Vincent Kong for Junior Sustainability and LEED Coordinator

Page 1

Vincent
Building Performance | Creative | Curious | Self-Motivated
Kong – Junior Sustainability and LEED Coordinator

Estate Management Intern

Electrical Intern

HK PolyU (2017-2019)

MSc Environmental Design & Engineering

LWK+ Partner (2019)

Cundall (2020-2023)

To be continue

Housing Authority (2016)

Everlight (2018)

BEng Building Services Engineer

Assistant Architect

UCL (2019-2020)

ON, Canada

Sustainability Engineer

Building Sustainability Life Cycle Assessment Certification Services

Project experience – Industrial, commercial and institutional (ICI) sectors

Centre
Vehicle Examination Centre Retrofit - Sherlock Office Tower & Mall Georgia Tech Student
Due diligence & Benchmarking Incorporate Client ESG Policy Scorecard Initiation Cost-Benefit Analysis Review MultiDisciplinary Drawing Site Coordination Arrange Site Measurement Manage Submission With USGBC

Site Location & Transportation Analysis

Water Use & Harvesting

Calculation
Plan Material Selection Manage Site Measurement Issue Specification Innovation
Energy Modelling Waste Management
Office tower w/ Mall Low rise Multi-family High rise Multi-family Higher Education Sport Arena Industrial Hospital Data Centre
Mechanical & Electrical Design ASHRAE Lv2 Energy Audit Energy Monitoring, Accounting, Analysis Lifecycle Assessment Carbon Tracking and Reporting Daylighting Glare Thermal Comfort
Award-Winning Project experience – Treehouse, Hong Kong

Design: 2021

Site Area: 4,238 m2

Gross Floor Area: 94,144 m2

Office Floor Area: 2,100 m2 (30m x 70m)

Grade A Office

Net zero building at 2050

Services:

- Energy Modelling

- Sustainable Design

- Economic Analysis

Achievement:

-

-

-

-

EUI=51 kWh/m2

RIBA 2030 Targets

Embodied Carbon 342 kgCO2e/m2

LETI Grade A

Notional Scheme

Self-shading built form

-19%
SOLAR IRRADIANCE
-20% OPERATION
CARBON

Permeable - cooling & ↑ PV efficiency

Integrated wind chimney - get 2°C cooler air

Cross ventilation – avoid corridor AC

Avoid downwash

-5% OPERATION CARBON

-5% OPERATION CARBON

BIPV-integrated overhang

Daylight reflector

Tilted low-e glazing (Uf – 1.7 W/m2K, Ug – 1.0 W/m2K, SHGC – 0.26, VLT – 0.5)

Self-shaded facade

Lighting power density 6.4 -> 3.8W/m2

Outperformed regulated 10W/m2

Fullfil WELL standard

Blanket Design

Task Light Design

Minimise High Water Usage Operations In High / Mid Zones • PCM integrates with chiller plant • Seawater cooling

-30% OPERATION CARBON

EMBODIED
-15%
CARBON
Project experience – Central River Renovation Project, Shenzhen China

Design: 2021

Completion: 2022

Length: 550 m

Renovation Project

Sustainability consultation

Achievement:

- Carbon Neutral

- Placemaking

- Provide leisure to banker on weekday and family on weekend

- Smart City facilities are giant carbon emission source

- Greenery cannot discount all emission

- Carbon credit only led project to carbon neutral

408 TCO2e 174 TCO2e Emission Offset
Scarborough, ON www.linkedin.com/in/vincentkckong kaichingkong@yahoo.com.hk

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.