Feeding the planet, energy for life From the purest sources.
Vitali Group A partner for The Hungarian Pavilion At Expo 2015
1
1
Vitali Group
Integrated process: Event management, construction construction, relocation
Vitali’s group is one of the most important operator in the management and the construction sector. It develops property areas, designs and builds office buildings, shopping centers, warehouses for logistics and structures for top events, trade fairs and exhibitions. Vitali group is able to operate in the whole Italian and European territory and it is a perfect partner for international designer and architects. Its strenght is the ability to act as a single interlocutor able to answer to each need of costumers.
Vitali combines a cultural wealth that crosses this family for three generations with the certainty of excellent acquired technics. Vitali is a leader of the Italian Real Estate Market, introducing the most advanced professional standards and an innovative business model. Thanks to the whole process, simplified in “production-project-execution”, the group now operates as a International Contractor, and is fully qualified and supported by a structure that allows the execution of works, from the concept to the final delivery of the product and the specific and innovative adoptive relocation. Projecting/co-projecting; • Engineering; • Project and construction management; • Construction; • Disassembly; • Control and management; • Facility management; • Relocation.
2
Construction partner
Vitali is a leading international partner of Public Administrations and Multinational Companies for the construction of structures for top events, trade fairs and international exhibitions. From the initial idea to the design, from the implementation to the management and also to the disassembly, in full compliance with the timing and with a careful monitoring of the costs, providing integrated and customized solutions. Thanks to its experience, Vitali is able to design, build and manage temporary or permanent facilities for exhibitions or sporting and social events, combining a high constructive capacity with the flexibility and the know-how of a dynamic and evolved company, always attentive to the needs of its customers.
3
2
Reference
Sports infrastructures, construction for social events, fairs and exhibitions.
PALAHOCKEY Olimpic Games 2006 - Stadio Arata Isozaki - Tokio
4
5
2
Reference
In a permanent two floors building of 2,500 sqm, extremely flexible and functional, characterized by elegant interiors and by tricks of light, it was created a special exhibition space dedicated to new technologies proposed by the Redmond company. Microsoft, in these spaces, offers the possibility to its partners to touch the new products in advance. PERMANENT EXHIBITION Microsoft Flores & Prats Architect - Barcelona
6
7
2
Reference
We realize pavilions for exhibitions and roadshows, organized by the most important brands in the world and with great affluence of public. Our experience makes us a reliable partner, able to give concrete form to the ideas, even the more curious. A full range of possibilities for our clients. EXHIBITION HALLS
8
9
3
EXPO
It’s the most important project of Lombardy’s roads network, which connects the exhibition area to the main roads (A4 and A8) and the secondary roads. The intervention aims to create a full integration between the exhibition area of Expo 2015 and the territory guaranteeing an appropriate site accessibility. EXPO 2015 - Door of Expo Citterio & Viel and partner - Milano
10
11
3
EXPO
CLIENT: Infrastrutture Lombarde Designer: Pro Iter; Antonio Citterio Patricia Viel and Partners WORK PERIOD: about 2 years EXPO 2015 - Door of Expo Citterio & Viel and partner - Milano
12
13
4 For Vitali Group respect for the environment is the philosophy at the basis of every iniziative. For this purpose, the Group has set out its own construction guidelines, arising from a constant search for eco-sustainable and technologically advanced solutions and for carrying out building compatible with certified environmental quality through use of environmentally friendly materials, solar and geothermal energy, district heating, etc. ... (able to ensure low energy consumption and high living standards). The main certification for Vitali are: LEED (Leadership in Energy and Environmental Design); BREEAM (Building Research Establishment Environmental Assessment Method) and Carbon Neutral.
14
Certification
5
Hungary and EXPO
“Who would want to live on a planet where everything has been dirtied, where everything is drying out and drinking water is dwindling due to climate changes?”. The challenge launched by the Expo 2015 is “Feeding the Planet”. And this challenge was fully embraced by the country that Dante Alighieri defined as “The crown of that land that the Danube crosses” that dedicated its pavilion to a key theme “From the purest sources”. 13.06.2013 Géza Szócs Commissioner General of the Hungarian Pavilion
UNGHERIA Thermal spring - mineral terrace Egerszalok - Hungary
16
17
Organization & General Planning
18
19
6 ORGANIZATION & CONCEPT
PROJECT & MANAGEMENT
CONSTRUCTION & MANAGEMENT
Expo 2015 participation fee + fees
Final project design
Temporary works
Country Expo Committee management fee
Executive project design
Construction Management
Concept draft
Energy design
Preliminary project design
Construction project design
Milan operational headquarters identification and outfitting
Design Supervision
Expo 2015 pavilion construction Civil Works Foundations Structure Enclosure
Accueil
Project Management Specialist on-site analyses Safety coordination project design Environmental Cronoprogram
Exterior finishing Flooring Landscaping Urban furnishing Systems Mechanical Electricity and computer networks Fire prevention and security Plumbing
FIT OUT MANAGEMENTS
Project Interior Design Engineering Security Management Furnishings Furniture Video Lighting Installations
FACILITY & BUILDING MANAGEMENT
Building management during Expo 2015 period - 6 months Facility management and maintenance Utilities Security Marketing, events, advertising, promotion, press room, catering, etc. Cleaning Staff, hostesses, translators, administration
Organization and general planning
DISPOSAL & DEMOLITION
RELOCATION & ADAPTATION
Tear down and demolition works
Identification of potential pavilion relocation and repositioning
Demolition and safety work design
hip 1 Innovation Campus
Exterior works and finishing tear down
hip 2 Italy
Tear down System tear down
hip 3 Hungary hip 4 Europe
Structure tear down Foundation demolition Area reclamation
Utility hook-up Mechanical Electricity and computer networks Fire prevention and security Plumbing
20
21
6
Project and crono road map
Timing Feb 2016
RELOCATION BUDGET
DISPOSAL & DEMOLITION
Jan 2016 Dec 2015 Nov 2015
Relocation and innovation
Oct 2015 Sep 2015
hip 1 Innovation Campus
FACILITY & BUILDING MANAGEMENT
Jul 2015
hip 2 Italy
EXECUTION BUDGET
Aug 2015
Apr 2015 Mar 2015 Feb 2015 Jan 2015 Dec 2014 Nov 2014 Oct 2014 Sep 2014 Aug 2014 Jul 2014 Jun 2014 May 2014
ORGANIZATION BUDGET
Jun 2015 May 2015
FIT OUT MANAGEMENTS
CONSTRUCTION & MANAGEMENT
hip 2 Italia
PROJECT & MANAGEMENT
Feb 2014 Jan 2014
hip 3 Ungheria hip 4 Europa
ORGANIZATION & CONCEPT 1
2
Phase
22
RELOCATION BUDGET
hip 1 Innovation Campus
Mar 2014
Nov 2013
hip 4 Europe
Relocation and innovation
Apr 2014
Dec 2013
hip 3 Hungary
3
4
5
6
Phase
23
Work quality is the result of expert planning
24
25
7 Organization & concept
Hungarian designer Hungary Expo Committee
Project design and management phases
PROJECT & MANAGEMENT
Final design
Design architect recruitment; Preliminary context analysis;
Final architectural, structural and system design;
Main Expo theme "Feeding the planet, Energy for life";
Geological, geotechnical, hydrological, hydraulic, seismic reports;
Hungarian designer Vitali SpA
Height and distance surveys;
Analysis of the identified Expo theme (water and research);
Environmental feasibility study;
Design concept identification
General specialty design (energy savings, certifications, noise impact);
Overall budget;
Descriptive and performance regulations for technical elements;
Overall budget item identification;
Forecasted bill of quantities; Budget;
Preliminary design
Hungarian designer Vitali SpA
Special contract specifications; Fire inspection application;
Identification of the design phases to be implemented and their logical sequence as well as scheduling;
Preparation of the documents required to obtain any licenses/authorisations from other boards;
Identification of the design levels and graphs and descriptions to be drafted;
Schedule check and update;
Recruitment of the structural designer to draft the feasibility plan Identification of the general goals to be achieved and strategies to achieve them; Identification of needs and demands to be met; Identification of the rules and technical regulations to be observed; Identification of legal restrictions concerning the work context; Job profile identification; Identification of the technical requirements to be met; Identification of the financial ceilings to be met and cost estimates and funding sources; Identification of the implementation system to be used; Preliminary geological and hydro geological surveys; Initial indications and draft of the safety plans;
Expense forecast and consistency check with preliminary budget; Special standards and performance plan; Draft of design documents that set the most significant characteristics according to the above analysis; Preliminary schedule;
Executive design
Hungarian designer Vitali SpA
Executive design that includes engineering of all work and, therefore, defines all and every architectural, structural and system detail to be implemented ; Executive design of architectural, structural and system finishes and environmental reclamation and improvement; Specialty design (energy savings, certifications, noise impact); Work and piece maintenance plans Safety and coordination plans in the design phase; Final bill of quantities and budget Scheduling Unit pricelist and analysis; Percent labour incidence for the various work or labour categories; Contract and special contract standard outline
Energy design for environmental certification
Vitali SpA
System and enclosure energy design; Architectural and system design coordination; Business plan draft for provisioning and implementation according to the certification procedure;
26
27
7 Design supervision
Hungarian designer
Architectural, structural and system design supervision
Pavilion construction
Design phase identification Vitali SpA
Safety action plans; Material provisioning;
Project management (general progress coordination)
Vitali SpA
Construction and structural works System installation
Overall design plan draft and management;
Interior finishes
Overall action plan draft and management;
Outfitting
Budget and scheduling; Work site assistance and regulations;
FACILITY MANAGEMENT & GESTIONE BUILDING
Vitali SpA
Safety coordination during the design phase; Engineering coordination (Plan and Schedule);
DISPOSAL & DEMOLITION
Architectural, system and structural design coordination;
Pavilion tear down and demolition
Vitali SpA
Design and standard specifications; Coordination with the design supervisor;
General management and identification of the work phases
Design coordination for environmental certification;
Nomination of job positions and professionals
Design phase validation.
Foundation demolition Structure tear down Finishing tear down
CONSTRUCTION & MANAGEMENT
Construction management
Vitali SpA
System tear down Outfitting and equipment tear down
Work Management;
Area reclamation
Work site business plans;
Identification of possible pavilion relocation sites
Provisioning plans; Purchasing department assistance to manage provisioning
RELOCATION
Vitali SpA
Safety coordination and plan during the execution phase; Executive temporary works plan; Work accounting (Initial budget, Bill of quantities, Deviation control and analysis); Quality management; Purchaser relations management; Coordination system management; Construction phase coordination for environmental certification; Budget and scheduling; Inspection assistance.
28
29
Hungary in Italy, Together to build a concept and enhance a project
30
31
8 Position
Technical job organisational chart*
HU
IT
Purchaser Architectural designer Structural designer Electrical and mechanical system designer Sound designer Plumbing designer Fire inspection designer Landscaper Specialist surveys (geological, environmental, etc.) Safety manager during the design and construction phases Work Director Work Manager General Contractor, Project and Construction Management Work inspectors Design supervision Interior Designer Work management committee
Technical job organisational chart *Nominations according Italian Public Works Regulation
32
33
Registered Office Via Alberto Da Giussano, 15 20145 Milano Tel.: +39 02 74281998 Fax : +39 02 45490814
Administrative Office Via Bisone, 7 Cisano Bergamasco – Bergamo Tel. : +39 035 783107 Fax. : +39 035 783345
Business office via Lombardia, 2A 20068 Peschiera Borromeo Tel. +39 02-74281998 Fax +39 02-45490814