1 minute read
Site Demarcation
Context
Site Condition Design Response
Advertisement
3m setback from site area Setback area can be use for parking activities and others.
Programme
Make sure car can go into service lane Add some connection between walkway and site chosen to create more contract
Site Condition Design Response
Site chosen on the lower contour area so put building upper and retaining wall to avoid flood
Building can connect with the bridge, more entrance and bring more convenient for circulation
Climate
Plant more trees to - reduce temperature - reduce noise - provide shades
Private and public zone both can take advantage of the views of the river
Vegetation around the Perimeter setback to avoid the view of carpark
Adding acoustic cladding on the wall reduction of noise and vibration coming from the railway tracks right next to the building
Raise building 1m from ground to prevent flooding and to have a better view
-Cross ventilation -Shading device that comes with the building to provide shades
Building openings face North and South side