scenery structure , so as to express the cold theme of “death” in a tender and poetry waythis is the last relationship of life and nature.

People weave Panchang knot to express the miss of distant friends.

Granite Surface Dry Cement Mortar C15 Concrete Crushed stone cushion Enhanced Soil Granite Surface Concrete Base Graded sand and Gravel Enhanced Soil 565m 571m 566m 540m 565m 557m 549m 550m 540m A-A' Section B-B' Section C-C' Section B' C' 537m 572m Route Analysis Main Road Landscape Node Ramps Vegetation & View Analysis Growing Vegetation Damaged Vegetation Standing Position Signt Line Function Partition Damaged Area Entrance Service Area Landscape Area Parking Area Burial Area Topographic Analysis Contour Line Infrastructure Analysis Lights Drain well Benches Runoff Analysis Main Runoff Ordinary Runoff Site Analysis 05 Vertical Analysis
06

Create a burial area of flowers and plants in a more spacious space. The vitality of grass and flowers symbolizes the cycle of life and death and endless life.

Inspired by the shape of rocks, the essence of mountains is the displacement of gravel. The gravel is used as an image of a 30 cm * 30 cm * 30 cm niche. The overlap of niches forms the shape of the wall, which makes the traditional square ashes wall become a form of expression of life.

Master Plan

Greenspace

Ordinary Green Space Burial Green Space

On the base of preserving original vegetation, bring in flower-plant burial and tree burial to expand green area.

Design Process

The spatial composition form design was inspired by the the basic life characteristics - lifeheart beating and brain operation. Integrate contrast (Imagine and Reality, Light and Shade, Big and Small) into the space, trigging people's thinking about life and death

Infrastructure Analysis Landscape Wall Landscape Structure

Landscape device should be installed through the whole site, forming a complex-functioned infrastructure integrated with bench, light, flower bed and landscape wall.

Functional Uses Map

6 6

1 2

2 3

4 5

9 9

10 10

Provide more possibilities for constructing complex-functioned landscape space on the base of guaranteeing burial function.

3 4

7 7

Service Area 1

5 6

8 8

On the basis of reserving the original efficient ramps, decorate the roads to connect the new landscape nodes.

Feature Entrance Wall Burial Area Central Square Forest Trail

Ecological Burial Area Parking Lot

Runoff Analysis N Entrance Plaza

11 11 07 08

Wall Burial Area Flower Burial Area Tree Burial Area Tree Burial Area Exit Square Ecological Landscape Area Traditional Burial Area Traditional Burial Area
Main
Secondary
Vehicle
Route Analysis
Route
Route
Route
Drainage System Water
Taking advantage of terrain to lea d fl ow into every pool and greenbelts to control soil and water loss, form water cycle, supplement water of flower-plant burial zone. 0m 25m 50m

Entrance square is mainly a large area of hard pavement, decorated with water scenery and characteristic hollow landscape wall, besides stubborn Huangge tree in the space enclosed by the landscape wall.

Osmanthus fragrans are planted in the entrance corridor. Landscape devices with "picture frame" image are set at the end. The combination of concrete and glass creates a sense of combination of imagine and reality.

Make full use of the original vegetation to create space where people can feel buddhist atmosphere. Surrounded by nature, people who come here can feel that the deceased has become one part of nature. The life of the deceased just becomes another forms. Lead people to think about life and feel nature.

Material Analysis

There are two distinct spaces along the canal. The contrast of size in the space s can give visitors a sense of openness when they enter the central area. In the central area, there is a smooth landscape device, which can be seen as the focus of sight in the elegant space. The device can project different lights and shadows with sunlight changes. The solar panel lamp inside the device absorbs sunlight and provides energy for night lighting. On the edge of vegetation, "24 solar terms" landscape wall is set up to provide seats for people to stay. This kind of landscape is friendly and symbolizes human life, reminding people to cherish the present.

In the summer morning, the sun will map the word ”morning” in the hollowed-out landscape wall to the ground.In the summer midday, sunshine above the landscape wall map the poem in the top to the static water.Sunset will build the interaction between the shadow in the landscape wall and the poem in the hollowed-out landscape wall .

8:30 12:30 17:30
Shadow A B C D E F G 0409 0410 Landscape Sequence
B.Central Plaza Landscape
A. Main Entrance Gray Fine Sand Dark Wood a. b. d. e.
b c e d
c.
a

Traditional Tomb Landscape Area

Traditional tombs follow the original form of tombs, only modifying local topography and adding landscape structures. A new spatial relationship model is obtained from the knitting process of the disk length knot. The yellow structure forms the frame of the surrounding environment. The design intent is to express that "after death, life can also become a unique landscape in another form".

Along with the ups and downs of the terrain, the burial area of flowers and plants can be planned. Rainwater collected from landscape canals can be irrigated daily. Irrigation water can be reused for landscape water through plant infiltration and filtration. The circulation of water elements can make flowers and plants grow healthily. It also expresses the philosophy of the ecological cemetery, that is, the shape of the cemetery is extinct, but our life will be changed. Blooming in another form in the world. Flowering plants mostly use white, yellow and purple systems, so that the burial area can also give people a feeling of gentleness and tranquility.

Material Analysis

Shadow

Sunshine map the transparent part in the landscape wall— butterfly wing to the ground.In the winter midday, sunshine project the poem on another wall on the butterf ly wing.In the winter afternoon, the sun lengthen the shadow of the device and form a strange texture on the ground.

Tree Burial Area

At the junction of the tree burial area and the background forest area, a silent space is enclosed by the deformed landscape wall and plants, which is fully integrated with the natural environment and conforms to the original terrain. Build wooden boards and bamboo boards directly on the ground for people to think, meditate, rest and set up tables and chairs, where people can rest or write letters to their deceased relatives and friends to express their sorrow. LED lights are arranged on the background woodlands so that night can also be the time for visiting the cemetery.

8:30 12:30 17:30
The Southern Pine wood Stained Glass Coloured Stainless Steel Teak wood
0410 04

Niche Burial Area

The three-sided niche walls shape a composite concrete building, which is connected by a circular slope to facilitate visitors'entry and exit. Skylights can get into the architecture. The natural light enables people to see more clearly the floating particles in the air and create a textured space. Paddle slopes also provide opportunities for the development of small private spaces in niches. The living not only stand in front of the cold wall and hang by the dead, but also stay in the space formed by the exterior projection of the wall. Looking at the scenery outside through the glass, the position of "human" and "place of death" is exchanged.

Concrete Niche White Concrete Brown Bamboo Wood
0411 0412
Material Analysis
Scenery Code
The interior wall and the niche in wall burial area constitute a relatively close space, and the crossing angle of the building formed by the stacked niche indicates the natural style of the mountain. The bottom of the device extends to the green land, and the top part is up to the air and formed view frame The device stretches across the 2m altitude difference, the low floor is the landscape wall and the flower bed, the end of the flower bed lift up and extend upwards The device at the end across the height of 2m and then connected with the ground, after rising from the ground up to form landscape frame, scene box ending as a seat
A A.
The device lie in the ground along the terrain, the low part can be seat, the middle part rise high into the air, and the high is parallel to the ground C. D. E. F.
B C D E F 13
14
The static water surface and the surrounding walls form a semi-closed space. B.
Section Analysis

Planting Strategy

The new vegetation is the combination of evergreen species and fast-growing species, and match between the vegetation in low, middle, high fl oor, forming a natural landscape with each passing year.

The original terrain of the hierarchical cemetery has a steep slope and lack of vegetation, and poor in visual effects, and is easy for soil erosion.

Located in the flat ground, the cemetery area lack of vegetation and is easy to be ponded.

Protect and restore the original vegetation, increase the vegetation in low fl oor, improve the ecological system, and promote the regeneration and development of the original vegetation, give full play to ecological benefits.

After the transformation , it was divided into gentle slope placed with tombs and the planted steep slope. The steep slope became the isolation of the cemetery area, enhance the visual effect, It also plays the role of collecting rainwater and regulating the water needed for vegetation growth around the cemetery.

Bring in ecological plants burial, and realize the restoration for land and increase the effective tombs.

Vertical Design Analysis Before After Terrain Design A-A' Section A A' B B' C C' (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) a-a' Section a b c c' b' a' B-B' Section b-b' Section C-C' Section c-c' Section Physical Model Fill Cut Fill Cut 15 16

Student Housing Area Deisgn Connectin Link

Mar-Apr 2014

Area : 56150 m²

Student Housing Area Design / Connection Link

The project aims to rebuild, integrate the public space of dormitory zone in Sichuan Agricultural University. The purpose of the design is to change staircase into a part of outdoor courtyard, so as to make the crowded and blocking dormitory zone connect with more light, more air and more vegetation, to increase visual fun and change the previous impression of nerd.

College Students' daily life is rich and colorful, the area of public activity space is not enough, extracurricular activities are concentrated in dormitories, playgrounds, easily causing the crowds concentrated so that activities are limited.High frequency of infrastructure use will bring about infrastructure damage; school public space has not been fully utilized, there are also potential to be developed

19
Traffic Movement Green Space Functional Uses Map Buildings Dormitory Library Canteen Teaching Building Arbor Pedestrian Road Sporting Area Quiet Activity Area Buildings Under Construction Roadway Parking Area Shrub Activity Analysis Gender Activity Type analysis(different area) Activity type analysis (different time periods) Public space used time distribution Playground Dorm Life Class Study Sports Dating Club Activities Studying Area Dormitory Area 6:00 9:00 24:00 12:00 15:00 30% Male Age 25% 75% 5% 14-18 19-22 23-26 Female 70%
Design Brief Location Background Analysis
Chengdu City Wenjiang Distrct The Site 20

Building density are moderate , it blocks the prevailing wind, and also cover some sunlight. In spring and autumn sunshine is the most adequate , supplying the entironment which is suitable for plant growing.I will apply the crop to design to create characteristic agricultural landscape.

Issues

Strategy

Hard pavement affect the infiltration of rainwater so that the road is easy to water.

Road surface is damaged

Inadequate ventilation and lighting

Various noise problem

Infrastructure is in short supply

Inadequate infrastructure, resulting in poor site landscape effects, visual effects clutter

Inspired by spike of rice connected by rice straw. In order to solve the current problems, remove some rooms to create some public space, and connect each other, forming a more convenient network and rich landscape structure.

Eco-landscape Landscape Installation Unobstructed Wind Environment Old

The corridor between the sides open, allowing more light, air, green interaction, the formation of new courtyard model, enhances the visual location, form a living landscape.In public space, adding plant community to beautify the environment and collect rain water may be an effective strategy to reduce seeper.

Traffic Movement Ground Analysis Green Space
Tree Shrub Soft Surface Roadway Infrastructure Analysis Planter Bench Clothes Hanger Lighters Bins Public Space Courtyard Green Space Pavement Bicycle Stop Hard Pavement 0-1h 3-4h 2-3h 75% 20% 5% Infrastructure usage Frequency Bins Lighters Clothes Hanger Tables and Chairs Used Never Used The shadow &Wind Analysis
Site Analysis
Spring Summer
Winter 21 22
Autumn
experience
New
experience
Design Process Master Plan 0m 20m 40m 1 2 4 5 3 6 1 2 4 5 3 6 Central Sunken Plaza Entrance Corridor Courtyard Ecological Garden Courtyard Space Connecting Contruture Planting Buildings Buildings New Public Space Traffic Movement Design Analysis 23 24 Visuals A-A' Section Sections A' B' Dormitory Unite Dormitory Unite Dormitory Unite Public Space Public Space B-B' Section Dormitory Dormitory Road Road Sunken Plaza 1 1 3 3 4 2 2 4

Water-front Design Landscape Revetment

May-Jul 2015

Area : 13447 m²

Water-front Design / Landscape Revetment

Design Brief

Site selection is located in an intertidal zone of the junction of Changjiang river and Tuo river with a total area of 13447m², right now, it face the problem of lacking of connection among city, river rapids, river, as well as the river erosion and rainstorm washing, which cause a poorer landscape effect. From the entry point that construct the connection of city and river, I make use of internal altitude difference in site and the site influence of natural factors, so as to reborn the life.

25
Analysis Activity Analysis Weather Structure & Vegetation Traffic Map Age Vacancy Analysis Activity Time Analysis Activity Type Analysis The Middle-aged The Elder 30% 15% 55% The Youth Sichuan Province China Luzhou city The Middle-aged The Elder The Youth 22% of area is active Mon 30% of area is active Tue 36% of area is active Wed 48% of area is active Thu 68% of area is active Fri 84% of area is active Sat 90% of area is active Sun 0 38 5 0 100 12 24 Rainfall 150 187 350 High water level 26
Backgrond

Design Process

Luzhou is well-know for “China wine city”, yeast of wine has the same energy exchange of outer world with plants, the design gains an inspiration from the growth history of wine yeast. The yeast starts meiosis under the advantageous condition and forms bulk appearance; and the yeast still can adopt germinal reproduction and form irregular bud under the disadvantageous condition; as the growth of cell, intercellular space is changing also, and forming into beautiful texture. Take the stereoplasm square and river rapids as the continuously-breathing yeast for growth, seek the most adaptable entire distribution during the course of its splitting and fusion, the “virtual space” form - intercellular space naturally becomes the best form of connecting dam.

Site
Vegetation Water level Landscape Nodes Construction Details Section A-A' Section B-B' Topographic Analysis Diverse Activity Area A B B' A' Arbor Shrub Issues & Strategy
Pavement
in the evening Ecological Condition for Day-time
of Canopy Tree
of Activity Space
block the way to river. Change the dam shape. Increase Canopy Tree Increase Activity Space Permeable Pavement & Planter Bed Before After 180m 190m 200m 27 Plan A Plan B Plan C Statistics O2 O2 O2 CO2 CO2 CO Cell Membrane Cell Wall Cytoplasm Nucleus
Analysis
Rigid
Concentrated
Lack
Lack
Dam
28

Most elderly people will choose quiet resting area and relatively isolated grass slope as a place for activities

The middle-aged people tend to activities in recreational areas and ecological beaches.

Young people tend to move in recreational areas and reformed dam spaces.

The

Compared with the traditional dam, after the transformation of the dam in preserving the original protective structure, the square extends outwards and is connected with the beach, expand the area in the square, also produced new activities in space under embankment.

Master Plan Relaxing Area Lawn Dam 0 80 Sunken Plaza Bridge Riverside Plaza 1 1 2 2 4 4 5 5 3 3 6 6 Activity Type Analysis Usage Time Analysis 0 0 0 12 12 12 6 6 6 18 18 18
Recreation Area Main Route Secondary Route Quiet Leisure Area Recreation Area Dam Restoration Area Ecological Beach Area Functional Uses Map Route Analysis Restorated Dam Connecting Bridge Structures Analysis High Point Cut Low Point Fill Standing Point & Eyesight Cut and Fill Analysis Terrain Analysis Lighter Planter Bed & Bench Bins Infrastructure Analysis Design Analysis 29
Eye View
Visuals Bird's
Dam
The Dam Route Analysis Upper Strata Lower Stratum The Dam Infrastructure Analysis The Dam Section Analysis of Dam Activity Type 30
Analysis

Disaster Prevention Ability

Dam Material Analysis

Bauhinia blakeana

Cercis glabra

In order to improve the resilience of the dam, I apply water resistant wet polymer materials to the design to ensure after the flflood the space under the dam still can be used by people

In Luzhou, more rain in summer , the water level increase, submerged part of the beach plant; with winter rain decreasing, the water level decrease, and the rough cobblestone embankment appeal.

The use of Chinese fir and polyurea ensure the effect of landscape,creating the warm and comfortable space. Before

Recorded flood water level in 30 years, most beach would be submerged, only emergent plants and fl floating plants can surface.Activities on hard square will not be restricted,the bridge can also become a tide of scenic spots

When the flood comes, the material on the dam surface completely prevents the infiltration of harmful medium and greatly prolongs the service life of the dam structure.

The disaster is coming

Recorded flood water level in 30 years,Beach is completely submerged, the space under the dam is not available, hard square and connecting bridge can still become a place for people to move.

After the flood, the space under the dam presents an original ecological landscape

Seasonal Appearance of

Magnolialiliflora

Michelia figo (Lour.)Spreng

Pterocarya stenoptera

Magnolia denudata

Ginkgo biloba L Jacaranda mimosifolia

Metasequoia glyptostroboides

Acacia confusa Salix babylonica

Rosa chinensis Jacq

Chimonanthus praecox

Murraya paniculata Berberis thunbergii

Runfelsia acuminata

Ligustrum × vicaryi Hort

Sorbaria sorbifolia

Buxus megistophylla

Canna indica L

Buxus megistophylla

Viola philippica

Leucanthemum vulgate Lam

Buxus megistophylla

Arrhenatherum elatius

Hosta plantaginea

Agrostis stolonifera

Festuca arundinacea

Cynodondactylon(Linn.)Pers

Zoysia japonica

Miscanthus sinensis Andress

Festuca glauca

Imperatacylindrica var.koenigii

halia geniculata L Typha davidiana

HedychiumcoronariumKoen

Eichhornia crassipes

Cyperus alternifolius

Cypereae Nees

Hydrocotyle vulgaris L Alisma plantago-aquatica

Plant Name & Growth Rules

Dry Season Dry Season Dry Season Normal Normal Normal Rainy Season Rainy Season Rainy Season Flood Disaster Flood Disaster
disaster
After disaster
UV resisting finish layer Crystal anchored non-skiding layer SPUA olastomeric layer Concrete base
Section A A' A-A' section Bioswale Open Grass Slope Space Under Dam Waterfront Space Dam Green Space 31 B B' B-B' section C-C' section C C' Spring Summer
Autumn Winter
Plant Planting Arbor Shrub Herb Hydrophyte Plant Disposition Form
Protective Hedge Open Grass Slope Space Under Dam Space Under Dam Bioswale Sunken Plaza Bioswale Connection Bridge Water-Front Space 32

I introduced the rain garden, in order to adjust the surface runoff, increase air humidity, enhance the landscape effect, to create a good environment for the realization of "ecological revetment" concept.

Children Courtyard Design

0-1 years

After a year of growth, landscape community initially formed, but has not yet formed a complete ecosystem.

Ecological Playground

Aug-Sep 2014

Area : 4800m²

2-4 years

The scale of landscape community is coarse, the purification and absorption capacity of rainwater is enhanced, the ecosystem is more perfect, and attracts the butterflies, dragonflies and other organisms.`

5-10 years

The landscape community formed three layers: high, medium and low, which had good purifying effect on water. The ecosystem tended to perfect and gradually showed biodiversity

Phytocenosis
Sketch map of rain garden
Rainy Garden 33
Rain Garden Node
34

Children Courtyard Design /Ecological Playground

Location Design Brief

SOS children village pattern consists of four parts ,they are SOS mothers ,brothers and sisters, family homes and villages. Each family has 6 to 8 orphans .The goal of the project is to build ecological children's space in the courtyard that is extended by children village ,and deal with the relationship between interior of the yard and outside world well. I take the children's needs and securities as the starting point, starting from the Children's insights, letting the children get close to nature among it.Communicate with the outside world under the premise of ensuring safety, and create interesting channels.

Site Analysis

0-4 years old children with limited activity, in the phase studying to move, behavioral activities rely on parents; 5-9 years old children like independent and diverse activities; 10-14 years old children with strong activity, prefer challenging, constructive activities

Conflict

As the children grow up,the world in their eyes is changing,and their paintings can reflect their perception of the world.Extract the elements of landscape from their paintings full of color and imagination,then combine them and change ,letting imagination and hope into reality,so create a space of fairy tales close to nature.In addition,breaking the rigid bounding wall,and enclose a semiopen space with micro topography, wooden fence and glass door that can be raised and lowered,not only to ensure safety, but also to achieve the connection of inside and outside the courtyard.

The children's activities are mostly concentrated in the afternoon and evening.The time spent outdoors in summer is more than that in winter.

The main contradiction within the site is the children eager to get close to nature, eager to contact with the outside world, there are more types of activities; management is considering the safety of the children, and plans to design a fully enclosed courtyard, placing several traditional, monotonous and safe game facilities.

The Site Residential Area Educational Area Quiet Area Temperature Rainfall Out-Site
Outdoor Time Outdoor Time In-door Time In-door Time Activity Time Analysis Summer Winter Main Road Path-Way The Site The Site Primary Road Secondary Road Traffic Movement Out-Site In-Site In-Site Functional Uses Map The Site Subway (under construction) Residential District Industrial Land
Activity Type Analysis
Analysis
35
1 3 5 7 2 4 6 12 9 11 10 8 1 3 5 7 2 4 6 8 12 9 11 10 Entrance Forest Theatre Sandpit Kids Facilities Area Tree House Pool Rainfall Collection Pool Terrace Toilet Exit Tunnel Baby-crawling way N 0m 75m 25m Master Plan
Design Concept
36

I try to design a liftable glass wall to guarantee safety,that connects the yard with the outside. It would be an entrance when it is flush with the ground.when the wall is adjusted to 1.2m height,people outside can communicate with the insides, but they can not pass. When it's rised to 2m, the space was divited into two parts completely by the wall, the different parts have a relationship with each other.

Design Analysis Landscape Frame Activity Area Main Path Forest Entertainment Children Facilities Water Feature Sand Pit Farm Yard Micro-Landform Label Resting Area Kids' Playground Secondary Path Trail Water Feature Children Village Residential Area Landform Entrance & Exit Hardscape Softscape Quiet Area Landscape Construction Functional Map Out-Site Circulation In-Site Circulation Node Visual Section 37 -0.500 -0.700 -0.800 1.200 2.200 1.000 1.200 0.000 0.600 2.800 Cucurbita moschata Triticumae stivum Brassica capestris Canna Ipomoea batatas Bioswale Terrace Paddling Pool Facility Area Sand Pit Toilet Prunus serrulata Sorbaria sorbifolia Jacaranda mimosifolia Ficus virens Ait. var. sublanceolata Wood House Zoysia japonica Ficus concinna Bischofia javanica Osmanthus fragrans Prunus serrulata Path Grass Slope Exploration Tunnel Slide Toilet A C C' B' A'
Glass-Fence Details Private Semi-Private Public Roof Wall Window Bench Pillar Wooden Floor Drawbridge Platform Beams Stairs Support Pillar Tree Hole Tree Hole Bench
Tree-House Details
38

Landscape Architecture Portfolio

Siyang Zhou

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.