+T W
+BK 8.75
13.
0
7.0
+TK 9.55
+RL 9.75
+BK 8.75
+TK 9.55
+BW
+T W
+BW
8
7
9.0
7.0
6
RL. 7.0
5
4
7.0
+BW
+T W
13.
0
+TK
2
+B
40m @ 1:2 0
7.0 K7 .8
3
.37
+BW 7.8
+8
FA LL
FFL. 9.37
+TW 13.0 33
+9.3 7
. +8
FPL. 8.37
K
+T
7.0
.8
K7
+B
+8.75
+9.3 7
RL. 8.75 +8.71
3 +9.3
+BW 7.0
66
+7.
FAL L
+5.5
+TW 13.0
RL. 5.5
33
+BK 5.5
L FAL
3
.3
+8
2
11
+TW 7.95
PROPOSED CONTOURS
+5.5
EXISTING CONTOURS
+BK 5.5
+TK 6.3
RL. 7.5
10
L FAL
:20
+RL 6.5
6 +7.
12
40m @ 1
.46
+9.
+TK 6.3
62 +7.
+5
FFL. 7.66
FLOOR BELOW
+BW 7.0
0.0.0 K K0 00 T ++B
9
RAMP +BK 00.0
8
RETAINING WALL
7 6
.3
K4
+T
5 4
m 40
@
K +B
0 1: 2
TREE
3.5 .5
L4
+R
K
+B
RELATIVE LEVEL
RL. 20.0
3.5
.3
K4
+T
4 4
FPL.20.0
FINISHED PLATFORM LEVEL
FFL.20.0
FINISHED FLOOR LEVEL
+3.5
RL. 3.5
L FAL PROJECT
+3.46
3
FARNSWORTHER PAVILION MARIBYRNONG RIVER
+3.5
DRAWING
+TK
+BK +RL +BK +TK
1.5
2.5
GRADING PLAN
2.3
DRAFT
1.5
SCALE
ASSIGNMENT. NO
DATE
TUTORIAL. NO
1:200 @ A2 40m
@ 1:
02 02
11/10/12
20
TUTOR
CHO / HANNES / DERMOT
2.3
SUBJECT
SITE TECTONICS
2
JESSICA ZHANG VICTOR WONG
RL. 1.5
UNIVERSITY OF MELBOURNE
1 0M 1CM = 2M
4M
6M
PROPOSED CONTOURS EXISTING CONTOURS TREES
PROJECT
FARNSWORTHER PAVILION MARIBYRNONG RIVER DRAWING
SITE PLAN DRAFT SCALE
ASSIGNMENT. NO
DATE
TUTORIAL. NO
1:500 @ A2
02 02
11/10/12 TUTOR
CHO / HANNES / DERMOT SUBJECT
SITE TECTONICS
JESSICA ZHANG VICTOR WONG
MARIBYRNONG EXPO SITE 1:500 @ A2
UNIVERSITY OF MELBOURNE
0M 1CM = 5M
10M
20M