Expo 2015 USA Pavilion

Page 1


Feeding the planet, energy for life From the purest sources.

Vitali Group A partner for The USA Pavilion At Expo 2015

1


1

Vitali Group

Integrated process: Event management, construction construction, relocation

Vitali’s group is one of the most important operator in the management and the construction sector. It develops property areas, designs and builds office buildings, shopping centers, warehouses for logistics and structures for top events, trade fairs and exhibitions. Vitali group is able to operate in the whole Italian and European territory and it is a perfect partner for international designer and architects. Its strenght is the ability to act as a single interlocutor able to answer to each need of costumers.

Vitali combines a cultural wealth that crosses this family for three generations with the certainty of excellent acquired technics. Vitali is a leader of the Italian Real Estate Market, introducing the most advanced professional standards and an innovative business model. Thanks to the whole process, simplified in “production-project-execution”, the group now operates as a International Contractor, and is fully qualified and supported by a structure that allows the execution of works, from the concept to the final delivery of the product and the specific and innovative adoptive relocation. Projecting/co-projecting; • Construction management; • Construction; • Disassembly; • Control and management; • Facility management; • Relocation.

2

Construction partner

Vitali is a leading international partner of Public Administrations and Multinational Companies for the construction of structures for top events, trade fairs and international exhibitions. From the initial idea to the design, from the implementation to the management and also to the disassembly, in full compliance with the timing and with a careful monitoring of the costs, providing integrated and customized solutions. Thanks to its experience, Vitali is able to design, build and manage temporary or permanent facilities for exhibitions or sporting and social events, combining a high constructive capacity with the flexibility and the know-how of a dynamic and evolved company, always attentive to the needs of its customers.

3


2

Reference

Sports infrastructures, construction for social events, fairs and exhibitions.

PALAHOCKEY Olimpic Games 2006 - Stadio Arata Isozaki - Tokio

4

5


2

Reference

LEED gold certified

In a permanent two floors building of 2,500 sqm, extremely flexible and functional, characterized by elegant interiors and by tricks of light, it was created a special exhibition space dedicated to new technologies proposed by the Redmond company. Microsoft, in these spaces, offers the possibility to its partners to touch the new products in advance. PERMANENT EXHIBITION Microsoft Flores & Prats Architect - Barcelona

6

7


2

Reference

We realize pavilions for exhibitions and roadshows, organized by the most important brands in the world and with great affluence of public. Our experience makes us a reliable partner, able to give concrete form to the ideas, even the more curious. A full range of possibilities for our clients. EXHIBITION HALLS

8

9


3

EXPO

It’s the most important project of Lombardy’s roads network, which connects the exhibition area to the main roads (A4 and A8) and the secondary roads. The intervention aims to create a full integration between the exhibition area of Expo 2015 and the territory guaranteeing an appropriate site accessibility. EXPO 2015 - Door of Expo Citterio & Viel and partner - Milano

10

11


3

EXPO

CLIENT: Infrastrutture Lombarde Designer: Pro Iter; Antonio Citterio Patricia Viel and Partners WORK PERIOD: about 2 years EXPO 2015 - Door of Expo Citterio & Viel and partner - Milano

12

13


4 For Vitali Group respect for the environment is the philosophy at the basis of every iniziative. For this purpose, the Group has set out its own construction guidelines, arising from a constant search for eco-sustainable and technologically advanced solutions and for carrying out building compatible with certified environmental quality through use of environmentally friendly materials, solar and geothermal energy, district heating, etc. ... (able to ensure low energy consumption and high living standards). The main certification for Vitali are: LEED (Leadership in Energy and Environmental Design); BREEAM (Building Research Establishment Environmental Assessment Method) and Carbon Neutral.

14

Certification


5

USA and EXPO

Food 2.0: Sustainable, Innovative, Healthful, Entrepreneurial and Delicious

USA

16

A lightly structured and welcoming barn, inviting visitors to embark on a journey in the world of sustainable food. Diversity and responsibility are the pillars on which the presence of the United States of America at Expo Milano 2015 will rest. These elements will be enhanced both in the technological equipment of the pavilion and through events, conventions and happenings which will enliven the exhibition area. Visitors will be engaged in an itinerary “from farm to table” where video installations and vertical and roof gardens – representing the 50 U.S. states and the White House – will lead them to discover the rich cultural, scientific and culinary tapestry which forms the United States of America.

17


Organization & General Planning

18

19


6 ORGANIZATION & CONCEPT

PROJECT & MANAGEMENT

CONSTRUCTION & MANAGEMENT

Expo 2015 participation fee + fees

Final project design

Temporary works

Country Expo Committee management fee

Executive project design

Construction Management

Concept draft

Energy design

Preliminary project design

Construction project design

Milan operational headquarters identification and outfitting

Design Supervision

Expo 2015 pavilion construction Civil Works Foundations Structure Enclosure

Accueil

Project Management Specialist on-site analyses Safety coordination project design Environmental Cronoprogram

Exterior finishing Flooring Landscaping Urban furnishing Systems Mechanical Electricity and computer networks Fire prevention and security Plumbing

FIT OUT MANAGEMENTS

Project Interior Design Engineering Security Management Furnishings Furniture Video Lighting Installations

FACILITY & BUILDING MANAGEMENT

Building management during Expo 2015 period - 6 months Facility management and maintenance Utilities Security Marketing, events, advertising, promotion, press room, catering, etc. Cleaning Staff, hostesses, translators, administration

Organization and general planning

DISPOSAL & DEMOLITION

RELOCATION & ADAPTATION

Tear down and demolition works

Identification of potential pavilion relocation and repositioning

Demolition and safety work design

hip 1 Innovation Campus

Exterior works and finishing tear down

hip 2 Italy

Tear down System tear down

hip 3 USA hip 4 Europe

Structure tear down Foundation demolition Area reclamation

Utility hook-up Mechanical Electricity and computer networks Fire prevention and security Plumbing

20

21


6

Project and crono road map

Timing Feb 2016

RELOCATION BUDGET

DISPOSAL & DEMOLITION

Jan 2016 Dec 2015 Nov 2015

Relocation and innovation

Oct 2015 Sep 2015

hip 1 Innovation Campus

FACILITY & BUILDING MANAGEMENT

Jul 2015

hip 2 Italy

EXECUTION BUDGET

Aug 2015

Apr 2015 Mar 2015 Feb 2015 Jan 2015 Dec 2014 Nov 2014 Oct 2014 Sep 2014 Aug 2014 Jul 2014 Jun 2014 May 2014

ORGANIZATION BUDGET

Jun 2015 May 2015

FIT OUT MANAGEMENTS

CONSTRUCTION & MANAGEMENT

hip 2 Italia

PROJECT & MANAGEMENT

Feb 2014 Jan 2014

hip 3 Ungheria hip 4 Europa

ORGANIZATION & CONCEPT 1

2

Phase

22

RELOCATION BUDGET

hip 1 Innovation Campus

Mar 2014

Nov 2013

hip 4 Europe

Relocation and innovation

Apr 2014

Dec 2013

hip 3 USA

3

4

5

6

Phase

23


Work quality is the result of expert planning

24

25


7

Agreement hypothesis Organization & concept

USA designer USA Expo Committee

Project design and management phases

PROJECT & MANAGEMENT

Final design

Design architect recruitment; Preliminary context analysis;

Final architectural, structural and system design;

Main Expo theme "Feeding the planet, Energy for life";

Geological, geotechnical, hydrological, hydraulic, seismic reports;

Analysis of the identified Expo theme (water and research);

Height and distance surveys;

Design concept identification

Environmental feasibility study;

Overall budget;

General specialty design (energy savings, certifications, noise impact);

Overall budget item identification;

Descriptive and performance regulations for technical elements;

USA designer Vitali SpA

Forecasted bill of quantities; Budget;

Preliminary design

USA designer Vitali SpA

Special contract specifications; Fire inspection application;

Identification of the design phases to be implemented and their logical sequence as well as scheduling;

Preparation of the documents required to obtain any licenses/authorisations from other boards;

Identification of the design levels and graphs and descriptions to be drafted;

Schedule check and update;

Recruitment of the structural designer to draft the feasibility plan Identification of the general goals to be achieved and strategies to achieve them; Identification of needs and demands to be met; Identification of the rules and technical regulations to be observed; Identification of legal restrictions concerning the work context; Job profile identification; Identification of the technical requirements to be met; Identification of the financial ceilings to be met and cost estimates and funding sources; Identification of the implementation system to be used; Preliminary geological and hydro geological surveys; Initial indications and draft of the safety plans;

Expense forecast and consistency check with preliminary budget; Special standards and performance plan; Draft of design documents that set the most significant characteristics according to the above analysis; Preliminary schedule;

Executive design

USA designer Vitali SpA

Executive design that includes engineering of all work and, therefore, defines all and every architectural, structural and system detail to be implemented ; Executive design of architectural, structural and system finishes and environmental reclamation and improvement; Specialty design (energy savings, certifications, noise impact); Work and piece maintenance plans Safety and coordination plans in the design phase; Final bill of quantities and budget Scheduling Unit pricelist and analysis; Percent labour incidence for the various work or labour categories; Contract and special contract standard outline

Energy design for environmental certification

Vitali SpA

System and enclosure energy design; Architectural and system design coordination; Business plan draft for provisioning and implementation according to the certification procedure;

26

27


7

Agreement hypothesis Design supervision

USA designer

Architectural, structural and system design supervision

Pavilion construction

Design phase identification Vitali SpA

Safety action plans; Material provisioning;

Project management (general progress coordination)

Vitali SpA

Construction and structural works System installation

Overall design plan draft and management;

Interior finishes

Overall action plan draft and management;

Outfitting

Budget and scheduling; Work site assistance and regulations;

FACILITY MANAGEMENT & GESTIONE BUILDING

Vitali SpA

Safety coordination during the design phase; Engineering coordination (Plan and Schedule);

DISPOSAL & DEMOLITION

Architectural, system and structural design coordination;

Pavilion tear down and demolition

Vitali SpA

Design and standard specifications; Coordination with the design supervisor;

General management and identification of the work phases

Design coordination for environmental certification;

Nomination of job positions and professionals

Design phase validation.

Foundation demolition Structure tear down Finishing tear down

CONSTRUCTION & MANAGEMENT

Construction management

Vitali SpA

System tear down Outfitting and equipment tear down

Work Management;

Area reclamation

Work site business plans;

Identification of possible pavilion relocation sites

Provisioning plans; Purchasing department assistance to manage provisioning

RELOCATION

Vitali SpA

Safety coordination and plan during the execution phase; Executive temporary works plan; Work accounting (Initial budget, Bill of quantities, Deviation control and analysis); Quality management; Purchaser relations management; Coordination system management; Construction phase coordination for environmental certification; Budget and scheduling; Inspection assistance.

28

29


USA in Italy, Together to build a concept and enhance a project

30

31


8 Position

Technical job organisational chart*

USA

IT

Purchaser Architectural designer Structural designer Electrical and mechanical system designer Sound designer Plumbing designer Fire inspection designer Landscaper Specialist surveys (geological, environmental, etc.) Safety manager during the design and construction phases Work Director Work Manager General Contractor, Project and Construction Management Work inspectors Design supervision Interior Designer Work management committee

*Nominations according Italian Public Works Regulation

32

33


Registered Office Via Alberto Da Giussano, 15 20145 Milano Tel.: +39 02 74281998 Fax : +39 02 45490814

Administrative Office Via Bisone, 7 Cisano Bergamasco – Bergamo Tel. : +39 035 783107 Fax. : +39 035 783345

Business office via Lombardia, 2A 20068 Peschiera Borromeo Tel. +39 02-74281998 Fax +39 02-45490814