Site Demarcation

Context

Site Condition Design Response

Advertisement

3m setback from site area Setback area can be use for parking activities and others.

Programme

Make sure car can go into service lane Add some connection between walkway and site chosen to create more contract

Site Condition Design Response

Site chosen on the lower contour area so put building upper and retaining wall to avoid flood

Building can connect with the bridge, more entrance and bring more convenient for circulation

Climate

Plant more trees to - reduce temperature - reduce noise - provide shades

Private and public zone both can take advantage of the views of the river

Vegetation around the Perimeter setback to avoid the view of carpark

Adding acoustic cladding on the wall reduction of noise and vibration coming from the railway tracks right next to the building

Raise building 1m from ground to prevent flooding and to have a better view

-Cross ventilation -Shading device that comes with the building to provide shades

Building openings face North and South side