Portfolio Design Studio 3

Page 10

Faculty of Engineering, Technology & Built Environment School of Architecture & Built Environment

AR315 Architectural Design Studio 3 Portfolio

Prepared

Vincent

Project 1 : Start Up Project 2A : i. Mapping ii. User Profile Project 3 : Business Incubator Project 2B : Responding
Table of Content

Project 1 : Start Up

DESIGN PRINCIPLES AXIS HIERARCHY SYMMETRY

Location: Venezia, Colombia Architects: FP Arquitectura Area: 766 sqm Year: 2015 Category: Community Center EDUCATIONAL PARK ZENUFANÁ / FP ARQUITECTURA Entrance 6Technicalroom OutdoorTheatre 7WorkTheatre Classroom 8Terrace Multipurposespace 9TownHall Garden

TERRACE MULTIPURPOSE SPACE education OFFICE MULTIPURPOSE SPACE PUBLIC SPACE CYCLING

CLASSROOM

ALUMINIUM IS CONSIDERABLY MORE RESISTANT TO THE OUTSIDE ELEMENTS COMPARED TO OTHER FRAMES MAKING THEM LESS LIKELY TO WARP OR ROT AS A RESULT

CONCRETE CONTRIBUTES TO THE BEAUTY OF THE PUBLIC SPACES AND ALSO HELPS TO LOWER CITY TEMPERATURES, REDUCE COOLING COSTS

STEEL RAILINGS ARE WELL KNOWN TO STAND THE TEST OF TIME AND THE WRATH OF EXTREME WEATHERS

ARCHITECTS' INFO

Philosophy: Iván Forgioni Founder of FP Arquitectura José Puentes Co- Founder of FP Arquitectura

1 2 3 4 5 CONSIDERATIONS IDEA & INTENTIONS APPROACH

Taking advantage of the grounds slope, the public space is taken to the interior of the site, and ascending by ramps and stairs, creates an environment for learning, that takes place in different levels, with double heights, outdoor theaters, balconies and terraces, that create visual and programmatic relations within themselves, and that serve to support the educational and cultural activities that take place in the park

The project is part of the initiative "Antioquia the most educated", with which the government of the department bets on the education, innovation, entrepreneurship and the culture, as an engine of change and an open door to new opportunities for children, young people and the community in general, all of this exposed in 80 educational parks and facilities of a public character, inclusive and open to all Adequate response to the human activities that take place in the space Efficient construction technique coherent with our environment

p
p p p
The building sits between the sidewalls of two adjoining buildings, articulating the existing building of the Mayor’s office of the municipality The scheme seeks to form a courtyard that gathers the distant landscape with the different spaces that conforms the educational park The intention is to incorporate the natural elements of the landscape to the architectural space, integrating them into a single spatial entity ages

Project 2A : Mapping

Climate Sun Path

21st June 9am

21st June 1pm 21st June 4pm

Temperature & Precipitation

Max temperature

21st March 9am

21st March 4pm 21st March 1pm

Wind speed

21st December 4pm 21st December 1pm

Sun starts to rise at 7 12am and set at 7 27pm

Strongest and hottest time around the site will be at 1pm High temperature around the site due to lack of skyscrapers to provide shading to the site

Wind Rose

Wind Path

Stronger wind from South, South West, West, North East & East North East Wind not strong enough to cool down the site

The drainage system of Centre Market reduce the flood risk The lower ground may have the risk of flood

Raining season in the month of April October November and December. -November is the rainest month

-In 2017 November an orang alert has been issued for Klang River where the water level has risen to 2 59metres

-Normal water rise level is 1.70metres.

-Southwest monsoon from May to September,Northeast monsoon from October to March Annual rainfall is 2981mm

Before &After Raining (Section 1) Before&After Raining(Section 2)

0 48h/year >1 41h/year >5 89h/year >12 1h/year
0km/h >5km/h >1km/h >12km/h Precipitation Cold nights Mean daily maximum Mean daily minimum Hot days
0 48h/year >1 41h/year >5 89h/year >12 1h/year
>25°C >30°C >20°C
<10km/h >10km/h
Klang river beside the centre market acts a natural drainage system,it can reduce the flood risk Low Risk of flooding Medium Risk of flooding High Risk of flooding
21st December 9am
Wind Rose

Project 2A : User Profile

Ms. Pui Yee

28 years old A fun & outgoing person Founder of Owl And Quill Calligrapher and Artist

Initially self taught, then picked up brush lettering & pointed pen calligraphy.

Owl & Quill

Founded in 2017 Calligraphy and design studio Specialized on luxurious, bespoke paper goods & services. Currently 2 employees Includes traditional, contemporary & western calligraphy

Office for the employees to have consultations with the clients.

Design studio for the employees to work on their designs.

Storage room for the employees to store their tools.

Classroom for the employees to teach the students that are interested in calligraphy arts.

Balcony for the employees to dry their works.

Display room for to hang some of their works for the public to enjoy.

Schedule of Accommodation

SLEEP RELAX B R E A K F A S T B R E A K F A S T L U N C H L U N C H R E L A X E M A I L O P E N S H O P D E S I G N EMAIL D E S I G N D R Y I N G P R O C E S S D E L I V E R Y P R O C E S S RELAX CLEAN D I N N E R SPORTS SLEEP MEALS WORK SPARETIME 5 9 8 7 6 10 11 12 13 14 15 18 16 17 19 20 21 24 1 2 23 22 MON TUES WED THUR FRI SAT SUN
Ms. Pui Yee's TIMETABLE
Prezi's link: https://prezi.com/view/1UbpwY1slLfSPcnxpB5N/

Project 2B : Responding

Site Demarcation

Context

Site Condition Design Response

3m setback from site area Setback area can be use for parking activities and others.

Programme

Make sure car can go into service lane Add some connection between walkway and site chosen to create more contract

Site Condition Design Response

Site chosen on the lower contour area so put building upper and retaining wall to avoid flood

Building can connect with the bridge, more entrance and bring more convenient for circulation

Climate

Plant more trees to - reduce temperature - reduce noise - provide shades

Private and public zone both can take advantage of the views of the river

Vegetation around the Perimeter setback to avoid the view of carpark

Adding acoustic cladding on the wall reduction of noise and vibration coming from the railway tracks right next to the building

Raise building 1m from ground to prevent flooding and to have a better view

-Cross ventilation -Shading device that comes with the building to provide shades

Building openings face North and South side

Sensory

Site Conditions

Design Response

Blocked view from car parking, open views from the river ,filtered views from central market

Development

Most facades of the building must face towards the river and central market

Building is located at the back of the site, far from the smell source

Buffer zone to minimize the noise from public road next to the site

Because of the increased traffic at Central Market we recommend that additional briage be built for people to visit our site, as this will be more convenient for them

Circulation

For more easy and quick access to the site, we recommend clearing a way or creating a shortcut in the central market

We propose that some signage directing visitors to the location be placed in the central market to make it easier for them to find it

There are benches available to be a lull area right below the rail route for the pedestrian before the rail road entering the subway

There are only few solid boundary around the river area, allowing flexibility of the pedestrian movement

Human and culture

There are more parking as you advance Thus, i proposed a drop off area to increase the professionalism of the site

It's best to replace the stairs with ramp considering the limited space and the cyclist. We also increasing the existent by extending it to the market

Taking advantage of the surroundings - trying to include the 'river if life' as part if the design - maybe create a scene / view for the LRT passengers while passing our site

Add security cameras to overcome the safety issue, especially around the river (under the bridge)

Adding a few mid sized rubbish bins might help with people not throwing their trash around

Having more cultural elements in and around the site to attract more visitors - cultural nights - murals representing the diversity of our malaysian culture

View to site
Direction of
smell
Noise direction to the site
View from site

Project 2B : Site Model

Project 2B : Site Responses

form Sliced horizontally Sliced off three corners
corners upwards Stretched horizontally Stretch vertically
Base
Move
Base form Sliced horizontally
from the middle Sliced into half Sliced into shapes Added shapes
Carved-out
Base form Sliced horizontally Diced into four Move the shapes Added a square on top Sliced into half
Base shape 1 Base shape 2 Shapes chosen 1 Shapes chosen 2 Merged
Responding 1: Sun Path & Accessibility Base Form Sliced into half Sliced into shapes Move pieces upwards Stretched pieces Elongated & shorten pieces Pull pieces into shapes Sun Path Wind Path Pedestrians & Vehicular Circulation Entrance view Sun Shading Wind Flow Vehicular Pedestrian PDrop-off/ickuppoint SunPath
Responding 2: Accessibility & Views Vehicular Sliced into half Carved-out shapes Shorten middle piece Plugged-in piece Base Form Wind Path Vehicular and Pedestrian Circulation Rooms zoning Views Multipurpose room Classrooms/ Workshops Shops&Outdoorspace Offices/Studios Shops & Outdoor space view Classrooms & Workshops view Pedestrians pDrop-off/ oint1 pDrop-off/ oint2 pPickup oint Public Semiprivate Semipublic
Responding 3: Sun, Wind Path & Accessibility Vehicular Pedestrians WindPath Diced into pieces Rearrange pieces Added pieces Carved-out shapes Base Form Classrooms/ Workshops Multipurpose room Offices/Studios Views Entrance view Wind Path Vehicular & Pedestrians circulation Rooms Zoning Public Semiprivate Semipublic SunPath PDrop-off/ickuppoint
Responding 4: Sun path & Accessibility Vehicular Pedestrians SunPath PDrop-off/ickuppoint Form from Responding 1 Upper part Shorten the height Form from Responding 2 Outside part Sliced into half Result Wind Flow Sun Shading Sun Path Wind Path Circulations
Responding 5: Accessibility & Circulation Form from Responding 2 Form from Responding 3 Middle part Outside part Result Wind Flow Entrance view Wind path Circulation Rooms zoning Public Sem private Sem public Vehicular Pedestrians Drop-off/ Pickuppoint

Project 3 : Interim

Owl & Quill

Cluster

Miss Pui Yee is an extreme workaholic. She spends most of her time working and ways to increase her business. She also has an exceeding active social life. She's consistenantly balancing her work life and her social life. Hence, the choice of cluster principle.

Mini Village

The site is located in Central Market, Kuala Lumpur. The shops around the site are mainly influenced by the Chinese and Malay architectural style. Both of the architectural styles have some things in common but most commonly, village. Hence, the mini village concept is chosen.

Modern Style

To compliment the surrounding buildings, Modern architectural style is chosen with some particular materials such as, concrete, wood & glass.

office
---
classroom balcony gallery workshop storage
28 ear o d A un & ou go ng p r on Founde o Ow And Qu Ca g apher and A s n t a se augh h n p cked up brush et e ng & po nt d pen ca raphy
ound d n 2017 Ca raphy and des gn ud o pec a ed on u ur ous b spoke pape good & se v c s Cu ren y emp oyee n ud s rad ona ontempo ar & wes e n a g aphy
Flashing tape OSB Rigid foam Flashing Subfascia Roof covering Air flow Trim piece Wall cladding Double top plate Interior wall Combination ESP and CI Batt insulation between studs Building sarking Concrete slab wall Concrete Beam Water proofed membrane Sand blinding Weep holes Ground line Internal slab foundation wall Concrete footing classroom2 classroom 1 storage malesurau femalesurau disabled toilet office shop lobby drop-offpoint disabledparking parking parking parking parking parking courtyard gallery entrance1 entrance3 entrance2 50m² 23m² 23m² 24m² 17m² 17m² 11m² 55m² 55m² 55m² 22m² parking parking parking parking parking disabledparking drop-offpoint multipurpose room outdoorworkshop maletoilet female toilet library pantry 30m² 55m² 55m² 22m² 24m 8m² section x-x ground oo eve n sh oo eve rs oo eve beam eve roo op eve A B C D E F 1880 3000 3000 3600 3000 6200 3300 3100 section y-y oo top eve beam eve s oor eve finish floor level ground floor level A B D E 3000 3000 1880 4000 7600 5400 west elevation south elevation concept board site plan ground floor plan 1: 100 first floor plan 1:100 south and west elevation 1:100 section x-x and y-y 1:100 construction detail 1:50

Project 3 : Final presentation

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.