VIET NGUYEN UC Berkeley - CED
a collections of both original and profressional work throughout the years of learning, investigating & practicing architecture.
Viet Nguyen
Email:
Phone:
Architectural Designer
viet.ca.nguyen56
510-825-2196
@gmail.com
San Francisco, CA, USA
Readers + Viewers, My design interest emphasizes respect for geometric forms, the uniformity of materials, natural light contrasts, and attention to architectural details. Through the projects presented in my portfolio, I seek to reconcile abstract thinking with pragmatism in architecture, enabling me not only to work in the realm of high-flying design imagination but also to work within the realm of functional reality. As such, I draw inspiration from historical precedents, historical events, and architectural precedents in order to create designs that will have a significant impact on the built environment. Apart from that, I also believe that architectural representation also plays an instrumental role in bridging the gap between architects and their viewers. It is always a joy to see drawings that describe a narrative, are unfamiliar, dark, and beautiful, but are equally succinct and compelling. I used a combination of digital, modeling, and drafting skills, as well as hand-drawing techniques and montage, to create drawings that explain the intent of my ideas. Thank you for taking the time to see my work. I hope you find my thoughts and approach to design enjoyable. My presentation demonstrates my fascination with architectural design, and I am excited to share it with you.
An Architect’s work station, Palo Alto, CA
2
3
P ro f e s s i on a l
4
Wor k s
5
PROJECT INFO: CONSTRUCTION ADMINISTRATION
WATSON RESIDENCE
CHIMNEY WALL CENTERLINE
3'-0" 4 1/2"
EQ.
EQ.
3'-8 1/2" VIF
4 1/2"
4 1/2"
EQ.
EQ.
4 1/2"
[MENLO PARK ] - 2022 TO PRESENT At Topos, my role involved assisting in the construction coordination and overseeing the progress of a 4000 square foot home remodel in Menlo 2'-11 1/2"
STANDING SEAM CHIMNEY CAP WESTERN METALS "BRONZE" FINISH METAL CHASE COVER WESTERN METALS "BRONZE" FINISH
7 1/4"
the principal architect in developing immediate design-based solutions in response to shifting conditions. Additionally, my duties included working
1"
closely with subcontractors to ensure that the design intentions were effectively met. I recall managing the construction of a custom game room bar. Our client’s decision to switch from traditional wood cabinets to a steel shelving
2'-4 1/4"
2 1/2"
EQUAL SPACING STANDING SEAM
7 1/4"
meeting minutes, and working directly with the general contractor and trades. I was responsible for sorting orders and materials, as well as assisting
2'-4 1/4"
2'-11 1/2"
Park. This complex project brought forth numerous challenges, including managing change orders, conducting punch lists, organizing and recording
2 1/2"
TOPOS Architects
1- 3/4" AIR GAP
1"
1"
1"
1
TOPOS ARCHITECTS 654 Gilman Street Palo Alto, CA 94301 650.327.7573
system required significant changes to the construction schedule and cost. The design the owner approved was a steel bar shelf and wine racks
www.toposarchitects.com
with integrated LED lighting. The structure was made of steel tubes welded together to create a cube-shaped shelf with glass in between each tube, which would serve as wine storage. To meet the time and schedule expectation, Topos Architects stepped in to manage the construction, choosing a fabricator and their bids, and modify the design. My principle architect appointed me as the main point of contact through fabrication and installation.
3
SQUARE CHIMNEY SHROUD - NORTHSIDE SCALE: 1"
=
4
1'-0"
SQUARE CHIMNEY SHROUD - EASTSIDE SCALE: 1"
=
1'-0"
CHIMNEY CAP DESIGN
1
fabricating and mounting anything above them. Through this experience, I had the chance to observe the progress of how each components come
CHIMNEY WALL CENTERLINE
3'-0"
together. In addition, finding the right 45-degree LED channel lighting that could be mounted on the steel bar shelf proved especially tricky and specific, 4 1/2"
EQ.
EQ.
3'-8 1/2" VIF
4 1/2"
4 1/2"
as we needed to drill holes and a planning bracket to hold that LED channel in specific locations as well as for fishing wire and coordinate the details
EQ.
EQ.
4 1/2"
DATE: 11/14/2022 REVISIONS: 1 05/21/2021 _________________ 2 06/28/2021 _________________ 3 08/30/2021 _________________ 4 09/21/2021 _________________ 5 3/8/2022 _________________ 6 10/27/2022 _________________ 3/24/2023
2'-11 1/2"
2'-4 1/4"
2 1/2" 2 1/2"
2'-4 1/4"
EQUAL SPACING STANDING SEAM
SHEET INDEX:
STANDING SEAM CHIMNEY CAP WESTERN METALS "BRONZE" FINISH
CHIMNEY SHROUD DESIGN INTENT
METAL CHASE COVER WESTERN METALS "BRONZE" FINISH
7 1/4"
7 1/4"
2'-11 1/2"
ahead of time before the steel was powdercoated.
1"
WATSON Residence
of coordinating countertop installation and finishes. I had to consider the countertops early in the process since they needed to be installed before
1810 White Oak Drive Menlo Park, CA 94025
This gave me the experience to work through shop drawings, adjust dimensions for tolerances and electrician needs, and understand the process
SHEET:
CD1.02
1- 3/4" AIR GAP
1"
1"
1"
5
SQUARE CHIMNEY PERSPECTIVE AT FRONT- CLOSE UP VIEW
1
TOPOS ARCHITECTS 654 Gilman Street Palo Alto, CA 94301 650.327.7573
SQUARE CHIMNEY SHROUD - NORTHSIDE SCALE: 1"
=
4
1'-0"
SQUARE CHIMNEY SHROUD - EASTSIDE SCALE: 1"
=
WATSON Residence
3
1'-0"
1
6'-4" VIF STUD WALLS 4 1/2"
EQ.
EQ.
1810 White Oak Drive Menlo Park, CA 94025
www.toposarchitects.com
CHIMNEY WALL CENTERLINE
4 1/2"
4 1/2"
3'-0" VIF STUD WALLS EQ. EQ.
4 1/2"
DATE: 11/14/2022 REVISIONS: 1 05/21/2021 _________________ 2 06/28/2021 _________________ 3 08/30/2021 _________________ 4 09/21/2021 _________________ 5 3/8/2022 _________________ 6 10/27/2022 _________________ 3/24/2023 SHEET INDEX: CHIMNEY SHROUD DESIGN INTENT
2'-11 1/2"
STANDING SEAM CHIMNEY CAP WESTERN METALS "BRONZE" FINISH METAL CHASE COVER WESTERN METALS "BRONZE" FINISH
7 1/4"
2 1/2"
EQ. EQ. EQ. EQ. SQUARE CHIMNEY PERSPECTIVE AT FRONT- CLOSE UP VIEW
2'-4 1/4"
2 1/2"
EQUAL SPACING - STANDING SEAM
CD1.02
7 1/4"
5
2'-4 1/4"
2'-11 1/2"
SHEET:
1"
1"
1"
1" 1- 3/4" AIR GAP FACE OF 2" BLUESTONE MASONRY
1
TOPOS ARCHITECTS 654 Gilman Street Palo Alto, CA 94301 650.327.7573
1
RECTANGLE CHIMNEY SHROUD - NORTHSIDE SCALE: 1"
=
1'-0"
5
RECTANGLE CHIMNEY SHROUD - WESTSIDE SCALE: 1"
=
1'-0"
7
k Drive 94025
4
6
Residence
www.toposarchitects.com
100-3/4"
2
67-1/4"
1
6
5
4
3
1/4" THICK MIRROR BACKDROP
Ten of 1/4" thick glass: 15-1/16" x 10-3/8" To provide rubber bumper under glass
9
1-1/4"X1-1/4" HHS TUBE
7
8
CABINET LINE BEYOND DETAIL A/A37
10
1/4" THICK GLASS - FLUSHED MOUNTING
3/4"
1"
STEEL FRAME 3D SCALE: 3/4" =
3/4"
13"
2
1'-0"
ALIGNED
1/8" THICK GLASS SUPPORT TAB WELDED TO TUBE
DETAIL A/A37 TOPOS ARCHITECTS 654 Gilman Street Palo Alto, CA 94301 650.327.7573 www.toposarchitects.com
3/4"
WINE RACK OPTION #2 2315/16"
STRIP-LIGHT FIXTURE, TYP. WIRING NEEDED CABLE MANAGEMENT TO BE INVISIBLE FROM THE SHELF LIGHT CHANNEL
DETAIL B/A37
1
2
METAL WINE RACK INSIDE CABINET, SEE INSPIRATIONAL IMAGES
24"x24" WOOD CABINET PANEL
02 SEE DETAIL 01/A38
2"X3/4" STEEL TUBE FRAME (IN PLANE OF CAB. DOOR ABOVE)
3/4"X3/4" STEEL TUBE FRAME WINE RACK, PERFECTLY FIT INSIDE OF CABINET
METAL DOOR FRAME & PANEL, SEE DETAIL 3/A37
EQ. 100-7/8" (SITE MEASUREMENT)
DETAIL B/A37
1/8" TOLERANCE ON BOTH SIDES
433/16" STEEL FRAME
EQ.
EQ.
43/16"
671/4" (SITE MEASUREMENT)
MIRROR BACKDROP
EQ.
(4) EQUAL ROWS OF STEEL WINE SHELVES
EQ.
METAL SHELF, SEE DETAIL 1/A37
1/8" DIAMETER WIRE RACKING PER MANUFACTURE
4"
3
1810 White Oak Drive Menlo Park, CA 94025
V.I.F
WATSON Residence
EQ.
FACE OF CABINET
(6) EQUAL ROWS OF STEEL WINE SHELVES EQ. EQ. EQ.
FACE OF METAL FRAME
EQ.
2315/16"
EQ.
FRAME TO ALIGN WITH CABINET ABOVE
V.I.F
DATE: 09/07/2023 REVISIONS: _________________ 1 05/21/2021 _________________ 2 06/28/2021 _________________ 3 08/30/2021 _________________ 4 09/21/2021 _________________ 5 3/8/2022 _________________ 6 10/27/2022 7/30/2023 SHEET INDEX:
01 SEE DETAIL 02/A38 24"x24" WOOD CABINET PANEL
3
2"X3/4" STEEL TUBE FRAME (IN PLANE OF CAB. DOOR ABOVE) 1/8" TOLERANCE ON BOTH EQ. SIDES
433/16"
WINE
RACK OPTION #2 24"x24" WOOD 24"x24" WOOD CABINET PANEL CABINET PANEL
1/8" DIAMETER WIRE RACKING PER MANUFACTURE
6"
01/A38 DETAIL 01/A38 02 SEE DETAIL 02 SEE 01 SEE DETAIL 02/A38
TOPOS ARCHITECTS 654 Gilman Street Palo Alto, CA 94301 650.327.7573
2"X3/4" STEEL 2"X3/4" TUBE STEEL TUBE FRAME (INFRAME PLANE (IN OF PLANE CAB. OF CAB. 6" DOOR ABOVE) DOOR ABOVE)
223/16" INT. WINE RACK STRUCTURE 2315/16" STEEL FRAME
www.toposarchitects.com
1/8" TOLERANCE 1/8" TOLERANCE ON BOTH SIDES ON BOTH SIDES
(6) EQUAL ROWS OF STEEL WINE SHELVES EQ. 1'-0" EQ. SCALE: 1 1/2"= EQ.
V.I.F
WINE RACK, WINE PERFECTLY RACK, PERFECTLY FIT FIT INSIDE OF INSIDE CABINET OF CABINET
STEEL FRAME
2
EQ.
EQ.
(6) EQUAL ROWS OF STEEL WINE SHELVES EQ. EQ. EQ.
1
EQ.
METAL SHELF, SEE DETAIL 1/A37
V.I.F
2
671/4" (SITE MEASUREMENT)
EQ.
43/16"
EQ.
1/8" DIAMETER 1/8" DIAMETER WIRE RACKING WIRE RACKING PER MANUFACTURE PER MANUFACTURE MIRROR BACKDRO
EQ.
(4) EQUAL ROWS OF STEEL WINE SHELVES
671/4" (SITE MEASUREMENT)
43/16"
433/16"
433/16" STEEL FRAME
EQ. EQ. EQ.
METAL SHELF, SEE DETAIL 1/A37
P METAL WINE RACK INSIDE CABINET, SEE INSPIRATIONAL IMAGES METAL DOOR FRAME & PANEL, SEE DETAIL 3/A37
MIRROR BACKDROP
METAL WINE RACK INSIDE CABINET, SEE INSPIRATIONAL IMAGES METAL DOOR FRAME & PANEL, SEE DETAIL 3/A37
WINEWINE RACKRACK OPTION OPTION #2 #2
100-7/8" (SITE 3 MEASUREMENT)
DETAIL 02/A38 02/A38 01 SEE DETAIL 01 SEE
METAL TO BEHERE WELDED HERE METAL ROD TO BEROD WELDED
3
4"
4"
100-7/8" (SITE MEASUREMENT) EQ.
(4) EQUAL ROWS OF STEEL WINE SHELVES
V.I.F
223/16" 223/16" INT. WINE RACK INT. STRUCTURE WINE RACK STRUCTURE 2315/16" 2315/16" STEEL FRAME STEEL FRAME
3
DATE: 09/07/2023 REVISIONS: _________________ 1 05/21/2021 _________________ 2 06/28/2021 _________________ 3 08/30/2021 _________________ 4 09/21/2021 _________________ 5 3/8/2022 _________________ 6 10/27/2022 7/30/2023 SHEET INDEX: GAME ROOM WINE RACK
7/30/2023
6"
6"
SHEET INDEX: GAME ROOM WINE RACK
SHEET:
A38 SHEET:
WINE BAR (SW)
SCALE: 3/4" =
DATE: 09/07/2023 REVISIONS: ______________ ___ 1 05/21/2021 ______________ ___ 2 06/28/2021 ______________ ___ 3 08/30/2021 ______________ ___ 4 09/21/2021 ______________ ___ 5 3/8/2022 ______________ ___ 6 10/27/2022
3
1'-0"
8
1
WINE BAR (SW) SCALE: 3/4" =
1'-0"
GAME GAME ROOM-WINE ROOM-WINE RACKRACK DETAILS DETAILS 1 SCALE: 1 1/2"=SCALE: 1'-0" 1 1/2"=
1'-0"
1810 White Oak Drive Menlo Park, CA 94025
EQ.
1810 White Oak Drive Menlo Park, CA 94025
1
WATSON Residence
GAME ROOM-WINE RACK DETAILS 3/4"X3/4" STEEL 3/4"X3/4" TUBE STEEL FRAME TUBE FRAME
1
EQ.
www.toposarchitects.com
433/16"
EQ.
TOPOS ARCHITECTS 654 Gilman Street Palo Alto, CA 94301 650.327.7573
WINE RACK OPTION #2
METAL ROD TO BE WELDED HERE
433/16"
EQ.
433/16"
433/16" STEEL FRAME
EQ.
3/4"X3/4" STEEL TUBE FRAME WINE RACK, PERFECTLY FIT INSIDE OF CABINET
411/2" INT. WINE RACK STRUCTURE
1/8" TOLERANCE ON BOTH SIDES
411/2" INT. WINE RACK STRUCTURE
V.I.F
1'-0"
2"X3/4" STEEL TUBE FRAME (IN PLANE OF CAB. DOOR ABOVE)
EQ.
671/4"
FRAME TO ALIGN WITH CABINET ABOVE
FRAME TO ALIGN WITH CABINET ABOVE 671/4"
671/4"
1'-0"
=
EQ.
411/2" INT. WINE RACK STRUCTURE
433/16" STEEL FRAME SCALE: 1 1/2"=
SCALE: 3"
24"x24" WOOD CABINET PANEL
METAL ROD TO BE WELDED HERE
GAME ROOM-WINE RACK DETA ILS
1
1
1'-0"
02 SEE DETAIL 01/A38
1/8" DIAMETER WIRE RACKING PER MANUFACTURE
01 SEE DETAIL 02/A38
SCALE: 1 1/2"=
GAME ROOM-BAR CABINET DETAILS
EQ.
3/4"X3/4" STEEL TUBE FRAME WINE RACK, PERFECTLY FIT INSIDE OF CABINET
223/16" INT. WINE RACK STRUCTURE 2315/16" STEEL FRAME
GAME ROOM-WINE RACK DETAILS
411/2" INT. WINE RACK STRUCTURE
1'-0"
FRAME TO ALIGN WITH CABINET ABOVE
671/4"
SCALE: 3/4" =
A37
INT. WINE RACK STRUCTURE 2315/16"
EQ.
02 SEE DETAIL 01/A38
WINE BAR (SW)
4
SHEET:
223/16"
WATSON Residence
FRAME TO ALIGN WITH CABINET
EQ.
ABOVE
GAME ROOM SHELF
A38 9
6"
6"
21/4"
6"
18" MIN. CLEAR
18" MIN. CLEAR
3 28
4 28
5
28
6
28
3 29
1
4
307
29
18" MIN. CLEAR
3 32
31
6 29
TOPOS ARCHITECTS 654 Gilman Street Palo Alto, CA 94301 650.327.7573
(N) FIREPIT
7 29
326
3849 Page Mill Rd 325 Palo Alto,324CA 94304
Henn Residence
329
3849 328 Page Mill Rd Palo3Alto, CA 94304 27
Henn Residence
42"
21/4"
1'-0"
29
(N) OUTDOOR KITCHEN AREA
8
42"
+/- 38" GLASS PANEL HEIGHT 31/4"
31 2
309
308
SCALE: 1 1/2"= 5
+/- 38" GLASS PANEL HEIGHT
21/4"
1 A8 (N) DECKING AREA
(N) 2" WATER LINE INLET
(e) 14" OAK
www.toposarchitects.com
2 A3
www.toposarchitects.com
29
31/4"
329
310
2
29
(e) 14" OAK
(N) 36" POOL GATE
TOPOS ARCHITECTS 654 Gilman Street Palo Alto, CA 94301 650.327.7573
DECK (e) 24" OAK
21/4"
(e) 28" OAK
2 www.toposarchitects.com
21/4"
A7
CO SSCO
DECK
21/4"
3 A16
GLASS RAILING
331
7 POOL COPING at DECK SCALE: 1 1/2"= 1'-0" FOUNDATION VENT
1'-0"
6
POOL STRUCTURE PER POOL CONSULTANT'S RECOMMENDATION MORTAR
CRAWL SPACE
POOL COPING SCALE: 1 1/2"=
3
1'-0"
5
1'-0"
SSCO
Henn Residence
3849 Page Mill Rd Palo Alto, CA 94304
TYP. DRILLED PIER (e) SEWER LINE
SCALE: 1 1/2"=
1'-0"
ARCHITECTURAL
(e) DETAILS 18" OAK
(e) SEPTIC TANK
313
FOUNDATION VENT SCALE:(e) 1 1/2"= PROTECT AND PRESERVE CEMENT PLASTER WALL FINISH
1'-0"
(e) SEWER LINE SHEET: 1
A18
DATE: 5/16/2023 REVISIONS: 1 8/31/2023 _________________ _________________ _________________ _________________ _________________ _________________ DATE: SHEET INDEX: 5/16/2023 ARCHITECTURAL REVISIONS: DETAILS 1 8/31/2023 _________________
(e) ELECTRICAL BOXES BELOW
SHEET INDEX:
4
5
SILICON SEALANT PROTECT AND PRESERVE (e) CEMENT PLASTER WALL FINISH NEW 14"x6" FOUNDATON VENT WUI RATED PER ASTM E2886/2912/E119 (e) FOUNDATION-NO CHANGE BRANDGUARD FV2011-FF, OR EQUAL NEATLY INSTALL THROUGH (e) WALL 312
PROTECT AND PRESERVE (e) CEMENT PLASTER WALL1FINISH LEDGER
(e) FOUNDATION
CRAWL SPACE (e) SEWER LINE
WALL-MAS.
31
CRAWL 1 (e) WALL w/ NEW REINFORCING S5 SPACE
11
(e) 16" OAK
NEW 14"x6" FOUNDATON VENT WUI RATED PER ASTM E2886/2912/E119 (e) 2x WALL FRAMING. MODIFYOR EQUAL BRANDGUARD FV2011-FF, AS NEATLY NEEDEDINSTALL TO ACCOMODATE THROUGH (e) WALL NEW FLOOR STRUCTURE. 31
NEW 14"x6" FOUNDATON VENTLEDGER S6 WUI RATED PER ASTM E2886/2912/E119 MORTAR BED BRANDGUARD FV2011-FF, OR EQUAL NEATLY INSTALL THROUGH (e) WALL PER POOL STRUCTURE POOL STRUCTURAL PLANS
MORTAR
1"
(e) 2 STORY RESIDENCE
DECK OVERHANG
SILICON SEALANT
31 7
1"
POOL STRUCTURE PER POOL CONSULTANT'S RECOMMENDATION POOL COPING MORTAR
DATE: 5/16/2023 REVISIONS: 1 8/31/2023 _________________ _________________ _________________ _________________ _________________ _________________
15 S6
AS NEEDED ACCOMODATE (N) POOL TO BARRIER NEW FLOOR STRUCTURE.
316
1
WATER LEVEL
FLOOR
(N) 4" SEWER LINE MIN. 1/4" PER FOOT SLOPE
3849 PAGE MILL ROAD
SCALE: 1 1/2"=
(N) POOL GATE MODIFY (e) 3'2xWIDE WALL FRAMING.
9
S5
TOP of CONCRETE
FACE OF MASONRY
1"
141/2"
WALL-EXT.
1'-0"
31 8
AS NEEDED TO ACCOMODATE POOLCOPING STRUCTURE PER POOL NEW FLOOR STRUCTURE. POOL STRUCTURAL PLANS TOP of DECK SILICON SEALANT
FACE OF MASONRY
DECK
SCALE: 1 1/2"=
WALL-MAS.
21/4"
(e) WALL w/ NEW REINFORCING
1"
WATER LEVEL
SET DECK FINISH MORTAR BED 1/8" BELOW COPING (e) 2x WALL FRAMING.+/MODIFY
(e) DRAIN
DECK OVERHANG
11
(e) 16"/14" OAK
320
11
1'-0"
31
21/4"
1/2"
SCALE: 1 1/2"=
POOL COPING
(e) DECK
15 TYP. DRILLED PIER S6 (e) GRADE-NO CHANGE
(e) 16" OAK
TYP. DRILLED PIER FLOOR
141/2"
DECK WALKWAY at SOUTH ELEVATION TOP of DECK 4 DECK DECK OVERHANG TOP of CONCRETE 1" 12 1"
POOL STRUCTURE PER CONSULTANT'S 1POOL 1 LEDGER (e) FOUNDATION RECOMMENDATION S6
325
WALL-EXT.
32
POOL COPING
1'-0"
(e) 18"/18" OAK
15 S6
(N) POOL FENCE
3849 Page Mill3849 Rd Page Mill Rd Palo Alto, CA Palo 94304 Alto, CA 94304
326
334
WALL-MAS.
TYP. DRILLED PIER
SSCO
(N) POOL GATE
322
15 S6
(e) ROCK VALVE BOX RETAINING EXTEND MASONRY WALL FINISH TO UNDERSIDE OF JOISTS WALL
14 LOWER GRADE BEAM (e) S6 GRADE-NO CHANGE
321
SET DECK FINISH +/- 1/8" BELOW COPING
LOWER GRADE BEAM GLASS RAILING
Henn Residence Henn Residence
332
333
WALL-MAS.
324
1'-0"
335
6"
SCALE: 1 1/2"=
FLOOR
SCALE: 1 1/2"=
14 LOWER S6 GRADE BEAM
INLET
14 3S6 A16
(e)OF GRADE-NO CHANGE LINE DECK BEYOND
SCALE: 1 1/2"=
121/2"
WALL-EXT.
6"
1
29
1"
0
1"
1'-0"
29
4
1"
FACE OF MASONRY
9
28
21/4"
8
(e) GRADE-NO CHANGE
DECK 1 LEDGER S6 POOL COPING
SLIDING DOOR HEAD/SILL POOL COPING
28
8
LOWER GRADE BEAM
DECK WALKWAY at SOUTH ELEVATION
(e) FOUNDATION-NO CHANGE
10
1
(N) POOL GATE
TOPOS ARCHITECTS 654 Gilman Street Palo Alto, CA 94301 650.327.7573 (e) 22" OAK
DRILLED PIER BEYOND
S6
t DECK
DECK at POOL
(e) 4" OAK
(e) GRADE-NO CHANGE 15 TYP. DRILLED PIER S6
NEW CEMENT PLASTER WALL FINISH
1 S5
7
CRAWL SPACE
LEDGER
28
1 S6
2
DECK LOWER SUB-FLOOR +/- 1" TO ACCOMODATE RECESSED DOOR SILL
WALL-MAS.
28
1
1
1
LEDGER S5 S6 POOL STRUCTURE PER POOL STRUCTURAL PLANS LINE OF NEW HEADER POST BEYOND
28
MORTAR BED
(N) SPA UNDER (N) SPA SEPARATE PERMIT
INLET
(e) 18"/18" OAK
NEW DOOR UNIT 15 G.S.M. DOOR SILL PANDRILLED NEW CEMENT PLASTER WALLPIER FINISH TYP. S6SEAMS -SOLDER ALL -EXTEND 6" UP WALL OPENING
1 S5
SCALE: 1 1/2"= PROVIDE 15 MIL. VAPOR BARRIER AT (N) VAPOR RETARDANT ENTIRE CRAWL SPACE (STEGO COVER WRAP, OR EQUAL)
EXTEND MASONRY WALL FINISH TO UNDERSIDE OF JOISTS
TOP of SUB-FLOOR
CRAWL SPACE
0
GLASS RAILING
WALL-MAS.
LOWER SUB-FLOOR +/- 1" TO ACCOMODATE RECESSED DOOR SILL
1"
(N) GUARDRAIL
FIN. GRADE AT CRAWL SPACE
TYP. DRILLED PIER
INLET
14 LOWER S6 GRADE BEAM
WALL-MAS. 14 S6
TOP of SUB-FLOOR
WATER LEVEL
28
TOP of CONCRETE
1
(e) GRADE AT CRAWL SPACE
DECK at POOL
DRILLED PIER BEYOND EXTEND MASONRY WALL FINISH TO UNDERSIDE OF JOISTS
G.S.M. DOOR SILL PAN -SOLDER ALL SEAMS -EXTEND 6" UP WALL OPENING
LINE OF NEW HEADER POST BEYOND
TOP of DECK
1'-0" 15 S6
14"/12"/10" OAK WALL-MAS. (e) TOP of CONCRETE LINE OF DECK BEYOND
(e) UNIT GRADE-NO CHANGE NEW DOOR
141/2"
(LOWER FLOOR)
(e) 12" OAK
DRILLED PIER BEYOND
1 1 S5 S6
PROVIDE 15 MIL. VAPOR BARRIER AT ENTIRE CRAWL SPACE (STEGO (e) FOUNDATION-NO CHANGE WRAP, OR EQUAL)
(e) 14" OAK
ALIGN JAMB14 w/ OUTSIDE LOWER FACE OF STUDS S6 GRADE BEAM NEW DOOR UNIT, PER SCHEDULE
SET DECK FINISH +/- 1/8" BELOW COPING LEDGER POOL COPING
PROTECT AND PRESERVE (e) FIN. GRADE AT CRAWL CEMENT PLASTER WALLSPACE FINISH FROM LEDGER TO GRADE. CO
TOP of DECK
3 A16
(e) 6" TR
9
DECK
P L
27
1'-0"
8
SCALE: 1 1/2"= SCALE: 1'-0" 1 1/2"=
DECK
SELF-ADHESIVE BITUTHENE FLASHING (GRACE 3000, OR
FLOOR
S I T E
27
1
WALL-MAS. EQUAL)-WRAP JAMB. BEYOND LINEONTO OF DECK
2x BLK'G w/P.E.N AND WAY at SOUTH ELEVATION (2) 16d NAILS/16"
(N) ADU -
1'-0"
A16A16
GUARDRAIL GUARDRAIL at MAS. at MAS. WALLWALL CAP CAP
1
SCALE: 1 1/2"=
DECK
FLOOR
294
SELF-ADHESIVE BITUTHENE NEW CEMENT PLASTER FLASHING (GRACE 3000,WALL OR FINISH-PATCH and MATCH (e) TOP of CONCRETE EQUAL)-WRAP ONTO JAMB. GSM FLASHING ALIGN JAMB w/ OUTSIDE FACE OF STUDS WOOD TRIM-MATCH (e) SCHEDULE NEW DOOR UNIT, PER
2x BLK'G w/P.E.N AND (2) 16d NAILS/16"
296
FILL STEEL BEAM CAVITY w/CLOSED CELL DECK SPRAY FOAM INSUL.
SHEET:
(e) GRADE-NO(e)CHANGE GRADE-NO CHANGE
1 FB-1, PER FRAMING PLAN S7 TOP of DECK
DRILLED 15 PIER BEYOND TYP. DRILLED PIER S6
(e) DRIVEWAY SCALE: 1 1/2"=
MODIFY (e) GRADE IF NEEDED TO PROVIDE CLEARANCE. SHEET: 1x TRIM-MATCH DECKING 1 DB-4 1 GLASS RAILING 1 A16 LEDGER S6 MODIFY (e) GRADE IF NEEDED TO PROVIDE CLEARANCE. TOP of DECK 1x TRIM-MATCH DECKING DB-4 TOP of CONCRETE 1 LEDGER S6
1
WOOD TRIM-MATCH (e)
WALL-EXT.
(MAIN FLOOR)
1 GLASS RAILING A16
SEE PLANS (51" V.I.F.)
S6
FUR (e) WALL AS REQ'D TO CONCEAL BEAM
1'-0"
DECK at POOL
1
DD
1 GSM FLASHING (e) WALL FINISH LEDGER
(e) 8"
299
FILL STEEL BEAM CAVITY w/CLOSED CELL SPRAY CEILING FOAM INSUL.
LEDGER
DECK GUARDRAILDECK GUARDRAIL
DECK at HOUSE
2
1 S6
(e) GAS LINE
SHEET INDEX: SHEET (e) 12" BAY INDEX:
MODIFY (e) GRADE IF NEEDED TO PROVIDE 1 CLEARANCE. FB-1, PER FRAMING PLAN S7 1x TRIM-MATCH DECKING NEW CEMENT PLASTER WALL DB-4and MATCH (e) FINISH-PATCH
WALL-EXT.
295
29 8
FUR (e) WALL AS REQ'D TO CONCEAL BEAM
PROVIDE 15 MIL. VAPOR BARRIER AT ENTIRE CRAWL SPACE (STEGO WRAP, OR EQUAL) SCALE: 1 1/2"=
GSM 'Z' FLASHING (e) FOUNDATION-NO CHANGE (e) DRAIN FOUNDATON VENT PER PLANS (e) GRADE AT CRAWL SPACE
(e) 3-CAR GARAGE -
(e) ELECTRICAL (e) GRADE AT CRAWL SPACE BOX (N) POOL BARRIER FIN. GRADE AT CRAWL SPACE
_________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________ _________________
SEE PLANS (51" V.I.F.)
L/4 (e) FLOOR FRAMING-NO 1 GLASS RAILING CHANGE A16 (e) WALL FINISH
PANEL LENGTHPANEL (L) = 60" LENGTH MAX. (L) = 60" MAX.
297
L/4
296
1'-0"
(e) 400 AMP. ELEC. SERVICE ENTRANCE -NO CHANGE
(e) FOUNDATION-NO CHANGE
DATE: DATE: 5/16/2023 5/16/2023 REVISIONS: REVISIONS: 1 8/31/2023 1 8/31/2023 _________________ _________________
DD
(N) POOL GATE
FROM LEDGER TO GRADE.
(e) 18" BAY
1'-0"
SEE PLANS (51" V.I.F.) CEILING
298
SCALE: 1 1/2"=
SCALE: 1 1/2"=
12" MASONRY12" WALL MASONRY CAP WALL CAP 15 TYP. DRILLED PIER S6
DECK at HOUSE
2
WINDOW HEAD/JAMB/SILL L/2
302
1'-0"
(e) FLOOR FRAMING-NO CHANGE
L/2
300 301
SCALE: 1 1/2"=
DD
303
(4) 3/8"x4" EXPANSION (4) 3/8"x4"ANCHORS EXPANSION ANCHORS ITW Red HeadITW Trubolt, Red OR Head EQUAL Trubolt, OR EQUAL
WINDOW HEAD/JAMB/SILL
3
304
1/2" 1CLEAR TEMPERED 1/2" CLEARGLASS TEMPERED GLASS LEDGER S6 CR LAURENCE CRAFWC1S-BS LAURENCE AFWC1S-BS DRILLED PIER BEYOND SURFACE MOUNT SURFACE FRAMELESS MOUNT FRAMELESS WINDSCREENWINDSCREEN CLAMP CLAMP
60 MIL. ADHESIVE FLASHING (GRACE BITUTHENE 3000)-WRAP INTO WINDOW OPENING
SE
305
7
LOWER GRADE BEAM
(e) GRADE-NO CHANGE
BASE PLATE COVER BASE PLATE FITTING COVER FITTING
3
306
14 S6
WALL-MAS.
1-1/2" x 3-1/2" TRIM, UNO ON ELEVATIONS WALL
30
60 MIL. ADHESIVE FLASHING (GRACE BITUTHENE 3000)-WRAP WINDOW/DOOR UNIT INTO WINDOW OPENING 3"x1-1/2" SILL w/5° SLOPE AND 1/4"X1/4" DRIP KERF
3/4"x3" APRON TRIM
8
WALL
1-1/2"x1" SILL TRIM FLUSH W/ WINDOW SILL
SILL
TOP of CONCRETE
1-1/2" x 3-1/2" TRIM, UNO ON ELEVATIONS
3/4"x3" APRON TRIM SILL
TOP of DECK DECK
WINDOW/DOOR UNIT WINDOW/DOOR UNIT 3"x1-1/2" SILL w/5° SLOPE AND 1/4"X1/4" DRIP KERF
1-1/2"x1" SILL TRIM FLUSH JAMB W/ WINDOW SILL
9
INSTALL CASING FLUSH TO INSIDE OF JAMB
(e) 2x WALL FRAMING. MODIFY
30
1-1/2" x 3-1/2" TRIM, UNO ON ELEVATIONS SILICON CAULKING
6 A21
INT. CASING
FLOOR
(e) 2x WALL FRAMING. MODIFY AS NEEDED TO ACCOMODATE (N) POOLNEW FENCE FLOOR STRUCTURE. 0
BUILDING PAPER WINDOW/DOOR UNIT 60 MIL. SELF-ADHESIVE FLASHING LAP OVER GSM FLASHING
31
WALL
JAMB
ANEL S REVEALS
LOWER (e) GRADE. PROVIDE SCALE: 1/4" = SCALE: 1'-0"2%1/4" = 1'-0" MIN. SLOPE AWAY CR LAURENCE CRCONTINUOU LAURENCESCONTINUOUS 1x TRIM-MATCH DECKING 1½"CAP . -1½"x1½" . SFR15BS RAILSFR15BS CAP-1½"x RAIL DB-4 SEEPROVIDE PLANS (30" V.I.F.) PROVIDE SRF15ECBS/ SRF15ECBS/ LOWER (e) GRADE TO PROVIDE SRF15HBS/SRF15H3BS/ SRF15HBS/SRF15H3BS/ 6" CLEARANCE FROM JOISTS. SRF15CBS BENDS AND BENDS AND SRF15CBS END, SLOPE 2% END, MIN. TO DAYLIGHT. CONNECTORCONNECTOR FITTINGS. FITTINGS.
30
1-1/2" x 3-1/2" TRIM, UNO ON ELEVATIONS SILICON CAULKING PLASER PER ELEVATION
NOTES:
AS NEEDED TO ACCOMODATE A RESIDENTIAL FIRE SPRINKLER SYSTEM IS (N)2% VAPOR RETARDANT LOWER (e) GRADE. PROVIDE NEW FLOOR STRUCTURE. 296 COVER REQUIRED IN ADU AND BREEZEWAY IN MIN. SLOPE AWAY WALL-EXT. (e) 10"/8"/8" TREE 1x TRIM-MATCH DECKING ACCORDANCE WITH NFPA 13D, STATE AND LOCAL DRIP EDGE FLASHINGDB-4 REQUIREMENTS WITH AGSM 4 HEAD CALC AND WITH WALL-EXT. (e) ELECTRICAL LINE EXTEND 4" UP WALL LOWER (e) GRADE TO PROVIDE DD AN INCREASE IN FIRE SPRINKLER PROTECTION GSM DRIP EDGE FLASHING6" CLEARANCE FROM JOISTS. SEE PLANS (51" V.I.F.) (N) 3'-8"X6'-0 POOL TO ALL BATHROOMS REGARDLESS OF SIZE, ALL EXTEND 4" UP WALL FLOOR TOP SLOPE 2% MIN. TO DAYLIGHT. (e) of2xSUB-FLOOR WALL FRAMING. MODIFY EQUIPMENT SHED CLOSETS REGARDLESSASOF SIZE,TOALL EXTERIOR NEEDED ACCOMODATE LOWER (e) GRADE. PROVIDE 2% (N) BOULDERS FLOOR TOP of SUB-FLOOR (e) HIGH VOLTAGE NEW FLOOR STRUCTURE. OVERHANGS GREATER THAN 4FT, AND ATTIC MIN. SLOPE AWAY ELECTRICAL BOX 317 WALL-EXT. SPRINKLER PROTECTION WITH HEADS SPACED TOP of DECKDECKING 1x TRIM-MATCH DECK 15FT ON CENTER. GSM DRIP EDGE FLASHINGDB-4 TOP(e) of CONCRETE EXTEND 4" UP WALL LOWER GRADE TO PROVIDE REMOVE (e) CEMENT PLASTER WALL REMOVE (e) 8" TREE 6" CLEARANCE FROM JOISTS. FINISH AT LEDGER 6 FLOOR 1 TOP of SUB-FLOOR SLOPE 3 REMOVE (e) CEMENT PLASTER WALL 14 2% MIN. TO DAYLIGHT. LOWER GRADE BEAM FINISH AT LEDGER (N) 30 MIL. 'PEEL and STICK' MEMBRANE 2 S6 STABILIZED OUTFALL GRACE VYKOR, OR EQUAL (e) WOOD C1 WALL-MAS. (N) SWIMING POOL RETAINING 5 (N) 30 MIL. 'PEEL and STICK' MEMBRANE of DECK CHANGE (e)TOP GRADE-NO 31 WALL 1 3 GRACE VYKOR, OR EQUAL UNDER SEPARATE PERMIT LEDGER DECK 1 CRAWL SPACE A7 S6 OF WORK (e) ELECTRICAL AREA TOP of CONCRETE A7 (e) WATER LINE BOX 1 REMOVE (e) CEMENT PLASTER WALL LEDGER GSM 'Z' FLASHING CRAWL SPACE FINISH AT LEDGER S6 4 31 FOUNDATON VENT PER PLANS 14 HW GSM 'Z' FLASHING (N) STAIRCASE LOWER GRADE BEAM (N) 30 MIL. 'PEEL and STICK' MEMBRANE S6 GRACE VYKOR, OR EQUAL WALL-MAS. FOUNDATON VENT PER PLANS PROTECT AND PRESERVE (e) 1 (e) GRADE-NO CHANGE CEMENT PLASTER WALL FINISH LEDGER 1 S6 LEDGER FROM LEDGER TO GRADE. 3 PROTECT AND PRESERVE (e) (e) 24"/22"/18" OAK CRAWL SPACE S6 31 CEMENT PLASTER WALL FINISH DRILLED PIER BEYOND
FLOOR
1 31
TOPOS Architects INT. CASING
ES PANEL EDGES
(e) GAS VAULT 312
[MENLO PARK ] - 2022 TO PRESENT
60 MIL. SELF-ADHESIVE FLASHING LAP OVER GSM FLASHING
6 A21
SEE PLANS (51" V.I.F.)
SEE PLANS (51" V.I.F.)
BUILDING PAPER
DD
SEE PLANS (30" V.I.F.)
DD
PLASER PER ELEVATION
SEE PLANS (30" V.I.F.)
(N) GAS LINE
www.toposarchitects.com www.toposarchitects.com
297
CONSTRUCTION HEAD ADMINISTRATION WALL
INSTALL CASING HEADFLUSH TO INSIDE OF JAMB
N UCTIO ONSTR CE LINE N EFERE
N UCTIO ONSTR CE LINE N EFERE
HENN DECKING
PROJECT INFO:
US RAIL CAP
TOPOS ARCHITECTS TOPOS ARCHITECTS 654 Gilman Street 654 Gilman Street Palo Alto, CA 94301 Palo Alto, CA 94301 650.327.7573 650.327.7573
(e) 20"/18" OAK
_________________ _________________ _________________ _________________ _________________ SHEET:
SITE PLAN
1 SHEET INDEX:
ARCHITECTURAL DETAILS
A18
SHEET: 1
11
RETURN TO WALL. MITER AND WELD.
(e) MASONRY FINISH BEYOND-NO CHANGE
21/2"
3
GRIP RAIL PERSPECTIVE
0
2'
SCALE: 1/4" =
CC
4'
8'
1'-0"
2
1411/16"-VERIFY
GRIPRAIL
0
SCALE: 3"
DD
+/- 303/4"-VERIFY (3) EQUAL - +/- 101/4"
+/- 3'-6 1/2" - VERIFY
1'-7"
(e) MASONRY FINISH-NO CHANGE
DECK 5 DECK BENCH A17
(2) EQ. +/- 1'-3 1/4"
1x RISER-MATCH DECK
P.T. NOTCHED STRINGERS PER FRAMING PLAN
/2"
MI N.
DECK
DECK +/- 301/2" - VERIFY
P.T. NOTCHED STRINGERS PER FRAMING PLAN
(4) EQUAL- (+/- 75/8")
1 NEW LEDGER. REMOVE (e) MASONRY FINISH AND S6 SET LEDGER DIRECTLY TO (e) CONCRETE WALL.
(1) EQ. +/-7 3/4"
(2) EQ. +/- 1'-9 1/4"
5-1
1x RISER-MATCH DECK DECK
5-1
/2"
MI
N.
MASONRY WALL CAP
(2) EQ. +/- 1'-3 1/4"
DECK
+/- 3'-2 1/4" - VERIFY
SLOPE 2%
FACE of (e) CONCRETE
1911/2"-VERIFY
WALL-MAS.
DECK
WALL-MAS. 1 NEW LEDGER. REMOVE (e) MASONRY FINISH AND S6 SET LEDGER DIRECTLY TO (e) CONCRETE WALL.
WALL-MAS. DECK WALL-MAS.
DECK BENCH
5
SCALE: 1 1/2"=
18" MIN.
SIDE
1'-0"
ELEVATION VIEW
1 GLASS RAILING A16
BENCH - TOP VIEW TOPOS ARCHITECTS 654 Gilman Street Palo Alto, CA 94301 650.327.7573 www.toposarchitects.com
3849 Page Mill Rd Palo Alto, CA 94304
ATTACHED FENC TO WALL
6 POST BASE PLA A17 MASONRY CAP
WALL-DECK FINISH GRADE
8 DECK
1 LEDGER S6 17 FIREPIT FOUNDATION S6 15 TYP. DRILLED PIER S6
Henn Residence
GLASS RAILING
POOL GATE at SOUTH ELEVATION SCALE: 3/4" =
DECK
LOWER (e) GRADE TO PROVIDE 6" CLEARANCE FROM JOISTS. SLOPE 2% MIN. TO DAYLIGHT. WALL-MAS. 14 LOWER GRADE BEAM S6
3849 Page Mill Rd
1
3 A16
Henn Residence
TYP. DRILLED PIER
www.toposarchite
7 POOL GATE A17
48" MIN.
DRAFT
TYP. GRADE BEAM
BENCH - SIDE VIEW
650.327.757
4" MAX. 1 OUTDOOR KITCHEN A19
2
TOPOS ARCHI 4 POOL FENCE 654 Gilman S A17 Palo Alto, CA 9
ALIGN
DATE: 5/16/2023 REVISIONS: 1 8/31/2023 _____________
_____________ _____________ _____________ _____________ _____________
(e) GRADE-NO CHANGE
SHEET INDEX
DATE: 10/17/2022 REVISIONS: 1 _________________ _________________ _________________ _________________ _________________ _________________
DECK at FIREP
SHEET INDEX: BENCH / RAIL DESIGN
SHEET: SHEET:
1
P4 3
12
BENCH - FRONT VIEW
A1
15 TYP. DRILLED PIER S6
1
DECK at FIREPIT SCALE: 1"
=
1'-0"
13
A c a de m i c
14
Wor k s
15
PROJECT INFO: MARIA PAZ GUITIEREZ - 100A
SPATIAL + ARCHIPELAGO
[ SAN FRANCISCO ] - MAR-MAY , 2018 SPATIAL ARCHIPELAGO - In this project, we explore the formal operation of “subtraction.” Double negative spaces are generated by intersecting subtracted voids. Through the intersection of voids, a continuous spatial sequence is created, resulting in an elongated and stretched spatial experience. Following the subtraction of forms, the residual form becomes the positive figure of the design, defining and supporting elevated, subtracted spaces. DOUBLE NEGATIVE - The project began with an exploration of double-negatives. The purpose of this exercise is to explore the correlation between sharp-cutting objects and the creation of negative space and the concepts of solid and void, or negative through positive, or positive through negative. STAIRCASE - With this exercise, I expand on double-negative by incorporating stairs into the unique double-negative space, transforming conceptual spatial experience into habitable space.
16
17
18
19
PROJECT INFO: TINY HOUSE COMPETITION [ SAN RAMON ] - MAR-APRIL , 2021
TINY HOUSE + COMPETITION A short walk from my apartment, the Dougherty Hills Trail offers a view of scenic green hills and a curvy landscape. This inspired this work. The spring season brings picturesque images of a green landscape and walking paths. I spent most of my time during Covid-19 working at home, interacting with a few others only occasionally. Looking out the window in the daytime, I often imagine space or a house of my dreams. This is why the tiny house competition gave me the opportunity to express my fantasies. The goal of the building’s limited size was to integrate space articulation with the site and create a sense of expansion, and I believe the curves result in a seamless living environment.
East Elevation
West Elevation
North Elevation
CIRCULATION SEQUENCE The circulation grid opposed with the program
PROGRAMATIC DEVELOPMENT_CONCEPT DIAGRAM
grids in this layout, in which the circular elements
The concept grids dissect this project into 3
indicates the circulations, and it simply mirror-
main programs. Spatial quality is dictated by
ing the grid system along the horizontal axis.
the radial quality of circles. The nature of curves creates the occupied space visually seamless.
20
21
ROOF FLOOR PLAN
Spatial Anaylsis Diagramatic The interior space is subdivided into a 4-quadrant. A radial flow manner dictates the design’s circulation. The 4-quadrant indicates the flow of the owner’s circulations throughout the seamless curling space wrapping from the entrance toward the bedroom and upward balcony. Eventually, this tiny house captures a woven spatial experience serving purposeful circulations and flexible FIRST FLOOR PLAN
activities. By devising a grid system based entirely on radial directions, I was able to establish order into these restricted areas and circulatory systems.The experience of living in such a small space does not necessarily mean cramping and discomfort. In essence, this project represents a series of circular circulation in a spiral manner, which provides the eye with a feeling of endless space, an extension of eyes’ delusion, and a sense of space.
22
23
24
25
PROJECT INFO: DAVID ORKAND - 100B
[UN]FAMILIAR DETACHMENT
[ SAN FRANCISCO ] - MAR-MAY ,
The objective of this studio is to design a multipurpose food building. The building’s form was meant to emulate the city gap by dividing it into two simple volumetric forms. This building consists of separate entities that divide the program into greenhouses and public uses, as well as production and consumption. The outdoor alley connects the two entities and, as you move from one building to another, there is a sense of separation, yet also a sense of connection. ‘The City Gap Profile’ is the core concept of this project, in which these gaps can be transformed into a large corridor wrapping around two programmatic components. There are two separate programs, but they are linked by a building skirt and visual interaction.
26
27
FLOOR DETAIL 1. Roof Finishes Panels
2. I-Beam @ Roof Corner
3. Glass Panel
4. Skylight - Glass Panel
5. Siting Conc. Detail Platform
6. Conc. Railing
7. Conc. Railing @ Stairs
8. Conc. Treatment @ Stairs
9. I-Beam @ Floor Plates
10. Conc. Footing
1 2 3 4
5
6
7 8
9
10
28
29
PROJECT INFO: MARK DANDERSON- 100D [ KRAKÓW | Poland ] - JAN-MAY 2019
King + Tunnel + Mistress UNDERGROUND MUSEUM
A_The Story = Esterka + King Kazimierz
30
31
1 to 12 Variations
Brainstorm Sketches: As a first step in designing the underground
of how the museum would look. These included
museum, I devised sketches of possible spatial
multiple simple geometries carved out of the
qualities to identify what it might be like under-
ground.
ground. The first sketches were very rough ideas
1. Main Tunnel Wheels
2. Chapel Floor Plan
3. Stage Floor Plan
A Place for memory, contemplation of
A Place for memory, contemplation of
A society underground performs its politics—this
the traumatized past of World War II. This
the traumatized past of World War II. This
space celebrating the hierarchy of power, a controlled
floor plan captures the typical memorial
floor plan captures the typical memorial
community underground. This spatial formation is cre-
architecture where people can treat it as
architecture where people can treat it as
ated to keep the peace; it could serve as a Chamber
a place for worshiping
a place for worshiping
of Judgement, Chamber of Execution, and Chamber of Entertainment. It is the displayed entourage spatial experience.
Gathering
1+2+3+4+5+6+7+8+9+10+11+12
Rail Sytem
Circulations
Gathering
Machinery Exhibition
Collaged Sketches: As a result of the first exercise, I combined the
quality spatial interaction that I then applied for
sketches as one, to study how the spaces would
advancing my concept.
interact. Furthermore, I started to realized many
32
33
34
35
PROJECT INFO: GENE LEE x CHERRI JEONG
WOVEN TOGETHER + TUBES
MARK ANDERSON - ARCH 100D [AFRICA] - MAR-APRIL 2018
<Woven Together> is a design proposal that challenges the preconception of peace pavilions. Most peace pavilion projects consist of large gathering areas that are well lit, allowing for communal contemplation. This project, however, recognizes privacy in the act of contemplation and reinforces that understanding with smaller vertical tubes where individuals can enter to experience the enclosure of the densely woven structure. Programs are executed in two simple concepts—24 pods that erect vertically for private contemplation and three horizontally oriented circulation tubes that weave through the vertical tubes.
SECTION 1 - An analysis section shows the two objects are submerged in the horizontal platform, subdividing the programs into two distinct spaces that are interconnected by a stairway. A public market is located in the belly of the building as a result of two objects being slightly raised above ground, which provides a continuous connection from the street, is open to the public, and minimizes the circulation interruption on cityscapes. The raised objects provide the opportunity for additional amenities such as a library, public kitchen, indoor farm, and research center.
36
37
SECTION 1 - An analysis section shows the two objects are submerged in the horizontal platform, subdividing the programs into two distinct spaces that are interconnected by a stairway. A public market is located in the belly of the building as a result of two objects being slightly raised above ground, which provides a continuous connection from the street, is open to the public, and minimizes the circulation interruption on cityscapes. The raised objects provide the opportunity for additional amenities such as a library, public kitchen, indoor farm, and research center.
38
39