R. Virajitha | Architecture Portfolio | USAP

Page 1


R. VIRAJITHA Student of B.Arch at University School of Architecture & Planning, GGSIPU Dwarka.

+91 9810941860

rvirajitha@gmail.com 4 th June 1999

51-E, Pocket 3, Mayur Vihar Phase 1

Delhi 110091.

@virajitha.rajaram

E

2 U

F S T F F

2 A

2 A

@_enchantress_04 @duosyncstudios

Virajitha Rajaram

Virajitha Rajaram

ABOUT ME I am a creative, practical and solution oriented person with sense of responsibility and passion.

OBJECTIVE Aspiring to acquire knowledge and skills to help me in my professional prospects. Looking for more learning oppurtuinities to learn and best utilize my strengths. I am keen to work on sustainability and climate responsive projects.

REFERENCES Ar. Sumant Sharma Professor, University School of Architecture & Planning. +91 9971598607 sumantsharma@ipu.ac.in Ar. Rajat Ray (Ex-Dean USAP) Professor, University School of Architecture & Planing.

+91 9810006311

rajatray@ipu.ac.in

S S

A A R G G A

H

M S M H

A

S S S S S S S S

C

2

2 2 2

W

2 2 2 2 2


EDUCATIONAL QUALIFICATION

2017-2022 | Bachelor of Architecture University School of Architecture and Planning, GGSIPU, Dwarka.

First Annual Second Annual Third Annual Fourth Annual Fifth Annual

8.69 8.21 8.56 Ongoing -

DOCUMENTATION “Significance of Sethon ka Ramgarh, Shekhawati” Prepared for INTACH by University School of Architecture & Planning, G.G.S.I.P.U.

EXTRAS

2015-2017 | 11 - 12 Adarsh Vidya Bhawan, I.P Extension - 90%

2021 : Graphic Designer at Vintclub, Lucknow Branding and Social-Media Handeling Duration - 1 Month

2014-2015 | 10th Aster Public School, Mayur Vihar - 10 CGPA

2020 : Co-Founder of DuoSyncStudios Graphic Design Solutions and Lifestyle Design Brand

th

th

2020 : David Gareth’s Keys to Create Competition Participant

SKILL SET Software Skills:

Autodesk AutoCad Adobe Illustrator Microsoft Word Autodesk Revit Adobe Photoshop Microsoft Powerpoint Rhinoceros Adobe Indesign Procreate Grasshopper Lumion Ecotect Google Sketchup Enscape PMV&Weather Tool Andrew Marsh’s tools Radiance DaySim

Hands-on Skills:

Model Making Sketching Mixed-Media Painting Hand Rendering

Digital Illustrations Measured Drawing Sculpting Photography

ACADEMIC PROJECTS

SEMESTER 1 Coffee Kiosk Design, Dwarka Delhi Documentation of Ramgarh, Rajasthan SEMESTER 2 Artists’ Residence Design, Ramgarh, Rajasthan SEMESTER 3 School Design, Dwarka, Delhi SEMESTER 4 Research Center Design, JNU, Delhi SEMESTER 5 Center For Performing Arts And Recreation Design, Dwarka, Delhi With Working Drawings SEMESTER 6 Transit Oriented Development Housing Project, Kasturba Gandhi Marg, Delhi Urban Design Community Center, East Of SEMESTER 7 Kailash, Delhi Dissertation On : The Symbiotic Relationship Between Art And Architecture. SEMESTER 8 Universal School & Oldage Home : The stroke of cre -ativity forming an intergenerational place. (Ongoing)

COMPETITIONS

2017 :

Zonal Nasa Design Competition. Amity University Youth Fest : Bridge The Gap. 2018 : Zonal Nasa Design Competition (Shortlisted). 2019 : Transparence : Railport. 2020 : Kndc Quarantine Facility Design (Finalist). Volume Zero : The Little Big Loo, Rethinking Public Toilets.

WORKSHOPS

2017 : AR/VR workshop in ZNC. 2018 : AGGREGATIVE TECTONICS workshop in ZNC. The Grasshopper Bible : Fundamentals (Udemy). Rhino 3D v5 & v6 Beginner to Advanced Level (Udemy). 2019 : Teach the trainers program in Smart Habitat Foundation. ACEDGE Computational tools for Environmental Analysis. ACEDGE Site Planning and Natural Factors. 2020 : ONEISTOX Biomimetic Design Studio. 2021 : Partnerships for Sustainable India Workshop by Ar. Gaurav Shorey (Ongoing).

2020 : Featured Artist by Lisa Bardot & Cat Coquillete 2019 : WiTees T-Shirt Design Competition Participant

INTERESTS Jogging Yoga Gardening Photography Listening to Music Skipping HandCrafting Travelling Painting Sketching Organizing


1

SELECTED PROJECTS

TRANSIT ORIENTED DEVELOPMEN 6TH SEMESTER | ACADEMIC PROJ

2

SOCIO-CULTURAL CENTRE 5TH SEMESTER | ACADEMIC PROJ

3

RAILPORT 2019 | COMPETITION

4

RESEARCH CENTRE 4TH SEMESTER | ACADEMIC PROJ


NT: HOUSING JECT

JECT

JECT

5

QUARANTINE CENTRE 2020 | COMPETITION | FINALIST

6

RAMGARH SHEKHAWATI 2018 | DOCUMENTATION |INTACH

7

BUILDING CONSTRUCTION 1ST -7TH SEMESTER | HAND DRAFTING | C.A.D

8

MISCELLANEOUS MODEL MAKING | PHOTOGRAPHY |ARTS | GRAPHICS



TRANSIT ORIENTED DEVELOPMENT : HOUSING 6TH SEMESTER | GROUP PROJECT | ACADEMIC PROJECT LOCATION :

KASTURBA GANDHI MARG, DELHI

SITE AREA :

22000 m2

COLLABORATORS : 4, R. VIRAJITHA, CHETNA GARG, PRACHI SATRAWAL, ANJALI RAMESH SOFTWARES USED : AUTODESK AUTOCAD ADOBE ILLUSTRATOR ADOBE PHOTOSHOP SKETCH-UP V-RAY LUMION


CONCEPT

AS

IA

E

A

G

HO

US

RG

M

ASIA

K.

HO

USE

SITE PT.

E

EG

RA

LL

VI S

O

HU

IN

KLL

C

W

A

DY

ER

LA

SC

HO

OL

1

SITE WITH PATHWAYS LEADING TO DIFFERENT LOCATIONS.

IAL

ERC

MM

CO

CO

MM

ERC

IAL

2

COMMERCIAL ON GROUND TO PROVIDE EYES ON THE STREET.

OPEN SPACE

OPEN SPACE

3

PUBLIC OPEN GREENS AND PLAZA SCOOPED OUT IN THE MIDDLE.

RESIDENTIAL TOWERS

4

PODIUM - TOWER TAKING SHAPE. TOWER IS RESIDENTIAL.

UP

RESIDENTIAL TOWERS

GIRDER DN UP

DN UP DN UP DN UP DN UP

DN UP DN DN UP

DN

UP

UP

UP

DN

DN

UP

DN UP

DN UP

DN UP DN UP

5

RESIDENTIAL GIRDERS FORM CONNECTION & SHADE PODIUM.

FORM EXPLORATION

FIRE ESCAPE CIRCULATION


SITE PLAN: COMMERCIAL LEVEL 1

LEGEND UP

COMMERCIAL CORE GREEN SPACE

DN UP

GUEST HOUSE

DN UP DN UP DN UP DN

COMMERCIAL CORE

UP

DN UP DN DN UP

POLYCINIC

DN

UP

UP

RESIDENTIAL CORE RESIDENTIAL ENTRY POINTS UP

DN

ROAD DROP OFF

COMMERCIAL PEDESTRIAN CIRCULATION PAVED

DN

RESIDENTIAL VEHICULAR CIRCULATION

UP

DN UP

DN UP

RETAIL

COMMERCIAL VEHICULAR CIRCULATION

CIRCULATION

SERVICE VEHICLE BASEMENT

RESIDENTIAL CORE

DN

SERVICE/EMERGENCY VEHICULAR CIRCU-

UP DN UP

SITE SITE CIRCULATION PLAN CIRCULATION


ZONING

TOWERS GIRDERS POLYCLINIC

OFFICES

CIRCULATION -18600

GUEST HOUSE

RETAIL

3 STILTED OPENING

RESIDENTIAL TOWER RESIDENTIAL GIRDER

OPEN

COMMERCIAL OFFICES DANCE ROOM

CONNECTIONS GUEST HOUSE

TRIPLE HT.

THE PODIUM - TOWER MODEL WAS ADOPTED MAINLY TO INCORPORATE EYES ON THE STREET & PROVIDE A SAFE OPEN SPACE FOR THE RESIDENCE ABOVE. THE DESIGN INCLUDES LOTS OF FUCNTIONS, WHICH WERE ONE OF THE NEEDS OF THE AREA, I.E POLYCLINIC, GUEST HOUSE, CAFES & RESTAURANTS. THE PODIUM FORMS A PRIVATE OPEN SPACE FOR THE RESIDENTS, WHICH ALSO HAS SOME BASIC RETAIL REQUIREMENTS, LAUNDARY ROOMS, COMMUNITY KITCHEN AND OTHER RECREATIONAL AREAS. THE TOWERS ARE ORIENTED ACCORDING TO THE SUN AND WITH BEST EFFORTS EVERY DWELLING UNIT RECIEVES LIGHT, VENTILATION AND VARIOUS VIEWS. VIERENDEEL GIRDERS ARE USED TO CONNECT EACH TOWER, IT ALSO CONTAINS DWELLING UNITS. THE CONNECTIONS ARE USED TO ACCESS DIFFERENT RECREATIONAL SPACES AT DIFFERENT LEVELS IN THE GIRDER AND TOWER. THE CIRCULATION OF PUBLIC AND PRIVATE W.R.T THE COMPLEX IS SORTED OUT IN ALL LEVELS.

SITE VIEW

-18600


TRIPLE HT.

4

READING ROOM

1 LOBBY BELOW

LOBBY BELOW

-18600

PODIUM LINE

-18600

TRIPLE HT.

2 TT ROOM

N SPACE BELOW

OPEN SPACE BELOW

-18600

THIRD FLOOR PLAN : GIRDER LEVEL

LEGEND 2BHK UNIT ( 100 mt sq )

CIRCULATION

1BHK UNIT ( 48 mt sq )

CORE

3BHK UNIT ( 130 mt sq )

SHAFT

+36600 MUMTY +34800 TOWER PARAPET

+28800 GIRDER PARAPET

+18600 GIRDER CONNECTION +16600 GIRDER SERVICES

+10200PODIUM PARAPET +8700 PODIUM +7500 SERVICE FLOOR +3900 COMMERCIAL L2 +300 PLINTH LEVEL +000 GROUND LEVEL FLAT SLAB STRUCTURAL SYSTEM

-4700 BASEMENT 1 -8300 BASEMENT 2

SITE SECTION


BALCONY

BALCONY

WASH ROOM

BAL

WASH ROOM

BALCONY

BALCONY BEDROOM SHAFT

UTILITY AREA

POWDER ROOM

LIVING + BED ROOM

LIVING + BED ROOM

SHAFT

WASH ROOM

BALCONY

WASH ROOM

LIVING + ROOM

STUDY SHAFT

BEDROOM WASH ROOM

KITCHEN SHAFT

KITCHEN

KITCHEN

WASH ROOM

LIVING ROOM

BEDROOM SHAFT

WASH ROOM

KITCHEN

DINING ROOM BEDROOM

BEDROOM

LIVING ROOM

DOUBLE HEIGHT LIVING ROOM

BALCONY

BALCONY BALCONY HV SHAFT

ELECTRICAL ROOM FIRE LIFT

PRESSURE SHAFT

KITCHEN LV SHAFT

BEDROOM UTILITY AREA

FIRE ESCAPE STAIRCASE

POWDER ROOM

BALCONY

WASH ROOM

DINING ROOM SHAFT SHAFT

WASH ROOM

LIVING ROOM

LIVING ROOM

BEDROOM

WASH ROOM

DOUBLE HEIGHT LIVING ROOM

BEDROOM BALCONY

SPRINKLER SHAFT GARBAGE CHUTE

SP

G

KITCHEN BALCONY

BALCONY BEDROOM

WASH WASH ROOM ROOM

BEDROOM

SHAFT

ODD FLOOR PLAN

EV

+34800 TOWER

+33600 TERRA

+30600 SEVENT FLOOR

+27600 SIXTH FLOOR

+24600 FIFTH FLOOR

+21600 FOURTH FLOOR

+18600 THIRD FLOOR

+15600 SECOND FLOOR

CRECHE

COMMON LOBBY

LAUNDARY `

`

+12600 FIRST FLOOR

TOWER +9600 PLINTH

+8700 PODIUM

+7500 SERVICE FLOOR

TOWER SECTION


LCONY

BALCONY WASH ROOM

BALCONY WASH ROOM

WASH ROOM

WASH ROOM

BALCONY

BALCONY

WASH ROOM

BEDROOM SHAFT

+ BED M

LIVING + BED ROOM

SHAFT

WASH ROOM

WASH ROOM

CLOSET

CLOSET

BALCONY

LIVING + BED ROOM

SHAFT

LIVING + BED ROOM

BEDROOM KITCHEN

KITCHEN

KITCHEN

KITCHEN

LIVING + BED ROOM KITCHEN

KITCHEN

LIVING ROOM

BALCONY

TYPE 1

TYPE 2

HV SHAFT

ELECTRICAL ROOM FIRE LIFT

GIRDER UNIT PLAN

PRESSURE SHAFT

LV SHAFT

FIRE ESCAPE STAIRCASE

LEGEND 2BHK UNIT ( 100 mt sq ) LIVING ROOM

1BHK UNIT ( 48 mt sq ) BALCONY

PRINKLER SHAFT

GARBAGE CHUTE

DN

KITCHEN

DN

UP

3BHK UNIT ( 130 mt sq )

UP

CIRCULATION BEDROOM

WASH ROOM

WASH ROOM

BEDROOM

CORE SHAFT

SHAFT

VEN FLOOR PLAN

FRAMING PLAN

R PARAPET

ACE

TH

X

H

EAST ELEVATION

SOUTH ELEVATION

D

LEGEND 3BHK (130 SQM)

2BHK ( 100 SQM) COMMUNITY SERVICES

M

E

LEGEND

SERVICE FLOOR

ZONING SECTION

SHAFT

THE INTENT OF MATERIAL & COLOR CHOICE IN ELEVATIONS WAS ACCORDING TO THE CONTEXT OF CP. THE FORM AND SHAPE OF EXTRUTIONS AND SHADING DEVICES WAS ACCORDING TO THE CLIMATE. THE WHITE COLOR CHOSEN WAS TO RELATE TO CP, THE PLANTERED PARAPETS REFLECT THE ABUNDANCE OF GREENERY IN THE LUTYENS AREA, THE RED SAND STONE WAS USED TO ACCENTUATE CERTAIN PARTS OF THE BUILDING. THE SHADING DEVICES AND TIMBER SLITS WERE DESIGNED ACCORDING TO THE SUN. THE EARTHLY COLOR SCHEME IS USED THROUGHOUT THE COMPLEX.



SOCIO - CULTURAL CENTRE 5TH SEMESTER | INDEPENDENT PROJECT | ACADEMIC PROJECT LOCATION :

DWARKA SECTOR 11, DELHI

SITE AREA :

7500 m2

SOFTWARES USED : AUTODESK AUTOCAD AUTODESK REVIT ADOBE ILLUSTRATOR ADOBE PHOTOSHOP LUMION ENSCAPE

“An Environment Filled With Opportunities For The Creators. An Environment Which Makes The User To Live In The Moment. An Environment Where Memories Are Made In Unexpected Ways.”


INITIAL IDEAS 3

2

6 1

4

5

SPACE POCKETS

DRAMATIC PATHWAYS

FLOWING OUT OF THE BUILT

LAYERS OF COMFORT

OPENNESS

PARTI

THE FLOATING MASS RECEPTION

PERFORATED ENTRY, GIVING THE BUILDING A FLOATING CHARACTER, CARVING OUT THE MASS FROM BENEATH. COMMON GREEN SPACE AEROBICS HALL

GAMES ROOM

AUDITORIUM

AEROBICS HALL

ENTRANCE PLATFORM

EXHIBITION SPACE SEMI OPEN

EXHIBITION SPACE

COMMON GREEN SPACE

GAMES ROOM

INTERNAL COURTYARD

A FLOATING MASS

CONTINUITY OF SPACES

THE IDEA WAS TO PROVIDE RELAXED TRANSITIONS FROM ONE SPACE TO ANOTHER, KEEPING THE IMAGEABLITY OF THE COMPLEX INTACT. BLACK BOX THEATERO

.A.T

THE SPACE IS FOR CREATIVE ARTISTS, SO SEAMLESS BUILT TO OPEN SPACES ARE DESIGNED, WHICH ARE MULTIPURPOSE, AND CAN BE ORGANISED ACCORDING TO THE CREATOR. THERE IS A CONNECTION BETWEEN THE BUILT AND THE LANDSCAPE WHICH IS ACHIEVED BY DESIGNING CONTINUOS SPACES.

BLACK BOX THEATER

O.A.T

SEAMLESS BUILT-OPEN FOR CREATIVES

FORM EXPLORATION

THE IDEA WAS TO CREATE A COMPLEX WITH GOOD VISUAL CONNECTIVITY, HENCE THE PLAY OF LEVELS.


B’

LEISURE ZONE

STAGE

LILLY POND

OPEN SEATING

-2400

-3300

-2580 -2400

SWIMMING POOL

-1950 -1500 -1050 -600 -150

PEDESTRIAN ENTRY / EXIT

300

00

750 1200 450

TODDLER’S POOL

O. A. T FOYER

STEPPED SEATING

ZONNING PLAN 1200 MUSIC ROOM

00

TAKE OUT AREA

00

900

OPEN AIR SEATING

MUSIC ROOM

1200

ENTRY/ EXITS

SERVICES

METAL ROAD

OFFICES

ENTERTAINMENT ZONE

FOOD

CORES

GAMES

GYM COMMON GREEN SPACE

CANTEEN SEATING

KITCHEN

CHANGING ROOM

1050

CHANGING ROOM

600

RECEPTION

SENSORY GARDEN

AEROBICS HALL

KITCHEN YARD

1200

900

YOGA GARDEN COURTYARD

3000

600

ELECTRICAL ROOM

SENSORY GARDEN

1050

C

C’

A.H.U BLACK BOX THEATER

FEMALE WASHROOM

INFORMAL O.A.T

900 600

MALE WASHROOM 1200

GENERATOR ROOM

MALE WASHROOM

MANAGER’S OFFICE OFFICES

AUDITORIUM FOYER

INDOOR EXHIBITION 1200

FEMALE WASHROOM

ACCUPRESSURE WALKWAY

A RECEPTION

A’

3000

KIOSK SEMI OPEN EXHIBITION

CIRUCULATION PLAN VEHICULAR CIRCULATION

SEMI OPEN EXHIBITION

SERVICE VEHICULAR CIRCULATION EMERGENCY VEHICULAR CIRCULATION

ENTRY RAMP

EXIT RAMP 1200

PEDESTRIAN CIRCULATION

3000

DROP OFF/ PICK UP

PICK UP / DROP OFF AREA 00

VEHICULAR EXIT

PEDESTRIAN ENTRY / EXIT

SURFACE PARKING

SURFACE PARKING

VEHICULAR ENTRY

B

SITE PLAN THE DESIGN’S MAIN FOCUS IS TO GIVE SEAMLESS ENVIRONMENT FILLED WITH OPPORTUNITIES FOR THE CREATORS & ARTISTS. THE SITE PLAN IS PEDESTRIAN FRIENDLY AND FILLED WITH GREENERY, PROVIDES DIFFERENT TEXTURES FOR WALKING, TO MAKE THE USER FEEL RELAXED. THE ENTRANCE IS SPECIALLY DESIGNED TO PROVIDE LAYERS OF COMFORT FOR THE USER. THERE ARE DIFFERENT TYPES OF INBETWEEN SPACES, DESIGNED TO GIVE A DIFFERENT CHARACTER TO THE COMPLEX, LIKE THE ENTRACE OF THE WASHROOM AND NEAR THE VERTICAL CORE.


SECTION PLANE 1 SECTION PLANE 2

3 D SECTION 1

3 D SECTION 2

SELF SHADING BRICK WALL

PAINT ON PLASTER BRICK CLADDING

LVL 20100

LVL 16500 LVL 15600

LVL 16500

LVL 12900

LVL 12000

LVL 8400

LVL 4800

LVL 1200 LVL 00 BRICK JAALI

FRONT ELEVATION

SELF SHADING BRICK WALL


LVL 15600

LVL 12000

LVL 8400

LVL 4800

LVL 1200 LVL 00 LVL -2400

SECTION

AUDITORIUM FACADE DESIGN

COURSE ARRANGEMENT

BOX WINDOW DESIGN

SUSTAINABLE DESIGN FEATURES & ELEVATION TREATMENT : 1. TO BREAK DOWN THE MASS IN THE FRONT FACADE, SELF SHADING FLY ASH BRICK JAALI AND WALL DESIGN IS USED. 2. TO CUT SUN FROM THE EAST AND WEST VERTICAL AND HORIZONTAL SHADING DEVICES ARE USED, THE BOX WINDOW DESIGN AND VERTICAL GLUED-LAM SLITS. 3. ALL THE SERVICES ARE PLACED ON THE WEST SIDE. 4. TO CUT DOWN THE DIRECT EFFECT OF SUN ON EAST AND WEST, THE FORM IS CUT IN BETWEEN SO THAT THE FORM SHADES ITSELF. 5. GREEN TERRACE IS USED TO REDUCE HEAT GAIN VIA ROOF. 6. LANDSCAPING IS DONE TO SHADE THE OPEN AREAS LIKE, THE OPEN SITTING SPACE OF THE CANTEEN, THE O.A.T AND BY THE POOL.


T R PO IL A R

NN OO TTI I AA SSTT YY AA WW ILIL AA : :RR EE CC EENN RR AA SSPP NN AA TTRR


RAILPORT 2019 | GROUP PROJECT | TRANSPARENCE RAILWAY STATION DESIGN COMPETITION LOCATION :

ANAND VIHAR RAILWAY STATION

SITE AREA :

109000 m2 (approx.)

COLLABORATORS : 3, R. VIRAJITHA, CHETNA GARG, MUSKAN CHOUDHARY SOFTWARES USED : AUTODESK AUTOCAD ADOBE ILLUSTRATOR ADOBE PHOTOSHOP SKETCH-UP V-RAY


B

BOA

BOARDI POIN

GREEN BELT

WAITING AREA

METRO F.O.B

HOSPITAL METRO STATION

CONVENTION / SKILL CENTER

SENSORY GARDEN

ROAD

PEDESTRIAN

TRACKS OFFICES

VEHICULAR

GREEN BELT

WATER FEATURE

PAVED

GREEN PATCH GREEN BELT FLYOVER

WASHROOMS RETAIL

RETAIL

TROLLEY AREA

RETAIL

RETAIL

WASHROOMS

WASHROOMS

RAILWAY OFFICES

WAITING AREA

STAIRCASE

C

PEDESTRIAN

CO

VEHICULAR

BUILT UP

PEDESTRAIN ORIENTED

BUILT UP

RETAINED SERVICES

SLEEPING

PARK GREEN BELT

CONCEPT LEGEND

PARK

CIRCULATION LEGEND

MALL

B

HATT AND CHAAT

CIRCULATION BASED FORM

GREEN PATCH HOTEL

QUEUE AREA

ESCALATOR

CENTRAL PLAZA

USER ORIENTED DESIGN

BUS STOP

BOARDING POINT

MALL

WAITING AREA

SLEEPING FACILITY

+11200

POLICE STATION

LIFT

OFFICES

DN

STATION BUILDING

BOARDING POINT

FARMS

PARKING/DROP OFF/ PICK-UP

LT

WAITING AREA

DN

CORE DETAIL

PARK

B

WAITING AREA

ADDED SERVICES

WAITING AREA

SLEEPING FACILITY

PARK

WAITING AREA

BOARDING POINT

MALL

WAITING AREA

MASTER PLAN

STAIRCASE

METRO STATION

NURSERY

RETAIL

HOSPITAL

SLEEPING FACILITY

SLEEPING FACILITY

BOARDING POINT WAITING AREA

GREEN BELT

SENSORY GARDEN

METRO F.O.B

HATT AND CHAAT

WAITING AREA

WAITING AREA

GREEN PATCH HOTEL

NURSING HOME

PLAZA

WASHROOMS

WAITING AREA

CLOAK ROOM BOARDING POINT

TROLLEY AREA

THE DESIGN HAS LOT OF EMPHASIS ON PEDESTRIAN & VEHICULAR CIRCULATION, WITH MANY SUB-DIVISIONS. IT AIMS TO RESOLVE THE CURRENT SITUATION & DECREASE CHAOS AS MUCH AS POSSIBLE. STATION BUILDING THE PLAN OF THE CONCOURSE WAS DERIVED FROM THE MOVEMENT PATTERN OF PEOPLE. THE DESIGN IS UNIVERSALLY ACCESSIBLE & WOMEN SENSITIVE, AS IT DOES NOT HAVE ANY BLIND BUS STOP SPOTS AND CONTAINS RAMPS, LIFTS AND OTHER REQUIRED INFRASTRUCTURE. THE WAITING AREAS, TICKETING COUNTERS ARE DESIGNED ACCORDING TO THE SLEEPING & POLICE STATION SEATING PATTERNS OF PEOPLE. THE DESIGN CONVERSES WITH PEOPLE IN INTRICATE DETAILS LIKE THESE. MALL TO RESOLVE THE CIRCULATION, MULTILEVEL PARKING IS DESIGNED WHERE DIFFERENT LEVELS ARE CENTRAL STATION. USED DIFFERENTLY TO EASE CIRCULATION FOR THE RAILWAY

SLEEPING PATTERN OF PEOPLE IN FOOD JOINTS

PARKING/DROP OFF/ PICK-UP

RETAIL KIOSKS

KIDS PLAY AREA

PLAN DEVELOPMENT

WAITING AREA

FARMS

OPEN EXHIBITION

PLAN INSPIRATION

A

MOVEMENT PATTERN OF TRAVELLERS.

CLOAK ROOM

RETAIL

TROLLEY AREA

BOARDING POINT

CRECHE

ADDED SERVICES

TROLLEY AREA

WASHROOMS

WAITING AREA

WAITING AREA

WAITING A

CONCEPT

WATER FEATURE


SECURITY CHECK +11200

A

SLEEPING

FROM AND TOWAR

DROP OFF

FOYER

SECURITY CHECK

ATM CYBER CAFE SUPERVISION OFFICE

INFO ROOM

FOYER LEISURE AREA

LEISURE AREA

TICKETING AREA

+11200

INFO BOOTH INFO BOOTH

A

WAITING AREA

BOARDING POINT

PLATFORM 5 SLEEPING FACILITY

PLATFORM 5

PLATFORM 4

SLEEPING FACILITY

WASHROOMS

LEISURE AREA

WAITING AREA

RETAIL KIOSKS

RETAIL RETAIL RETAIL

WAITING AREA

WAITING AREA

PLATFORM 2

BOARDING POINT

PLATFORM 1

WAITING AREA

PLATFORM 1

B WASHROOMS

SUPERVISION OFFICE

CYBER CAFE

B

WASHROOMS INFO BOOTH TICKET VENDING MACHINES

SLEEPING FACILITY

PLATFORM 2

WAITING AREA

TROLLEY AREA

INFO ROOM

TICKET VENDING MACHINES

RAILWAY OFFICES

PLATFORM 3 BOARDING POINT

FOYER

SECURITY CHECK

TICKETING AREA

BOARDING POINT

PLATFORM 3

CLOAK SLEEPING ROOM FACILITY

ATM

TROLLEY AREA WASHROOMS

WAITING AREA

WASHROOMS

WAITING AREA

LEISURE AREA SECURITY CHECK

CONCOURSE PLAN

TICKET VENDING MACHINES

WASHROOMS

RAILWAY OFFICES WASHROOMS

FOOD JOINTS

RETAIL

RETAIL

RETAIL

TICKETING AREA

WAITING AREA

SLEEPING FACILITY

INFO BOOTH

PLATFORM 6

PLATFORM 4

RAILWAY OFFICES

NURSING HOME

INFO BOOTH

WASHROOMS

TICKETING AREA

CYBER CAFE SUPERVISION OFFICE

TROLLEY AREA

WAITING AREA

WAITING AREA

BOARDING POINT KIDS PLAY AREA

PLAN INSPIRATION FOR WAITING AREAS

WAITING AREA

PLATFORM 6

+11200 INFO ROOM +11200 ATM A CYBER CAFE LEISURE SUPERVISION AREA OFFICE

RAILWAY OFFICES WASHROOMS TICKET VENDING MACHINES INFO ROOM

TICKETING AREA DROP OFF

SECURITY CHECK

DN

DROP OFF

+11200

ATM DN CYBER CAFE SUPERVISION OFFICE TOWARDS PARKING AND PICK UP

TOWARDS PARKING AND PICK UP

FOYER

WAITING AREA

INFO ATM BOOTH

RETAIL

7 WAITINGPLATFORM AREA

WAITING AREA

BOARDING POINT FOOD JOINTS

RETAIL AREA WAITING

TROLLEY AREA

TICKET VENDING MACHINES

RETAIL RETAIL

RETAIL

WASHROOMS RETAIL

WASHROOMS

INFO ROOM

CLOAK ROOM BOARDING POINT

BOARDING POINT WAITING AREA

ATM

FOOD JOINTS RAILWAY OFFICES

NURSING HOME

SUPERVISION OFFICE

CYBER CAFE

INFO ROOM

RETAIL KIOSKS

BOARDING POINT

WASHROOMS

BOARDING POINT

CRECHE

WASHROOMS

BOARDING POINT WAITING AREA WAITING AREA

WAITING AREA

CRECHE

TROLLEY AREA

SITTING PATTERN OF PEOPLE IN RAILWAY STATION

PLATFORM 7

WAITING AREA OPEN EXHIBITION

WAITING AREA

SECURITY CHECK

WASHROOMS

KIDS PLAY AREA

CLOAK ROOM BOARDING POINT

FOYER

TICKETING AREA

TROLLEY AREA

A

TROLLEY AREA

RETAIL KIOSKS

LEISURE WAITING AREA AREA

KIDS PLAY AREA

BOARDING POINT

AREA

RETAIL

WAITING AREA

OPEN EXHIBITION

WAITING AREA

RETAIL

CLOAK ROOM

A

RETAIL

INFO BOOTH

A

WAITING AREA

CLOAK ROOM

CONCOURSE PLAN TROLLEY

BOARDING POINT WAITING AREA

+11200 WASHROOMS

CRECHE

FROM PARKING AND PICK UP

FOYER FROM PARKING AND PICK UP

CONCOURSE PLAN CONCOURSE PLAN SLEEPING FACILITY

FROM AND TOWARDS FLYOVER

B

EXHIBITION

TROLLEY AREA

+11200

FOYER

WAITING AREA

SLEEPING FACILITY

SECURITY CHECK

BOOTH

LEISURE AREA POINT BOARDING

TICKETING AREA

SLEEPING PATTERN OF PEOPLE IN RAILWAY STATION

BOARDING POINT

BOARDING TICKET VENDING POINT MACHINES

L

WAITING AREA

I

T

WAITING AREA BOARDING POINT WAITING AREA INFO

RAILWAY STATION

CONCOURSE PLAN

CONCEPT LEGEND

FROM AND TOWARDS FLYOVER

CONCEPT LEGEND

PEDESTRAIN ORIENTED QUEUE AREA

DN

CORE DETAIL

ORE DETAIL

CUT OUT

ESCALATOR LIFT

DN

STORAGE

CABINET USER ORIENTED DESIGN

BOARDING POINT

USER ORIENTED DESIGN STORAGE

+11200

STAIRCASE

DN

CUT OUT CIRCULATION BASED FORM

CIRCULATION BASED FORM

BOARDING POINT

+11200

PARTITION ( LOW HEIGHT )

GLASS PARTITION ( LOW HEIGHT )

QUEUE AREA

WAITING AREA

PEDESTRAIN ORIENTEDGLASS

CABINET

DN

ESCALATOR LIFT

SLEEPING+11200

SLEEPING+11200

RAILING

RAILING

CORE DETAIL

CIRCULATION SLEEPING UNIT

CIRCULATION SLEEPING UNIT DETAILLEGEND SLEEPING UNIT

PEDESTRIAN VEHICULAR

LEGEND

PEDESTRIAN VEHICULAR


FROM AND TOWARDS FLYOVER

+11200

P POINT

TOWARDS CONCOURSE

RETAIL

WAITING AREA RETAIL

RETAIL

WAITING AREA RETAIL RETAIL

RETAIL

WASHROOMS CAB/ AUTO BOOKING

CAB/ AUTO BOOKING RETAIL RETAILWAITING WAITING AREA

RETAIL

AREA

WAITING AREA

RETAIL

RETAIL

RETAIL RETAIL

RETAIL

RETAIL RETAIL

RETAIL

HOTEL BOOKING

HOTEL BOOKING

CAB/ AUTO BOOKING

CAB/RETAIL AUTO BOOKING WAITING AREA RETAIL

CAB/ AUTO BOOKING

POLICE STATION

SLEEPING FACILITY

SLEEPING FACILITY

RETAIL RETAIL

CAR / BUS PICKUP POINT

RETAIL HOTEL BOOKING

SHOPPING MALL

FACILITY

CAB/ AUTO BOOKING

SLEEPING FACILITY

CAR / BUS PICKUP POINT

AUTO PICKUP POINT

O.A.T

O.A.T

AUTO PICKUP POINT

FOOD KIOSKS AND SITTING FOOD KIOSKS AND SITTING

PUBLIC FACILITIES

ARRIVAL PLAN

GLASS PARTITION (LOW HEIGHT) STORAGE CABINET GLASS PARTITION (LOW HEIGHT)

SLEEPING UNIT DETAIL

ROOF

MEZZANINE CONCOURSE PLATFORM ARRIVAL

THE DESIGN INCLUDES A PUBLIC PLAZA, A MARKETPLACE A “CHAAT & HAAT” IN THE OPEN SPACE OF THE RAILWAY STATIO THE ARRIVAL DIRECTLY OPEN UPTO THIS SPACE, WELCOMIN TRAVELLERS VIA GIVING A SENSE OF DELHI. THE PUBLIC PLAZA ALSO CONTAINS SLEEPING UNITS AND A L SPACE FOR CULTURAL ACTIVITIES LIKE CHATT POOJA.

MULTILEVEL PARKING IS USED TO REGULATE THE MOVEMENT O HICLES, WHICH MAKES THE PLAZA COMPLETELY PEDESTRIAN.

ROOF DESIGN :

THE ROOF IS DESIGNED ACCORDING TO THE CLIMATIC CONDITIONS. IT IS BROKEN UP INTO 2 MODULES, WHICH CUT OUT HEAT GAIN FROM EAST & WEST AND PROVIDES A SPACE FOR THE PLACEMENT OF SOLAR PANELS. ONLY THE DIFFUSED LIGHT ENTERS INTO THE BUILDING, IN A DESIGNER PATTERN SHOWN IN THE VIEW.


VICES

STAFF PARKING TOWARDS SERVICES

+11200

DN

DROP OFF TOWARDS PARKING AND PICK UP

DROP OFF

RETAIL

TOWARDS PARKING AND PICK UP

FROM PARKING AND PICK UP

TOWARDS CONCOURSE

FROM PARKING AND PICK UP

TOWARDS CONCOURSE

CIRCULATION LEGEND CIRCULATION LEGEND PEDESTRIAN PEDESTRIAN

ALL VEHICLES ALL VEHICLES

AUTO AUTORIKSHAW RIKSHAW

OFF PLAN DROP DROP OFF PLAN DROP OFF PLAN

TOWARDS PARKING AND PICK UP

BUS BUS SERVICE TRUCK TRUCK SERVICE

DN

PRIVATE CAB PRIVATE CAR/ CAR/ CAB

FROM AND FLYOVER TOWARDS FLYOVER FROM AND TOWARDS

PICK UP POINT

TOWARDS SERVICES

EXIT RAMP PICK UP FOR PVT CAR / CAB

AND A ON. NG THE

BUS PARKING

FROM ARRIVAL HALL PICK UP BUS AUTO PARKING

TOWARDS CONCOURSE

GLASS PARTITION (LOW HEIGHT)

BUS DROP OFF

PICK UP FOR AUTO

DROP OFF

+400

LARGE

AUTO PARKING ENTRY RAMP

STORAGE CABINET GLASS PARTITION (LOW HEIGHT)

+11200

OF VE-

DN

STAFF PARKING

WAITING AREA

+11200

PICK UP POINT

DROP OFF LEVEL PARKING LEVEL PARKING LEVEL PICK UP LEVEL

PICK UP PLAN

RETAIL

RETAIL



RESEARCH CENTRE 4TH SEMESTER | INDEPENDENT PROJECT | ACADEMIC PROJECT LOCATION :

JAWAHARLAL NEHRU UNIVERSITY, DELHI

SITE AREA :

15000 m2

SKILLS USED : HAND MODELLING PHYSICAL SUNPATH & WINDPATH ANALYSIS & SIMULATIONS HAND DRAFTING HAND RENDERING


INITIAL IDEAS

CONCEPT & EVOLUTION ( SCULPTING SELF SHADING PLAN

PLAN

CLASSROOM

OPEN GREEN

SPACE OF PAUSE

SIDE ELEVATION

TEACHERS ROOM LABORATORY

FOCUSSED SPACES

VISUAL HIERARCHY

THE ZONING IS DONE TO MAXIMISE FOCUS FOR THE RESEARCH SCHOLARS, PROVIDING ALL THE NECESSARY ROOMS ADJACENT TO EACH OTHER.

ROOF DESIGN FORMS A VISUAL HIERARCHY FOR THE USER, FROM THE ENTRY GATE TO THE ACADEMIC ZONE.

FRONT ELEVATION

FRONT ELEVATION

OFFICES

1 VAULTS : SHADED BY ONE SIDE AT ONE TIME BE-

CAUSE OF THE ROOF. HALF THE ROOF IS SHADED BECAUSE OF THE MOVEMENT OF SUN, THE OVERHANGS SHADE THE WALLS.

SUMMER LOO

2 TO SHADE THE BUILDING BY A

EXPERIMENTED ON. VAULT S WEST AND EAST, TO SHADE I DIFFERENT EXPERIMENTS WER

TREES

SOLAR ANALYSIS & FORM EXPERIMENTS

STAGGERING OF MASS MASS IS STAGGERED TO INCREASE SHADE AND SHADOW IN THE COMPLEX, WITH HEAVY PLANTATION ON THE WEST SIDE TO CUT DOWN SUMMER LOO.

VERTICAL & HORIZONTAL PARGOLAS TO SHADE PATHWAYS HORIZONTAL PARGOLAS / JAALI IS USED TO SHADE THE TOP AND VERTICAL JAALIS / PARGOLAS IS USED ON THE WEST SIDE TO SHADE FROM DIRECT SUNRAYS.

SUMMER SUN 8-10AM

SUMMER SUN 12-1PM

SUMMER SUN 4-5PM

1 EXPERIMENTS ON BASIC VAULT ROOF. SHADING PATTERN WAS OBSERVED IN SUMMERS.

BOULDERS SWALES

HEAVY PLANTATIONS THE COMPLEX IS LANDSCAPED TO PROVIDE SHADE, AND CREATE A MICROCLIMATE.

CONTEMPLATIVE SPACES CONTEMPLATIVE ESCAPE SPACES WERE DESIGNED FOR THE SCHOLARS USING THE SITE’S ELEMENTS.

SUMMER SUN 8-10AM THE SITE THE SITE IS IN JNU, A CONTOURED SITE WITH A WATER BODY ADJACENT TO IT, SEPERATED BY A RETAINING WALL.

PLACEMENT OF UNIT THE PLACEMENT OF UNIT WAS DONE ACCORDING TO THE CLIMATE AND VISUAL HIERARCHY.

SUMMER SUN 12-1PM

5 EXPERIMENTS ON FORM: THE LEVELLED VAULT FORM WAS THEN ADDED WITH EXTER

OF THE ROOF, BUT IT WAS DISCARDED AS IT HAS A LOT OF MAINTAINANCE ISSUES. TH OF FINS.


FORMS )

SIDE ELEVATION

SIDE ELEVATION

PLAN

SIDE ELEVATION

PLAN

FRONT ELEVATION

ALL SIDES, THIS FORM WAS SHADED THE BUILDING IN IT ON NORTH AND SOUTH RE DONE.

3

FRONT ELEVATION

THE FORM ON THE SOUTH WAS STAGGERED AND CUT, SO THAT THE BUILDING SHADES ITSELF, WHEN THE SUN IS ON THE TOP.

WINTER SUN 8-10AM

WINTER SUN 12-1PM

WINTER SUN 4-5PM

2 EXPERIMENTS ON BASIC VAULT ROOF. SHADING PATTERN WAS OBSERVED IN WINTERS.

SUMMER SUN 4-5PM

RIOR SLITS TO INCREASE THE MICROSHADING HE ISSUE WAS RESOLVED AFTER THE ADDITION

SUMMER SUN 8-10AM

6

4

CUTOUTS IN ROOF WAS ADDED TO LET IN DIFFUSED LIGHT FROM THE NORTH, THE OPENINGS WERE SHADED BY A FIN, WHICH EVENTUALLY SHADED THE ROOF.

STEPPED FORM

STEPPED FORM WITH ROOF

3 STAGGERING THE FLOORS TO SHADE 4 THE ROOF ATTACHED THE SOUTH SIDE IN SUMMERS, AND LET IN SUNLIGHT IN WINTERS.

SUMMER SUN 12-1PM

WITH THE FORM INCREASES THE SHADING.

SUMMER SUN 4-5PM

EXPERIMENTS ON FORM: CUTOUTS WERE DESIGNED ON THE ROOF TO INCREASE THE DAYLIGHTING INSIDE VIA NORTH. FINS WERE ADDED TO SHADE THOSE OPENINGS AND THE ROOF ITSELF FROM THE SOUTH SUN.


1 SHADING PATTERN BECAUSE OF THE ROOF:

THE FINS HELP IN SHADING THE ROOF. THE AIR GAP BETWEEN HELPS AS INSULATION. THE STAGGERED FORM HELPS IN SHADING THE WINDOWS IN SUMMER AND LETING IN SUN DURING WINTER.

2 DAYLIGHTING BECAUSE OF THE ROOF:

DAYLIGHTING IS INCREASED BECAUSE OF THE ROOF AS IT HAS SLITS ON THE NORTH SIDE, WHICH LETS IN DIFFUSED LIGHT FROM IT, IN THE SOUTH SIDE THERE ARE WINDOWS WHICH ARE SHADED, SO DIFFUSED LIGHT IS LET IN FROM THAT SIDE TOO.

3 AIR CIRCULATION BECAUSE OF TH

THERE IS AN INCREASE IN CROSS EFFECT AS THERE ARE SLITS PRO WHICH HELP KEEP THE AIR FLOW ARE SHADED BY THE FINS TO PR FROM OUTSIDE WEATHER.

CONSTRUCTION DETAILS 1

2

THE CLUSTER IS MADE AS SHOWN, TWO UNITS ARE PLACED WITH AN OPEN SPACE IN THE CENTER, AND A CORE WHICH CONNECTS BOTH THE UNITS AT EVERY LEVEL. BECAUSE OF THE SLANTED ROOF, COURTYARD EFFECT HAPPENS. THE GREEN SPACE IN THE MIDDLE CREATES A MICROCLIMATE.

GLUED-LAMINATED TIMBER FRAME WITH INSULATION BOARDS AS INFILL PANEL

GLUED-LAM

4

SIDE VIEW WITH SUPPORTS ATTACHED TO THE GROUND

FRONT VIEW

TOP VIEW WITH FINS STRUCTURE & OPEN- SIDE VIEW WITH INGS

CONCRETE - FERROCEMENT SHELL


HE ROOF: VENTILATION / STACK OVIDED IN THE ROOF CONTINUOS. THE SLITS ROTECT THE INTERIORS

4 ELEVATION

THE FINS SHADING THE OPENING AND THE ROOF IS VISIBLE HERE.

5 WATER MANAGEMENT:

THE ROOF HAS GUTTER ON BOTH SIDES WHICH COLLECTS WATER AND PASSES IT ON TO A SWALE , WHICH IS LANDSCAPED WITH BOULDERS. THIS CAN BE AN ACTIVE SPOT ONLY AT RAINY MONTHS.

AFTER A LOT OF EXPERIMENTATION ON THE ROOF DESIGN, A CURVILINEAR FORM WAS DEVELOPED. THE FORM NEEDED TO BE REALISED, SO DIFFERENT ALTERNATIVE CONSTRUCTION METHODS WERE LOOKED UP AND FOUR OF WHICH WERE SHORTLISTED.

3

1. GLUED LAMINATED TIMBER FRAME WITH INSULATION BOARDS AS INFILL PANEL 2. GLUED LAMINATED TIMBER FRAME WITH TENSILE FABRIC 3. CONCRETE - FERROCEMENT SHELL 4. STEEL BARS AS FRAME WITH TENSILE FABRIC DETAILED CONSTRUCTION MODEL WAS MADE AS SHOWN IN THE PHOTOGRAPHS. A MORE SUSTAINABLE AND ENVIRONMENT FRIENDLY CONSTRUCTION WAS ALSO THOUGHT OF : RAMPED EARTH WITH TREATED BAMBOO AS REINFORCEMENT. BECAUSE OF THE LACK OF AVAILABILITY OF BAMBOO IN THE VICINITY, THIS METHOD WAS DROPPED. THE ROOF ACTS AS A SKIN TO THE BUILDING AND PROTECTS IT FROM THE WEATHER, INDEPENDENT OF THE CONSTRUCTION MATERIAL / PROCESS USED.

MINATED TIMBER FRAME WITH TENSILE FABRIC

STRUCTURE OF FRAME : GLUED LAMINATED FRAME OR STEEL FRAME

5

SUPPORTS ATTACHED TO THE GROUND

SIDE VIEW WITH SUPPORTS ATTACHED TO THE GROUND

STAGGERING ON THE SOUTH SIDE

STEEL BARS AS FRAME WITH TENSILE FABRIC

FINS AND OPENINGS STRUCTURE


THE SITE THE SITE WAS DESIGNED ACCORDING TO THE NEEDS OF THE SCHOLARS, PLACING THEM IN A SPACE DESIGNED ONLY TO INCREASE FOCUS. THE SITE IS PEDESTRIAN FRIENDLY & UNIVERSALLY ACCESSIBLE. THE SITE IS LANDSCAPED ACCORDINGLY TO CREATE A MICROCLIMATE. THE SINGLE FLOOR BUILDINGS HAVE JACK ARCHES AS ROOF, TO CREATE MICRO SHADING EFFECT ON IT. BOULDERS PRESENT ON SITE ARE USED AS SEATING, STEPS AND LANDSCAPING. WATER FEATURES ARE USED APPROPRIATELY.

SITE SECTION 1


LEGEND

SITE PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

SITE SECTION 2

MAIN RECEPTION OFFICE INDIVIDUAL OFFICES ATTACHED WASHROOM CLASSROOM LABORATORY STAFF ROOM SEMINAR HALL BOYS WASHROOM GIRLS WASHROOM HANDICAP WASHROOM STAIRWELL GREEN ROOM AUDITORIUM RECEPTION BOYS WASHROOM HANDICAP WASHROOM

18 GIRLS WASHROOM 19 INDOOR SITING 20 SEMI OPEN SITING 21 KITCHEN CANTEEN 22 KIOSK 23 WATER CATCHMENT 24 O.A.T STAGE 25 WATER POND 26 WATER SWALES 27 SECURITY ROOM 28 SENSORY GARDEN 29 CONTEMPLATIVE SITING 30 BOULDERS SITING 31 PARKING 32 DROP OFF POINTS


99 --11 IIDD VV OO CC

IICC EEMM DD NN AA PP

QU AR AN TIN EC EN TR E


QUARANTINE CENTRE 2020 LOCKDOWN | GROUP PROJECT | KAARWAN NATIONAL DESIGN COMPETITION (FINALIST) LOCATION : NEAR ANY RAILWAY STATION. “A Place Where One’s Physical, Mental & Spiritual Needs Can Be Catered To. (MODULAR DESIGN) A Spark Of Light & Hope, Admist The 2 Dark & Tough Times.” SITE AREA : 7800 m COLLABORATORS : 3, R. VIRAJITHA, CHETNA GARG, AMULYA GUPTA SOFTWARES USED : AUTODESK AUTOCAD AUTODESK REVIT


CONCEPT

THE CONCEPT FOR THE FACILITY WAS SAME AS THE NEED AT THAT TIME, A FUNCTIONALLY SOUND, PRACTICAL, FAST CONSTRUCTION DESIGN.

CORRIDOR RESTRICTED FOR STAFF

SEMI OPEN RECREATION

SEMI OPEN RECREATION

SEMI OPEN RECREATION

DIFFERENCIATION IN CIRCULATION AND ZONING WAS AN IMPORTANT FACTOR IN DESIGN, TO REDUCE THE SPREAD OF THE VIRUS.

SEMI OPEN RECREATION

CORRIDOR RESTRICTED FOR PATIENTS

INDOOR RECREATION

INDOOR RECREATION

OPEN RECREATION

INDOOR RECREATION

INDOOR RECREATION

MEP

CORRIDOR RESTRICTED FOR STAFF

HEALING ARCHITECTURE WAS INCLUDED IN CONCEPT FOR THE MENTAL WELLBEING OF THE INHABITANTS.

SERVICE

LOW RISK ZONES GREEN ZONE

MODERATE RISK ZONES ORANGE ZONE

OPEN SPACE FOR PATIENTS

CORRIDOR CORRIDOR RESTRICTED FOR STAFF DIRTY UTILITY

CORRIDOR RESTRICTED FOR PATIENTS

OPEN RECREATION

REGULATING CIRCULATION

ISOLATION WARDS

HIGH RISK ZONES RED ZONE

MEP INDIVIDUAL LEVEL RECREATIONAL AREA

INTERACTION WITH SMALL GROUPS ( MAINTAINING SOCIAL DISTANCE )

MEDICAL CARE LOW RISK ZONES GREEN ZONE

INDIVIDUAL LEVEL RECREATIONAL AREA

HIGH RISK ZONES RED ZONE COMMON RECREATIONAL FACILITIES WITH PROPER CAUTION

HEALING ENVIRONMENT

INTERACTION WITH SMALL GROUPS ( MAINTAINING SOCIAL DISTANCE )

DIVIDING THE DESIGN INTO 3 ZONES BUILT OPEN RELATIONSHIP WATER FEATURES

GREENERY

BUILT

SEMI OPEN

SEMI OPEN RECREATION

HEALING ENVIRONMENT

LOADING/ UNLOADING AREA

HEALING ARCHITECTURE

OPEN SPACE FOR PATIENTS

A

OPEN

INDIVIDUAL LEVEL RECREATIONAL AREA

INTERACTION WITH SMALL ROUPS ( MAINTAINING SOCIAL DISTANCE )

ISOLATION WARDS

DIRTY UTILITY

WATER FEATURES

GREENERY

INDIVIDUAL LEVEL RECREATIONAL AREA

MODERATE RISK ZONES ORANGE ZONE

CORRIDOR RESTRICTED FOR OPEN SPACE FOR PATIENTS PATIENTS

SERVICE CORRIDOR

MEDICAL CARE

INTERACTION WITH SMALL GROUPS ( MAINTAINING SOCIAL DISTANCE )

SEMI OPEN RECREATION MEDICAL CARE

INTERACTION WITH SMALL GROUPS ( MAINTAINING SOCIAL DISTANCE )

INDOOR RECREATION

MEP

INDOOR RECREATION OPEN RECREATION SERVICE CORRIDOR

FLOW OF SPACES

A’

INDIVIDUAL LEVEL ECREATIONAL AREA

WATER FEATURES DIRTY

GREENERY

INDIVIDUAL LEVEL RECREATIONAL AREA

DORMS

UTILITY

THE FACILITY IDENTIFIES THE FUNDAMENTALS OF CIRCULATION, FUNCTIONALITY, BUILT OPEN RELATIONSHIP ZONING AND VENTILATION. IT SPEAKS OF HEALING ARCHITECTURE AND IS SEPBUILT SEMI OPEN OPEN ARATED INTO HIGH, MODERATE AND LOW RISK ZONE WITH THE CIRCULATION AND RECREATIONAL FACILITIES SEGREGATED ACCORDINGLY FOR THE HEALING PHYS-ENVIRONMENT ICAL AND MENTAL WELLBEING OF THE STAFF, SERVICE PERSONNEL, PATIENTS AND VISITORS. IT IS MODULAR, COST EFFECTIVE AND SIMPLE TO CONSTRUCT WITH THE SIP USED FOR THERMAL COMFORT. THE FACILITY CAN BE EXPANDED LOW LEGEND RISK ZONES MODERATE RISK ZONES HIGH RISK ZONES AND REUSEDGREEN IN FUTURE AS SHELTER HOMES AND AS MULTIPURPOSE EXPANDZONE ORANGE ZONE RED ZONE VEHICULAR CIRCULATION ABLE HALLS. COMMON RECREATIONAL FACILITIES WITH PROPER CAUTION

INTERACTION WITH SMALL GROUPS ( MAINTAINING SOCIAL DISTANCE )

DORMS

ISOLATION WARDS

OPEN SPACE FOR PATIENTS

EMERGENCY VEHICLES

SERVICE VEHICLES ( WASTE DISPOSAL AND LAUNDRY)

THE DESIGN IS DETAILED SERVICE VEHICLES FOR GOODS OUT TO MAKE IT PRACTICAL & GOOD FOR CONSTRUCTION. STAFF VEHICLES A’ AMBULANCE OPEN SPACE FOR PATIENTS CIRCULATION PEDESTRIAN VISITORS STAFF AND ADMIN PATIENTS

DORMS

INDIVIDUAL LEVEL RECREATIONAL AREA

ZONING INTERACTION WITH SMALL GROUPS ( MAINTAINING SOCIAL DISTANCE )

DORMS

INDIVIDUAL LEVEL RECREATIONAL AREA

R

00

PATIENTS AREA

ROAD

SERVICES

PARKING

CIRCULATION

WATER BODY

NURSING STATION

GREEN AREA

VISITORS AREA

HIGH RISK ZONE

STAFF AND ADMIN

MODERATE RISK ZONE

RECREATIONAL ZONE

LOW RISK ZONE

LEGEND VEHICULAR CIRCULATION EMERGENCY VEHICLES SERVICE VEHICLES ( WASTE DISPOSAL AND LAUNDRY) SERVICE VEHICLES FOR GOODS STAFF VEHICLES AMBULANCE

PEDESTRIAN CIRCULATION INDIVIDUAL LEVEL

PATIENTS MEETING AREA

RECREATIONAL AREA VISITORS

PAVED AREA

STAFF AND ADMIN PATIENTS

SITE PLAN

ROOF LVL + 4000 LINTEL LVL + 2400 CILL LVL + 1200 PLINTH LVL + 300

GREENERY

SITE LVL 0.0

ZONING COMMON RECREATIONAL PATIENTS AREA FACILITIES WITH PROPER CAUTION

KAARWAN NATIONAL DESIGN COMPETITION 2020 TEAM ID - KNDC 151 INTERACTION WITH SMALL SHEET NO - 2 GROUPS ( MAINTAINING SOCIAL

MEDICAL CARE

INTERACTION WITH SMALL GROUPS ( MAINTAINING SOCIAL DISTANCE )

SERVICES

ROAD PARKING

HEALING ENVIRONMENT


SITE ENTRY 2

( FOR STAFF, ADMIN AND SERVICE VEHICLES )

C’

B’

STAFF AND ADMIN ENTRY STAFF PARKING

SERVICE ENTRY

LOADING/ UNLOADING AREA

EXAMINATION ROOM

NURSING STATION

NURSING STATION

PATIENTS ENTRY VISITORS ENTRY

VISITORS ENTRY STAFF AREA

WASH ROOM

RECEPTION INFORMATION AREA

CMO

CLERICAL DEPT.

PHARMACY

VEHI

DORMS

KITCHEN

DORMS

DIRTY UTILITY

MEP

STAFF CORRIDOR

NURSING STATION

READING SPACE

NURSING STATION

GAMES AREA AMBULANCE PARKING

OPEN SPACE FOR STAFF

DORMS

LAUNDRY

PATIENT CORRIDOR PATIENTS AREA

VISITOR’S AREA

C

CHECKING

SAMPLE TESTING LAB

ZONI

OPEN SPACE FOR STAFF

DANCE/YOGA AREA

RECREATIONAL AREA

PEDE

SERVICE CORRIDOR

VISITOR’S AREA

B

PATIENTS AREA

SPILL OVER FOR LAUNDRY OPEN SPACE FOR PATIENTS

A’

DORMS

CHECKING

SITE ENTRY 1EXAMINATION ROOM

( FOR PATIENTS, VISITORS, AMBULANCE AND EMERGENCY VEHICLES)

NURSING STATION

NURSING STATION

NORTH

PATIENTS ENTRY VISITORS ENTRY

VISITORS ENTRY

SCALE 1:300

DORMS

INFORMATION AREA

MEP

DIRTY UTILITY

P

SERVICE CORRIDOR

AMBULANCE PARKING

Z

SPILL OVER FOR LAUNDRY

LAUNDRY

C

V

KAARWAN TEAM ID - K

B SITE ENTRY 1

( FOR PATIENTS, VISITORS, AMBULANCE AND EMERGENCY VEHICLES)

SITE PLAN

NORTH SCALE 1:300

SECTION

KAARWA TEAM ID


ISOLATION ROOM ISOLATION ROOM ISOLATION ROOM WASHROOM WASHROOM WASHROOM ANTEROOM ANTEROOM ANTEROOM

MODULE 1 : NURSING STATION

DONNING AREA

DOFFING AREA

DOFFING AREA

NURSING STATION

DOFFING AREA

ISOLATION ROOM WASHROOM

NURSING STATION NURSING STATION ANTEROOM NURSING STATION AIRLOCK LOBBY ARCHITECTURAL AIRLOCK LOBBY AIRLOCK LOBBY DONNING & DOFFING PLAN DONNING & DOFFING DONNING & DOFFING

PLUMBING PLAN

ELECTRICAL PLAN

DONNING AREA

MODULE 2 : ISOLATION ROOM NURSING STATION

AIRLOCK LOBBY

DOFFING AREA

NURSING STATION

ISOLATION ROOM

ISOLATION ROOM

ISOLATION ROOM

WASHROOM

AIRLOCK LOBBY

ANTEROOM

ANTEROOM DONNING & DOFFING

WASHROOM

WASHROOM

ANTEROOM

DONNING AREA

ISOLATION ROOM ISOLATION ROOM ISOLATION ROOM WASHROOM WASHROOM WASHROOM

ARCHITECTURAL NURSING STATION PLAN AIRLOCK LOBBY

ANTEROOM ANTEROOM ANTEROOM

DONNING AREA

PLUMBING PLAN AIRLOCK LOBBY

NG STATION

NURSING STATION

ELECTRICAL PLAN

DOFFING AREA

DOFFING AREA

MODULE 3DONNING : DORMS

NURSING STATION

NURSING STATION DONNING DONNING AREAAREA AIRLOCK LOBBY AREA DONNING & DOFFING

CK LOBBY

ING & DOFFING

MS

DONNING AREA

NURSING NURSING STATION STATION AIRLOCK LOBBY AIRLOCK LOBBY AIRLOCK LOBBY

NG ON

MS

DONNING AREA

AIRLOCK LOBBY DONNING & DOFFING

NURSING NURSING NURSING STATION STATION STATION AIRLOCK LOBBYLOBBY AIRLOCK AIRLOCK LOBBY

DOFFING DOFFING DOFFING AREAAREA AREA

DORMS

DORMS

DORMS DORMS

WASHROOM WASHROOM WASHROOM COMMON SPACE COMMON SPACE COMMON SPACEANTEROOM ANTEROOM ANTEROOM

NURSING STATION NURSING STATION NURSING STATION AIRLOCK LOBBY AIRLOCK LOBBY AIRLOCK LOBBY DONNING & DOFFING DONNING DOFFING DONNING & &DOFFING DONNING DONNING

DONNING AIRLOCK

NURSING STATION

NURSING AIRLOCK STATION

AIRLOCK

NURSING STATION

DOFFING DOFFING

DOFFING

DORMS

DORMS

DORMS

WASHROOM COMMON SPACE

WASHROOM DORMS COMMON SPACE

WASHROOM COMMON SPACE

ARCHITECTURAL ANTEROOM PLAN

ANTEROOM WASHROOM

PLUMBING PLAN

COMMON SPACEDORMS ANTEROOM

DONNING

DONNING

AIRLOCK

NURSING STATION

AIRLOCK

NURSING STATION

ANTEROOM

ELECTRICAL PLAN


ISOLATION ROOM -VE PRESSURE

ISOLATION ROOM

ANTEROOM 0.5 +VE PRESSURE WASH ROOMS DOUBLE-VE PRESSURE

NURSING

WASHROOM

INTERIOR LAYOUT WITH AIR FLOW ROOF PANEL PLUMBING PLAN (190 MM TH

CORRIDOR +VE PRESSURE

DONNING AREA

ROOF PANEL (190 MM TH SIP PANEL)

CORRIDOR +VE PRESSURE

DONNING ISOLATION ROOM AREA

ISOLATION ROOM -VE PRESSURE

AIRLOCK LOBBY

ANTEROOM WALL PANEL (140 MM TH SIP PANEL)

SIP PANEL)

DOFFING AREA

STATION ROOF PANEL (190 MM TH PLUMBING SIP PANEL)

PLAN

NURSING STATION AIRLOCK LOBBY

TION ROOM ESSURE

INTERIOR LAYOUT WALL PANEL WITH AIRFLOW (140 MM TH SIP PANEL)

AIRLOCK

C SECTION (100 X 50X 7.7 MM)

NURSING STATION

WASH ROOMS DOUBLE-VE PRESSURE

DONNINGDOFFING AREA

WASH ROOM

ROOF PANEL (190 MM TH SIP PANEL)

WASH ROOM

CORRIDOR +VE PRESSURE ANTEROOM 0.5 +VE PRESSURE

DONNING

WALL PANEL (140 MM TH SIP PANEL)

AIRLOCK LOBBY

NURSING STATION

DOFFING AREA ISOLATION ROOM -VE PRESSURE

H AIRFLOW

NURSING STATION

C SECTION (100 X 50X 7.7 MM)

FLOOR PANEL (190 MM TH SIP PANEL)

WASH ROOM

NURSINGDORM STATION

-VE PRESSURE

C SECTION WASH ROOM (100 X 50X 7.7 MM)

AIRLOCK LOBBY

NURSING STATION

DONNINGDOFFING AREA

ISOLATION ROOM -VE PRESSURE

EXPLODED VIEW

WALL PANEL (140 MM TH SIP PANEL)

ANTEROOM 0.5 +VE PRESSURE DORM -VE PRESSURE

DOFFING CORRIDOR +VE PRESSURE

ROOF PANEL (190 MM TH SIP PANEL)

PLUMBING PLAN

ELECTRICAL PLAN FLOOR PANEL (190 MM TH SIP PANEL)

INTERIOR LAYOUT

NURSING STATION

ISOLATION ROOM INTERIOR LAYOUT WITH AIRFLOW

ISOLATION ROOM

DORMS

WALL PANEL (140 MM TH SIP PANEL)

WASHROOM

ISOLATION ROOM

ANTEROOM

DONNING

EXPLODED VIEW

AIRLOCK

C SECTION (100 X 50X 7.7 MM)

EXPLODED CONSTRUCTION DETAILS

EXPLODED VIEW

DOFFING

INTERIOR LAYOUT ISOLATION ROOM -VE PRESSURE

FLOOR PANEL (190 MM TH SIP PANEL)

ANTEROOM 0.5 +VE PRESSURE WASH ROOMS DOUBLE-VE PRESSURE

DONNING AREA

ROOF PANEL (190 MM TH SIP PANEL)

CORRIDOR +VE PRESSURE

G PLAN

ROOF PANEL (190 MM TH SIP PANEL)

EXPLODED VIEW

NURSING STATION

ELECTRICAL PLAN

ISOLATION ROOM -VE PRESSURE

WASH ROOM

AIRLOCK LOBBY

WALL PANEL (140 MM TH SIP PANEL)

WALL PANEL (140 MM TH SIP PANEL)

WASH ROOM

DOFFING AREA

EXPLODED VIEW

WALL PANEL (140 MM TH SIP PANEL)

INTERIOR LAYOUT WITH AIRFLOW

ING ON

DORM -VE PRESSURE

C SECTION (100 X 50X 7.7 MM)

NURSING STATION

C SECTION (100 X 50X 7.7 MM)

WASH ROOM

NURSING STATION

WASH ROOM

AIRLOCK LOBBY DONNINGDOFFING AREA

ANTEROOM 0.5 +VE PRESSURE

C SECTION (100 X 50X 7.7 MM)

DORM -VE PRESSURE

NG

WASH ROOM

CORRIDOR +VE PRESSURE

DORM -VE PRESSURE

AYOUT

WASH ROOM

FLOOR PANEL (190 MM TH SIP PANEL) ANTEROOM 0.5 +VE PRESSURE

NURSING STATION

VIEWS

ROOF PA (190 MM SIP PANE

PLUMBING PLAN FLOOR PANEL (190 MM TH SIP PANEL)

EXPLODED VIEW DORMS ROOF PANEL (190 MM TH SIP PANEL)

CORRIDOR +VE PRESSURE

DONNING NURSING STATION

ROOF PANEL (190 MM TH

SIP PANEL) THE FACILITY INCLUDED 3 MAIN COMPONENTS, IN THE FORM OF MODELECTRICAL PLAN ULES. THE 3 MODULES CAN BE REPEATED ‘N’ NUMBER OF TIMES FOR THE EXPANSION OF THE FACILITY, ACCORDING TO THE NEED. WALL PANEL

PLUMBING PLAN

AIRLOCK

DOFFING

WASH ROOM

AIRLOCK

NURSING STATION

(100 X 50X 7.7 MM)

WASH ROOM

TO COOL DOWN THE GREEN SPACES, TERRACOTTA COOLER WALLS ARE SECTION USED, WHICH ALSO DEFINE THE BOUNDARYC(100 OF ACCESS. X 50X 7.7 MM) EXPLODED VIEW FLOOR PANEL

DOFFING

OM RESSURE DORM -VE PRESSURE

WALL PANEL (140 MM TH SIP PANEL)

(140 MM TH SIP PANEL)

THE FACILITY HAS RECREATIONAL SPACES, INSIDE THE ISOLATION ROOM, A WINDOWINTERIOR SEATINGLAYOUT TO VIEW THE LANDSCAPE. C SECTION

DONNING

WASH ROOM

FLOOR PANEL (190 MM TH SIP PANEL)

EXPLODED ROOM VIEW ISOLATION

DORM -VE PRESSURE

EXPLODED VIEW

FLOOR PA (190 MM T SIP PANEL

ROOF PANEL (190 MM TH SIP PANEL)

WASH ROOM

WASH ROOM

C SECTI (100 X 5

ELECTRICAL PLAN

PLUMBING PLAN

NURSING STATION

FLOOR PANEL (190 MM TH SIP PANEL)

INTERIOR LAYOUT

APPROPRIATE CONSTRUCTIONSIP PANEL) & FINISHING MATERIALS WERE CHOSEN TO ENSURE LESS HEAT GAIN AND LESS SPREAD OF VIRUS VIA SURFACES. (190 MM TH

EXPLODED VIEW ROOF PANEL (190 MM TH SIP PANEL)

FLOOR PANEL (190 MM TH SIP PANEL) WASH ROOM

EXPLODEDWASH VIEW

WASH ROOM

WALL PANEL (140 MM TH SIP PANEL)

ROOM

WASH ROOM

WASH ROOM

DORM -VE PRESSURE

WASH ROOM

WASH ROOM

DORM -VE PRESSURE

WASH ROOM

ANTEROOM 0.5 +VE PRESSURE DORM -VE PRESSURE

C SECTION (100 X 50X 7.7 MM)

ANTEROOM 0.5 +VE PRESSURE DORM -VE PRESSURE

CORRIDOR +VE PRESSURE

CORRIDOR +VE PRESSURE

FLOOR PANEL (190 MM TH SIP PANEL)

EXPLODED VIEW

FLO (190 SIP


DOOR 1

DOOR 2

DOOR 3

DOOR 4

WINDOW 1

WINDOW 2

WINDOW 3

MEASURED DRAWING OF DOORS & WINDOWS ( INDEPENDENT PROJECT)

DOOR 5

Door & Window types present in Kesardev Poddarki Chhatri, elevational measured drawing done thor. Each door irrespective of size had two shutters which were pivoted to top and base. Intricate timber Shutters are used and light metal work is done to provide stiffness to the doors. Windows we ally made of timber Lintel and Jaali made of weaving metal rods as shown in the drawing.

KESARDEV PODDARKI CHHATRI

Chhatri complexes are funerary structures built as memorials to ancestors and in many a case these housed a shrin dharamshala. The Kesardev Poddarki Chhatri in Ramgarh is among the best specimens. With an imposing flight of ste ing to it, the cenotaph is crowned by multiple domes and a bagicha with well-defined pathways and 4 tanks at the These monumental cenotaphs were built outside the town limit. Kesar dev Poddar Chattri is three storey high structu ground using steps one can approach second floor. Ground floor is not approachable and used for storage now. First a Shiv temple in the center and it can be accessed by one of the landings of the main staircase. Second floor is cen podium with dome above). Each large chhatris stands on a basement containing a Shiva temple and several tibaris i for house travellers. It also includes a kitchen, which was used to serve Brahmins back in the day.


RAMGARH, RAJASTHAN ( TRIP 1) 2017 | GROUP PROJECT | MEASURED DRAWING & DOCUMENTATION ARCHITECTURAL TYPOLOGY : CHATTRI ( KESARDEV PODDARKI CHATTRI ) COLLABORATORS : 10

CHATTRI PLAN

by the Auely carved ere gener-

ne and a eps leade corners. ure. From t floor has notaph (a intended

CHATTRI ELEVATION


SPATIAL ORGANIZATION OF DIFFERENT NODES, RAMGARH BISSAU GATE NODE

CHURU GATE NODE

PLAN

PLAN 1 - BISSAU GATE 2 - JEWLERRY SHOP 3 - GENERAL STORE 4 - RESTAURANT 5 - SWEETS & PAN SHOP 6 - SEEDS SHOP 7 - WATER PLACE 8 - BANGLES SHOP

1 - CHAI SHOP 2 - STAIRCASE 3 - WELL MINAR 4 - WATER STORAGE AREA 5 - SITTING 6 - SHOPS

STREET ELEVATION

STREET ELEVATION

SHIV MANDIR NODE

STREET ELEVATION

1 - SHIV MANDIR 2 - FURNITURE SHOP 3 - DHABHA 4 - SWEETS SHOP 5 - VEGETABLES & FRUITS SHOP 6 - GENERAL STORE PLAN

STREET ELEVATION


RAMGARH, RAJASTHAN ( TRIP 2) 2018 | SIGNIFICANCE OF SETHON KA RAMGARH, SHEKHAWATI | PREPARED FOR INTACH BY U.S.A.P Ramgarh Sethan, established in the late eighteenth century is notable as one of the towns established by the merchant community in the Shekhawati region of Rajasthan, which is otherwise known for beautiful fresco paintings. Significance of Ramgarh lies primarily in the original physical morphology and the original socio economic pattern of the town emerging out of a characteristic occupational structure and system of governance. The large number of fresco paintings, Havelis, Chatrris, and other structures mark the USP of Ramgarh.

2 CHURU GATE

NODE 3: CHURU GATE

NODE 1: SHIV MANDIR

1 BISSAU GATE

NODE 2: BISSAU GATE

FATEHPUR GATE

3

1 - SHIV MANDIR 2 - GADDI 3 - CBI (GADDI) 4 - RUIYA HAVELI 5 - WELL 6 - HOSPITAL 7 - DHARAMSHALA 8 - LIBRARY

SPATIAL ORGANIZATION OF BUILDINGS ALONG THE MAIN AXIS, RAMGARH BISSAU GATE :This is the main axis in Ramgarh town with Bissau gate at one end. This street is lined with the prominent havelis with their gaddis and choubaras facing the main road. Being the most clustered and busy road of ramgarh this street is the trading hub and invites all the traders and bussinessmen. CHURU GATE : This is the street leading towards Churu gate. It is lined with all the havelis of Poddar clan with shops facing towards the road. FATEHPUR GATE : This is the street leading towards Fatehpur gate. It is lined with havelis and shops.



BUILDING CONSTRUCTION 1ST & 2ND YEAR | INDEPENDENT PROJECT | ACADEMIC PROJECT

HAND DRAFTED DRAWINGS




KEY PLAN (NOT TO SCALE.)

S.N. TYPE

B'

1. 2. 3. 4. 5. 6. 7.

2400

1800

1775

350

4

W1

WIDTH

CILL

W1 W2

900 900

1200 900

LINTEL HEIGHT 2200 2200

1000

W3

900

2200

2600

D1

800

---

2400

400 2400

D2

1000

---

2400

2400

D3

700

---

2400

2400

D4

2000

---

2400

2400

1300

885

SCHEDULE OF OPENINGS 600

1200

1500

1200

600

478 450

505

7310

W1

1000

W1

1600

TREAD - 300 RISER - 150

D4

1312

555

3

DN

UP

W1

D4

LIFT / STAIRCASE LOBBY

700

4000

W1

W1 JANITOR'S CABINET

WASHROOM LOBBY WATER COOLER

1503

1

500

W2

635 115

1165

1800

D1

1800

H.V SHAFT 150

350

815

815

815

PLUMBING SHAFT

D1 D3

1530

W2 265

W3

715

W3

W3

A 900

1000

D2

575 360

1140

A'

500

MALE WASHROOM

D1

1500

A.H.U 3000 3500

3000

750

1165

525

D1

D4

500

3000

750

D1

D4

ELECTRICAL ROOM

750

525

FEMALE WASHROOM

L.V SHAFT 1000 100

W1

D2

1065

800

F.H.C

600

W3 260

W3 260

W3 260

B

3625

5645

A

6430

B

E

D

C 20TH CEREMIC TILE FLOORING

INTEGRATED SERVICE CORE20TH MORTAR 900

360

CEREMIC TILES CLADDING

4980

3600

8000

W1

D2

1998

525

DN

UP

D3

1295

1295

115

1650

FIRE EXIT TREAD - 300 RISER - 150

1185

800

500

W1

635

D4

1110

2

TYPICAL FLOOR PLAN

D. P .C

PCC 75TH WATER PROOFING 50 TH ELEVATIONAL SECTION C - C'

SUNKEN SLAB 300 TH

3600

BROKEN BRICK BATS 200TH

PLUMBING SHAFT

T. 900

INTEGRATED SERVICE CORE ELEVATIONAL SECTION D - D'

SIGN

ALL DIMENSIONS ARE IN MM SCALE - 1 : 50 20TH CEREMIC R.VIRAJITHA SHEET NO. TILE FLOORING 3 -A 20TH MORTAR 3 BUILDING CONS. PCC 75TH USAP

2

CEREMIC TILES CLADDING

WASHROOM SECTION SECTIONAL ELEVATIONS - WASHROOM

WATER PROOFING 50 TH SUNKEN SLAB 300 TH

BROKEN BRICK BATS 200TH T. SIGNATURE SHEET NO.

5

ALL DIMENSIONS ARE IN MM SCALE - 1 : 20 R. VIRAJITHA 3-A 3 BUILDING CONSTRUCTION USAP


BUILDING CONSTRUCTION 3RD & 4TH YEAR | INDEPENDENT PROJECT | ACADEMIC PROJECT

C.A.D DRAWINGS

JANITOR'S CABINET

B'

WATER COOLER

1295

1295

115

1250

C'

1185

600

635

525

635

D3

WASHROOM LOBBY

D2

750

750

750

500 1110

800

1998

1500

D2

1065 115

115

525

FEMALE WASHROOM

115 760

D2

1800

D1

360

1165

520 D1

1800

500

1165

360

575

MALE WASHROOM

360

A.H.U 3000 X 3500

3680

D1

525

D4

A'

360

1650

800

A

D1

1800

1050 730 1140

360

1500

50

350

50 730

815

50 730

815

815

D

D'

PLUMBING SHAFT

PLUMBING SHAFT 900

D1 D3

JANITOR'S CABINET

JANITOR'S CABINET

715

W3

W3

6430

Y

W3

260

W3

W3

T. SIGNATURE SHEET NO.

ARCHITECTURAL PLAN - WASHROOM JANITOR'S CABINET

WASHROOM LOBBY

CILL

900 900

1200 900

900

2200

D1

800

---

D2

1000

---

D3

700

---

D4

2000

---

W3

JANITOR'S CABINET

1

R. VIRAJITHA 3-A 3 BUILDING CONS USAP

WASHROOM LOBBY WATER COOLER

WATER COOLER

FEMALE WASHROOM

FEMALE WASHROOM

MALE WASHROOM

MALE WASHROOM

A.H.U 3000 X 3500

A.H.U 3000 X 3500

500

500

1500

1500

500

FEMALE WASHROOM

MALE WASHROOM

A.H.U 3000 X 3500

MALE WASHROOM

1500

PLUMBING SHAFT

PLUMBING SHAFT

PLUMBING SHAFT

D3

PLUMBING SHAFT

D3

LEGEND

LEGEND

WASTE WATER PIPE

6 A POWER SOCKET SWITCH

SOIL PIPE

6430 PLUMBING SHAFT

4980

D

C

C

T. SIGNATURE SHEET NO.

3

WASTE WATER PIPE

6430

E T. SIGNATURE SHEET NO.

PLUMBING SHAFT

ALL DIMENSIONS ARE IN MM SCALE - 1 : 20

E

LEGEND

PLUMBING PLAN

4980

PLUMBING SHAFT D3

DRAINAGE PLAN - WASHROOM

D

FRESH WATER PIPE

R. VIRAJITHA 3-A 3 BUILDING CONSTRUCTION USAP

SOIL PIPE

R. VIRAJITHA

D

DOWNLIGHT

4980

PICTURE LIGHT

D

ALL DIMENSIONS ARE IN MM SCALE - 1 : 20

E

ELECTRICAL PLAN - WASHROOM

ELECTRICAL PLAN

T. SIGNATURE LEGEND

SHEET NO.

6 A POWER SOCKET

2

R. VIRAJITHA 3-A 3 BUILDING CONSTRUCTION USAP

SWITCH DOWNLIGHT

4980

FRESH WATER PIPE ALL DIMENSIONS ARE IN MM SCALE - 1 : 20

6430

C

L

ALL DIMENSIONS SCALE - 1 : 20

E

WATER COOLER

WASHROOM PLAN

WIDTH

W1 W2

SCHEDULE OF OP

4980

D

WATER COOLER

260

W3

WASHROOM LOBBY

C

C

260

1. 2. 3. 4. 5. 6. 7.

B

1530

S.N. TYPE

PICTURE LIGHT

E T. SIGNATURE SHEET NO.

ALL DIMENSIONS ARE IN MM SCALE - 1 : 20 R. VIRAJITHA 3-A 3


15 T B'

0 00

7

14

10

00

50 00

13

0

-2400

S

00

-3300 -2850

50

12

00

80

-2400 -1950

R

-1500 TREAD - 300 RISER - 150

05 00

300

50 0

0 86 0

W2

W1

50 05 00 50 05 00 50 0

N W

46 0

75 64

W1

W N

5

W1

80

00

0 50

O D

50 500 500 500 500 500 500 500 500

1750

W2

D2

0

500 500 500 500 500 500 500 500

1200

5

TREAD - 300 RISER - 150

0.00

11

2

1

4

TREAD - 300 RISER - 150

P

95 13 1

4

80 5

46 0

43 70

W D O

10

2

1

4

900

TREAD - 300 RISER - 150

D

O

W

N

30

10

D2

V5

N

3 4

W6

D3

4

1

1

1680

D1

D1

46

0

50 11

W5

V5

W5

50

0

92

W4

11

1750

D1

V5

D2

30

10

5425

2 4

690

W5 460

W5

UP

3

8 1

D3

DN

1200

1

1140

DOWN

600

1200 600

1000

3575

6

W5

3000

W11

C

0

FHC

D1

6

900

1500

580 ELEC. SHAFT

W5 46

L.V SHAFT

1200

0

600

46

TREAD - 300 RISER - 75

REFER TO DWG NO. - XXX

W5 1255

40

19

REFER TO DWG NO. - XXX

2930

7

V5

0

92

56

65

46 0 0

9 1

W5

0 92

0 46

46

V5 5

5075

D2

50 46

W5

W4

1

80

W4

4

1

TREAD - 300 RISER - 75

40 19

1180

12 65 11 50

0

D1

W12

W12

D2 55

12

4

V5

V5

V5

69

N'

W

1

W6

W5

D O

9230

1180

3

2

0 46

1

W4 13

0

W5

0 96

2

92

W5 0 46

0

V5

V5

5

46

W12 14

0

46

W4

1050

W5

80

0 46

0

46

W7

TREAD - 300 RISER - 75

W5

1200

11 50

0

0

W2

46

92

W4

D O

W

D3

N

75

W1

2

54

5

0

12

0

V2

96

W1

69

80

90° 40 10

V2

W4

W7

135°

20 45

44

W4

V2

D2 0 46

40 10

5

N

D1

80

10 35

W2

W1

90

0

0

W4

480

0

55 26

50

50

8

Q

69

00

0

D O

50

W2

W1

0 69

00 30

50 05 00

0

9'

W1

46 30 00

0 50 0

TREAD - 300 RISER - 150

50

0.00

0

46

0 69

30 00

N W

00

D O

05 50

60

0

1200

50

450

9

00

0 50

46 0

00

50

10

0

90 50 11

DOWN TREAD - 1000 RISER - 450

50

50

50

750

0.00

50

N W

0

-150

05 00 50 05 00 50 0

11

0

50

50

N

D O

W

O D

-600

TREAD - 300 RISER - 150

0

80

00

-1050

C'

D1

B' 225

6000

A

C''

C'

5895

3500

C

K'

J'

7000

B

4845

3880

B

1900

4000

3235

3500

4000

G

F

E

D

6000

4000

H

6000

8425

L

K

J

WORKING DRAWING PLAN

A

B

C

D

E

G

F

H

J

K

L

M

20100

3600

900HT- 230TH PARAPET WALL REFER TO : TERRACING DETAILS REFER TO :

6'

15600

16500

5

5'

12000

12900

4

4'

-21030

3600

4500

3600

12000

8400

38437 8400

3

3940

3600

8400

3'

6000 4800

2'

1200

0.00

PLINTH PROTECTION REFER TO :

1

1'

PLINTH PROTECTION REFER TO : D - 101

-2400

RETAINING WALL FOOTING (A.P.S) REFER TO : D - 101

TIE BEAM (A.P.S)

300TH RETAINING WALL 35TH TRIMEX FLOORING 150TH PCC FLOORING SAND FILLING RAFT SLAB (A.P.S) WATER PROOFING 100TH PCC RAMPED EARTH

COLUMN FOOTING (A.P.S)

WORKING DRAWING SECTION SECTION AA'

1

2

3

4

5

6

7

8

0.00

-2400 BOUNDARY WALL DETAIL RAIN WATER CHANNEL REFER TO : D - 102

1200 0.00

3490

3490

1200

-2400 BOUNDARY WALL DETAIL RAIN WATER CHANNEL REFER TO : D - 102

3600

-11580

2

3260

3600

3600

4800

BOUNDARY WALL DETAIL RAIN WATER CHANNEL REFER TO : D - 102

3600

3600

3600

15600

3600

6


NOTES

3. 4. 5. 6. 7.

8.

ALL DIMENSIONS ARE IN MM. ALL WALLS ARE 230 MM THICK UNLESS OTHERWISE SPECIFIED. FINISH SCHEDULE ALL DIMENSIONS ARE TO BE READ NOT SCALED. ANY DISCREPANCY SHALL BE NOTIFIED TO THE ARCHITECT IMMEDIATELY. ALL DIMENSIONS ARE TO BE CLARIFIED BEFORE COMMENCEMENT OF WORK. ALL DOOR AND WINDOW LEVELS ARE WITH RESPECT TO FINISHED FLOOR LEVEL.

ROOM NO. CEILING FINISH

12

R

NOTES

WALL FINISH FLOOR FINISH

1. 2. 3. 4.

90

80

00

WALL FINISHES: 1. OIL BOUND DISTEMPER 2. PLASTIC PAINT 3. TERRAZZO TILES 4. CERAMIC TILES 5.

00

11

5.

Q

B'

1. 2.

CEILING FINISH 1. PLASTER OF PARIS ( FALSE CEILING 2.

6.

FLOOR FINISH 1. KOTA STONE TILE 2. TRIMIX INDUSTRIAL FLOORING 3. P.C.C 4. TERRAZZO FLOORING

7.

8.

90

80

00

ISSUES

00

38

9'

1 2

480

P

AIR CONDITIONING PLANT ROOM

8

2

1

1

2100

1000 750

300 1200

2400 V1 2800

2100 1600

1200

2800

1600

2200

2800

600

2200

2800

600

----

2000

3000

3000

3000

3000

V1 3000

3000

3000

3000

1000

-21030

2'

3

2400 2400

BOUNDARY WALL DETAIL RAIN WATER CHANNEL REFER TO : D - 102

1200 4'

2000

W6

500

38437

W6

500

W6

1150

8645

LIFT LOBBY 39

2

1

1

V1

8400

UP

V1

600

2'

D2

225 NO. DWG.

RETAINING WALL FOOTING (A.P.S) REFER TO : D - 101

TIE BEAM

A

A - 104 (A.P.S)

FHC

1200

1000

1000

DATE

V1

1000

V1

V1

1000

1000

1000

V1

V1

1000

V1

V1

1000

V1

V1

B' COLUMN FOOTING (A.P.S)

1900

4000

3235

C'

5895

C''

C

K'

J'

7000

B

3880

3500

3500

E

D

6000

F

4000

G

4000

H

6000

K

J

PLINTH PROTECTION REFER4845 TO : D - 101 300TH RETAINING WALL 35TH TRIMEX FLOORING 150TH PCC FLOORING 8425 SAND FILLING RAFT SLAB (A.P.S) WATER PROOFING 100TH PCC RAMPED EARTH

L

750

1200

1000

W5

500

300

W6

1500

900

W7 W8

3000 1500

900 300

800

300

1000 750

300 1200

W12

1000

1200

V2

600

2200

V3

2200

V4 V5

1000 750 600

D1

1500

D2 D3

1000 3000

D4

1500

D5 R1

3000

----

2000

----

900

2200 2200 -------------

KEY PLAN

BASEMENT ARCHITECTURAL PLA BASEMENT DRAINAGE PLAN. AT LEVEL -1800 1-1'

NORTH PO R. VIRAJITHA III YEAR - A, B.ARCH USAP, GGSIPU

-2400 BOUNDARY WALL DETAIL RAIN WATER CHANNEL REFER TO : D - 102

W3 W4

TITLE :

V1

1000

0.00

1200 1200

SOCIO - CULTURAL AND RECREA CENTER.

150 1200

1000 1'

REV.6000 NO. R - 000

SUMP 1000

STORAGE

D1

SCALE 1:100

CHECKED BY

840

2000

SUMP

CILL

800 1000

PROJECT :

I.L - 2710

2930

NORTH POINT

1

PROTECTION R. VIRAJITHA REFER TO : III YEAR - A, B.ARCH USAP, GGSIPU

225

-2400

D1

I.L - 2650

I.L - 2710

1050

1

PLINTH

I.L - 2700

12900

3'

2000

-11580

2

GROUND FLOOR ARCHITECTURAL PLAN. V1 SECTOR 1 PLAN AT LEVEL 3000 2-2'

0.00

I.L - 2685

V1

2

4000

3600

1200

I.L - 2685

D1

SOCIO - CULTURAL AND RECREATIONAL CENTER.

TITLE :

1000

I.L - 2700

A'

V1

5'

3260

3600

PROJECT :

----

3000 4

2400 2400

RAMP WIDTH- 6M, SLOPE 1:10

12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23.

3490

3

3000

D5 R1

V1

16500

WIDTH

W1 W2

W9 10. W10 11. W11

6'

SLOPE 1:10

V1

1000 3' ---3000 ---1500

D4

20100

1000

D2 D3

----

5

1. 2. 3. 4. 5. 6. 7. 8. 9.

V1

600 2800 WIDTH- 6M, 2800 RAMP600

A ----

1500

I.L - 2675

V1

2200 2200

S.N. TYPE

V1 I.L - 2650

I.L - 2675

1500

D1

TERRACING DETAILS REFER TO :

SCHEDULE OF OPE

M

B

V4 V5

4800

3490

1000 6 750 600

V3

L

K

J

1000

V2

600

900HT- 230TH PARAPET WALL REFER TO :

1000

1000

4

H

1000

2100

2400

G

F

E

D

1000

V1

300

C

3600

2400

800

2380

8400

1000 1000

900 300

1000

900

3000 1500 6000

1500

W12

V1

2400 B 2100 2200 1300 2200 1300

300

8000

3600 3600

12000

1300

W7 W8

3580

00 15600

2200

W6

W9 10. W10 11. W11

12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23.

1000

900

1000

1000

500A

V1 2200

V1

1000

W5 5

1200

3600

1000

1000

4500

750

2200 2200

1020

W3 W4

V1

LINTEL HEIGHT

3940

1200 1200

1000

1000

9190

CILL

800 1000

-2400

UP

00

N

1. 2. 3. 4. 5. 6. 7. 8. 9.

ISSUES

I.L - 2665

UP

WIDTH

W1 W2

S.N. TYPE

V1

I.L - 2650

-2400

1000

SECTOR 2

1000

1000

C'

I.L - 2665

'

KEY PLAN

W6

V1

SCHEDULE OF OPENINGS

N'

25

34

19395

D1

UP

C

6

37

FLOOR FINISH 1. KOTA STONE TILE 2. TRIMIX INDUSTRIAL FLOORING 3.

3750

150

SECTOR 1

3575

1200

580 ELEC. SHAFT

775

FHC

°

°

600

1200

1000

L.V SHAFT

1500

135

120

70 12

600

600

5425

1 2

7

R1

30

36

WA FLO

CEILING FINISH 1. PLASTER OF PARIS ( FALSE CE 2.

2930

54

KEY PLAN

ROOM NO. CEILING FINISH WALL FINISHES: 1. OIL BOUND DISTEMPER 2. PLASTIC PAINT 3. TERRAZZO TILES 4. CERAMIC TILES 5.

LIFT LOBBY

R1 ELEC. + GENERATOR ROOM

ALL DIMENSIONS ARE ALL WALLS ARE 230 M UNLESS OTHERWISE S FINISH SCHEDULE ALL DIMENSIONS ARE NOT SCALED. ANY DISCREPANCY SH NOTIFIED TO THE ARC IMMEDIATELY. ALL DIMENSIONS ARE CLARIFIED BEFORE CO OF WORK. ALL DOOR AND WINDO WITH RESPECT TO FIN LEVEL.

PROJECT :

SOCIO - CULTURAL AND DWG. N CHECKED BY CENTER. RECREATIONAL

5995

A - 103

TITLE :

M

SECTIONS DATE R. VIRAJITHA III YEAR - A, B.ARCH USAP, GGSIPU

WORKING DRAWING BASEMENT PLAN

CHECKED BY

SECTION AA'

1

2

4

3

5

6

7

SCALE 1:100

DWG. NO.

REV. NO

SEC - 101

R - 000

8 900HT- 230TH PARAPET WALL REFER TO : TERRACING DETAILS REFER TO :

RAILING DETAILS REFER TO :

KEY PLAN

COURTYARD DETAILS REFER : D - 102

PLINTH PROTECTION REFER TO : D - 101 300TH RETAINING WALL

RETAINING WALL FOOTING (A.P.S) REFER TO : D - 101

TIE BEAM (A.P.S)

300TH RETAINING WALL 35TH TRIMEX FLOORING 150TH PCC FLOORING SAND FILLING RAFT SLAB (A.P.S) WATER PROOFING 100TH PCC RAMPED EARTH

COLUMN FOOTING (A.P.S)

150TH PCC RCC FOOTING (A.P.S) RAMPED EARTH

BOUNDARY WALL DETAIL RAIN WATER CHANNEL REFER TO : D - 102

PROJECT : SOCIO - CULTURAL AND RECREATIONAL CENTER.

TITLE : SECTIONS DATE R. VIRAJITHA III YEAR - A, B.ARCH USAP, GGSIPU

SECTION BB'

WORKING DRAWING SECTION

CHECKED BY

SCALE 1:100

DWG. NO.

REV. NO

SEC - 102

R - 000


SHAFT END DETAIL GLU LAM TIMBER SECTION 50 X 50 LAP JOINT

230TH BRICK WALL

CLEAT AND BOLTS

CONCRETE GRATING 20TH PLASTER WITH JOINERY DETAIL B WATER PROOFING

10TH PLASTER

115TH BRICK WALL 75TH PCC BASE D.P.C

GLU LAM TIMBER SECTION 50 X 50

JOINERY DETAIL C

JOINERY DETAIL C

35 TH TRIMEX FLOORING 150TH PCC FLOORING

GLU LAM TIMBER SECTION 50 X 50 BOLTS STEEL SECTION

SAND FILL

A JOINERY DETAIL B

COLUMN FOOTING

STONE 25TH

RAILING RETAINING WALL FOOTING 35 TH TRIMEX FLOORING STORM WATER DRAIN 20TH FLOOR FINISH 150TH PCC FLOORING BRICK MASONRY115TH RAFT SLAB 300TH CHANNEL DETAIL SAND FILL

RAMPED EARTH

GLU LAM TIMBER SECTION 50 X 50

BOLTS

JOINERY DETAIL B WATER PROOFING LAYER 35 TH TRIMEX FLOORING COLUMN FOOTING 150TH PCC FLOORING P.C.C 100TH

STEEL SECTION

SANDFOOTING FILL RETAINING WALL JOINERY DETAIL A COLUMN FOOTING

RAFT SLAB 300TH RETAINING WALL FOOTING WATER PROOFING LAYER P.C.C 100TH RAFT SLAB 300TH

20TH TERRAZZO FLOORING

BRICK MASONRY FOOTING

WATER PROOFING LAYER P.C.C 100TH

GLU LAM TIMBER SECTION 50 X 50 JOINERY DETAIL A 20TH FLOOR FINISH 20TH MORTAR P.C.C 300TH RAMPED EARTH

20TH MORTAR

100TH P.C.C BASE

75TH PCC BASE

SWEET S GRAV 1:4 PLAST WATER PROOF MEMBRANE 1:6 PLASTER 100TH PCC BAS

RAFT FOUNDATION DETAIL GLUED LAM SLITS GLU LAM SLITS RAFT FOUNDATION DETAIL FOUNDATION DETAIL EXTERNALRAFT FLOORING DETAIL

WINDOW ELEVATIONS BOUNDARY WALL DETAIL

15TH PLASTER 75TH PCC IN15TH SLOPE PLASTER

230 TH BRICK

PRECAST RCC SHADE

15TH PLASTER 75TH PCC IN SLOPE

A'

75TH PCC IN SLOPE

STANDARD VENTILATORVENTILATORFLY ASH BRICK 25TH FLOORING

200TH BROKEN BRICKBATS PLAN 25TH FLOORING 25TH WATER PROOFING

25TH FLOORING 200TH BROKEN BRICKBATS 300TH SLAB 25TH WATER PROOFING 200TH BROKEN BRICKBATS 25TH WATER PROOFING

COLUMN FOOTING

300TH SLAB

300TH SLAB

RETAINING WALL FOOTING

SHAFT END DETAIL SHAFT END DETAIL ELEVATION

BOLTS

STEEL SECTION

CLEAT AND BOLTS

JOINERY DETAIL B

GLU LAM TIMBER SECTION 50 X 50

GLU LAM TIMBER SECTION 50 X 50

JOINERY DETAIL B

JOINERY DETAIL B

2220

2220

V1

V2

WINDOW ELEVATIONS

STEEL SECTION

GLU LAM TIMBER SECTION 50 X 50

W7

730

SHAFT END DETAIL 1500 1460

730

730

730

1000 960

1000 960

STEEL SECTION

A

JOINERY DETAIL A

GLU LAM TIMBER SECTION 50 X 50 BOLTS

STEEL SECTION GLU LAM TIMBER SECTION 50 X 50

BOLTS

STEEL SECTION

GLU LAM TIMBER SECTION 50 X 50 JOINERY DETAIL A 20TH FLOOR FINISH JOINERY DETAIL B 20THJOINERY MORTARDETAIL A P.C.C 300TH RAMPED EARTH

GLU LAM TIMBER SECTION 50 X 50

BOLTS

JOINERY DETAIL A 20TH FLOOR FINISH 20TH MORTAR P.C.C 300TH RAMPED JOINERY EARTH DETAIL A

GLU LAM TIMBER SECTION 50 X 50 JOINERY DETAIL A1000

LIFT PIT DETAIL 960

A

35T 150 SWEE GR 1:4 PLA WATER PRO MEMBRANE 1:6 PLAS 100TH PCC SAB

STEEL SECTION

GLU LAM SLITS 1460

W

BOLTS

WINDOW ELEVATIONS + SHUTTER TYPES

1500

A

BOLTS

GLU LAM TIMBER SECTION 50 X 50 JOINERY DETAIL B GLU LAM SLITS

W12

SECTIO

JOINERY DETAIL C

920

920 320 550

W6

50

1220

1220 320

320

W10

W9

GLU LAM TIMBER SECTION 50 X 50

GLU LAM TIMBER SECTION 50 X 50

RAILING 20TH FLOOR FINISH BRICK MASONRY115TH

RAILING 20TH FLOOR FINISH BRICK MASONRY115TH

230TH BRICK WALL 12TH PLASTER

W11

GLU LAM TIMBER SECTION 50 X 50

LAP JOINT

1560

50 960

1560 2060

2060

480

300TH SLAB

JOINERY DETAIL C

SECTION

RAILING 1200 20TH 1160 FLOOR FINISH BRICK MASONRY115TH

600 560

25TH FLOORING 200TH BROKEN BRICKBATS 25TH WATER PROOFING

CLEAT AND BOLTS

JOINERY DETAIL C SELF SHADING BRICK WALL JOINERY DETAIL B

1000 960 480

550

1000 960

1

LAP JOINT

WINDOW SHADES DETAIL

JOINERY DETAIL C

560

710 800 760

W5

W4

W3 VENTILATOR

750

ELEVATION JOINERY DETAIL B

560

WALL

JOINERY DETAIL C

960

W2B SHADING

JOINERY DETAIL B

920

15TH PLASTER 75TH PCC IN SLOPE

W1 W2A AUDITORIUM SELF

1260

480

1 3000 2960

JOINERY DETAIL C

1220

1220

1220

1220

500

RAFT FOUNDATION DETAIL ELEVATION

SHAFT END DETAIL

JOINERY DETAIL B

1460

1260

960

480

GLU LAM TIMBER SECTION 50 X 50

1500

460

960

710 355 355

SECTION

500

1000

750 480

960

480

960

380

960

380

1000 960 480

CLEAT AND BOLTS

GLU LAM TIMBER SECTION 50 X 50

COURSE 2

2060

1000 960

LAP JOINT

SHAFT END DETAIL

300TH SOUND PROOFING 480

GLU LAM TIMBER SECTION 50 X 50

1460

RAFT FOUNDATION DETAIL

800 760

230TH BRICK WALL 12TH PLASTER

230TH BRICK WALL 12TH PLASTER

A

COURSE 2

230TH BRICK WALL 12TH PLASTER

COURSE 1

RAFT SLAB 300TH WATER PROOFING LAYER P.C.C 100TH

A

COURSE 1

920

600

AERO CONCRETE BLOCKS SAND FILL

1260

A' 500 400

VENTILATOR

35 TH TRIMEX FLOORING 150TH PCC FLOORING

LIF 35T

SWEET SOI 10 GRAVE 1:4 PLASTER RA EA WATER PROOFING MEMBRANE 1:6 PLASTER 100TH PCC BASE

1000 960


SWEET SOIL

230TH BRICK WALL

GEOTEXTILE

RUBBER GASKET 75TH RCC SHADING DEVICE

DRAINAGE PIPES

20 TH PLASTER 230TH BRICK WALL

230 TH BRICK WALL

CONCRETE GRATING 20TH PLASTER WITH WATER PROOFING

SECTION C 6TH GLASS PANE SECTION A 50MM LONG SCREW SECTION B

10TH PLASTER

RUBBER GASKET

115TH BRICK WALL 75TH PCC BASE

PRECAST GRAVEL

D.P.C

RCC SHADES

WATER PROOFING

STORM WATER DRAIN DETAIL

STONE 25TH

JAMB DETAIL

STORM WATER DRAIN CHANNEL DETAIL

RAMPED EARTH

COURTYARD DETAIL

20TH PLASTER 75TH RCC SHADING DEVICE SECTION A SECTION B

PLAN RUBBER GASKET

SECTION C 6TH GLASS PANE SECTION A 50MM LONG SCREW SECTION B

RUBBER GASKET 75TH RCC SHADING DEVICE

GRAVEL

20 TH PLASTER 230TH BRICK WALL

BRICK WALL

GEOTEXTILE 6TH GLASS PANE RUBBER GASKET

PRECAST RCC SHADES

OUTSIDE

10TH MORTAR

SECTION E

100TH P.C.C BASE

SLIDING WINDOW JAMB DETAIL

100TH PCC BASE

STONE 75TH PCC BASE

BOUNDARY WALL DETAIL RUBBER GASKET

6TH GLASS PANE RUBBER GASKET

INSIDE

OUTSIDE

SECTION D

15TH GRANITE STONE 10TH MORTAR

480

480

480

ELEVATION

A' 480

W2A

W2B

500

1460

1260

1260 920

920

TREAD - 300 RISER - 75

PARGOLA DETAIL

SECTION

50 960

2220

A'

1000

PLAN FOLDABLE DOOR 300DP LINTEL

300

D2D

D2C

PROJECT : 3000 2960

SOCIO - CULTURAL AND RECREATIO CENTER.

500

2000

2OTH FLOOR FINISH 20TH MORTAR

1050

2500

1000

2980

200

2380

1000

R. VIRAJITHA III YEAR - A, B.ARCH USAP, GGSIPU

CHECKED BY

DWG. NO D - 101

GREEN SPACE DETAIL

D3B

D3

R1

230TH BRICK WALL

DOOR ELEVATIONS DOOR ELEVATIONS + SHUTTER TYPES

PLAN

NORTH POIN

100TH P.C.C FOOTING

PLAN

600

DOWN

TREAD - 300 RISER - 150

BRICK MASONRY STEPS TIE BEAM

SECTION

SECTION

D3A GREEN DETAIL STEPPED

TITLE : SECTIONAL DETAILS

50

230TH BRICK WALL DRAIN CHANNEL

300

300

1000 300

300

TREAD - 300 D2B RISER - 75

TREAD - 300 RISER - 75

A' 50

200

50 1730

2380

200

1730

2380

2380

2380

1730

200 1000

600

D2A

DOWN

DOWN

A

750 710

A'

1000 960

200

600 A'

300

D1B

100TH PCC RAMPED EARTH

DOWN

230TH BRICK WALL

50

2380

TREAD - 300 RISER - 150 DOWN

1050

1000 960

960

50

LIFT FOOTING 35TH WATERPROOFING

TREAD - 300 RISER - 150

RCC BEAM 150 X 300

SECTION

TREAD - 300 RISER - 75

PLAN 1000

1000 960

PLAN

600

V2

1050 PLINTH PROTECTION DETAIL WINDOW ELEVATIONS + SHUTTER TYPES

730

35TH TRIMEX FLOORING 150TH PCC

D1A

00

560

550

550 960

600

TREAD - 300 RISER - 150 DOWN

1050

1050

V1 A

1460 730

150

2380

1220

1220

320

320 2380

W12

1500

730

SAND FILL

TREAD - 300 RISER - 150 DOWN

A'

PARGOLA DETAIL

1460

20 TH PLASTER 230TH BRICK WALL

TREAD - 300 RISER - 75

PLINTH PROTECTION DETAIL

1500

RUBBER GASKET

RCC BEAM 300 X 400

RAMPED EARTH

LIFT FOOTING 35TH WATERPROOFING 100TH PCC RAMPED EARTH

LIFT PIT DETAIL

RUBBER GASKET

DOWN

LIFT PIT DETAIL SECTION

RCC BEAM 300 X 400

300TH RETAINING WALL

DOWN

W11

W10 W9 LIFT PIT DETAIL

A'

SELF SHADING BRICK WALLRCC BEAM 150 X 300

DOWN

TION

W8 BEAM

SECTION

PLAN

BEAM APS

115TH BRICK MASONRY 100TH PCC BASE TREAD - 300 215TH PCC BASE RISER - 75 A

BEAM RCC INTERNAL

A'

W7

ELEVATION

AUDITORIUM SELF SHADING WALL STONE 25TH

35TH TRIMEX FLOORING 150TH PCC

CILL DETAIL SAND FILL

EARTH

SECTION

2220

2060

2060

ELEVATION

SECTION E

RCC PERIPHERAL BEAM RCC INTERNAL BEAM RCC PERIPHERAL

PLAN

OUTSIDE

SAND FILL

100TH PCC

1200 1160

600 560

480

SECTION D

10TH MORTAR

PRECAST RCC SHADES RAMPED

480

6TH GLASS PANE RUBBER GASKET

LIFT FOOTING 35TH WATERPROOFING

75TH RCC SHADING DEVICE

COURSE 230TH WALL 2 20TH FLOORING 20TH MORTAR

RUBBER GASKET

INSIDE 15TH GRANITE STONE

PARGOLA DETAILSLIDING WINDOW

W SHADES DETAIL

A

W6

1560

1560

PRECAST RCC

35TH TRIMEX FLOORING 150TH PCC SHADES

50

DASH FASTNER 15TH GRANITE STONE

SECTION

A

1000 960

20TH PLASTER 75TH RCC SHADING DEVICE SECTION A SECTION B

1000 960

RAISED PLANTER DETAIL

560

JAMB DETAIL

800 760

300TH SOUND PROOFING A

710

COURSE 1

PLINTH PROTECTION DE RAISED PLANTER DETAIL RAISED PLANTER DETAIL PLINTH PROTECTION DETAIL

W5

W4

W3

RCC BEAM 150 X 300

750

IT DETAIL

1460

320

RUBBER GASKET

20 TH PLASTER 230TH BRICK WALL

PRECAST RCC SHADES

COURSE 2

SECTION C 6TH GLASS PANE SECTION A 50MM LONG SCREW SECTION B

75TH RCC SHADING DEVICE

750 710

1500

2960

A

RCC BEAM 300 X 400

230 TH BRICK WALL

ET SOIL RAVEL ASTER OOFING E STER BASE

1460

2060

1260

1220

1220

1220

920

1220

SECTION

WINDOW SHADES DETAIL

730

DRAIN CHANNEL

1:4 PLASTER WATER PROOFING MEMBRANE 3000 1:6 PLASTER 100TH PCC BASE

1500

920

960

960

960

SECTION

WINDOW SHADES BOX DETAIL WINDOW DETAIL

N

230TH BRICK WALL

STANDARD FLY ASH BRICK

1:4 PLASTER GRAVEL WATER PROOFING MEMBRANE 1:6 PLASTER

RAMPED EARTH

COURSE 1

RUBBER GASKET

D - 300 - 150

480

230TH BRICK WALL

300TH RETAINING WALL DRAIN CHANNEL

100TH PCC BASE

PLAN

W1

SWEET SOIL

GRAVEL SWEET SOIL

215TH PCC BASE 500 AERO CONCRETE BLOCKS 460

960

WATER WATER PROOFING

RAMPED EARTH

115TH BRICK MASONRY 100TH PCC BASE

CILL DETAIL 1000

710 355 355 400

380

960

380

480

PRECAST RCC SHADES 500 750

1000 960

A'

STONE 25TH

600

1000 960

800 760

SECTION E

SLIDING WINDOW RCC PERIPHERAL BEAM RCC INTERNAL BEAM

ELEVATION

CILL DETAIL

PRECAST RCC SHADES

GRAVEL GRAVEL

COURTYARD DETAIL

DASH FASTNER 15TH GRANITE STONE

PRECAST RCC SHADES

25TH

PROOFING 115TH BRICK MASONRY 100TH PCC BASE COURTYARD DETAIL BEAM APS DETAIL COURTYARD DETAIL EXTERNAL FLOORING 215TH PCC BASE

20TH PLASTER 75TH RCC SHADING DEVICE SECTION A SECTION B

PLAN

230TH WALL 20TH FLOORING 20TH MORTAR

20TH MORTAR

SECTION D

15TH GRANITE STONE

DRAINAGE PIPES PIPES

20TH TERRAZZO FLOORING

BRICK MASONRY FOOTING INSIDE

PRECAST RCC SHADES

RAISED PLANTER DETAIL

DRAINAGE

RUBBER GASKET

DRAIN CHANNEL

1:4 PLASTER OOFING MEMBRANE 1:6 PLASTER

GEOTEXTILE

A'

230 TH 230TH BRICK WALL

SWEET SOIL

SWEET SOIL

SWEET SOIL

DASH FASTNER 15TH GRANITE STONE

300DP LINTEL FOLDABLE DOOR

20TH PLASTER 75TH RCC SHADING DEVICE SECTION A SECTION B

SECTION C 6TH GLASS PANE SECTION A 50MM LONG SCREW SECTION B

20TH PLASTER SECTION H 20 TH PLASTER 230TH BRICK WALL

150DEPTH RCC LINTEL 80 BY 20 TIMBER STUD 50MM LONG SCREW

SECTION I (CLIP) RUBBER GASKET 8 TH GLASS PANE

DASH FASTNER 80 BY 20 TIMBER STUD

RUBBER GASKET

SECTION F SECTION G

PROJECT :

20 TH PLASTER 230TH BRICK WALL

SECTION I (CLIP) RUBBER GASKET

20 TH PLASTER 230TH BRICK WALL


TWISTED COLUMN

STEEL CONNECTIONS IN COLUMN

WORKSTATION DESIGN (1st Year)

ONEISTOX PAVILLION DESIGN


MODEL MAKING

CAVITY WALL

SELF SHADING WALL

BRIDGE DESIGN ( BRIDGE THE GAP )

EXTERNAL WALL SECTIONAL MODEL

GUGGENHEIM MUSEUM


Brihadeshwara Temple, Thanjavur

Kapaleeswarar Temple, Madr

Udai Sagar Lake, Udaipur

Kumbhalgarh Fort, Udaipur

Brihadeshwara Temple, Thanja


PHOTOGRAPHY

Haveli, Ramgarh, Rajasthan Lodhi Garden, Delhi

ras

avur

Beautiful Struggle

Shattered

Metal Green

Dramatic Sky


PATTERN DESIGN & COLOR EXPLORATION

PRODUCT DESIGN

PRODUCT MOCKUPS USING MY PATTERN & SURFACE ILLUSTRATIONS

A3 SIZE HANDMADE PORTFOLIO


ARTS & GRAPHICS

WINDOW ILLUSTRATION

NEIGHBORHOOD SPIDER

KAALI PEELI

Hills & Beaches Experience life in its true form.

LOGO DESIGN

LAND-WATER-SKY ESCHER PATTERN

OWL ESCHER METAMORPHOSIS

KEYS TO CREATE



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.