Estate Management Intern
Electrical Intern
MSc Environmental Design & Engineering
To be continue
HK PolyU (2017-2019)
LWK+ Partner (2019)
Cundall (2020-2023)
Housing Authority (2016)
Everlight (2018)
BEng Building Services Engineer
Assistant Architect
UCL (2019-2020)
ON, Canada
Sustainability Engineer
Design: 2021
Site Area: 4,238 m2
Gross Floor Area: 94,144 m2
Office Floor Area: 2,100 m2 (30m x 70m)
Grade A Office
Net zero building at 2050
Services:
- Energy Modelling
- Sustainable Design
- Economic Analysis
Achievement:
-
-
-
-
EUI=51 kWh/m2
RIBA 2030 Targets
Embodied Carbon 342 kgCO2e/m2
LETI Grade A
Notional Scheme
Self-shading built form
Permeable - cooling & ↑ PV efficiency
Integrated wind chimney - get 2°C cooler air
Cross ventilation – avoid corridor AC
Avoid downwash
-5% OPERATION CARBON
-5% OPERATION CARBON
BIPV-integrated overhang
Daylight reflector
Tilted low-e glazing (Uf – 1.7 W/m2K, Ug – 1.0 W/m2K, SHGC – 0.26, VLT – 0.5)
Self-shaded facade
Lighting power density 6.4 -> 3.8W/m2
Outperformed regulated 10W/m2
Fullfil WELL standard
Blanket Design
Task Light Design
Minimise High Water Usage Operations In High / Mid Zones • PCM integrates with chiller plant • Seawater cooling
-30% OPERATION CARBON
Design: 2021
Completion: 2022
Length: 550 m
Renovation Project
Sustainability consultation
Achievement:
- Carbon Neutral
- Placemaking
- Provide leisure to banker on weekday and family on weekend
- Smart City facilities are giant carbon emission source
- Greenery cannot discount all emission
- Carbon credit only led project to carbon neutral
-
-
Prepare for SBTi
Scope 1 & 2 setting
-
-
Carbon accounting
Engagement
Reduction potential
-
Forecast scope 1 & 2
emissions
- Gap analysis
-
High-level recommendation
BAU – Grid only Grid and Energy-saving measures
Forecasted GHG Emission and Reduction Percentage from 2021 to 2030 (Without Fire Extinguisher) - Hong Kong (Grid only)
Forecasted GHG Emission and Reduction Percentage from 2021 to 2030 (Without Fire Extinguisher) - Hong Kong (Grid and Energy-saving measures)
Scope 2 (Absolute) (kg CO2-e)
Scope 1 (Absolute) (kg CO2-e)
Total Scope 1 & 2 GHG reduction (compared with base year)
Scope 2 (Absolute) (kg CO2-e)
Scope 1 (Absolute) (kg CO2-e)
Total Scope 1 & 2 GHG reduction (compared with base year)