Urban energy factory

Page 1

1/2

C4C5t

urban planning

urban=energetic=concept

SANTIAGO STREET

URBAN STAIRS

The old design of the street is

To design a fluent

preserved with a progressive

STAIRS

UMBRACULUM

FAB-LAB

And also a community

Urban linker for open

Meeting point with 360

A small-scale workshop

public space. They

center

air concerts.

degrees panoramic

for everybody.

change of the scale as we move

solve several connections changing

SOLAR COLLECTOR

It provides of an

KINETIC COLLECTOR

views.

towards Cachamuíña Street.

FLOODABLE DECK

their scale and their

uniform temperature.

The stairs steps

The glass front

generate energy from

encourages the natural

footsteps.

convection of the retail

>

>

>

shape.

LIBRARY

Urban energy factory

St.

Old Fortress

Santiago

Blvd . o XII Alfon s

+53m

1

+67m

Falperra St.

Ma rga l

l St .

Granada B

+61m

Pi y

collectors.

building.

The heart of the energy production is located in the former building of the Silos. It is supplied with renewable energy sources so as to produce central heating, hot water or even electricity for the immediate neighbourhood. The main aim is to create an invisible and sustainable first layer to generate an efficient, comfortable and attractive environment. In this way, the neighbourhood, currently over 40% deserted, may be repopulated.

lvd.

+40m

3

t. aS

uíñ ham

Cac

+51m

s lia

me

Ca

The second layer is about urban linkers. It consists of a sequence of iconic elements connected together. They not only solve the functional connection problem between different areas of the city, but also activate the neighbourhood providing a new urban program.

. Av

site plan e:1/2000 SEQUENCE OF SQUARES 2. FACTORY´S SQUARE

3. SILOS´ SQUARE

City Council´s square. Designed for public events.

A set of public spaces

4. NATIONAL LIBRARY´S SQUARE

1. PRAZA DO REI

Large deck with solar

The Bread Factory Complex was certainly a cornerstone of the Vigo´s industrial development. The Silos´s iconic outline brings back melancholic and proud memories of a dynamic and prosperous city which would be worthwhile to highlight. The value and beauty of functionality, together with the current situation of efficiency and energy saving, take us to attempt to provide the Bread Factory Complex with a profitable second life: a life as an urban energy factory. In the words of Aldo Rossi, “a propelling element”.

4

2

SOLAR CHIMNEY

sup: 8.371m2

sup: 2.353m2

surrounding the iconic

A quite and welcoming

size: XL

size: L

building.

space.

sup: 952m2

sup: 529m2

size: M

size: S

Consequently, the design is based on two concepts: energy production and urban linkers. We propose the insertion of a set of 8 architectural elements, each one with a double function: as support of the energetic infrastructure and as an urban linker. To sum up, the proposal hopes to build a sustainable neighbourhood in both an environmental and economical way. In a sense, It makes a profit (energy) to guarantee its own future in addition to invest in the common good.

SCENIC FACADE

ARCADE

BASTIONS

SILOS

A monumental set, to

A new boundary of the

Urban linker. They house

Iconic building, focal

complete the square´s

square that links this

a carpark and housing

point of Praza do Rei,

scale. It houses new

square with Camelias

program.

symbol of the proposal.

offices for the council.

St. and the Factory.

SOLAR FARM

AQUEDUCT

EFFICIENT CAR PARK

Located on the roof,

It canalizes the

It provides a car park for

URBAN ENERGY FACTORY

with panels facing due

rainwater from Monte

the old houses. Besides,

Clean energy plant that

south.

de Castro into the silos.

its hot air can be used as

provides urban

heat source.

facilities.

8%

4% 24%

12%

VIGO

75.000

AVERAGE

37.052

VIGO

14%

AVERAGE

20.000

?

9.000

COMMUNITY CENTRE

PUBLIC LIBRARY

EXTEND THE CITY COUNCIL

In Vigo there are less community centres

In Vigo there are less public libraries for

New municipal offices are required to

for every inhabitants than the average for

every inhabitants than the average for the

extend the current city council.

the rest of Spain.

rest of Spain.

OLD HOUSING WITHOUT CAR PARK

23% 17%

FUNCTIONAL PROGRAM AND AREAS

ABANDONED HOUSING

Most of the houses in the neighbourhood

At least 1/3 of all housing in the old city of

are over a century old and they don´t have

Vigo (600 homes) are absolutely abandoned.

a car park.

There is no need to build more. This neighbourhood needs to be repopulated.

Scenic Facade Solar farm

Umbraculum Solar Chimney

24% Retail building 23% New municipal offices 17% Bastion Car Park 14% Bastion housing 12% Fab-Lab 8% Library 4% Silos

Arcade Acueduct

section E-W e:1/500

Fab-Lab Solar collector

+67m

+67m

+61m

+62m +53m

Pre-existing car park

Library Floodable deck

+47m

Bastions New Efficient car park +40m

5580 m2 5348 m2 3797 m2 3159 m2 2691 m2 1306 m2 564 m2


2/2

C4C5t

hygrothermal behaviour

silos=Energy plant

air

wind generator

treatment

photovoltaic Rainwater harvesting

solar power

at Monte del Castro

heat pumps

units

Water supply system

SOLAR CHIMNEY OF UMBRACULUM

DOUBLE COURTAIN WALL

The glass front encouraged

curtain-wall system turns the

the natural convection of

facade into a mechanism for

the interior space of the

thermal regulating. The north

retail building through the

facade has traditional walls

vertical communication

with windows in order to limit

core.

heat lost.

The ventilated double

heating

kinetic energy generator from the

cooling

solar

electricity

water

collectors

stairs

turbines

water for irrigation or urban cleaning domestic hot water

Umbraculum

Silos

Fab-lab

FAB-LAB DECK

INSULATION

FLOODABLE DECK

URBAN FACILITIES

HEATING

ELECTRICAL POWER

The Fab-Lab deck consists

The insulation of the rehabilitated buildings and new

Rehabilitation of the

The Silos building houses a clean energy

The collected rainwater of the Monte do Castro supplies two

Likewise there is an electric installation provided

of a set of skylights faced

constructions has been set in the one case in the inner side and,

floodable deck of the old

plant that supplies the neighbourhood

tanks to server (as cold or hot source according to climatic

by the following energy sources :the photovoltaic

to the north in order to

in the other, in the outside according to the heritage value of the

feed store (this deck is one of

using the energy resources of the local

season) two heat pumps water-water. This two heat pumps heats

solar power, the wind energy, the water power

iluminate the spaces with

finishing materials of the interiors or the facades. Even so, in

the first of Spain). It will be

urban enviroment. In this sense, the

the hot/cold batteries of the buildings’ air treatment unit and an

(there are 4 generators under each tank) and the

diffuse light as far as

some cases, like in the Fab-lab, the insulation is not continuous

supplied by the water from

Urban Energy Factory is an urban

urban hot water network that supplies domestic hot water and

kinetic energy (the steps of the concert stairs are

posible and avoid the

and it is former by overlapping. As a result, the stone facade

the aqueduct.

catalyst that aims to regenerate this

heating to the houses of the neighborhood. Furthermore, a set of

formed by a large set of tiles that generate power

south excessive heat gains.

and the inner structure can be appreciated as they once were .

currently deteriorated neighborhood.

solar collectors gives back-up to the heat installation.

with footsteps or the jumps of concertgoers)

ANNUAL PRECIPITATION IN VIGO Annual precipitation in Vigo = 1.800 mm/m2 (Almost every year the rainiest city of Spain) Monte del Castro area = 80.000 m2 Rainwater harvesting = 144.000 m3/year Annual precipitation in Vigo

mm/m2 2000

HYDROELECTRIC GENERATION Volume rainwater tanks = 628 m3 Silos´s height = 18 m Diameter = 5 m Constructive strengthen = Inner second wall of 30cm Total power hidroelectric = 1 Kw

WIND GENERATION

HOT WATER GENERATION

KINECTIC COLLECTOR

PV panel Power/m2 = 0.033 Kw/m2 Area photovoltaic farm = 752 m2 Repayment period = 8 - 10 years Total power photovoltaic = 25Kw

Solar collector area= 700 m2 1 heat pump water-water Volume hot water tanks = 628 m3 Total energy = 28.000.000 Kcal

Altitude= 81 metres above sea level Average Wind Speed = 10 m/s Vertical axis wind generator = 6 Kw Number of generators = 4 Total power wind = 24Kw

PHOTOVOLTAIC GENERATION

Step energy = 5 w/step stairs area = 300 m2 1 concert: Planned number of concertgoers = 600 Jumps per concertgoer = 1000 Total power generated = 3600Kw

1500 1000 500 0 J

F

M

A

M

J

J

A

S

O

N

Scenic facade Solar farm

Umbraculum Solar chimney

D

Silos Urban Energy Factory

+67m Stairs Kinetic collector

+53m

Section N-S e:1/500

Library Floodable deck

+51m