Boyukshor, ENG

Page 1

BOYUKSHOR LAKE REHABILITATION PROJECT FOR NORTH SHORE AND NORTH INTERCEPTION LAKE

BOYUKSHOR DEVELOPMENT CONCEPT

maksymkotsiuba.com | issuu.com/vlodco_zotov/ | buro-o.com


TABLE OF CONTENTS

LOCATION MAP....................................................................................................................................3 THE LAKE AND SURROUNDINGS.........................................................................................................4 CURRENT LOOK...................................................................................................................................5 AREA RESTRICTIONS...........................................................................................................................6 TERRITORY DEVELOPMENT SCENARIOS............................................................................................7 BOYUKSHOR RECREATIONAL PARK....................................................................................................8 MASTER PLAN......................................................................................................................................9 BALANCE OF TERRITORIES & BUILDING FABRIC..............................................................................10 ZONING PLAN.....................................................................................................................................11 THE BAKU ZOO PROJECT TIME LINE.................................................................................................12 ZOOS IN SURROUNDING REGION......................................................................................................13 BEST ZOOS OF THE WORLD..............................................................................................................14 OVERALL VIEW OF TERRITORY..........................................................................................................15 ZOO AND THEME PARK CONCEPT.....................................................................................................16 THE ZOO CONCEPT LAYOUT..............................................................................................................17 GREENING OF ZOO TERRITORY.........................................................................................................18 AFRICAN SAVANNAH.........................................................................................................................19 YEAR-ROUND AMUSEMENT PARK WITH HOTELS ...........................................................................20 MOBILITY PLAN.................................................................................................................................21 KEY BUILDINGS AND STRUCTURES..................................................................................................22 CENTRAL SQUARE............................................................................................................................23 BOYUKSHOR TECHNOPOLIS.............................................................................................................24 MASTER PLAN....................................................................................................................................25

BALANCE OF TERRITORIES & BUILDING FABRIC..............................................................................26 WHAT IS A MODERN INDUSTRIAL PARK?..........................................................................................27 PROTOTYPES OF INDUSTRIAL PARKS AROUND THE WORLD..........................................................28 SITE ACCESSIBILITY..........................................................................................................................29 PRODUCT...........................................................................................................................................30 OVERALL VIEW OF TERRITORY..........................................................................................................31 FUNCTIONAL ZONING........................................................................................................................32 FUNCTIONAL ZONING PRINCIPLES...................................................................................................33 RESEARCH & DEVELOPMENT PARK..................................................................................................34 DEVELOPMENT PHASING..................................................................................................................35 MOBILITY PLAN.................................................................................................................................36 ะกULTURAL CENTER ON THE WATERFRONT.......................................................................................37 BOYUKSHOR RESIDENTIAL DISTRICT...............................................................................................38 FOREWORD........................................................................................................................................39 MASTER PLAN....................................................................................................................................40 BALANCE OF TERRITORIES & BUILDING FABRIC..............................................................................41 ENVIRONMENT RENEWAL..................................................................................................................42 STREET VIEW......................................................................................................................................43 LOCAL DWELLING TYPOLOGY...........................................................................................................44 OVERALL VIEW OF TERRITORY..........................................................................................................45 ZONING PLAN.....................................................................................................................................46 MOBILITY PLAN.................................................................................................................................47 STAGES OF DEVELOPMENT...............................................................................................................48 DISTRICT CENTER VIEW...................................................................................................................49

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

2


15,0 km

LOCATION MAP LOCATION MAP

legend lorem ipsum, 1.5 га lorem ipsum lorem ipsum

11,5 km 4

lorem ipsum

km

2 km

lorem ipsum

m

М

lorem ipsum, 1.5 га lorem ipsum

7,5 k

m

М

10, 0k

lorem ipsum

lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum lorem ipsum

maksymkotsiuba.com | ISSUU.COM/VLODCO_ZOTOV | buro-o.com

3


SPublisherEngine 0.0.100.100

THE LAKE AND SURROUNDINGS THE LAKE AND SURROUNDINGS

Lake Area = 1060 Га

Water Area = 38,9 Га Site Area = 101,1 Га

BOYUKSHOR

CLEAN BOYUKSHOR

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

4


0.100

ФОТОФИКСАЦИЯ CURRENT LOOK

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

5


OIL DEPOT

DUMPING GROUND

OILDEPOT DEPOT OIL OIL DEPOT

DUMPING GROUND DUMPING GROUND DUMPING GROUND

POWER PLANT

OILDEPOT DEPOT OIL

ÎÃÐÀÍÈ×ÅÍÈß AREA RESTRICTIONS ÎÃÐÀÍÈ×ÅÍÈß AREA LIMITS AREA RESTRICTIONS

FACADE FACADE SYSTEM FACADE SYSTEM FACTORY SYSTEM FACTORY FACTORY

POWER PLANT POWER PLANT POWER PLANT

DUMPING GROUND DUMPING GROUND

ÎÃÐÀÍÈ×ÅÍÈß AREA LIMITS AREA RESTRICTIONS

FACADE SYSTEM FACTORY

ÎÃÐÀÍÈ×ÅÍÈß

FACADE FACADE SYSTEM SYSTEM FACTORY FACTORY

BALAXANI VILLAGE

POWER PLANT POWER PLANT BALAXANI VILLAGE BALAXANI VILLAGE

indentation 100m from the cemetery / building normatives 2.07.01-89 p.4.2.1. table 6

BALAHANI VILLAGE CEMETERY BALAXANI VILLAGE

indentation 25m from switching 100ì îò êëàäáèùà / the indentation 100m from the cemetery / station / ÑÍèÏ 2.07.01-89 ï.4.2.1. òàá.6 indentation 100m from standard the cemetery building normatives 2.07.01-89 p.4.2.1. /table 6 the electrical installation building normatives 2.07.01-89 p.4.2.1. table 6 indentation 25m from the switching station 100ì îò êëàäáèùà / the cemetery indentation 100m indentation 50m from the/ from primary roads / / 25ì îò ýëåêòðîñòàíöèè ÏÓÝ indentation 25m from switching ÑÍèÏ 2.07.01-89 ï.4.2.1. òàá.6 100ì îò êëàäáèùà / the electrical installation standard indentation 100m from the cemetery / building normatives 2.07.01-89 p.4.2.2. subp.5table 6 building normatives 2.07.01-89 p.4.2.1. station2.07.01-89 / ÑÍèÏ ï.4.2.1. òàá.6 p.4.2.1. table 6 building normatives 2.07.01-89 the electrical installation standard 50ì îò äîðîãè / from25m indentation 50m the from primary / station / indentation the/ roads switching recommended 25ì îò indentation ýëåêòðîñòàíöèè ÑÍèÏ 2.07.01-89 ï.4.4.2. ïîäï. 5ÏÓÝstation building normatives 2.07.01-89 p.4.2.2. subp.5 indentation 25m from the switching 100ì îò êëàäáèùà / electrical installation standard 50m from the 50m lake from indentation 100m the cemetery indentation the/ from primary roads / / 25ì îò ýëåêòðîñòàíöèè ÏÓÝ ÑÍèÏ 2.07.01-89 ï.4.2.1. òàá.6 electricalbuilding installation standard building normatives 2.07.01-89 p.4.2.2.p.4.2.1. subp.5table 6 normatives 2.07.01-89 50ì îò äîðîãè / ðåêîìåíäóåìûé îòñòóï indentation 50m from the primary roads indentation 500m from the50m lakefrom / the lake / recommended indentation ÑÍèÏ 2.07.01-89 ï.4.4.2. 5/ station 50ì îò îçåðà 50ì îò äîðîãè / building normatives 2.07.01-89 p.ïîäï. 9.12* indentation 50m from25m the from primary building 2.07.01-89 subp.5/ indentation the switching recommended indentation 25ì îò normatives ýëåêòðîñòàíöèè /5roads ÏÓÝp.4.2.2. ÑÍèÏ 2.07.01-89 ï.4.4.2. ïîäï. building normatives 2.07.01-89 p.4.2.2. subp.5 electrical installation standard 50m from the lake indentation 500m lake / 500ì îòðåêîìåíäóåìûé îçåðà / from theîòñòóï indentation 200m ïóíêò from the oil depot terminals building50ì normatives 2.07.01-89 p. 50m 9.12* ÑÍèÏ2.07.01-89* 9.12* recommended indentation from the/ lake îò500m 50ì îòîçåðà äîðîãè ðåêîìåíäóåìûé îòñòóï indentation 50m/the fromlake the/primary roads / building normatives II-106-79 table 2 indentation from recommended indentationï.4.4.2. 50m from the 5lake ÑÍèÏ 2.07.01-89 50ì îò îçåðà building normatives 2.07.01-89 p.ïîäï. 9.12*p.4.2.2. building normatives 2.07.01-89 subp.5 indentation 200m from the oil depot terminals / indentation 500m the lake / îò îçåðà / from 200ì îò500ì åìêîñòåé íåôòåindentation 30m thethe oil depot / building normatives II-106-79 table 2 p. 9.12* indentation 500m from lake / terminals building normatives 2.07.01-89 ÑÍèÏ2.07.01-89* ïóíêò 9.12* õðàíèëèùà / ÑÍèÏ II-106-79 òàá.2 500ì îò îçåðà /from ðåêîìåíäóåìûé îòñòóï building normatives II-106-79 table 2 indentation 200m from the oil depot terminals building50ì normatives 2.07.01-89 9.12*from the/ lake ÑÍèÏ2.07.01-89* ïóíêò 9.12* p. 50m recommended indentation îò îçåðà building normatives II-106-79 table 2 terminals indentation 30m from the from oil depot terminals / indentation 200m the oil depot / 30ì îò åìêîñòåé íåôòå200ì îò åìêîñòåé íåôòåbuilding normatives II-106-79 table indentation 200m from the oilòàá.2 depot terminals building normatives II-106-79 table õðàíèëèùà / ÑÍèÏ indentation 500m from the 2lake / 2 / õðàíèëèùà /II-106-79 ÑÍèÏ òàá.2 area limits that are not considered 500ì îò îçåðà / II-106-79 200ì îò åìêîñòåé íåôòåindentation 30m from the oil depot terminals / building normatives II-106-79 table 2 building normatives 2.07.01-89 p. 9.12* ÑÍèÏ2.07.01-89* ïóíêò 9.12* ãðàíèöà òåððèòîðèè õðàíèëèùà / ÑÍèÏ II-106-79 òàá.2 site boundary building table 2 gas and indentation oilnormatives pipelines30mII-106-79 from the oil depot terminals / 30ì îò åìêîñòåé íåôòåñóùåñòâóþùàÿ èíôðàñòðóêòóðà existing infrastructure indentation 30m from the oil depot terminals / building normatives II-106-79 table 2terminals indentation 200m from the oil depot / õðàíèëèùà / ÑÍèÏ II-106-79 òàá.2 30ì îòpipelines åìêîñòåé íåôòå- íåôòåsewage 200ì îò åìêîñòåé building normatives II-106-79 table 2 building normatives II-106-79 table 2 õðàíèëèùà / ÑÍèÏ òàá.2 òàá.2 ãðàíèöà òåððèòîðèè õðàíèëèùà /II-106-79 ÑÍèÏ II-106-79 area limits that are not considered site boundary azersu pump station ãðàíèöà òåððèòîðèè site boundary ñóùåñòâóþùàÿ èíôðàñòðóêòóðà existing infrastructure gas and oil pipelines indentation 30m from the oil depot terminals / site boundary 30ì îò åìêîñòåé íåôòåñóùåñòâóþùàÿ èíôðàñòðóêòóðà existingbuilding infrastructure II-106-79òàá.2 table 2 / ÑÍèÏ II-106-79 sewageõðàíèëèùà pipelinesnormatives existing infrastructure ãðàíèöà òåððèòîðèè site boundary azersu pump station ñóùåñòâóþùàÿ èíôðàñòðóêòóðà existing infrastructure site boundary

CEMETERY

BALAHANI VILLAGE CEMETERY CEMETERY OIL DEPOT

CEMETERY

BOYUKSHOR LAKE

BOYUKSHOR LAKE LAKE BOYUKSHOR BOYUKSHOR LAKE

OIL DEPOT

CEMETERY

OIL DEPOT

OIL DEPOT OIL DEPOT

BOYUKSHOR LAKE LAKE BOYUKSHOR

OIL DEPOT

OLYMPIC STADIUM

OLYMPIC STADIUM OLYMPIC STADIUM

OLYMPIC STADIUM OLYMPIC STADIUM

Ì 1:10828

50 100 100ì

250

500 ì м

250 ì

500 ì

1000 ìм

8.40 GSPublisherEngine 0.0.100.100

Ì 1:10828

25 50

100ì

50 100 100ì

250

500 ì м

GSPublisherEngine 0.0.100.100

1000 ìм

8.40

GSPublisherEngine 0.0.100.100

25 50

100ì

250 ì

500 ì

existing infrastructure m a k s y m k o t s iu b a . c o m | I S S U U . CO M/ V L O D CO _ Z O T O V / | b u r o -o . c o m

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

6

m a k s y m k o t s iu b a . c o m | I S S U U . CO M/ V L O D CO _ Z O T O V / | b u r o -o . c o m


TERRITORY DEVELOPMENT SCENARIOS

BOYUKSHOR RECREATIONAL PARK

BOYUKSHOR TECHNOPOLIS

BOYUKSHOR RESIDENTIAL DISTRICT

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

7


BOYUKSHOR RECREATIONAL PARK

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

8


MASTER PLAN BOYUKSHOR RECREATIONAL PARK

50 100 1000 м

50

100 250

50

100

500 м

250

500 м

250

500 м

1000 м

50

100

250

500 м

50

100

250

500 м

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

25 50

100ì

250 ì

500 ì

9


ZONING PLAN ZONING PLAN BOYUKSHOR RECREATIONAL PARK

BOYUKSHOR RECREATIONAL PARK PROJECT

% of territory

Ð

Áàëàíñ òåððèòîðèè

Ð

41%

zoo exhibition area: 57,4 ha

5% 1,2% 5,1%

central square: 7,0 ha technical facilities: 1,7 ha beach area and hotel district: 7,2 ha

5,6%

amusement park: 7,9 ha

6,3%

waterfront: 8,8 ha

19,5%

green buffer zone: 27,2 ha

16,3%

roads and parking: 22,8 ha

Ð

Overall area

140 ha Ïëîùàäü ó÷àñòêà

140 ÃÀ

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

11


THE BAKU ZOO PROJECT TIME LINE BOYUKSHOR RECREATIONAL PARK THE BAKU ZOO PROJECT TIME LINE THE BAKU ZOO PROJECT TIME LINE BOYUKSHOR RECREATIONAL PARK PROJECT BOYUKSHOR RECREATIONAL PARK PROJECT

A zoologicalA garden wasgarden first founded in founded Baku in 1928 andinhas since zoological was first in Baku 1928 and has since moved fourmoved times: four in 1942, 1958, 19751958, and 1985. of 45 times: in 1942, 1975 An andarea 1985. An area of 45 hectares was finally was assigned development in 1985. However, 2 hectares finallyforassigned for development in 1985.only However, only 2 hectares were developed planned.asThe expectation was to expand hectares were as developed planned. The expectation was to expand gradually, but as late as onlyin 22001 moreonly hectares were added.were added. gradually, butinas2001 late as 2 more hectares Today BakuToday Zoo still operates thesewithin 4 hectares. Baku Zoo stillwithin operates these 4 hectares. The situation inconvenient for all stakeholders. The zoo needs Theis situation is inconvenient for all stakeholders. The zoo needs drastically more space.more The space. city canThe profit usagebetter of this drastically cityfrom can better profit from usage of this land. land. Baku zoo Baku zoo

In 2008 President AliyevIlham ordered to move thetozoo for the expanding In 2008Ilham President Aliyev ordered move zoo for expanding its territory.itsThe first location considered was near Guzdek andGuzdek Gobu and Gobu territory. The first location considered was near villages. Later, a siteLater, withina the nature reserve wasreserve was villages. siteCeyranbatan within the Ceyranbatan nature chosen. As chosen. of 2012,As a total of 55a hectares of hectares land nearofGumyatag of 2012, total of 55 land near was Gumyatag was assigned toassigned the zoo. But thezoo. project is still not launched. to the But the project is still not launched.

CeyranbatanCeyranbatan

GSPublisherVersion 0.0.100.23 GSPublisherVersion 0.0.100.23

S = 4,2 ha S = 4,2 ha

25 km

Both locations too far away from This Baku. would This makewould the zoo Bothare locations are too far Baku. away from make the zoo less attractive casual visitors andvisitors more difficult to justify lessforattractive for casual and more difficulttheto justify the investments.investments.

25 km

City CenterCity Center

The high-tech Lake Cleaning Improvement Project Project TheBoyukshor high-tech Boyukshor Lakeand Cleaning and Improvement has revealedhas possible for the landfor surrounding the lake. The revealedusages possible usages the land surrounding the lake. The new area has thearea potential be integrated Baku. into Baku. new has thetopotential to beinto integrated

Boyukshor Boyukshor

7,8 km

7,8 km

City CenterCity Center

The lake is The inside city limits, location is alocation plus. Two lakeBaku is inside Baku so citythe limits, so the is a plus. Two Metro lines,Metro majorlines, roads,major and roads, the airport The new and are the within airportreach. are within reach. The new Olympic Stadium, has already become onebecome of the citys Olympicwhich Stadium, which has already one of the citys symbols, issymbols, also nearby. is also nearby.

S = 66,0 haS = 66,0 ha

Boyukshor Boyukshor Lake Lake

A modern recreational park with a park 66 hectare can become a new A modern recreational with a zoo 66 hectare zoo can become a new city attraction. profit can thecosts land of cleaning cityThe attraction. Thecover profitthe cancosts coverofthe the land cleaning project. Besides, blenditthe Stadium andStadium the nearby project.it can Besides, canOlympic blend the Olympic and the nearby waterfront into the cityinto fabric, no longer like a place on a place on waterfront the so citythey fabric, so theyfeel no longer feel like the outskirts. the outskirts.

Olympic Stadium Olympic Stadium

Dernegul Dernegul Koroglu

Koroglu

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

12


ZOOS IN SURROUNDING REGION BOYUKSHOR RECREATIONAL PARK

ZOOS IN SURROUNDING REGION BOYUKSHOR RECREATIONAL PARK PROJECT 6 814 animals 264 species

Moscow - 1 932 km GAZIANTEP, TURKEY Population: 1,500,000 Gaziantep Zoo founded in 2001

$5 S = 100 ha 8,9 km from city center

800 animals 190 species TBILISI, GEORGIA Population: 1,100,000 Tbilisi - 450 km

Baku

Tbilisi Zoo founded in 1927

$ 2,5 S = 10 ha 2,5 km from city center

Gaziantep - 1 151 km

290 species

Tehran - 532 km

TEHRAN, IRAN Population: 8,800,000 Tehran Zoological Garden founded in 1992

S = 5 ha

4,0 km from city center

5 089 animals 1 132 species

MOSCOW, RUSSIA Population: 12,300,000 Moscow Zoo founded in 1864

$ 3,5

S = 21,5 ha

$ 7,8 2,6 km from city center

Riyadh - 1 764 km

RIYADH, SAUDI ARABIA Population: 7,100,000 Riyadh National Zoo founded in 1957

350 species S = 16 ha

$ 2,7 7,4 km from city center

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

13


BEST ZOOS OF THE WORLD BOYUKSHOR RECREATIONAL PARK BEST ZOOS OF THE WORLD

BOYUKSHOR RECREATIONAL PARK PROJECT

PARIS, FRANCE Population: 10,000,000

NEW YORK, USA Population: 8,550,000

BERLIN, GERMANY Population: 3,600,000

SYDNEY, AUSTRALIA Population: 4,900,000

SINGAPORE Population: 5,690,000

Paris Zoo founded in 1934

Bronx Zoo founded in 1899

Berlin Zoological Garden founded in 1844

Taronga Zoo founded in 1916

Singapore Zoo founded in 1973

S = 35 ha

S = 21 ha

S = 28 ha

S = 14,5 ha

S = 107 ha

1 000 animals 180 species

4 000 animals 650 species

17 107 animals 1 444 species

4 000 animals 350 species

2 530 animals 315 species

1,5 million annual visitors

2,1 million annual visitors

2,6 million annual visitors

1,5 million annual visitors

1,7 million annual visitors

$ 25

$ 33,95

$ 22

$ 41,4

$ 33

5,5 km from city center

18,7 km from city center

4,7 km from city center

3,7 km from city center

6,4 km from city center

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

14


OVERALL VIEW OF TERRITORY BOYUKSHOR RECREATIONAL PARK

augerandswan.com | maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

15


ZOO AND THEME PARK CONCEPT BOYUKSHOR RECREATIONAL PARK

ZOO AND THEME PARK CONCEPT

BOYUKSHOR RECREATIONAL PARK PROJECT

Baku

“MEET THE PLANET IN BAKU“ AROUND THE WORLD IN 15 MANATS!

"MEET THE PLANET IN BAKU" AROUND THE WORLD IN 15 MANATS!

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

16 GSPublisherVersion 0.0.100.30


THE ZOO CONCEPT LAYOUT BOYUKSHOR RECREATIONAL PARK

THE CONCEPT. ZOO LAYOUT

BOYUKSHOR RECREATIONAL PARK PROJECT

19th century CAGED ANIMALS

20th century ANIMAL HABITAT EXHIBITS

The first zoos consisted of small cages where animals were kept without any regard to their natural habitat and with no space to move around. The visitors could only see them from the front, so it was mainly an elevational exhibit experience.

Eventually the cages became more spacious and special exhibits were set up to imitate the animals natural habitat. Fences and metal bars got replaced with glass walls and ditches; landscaping was added. Perimeter view was one of the main changes. Most zoos in the Soviet bloc were built in this manner.

21st century NATURAL HABITATS Modern zoos aim to recreate the animals authentic habitats and safely immerse the visitors straight into the wild. The animals are no longer kept in species-specific exhibit spaces and get to share their common habitat zones. The visitors stroll through these zones by special paths. This allow for a very realistic immersion experience while keeping both the visitors and the animals safe and comfortable.

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com GSPublisherVersion 0.0.100.30

17


GREENING OF ZOO TERRITORY GREENING OF RECREATIONAL ZOO TERRITORY BOYUKSHOR PARK BOYUKSHOR RECREATIONAL PARK PROJECT

ZOOGEOGRAPHICAL REGIONS

Asia

African Savannah and Desert Australia

North America

Baku

AFRICA

AUSTRALIA

ASIA

OCEANIA

SOUTH AMERICA

NORTH AMERICA ANTARCTICA

Acacia erioloba

Eucalyptus

Hibiscus syriacus

Phoenix canariensis

Araucaria araucana

Abies concolor

Phoenix

Xanthorrhoea

Lonicera pileata

Cycas circinalis

Yucca filamentosa Chamaecyparis lawsoniana

Ficus sycomorus

Araucaria bidwillii

Bambusa

Aucuba japonica

Campsis radicans

Gymnocladus canadensis

Euphorbia damarana

Eragrostis

Prunus serrulata

Myrtus communis

Arbutus unedo

Cercis canadensis

South America Antarctica

Oceania Beach Area and Hotel District Amusement Park

Greening program for zoo areas requires using various plants specific to relevant continents and zoogeographical regions. These solutions provides absolut effect of physical presence. Coniferous trees are selected as well as deciduous trees, palm trees, succulents and cereals. All types of trees are wind, heat, salt and drought tolerant and can be grown in Baku.

“MEET THE PLANET IN BAKU“ AROUND THE WORLD IN 15 MANATS!

"MEET THE PLANET IN BAKU" AROUND THE WORLD IN 15 MANATS!

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

18


AFRICAN SAVANNAH BOYUKSHOR RECREATIONAL PARK

augerandswan.com | maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

19


YEAR-ROUND AMUSEMENT PARK WITH HOTELS YEAR-ROUND AMUSEMENT PARKRECREATIONAL WITH HOTELS BOYUKSHOR PARK BOYUKSHOR RECREATIONAL PARK PROJECT

Beach zone with pools and spa complex is situated at the lakeside. Pool can be heated in wintertime and can be used as a unified complex with spa

Hotel is situated on the north part of the entertainment zone close to the central core.

image 1 http://www.theclubatharborbeach.com/

Bungalow around the artificial lake is a particular part of the hotel.

The first perennial indoors water park in the city with pools and waterslides located on territory.

image 2 http://www.tahiti.com/vacations/huahine-family-escape

image 4 http://skylinehotelniagarafalls.com/hotel-packages/

Pedestrian boulevard on embankment passes through the entertainment zone and has a free access.

Also there are amusements and fair zone. image 5 https://www.parcasterix.fr/

image 3 http://www.nyrens.se/projekt/hornsbergs-strandpark

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

20


MOBILITY PLAN MOBILITY PLAN

BOYUKSHOR RECREATIONAL PARK PROJECT

BOYUKSHOR RECREATIONAL PARK

Electric transport and bike lanes. Water routes

Size and variety of territory make it an attractive area for biking. Eco-friendly electric cars will help to organize excursions and group transportation for zoo and will make all the territory available for people with limited mobility. Organization of visitors transportation along the entertainment route through the Boyukshor lake with a stopping point next to the Lighthouse is available. Tour across the lake and entertainment water routes around bird islands which are not connected to the ground may become a feature of the project. Public and private transport

Pedestrian routes

A dense net of pedestrian paths and bridges, which are situated between the main pedestrian-bicycle routes, allows to move from civilization to wild of different climatic, landscape and nature zones by a few steps.

Technical transport

5

1

2 4

3 Parking and public transport stops are located nearby three main entry to the territory. The main parking lot of public transport and a stop for organized groups is situated next to the central core.

5 Access points to the park

Separate road for technical transport goes through the buffer zone of territory. It allows providing a vital functions of park and zoo in any time without disturbing visitors.

Public transport stops maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

GSPublisherVersion 0.0.100.30

21


KEYKEY BUILDINGS ANDAND STRUCTURES BUILDINGS STRUCTURES 17

4

8

9

17

9 10

4

1

3

4

3 14

11

10

11 17

5

11

BOYUKSHOR RECREATIONAL PARK PROJECT

BOYUKSHOR RECREATIONAL PARK

17

17

Total Floor Area Of Buildings

103 427 m2

Commerce 1 Central Core & Retail

79 767 m2

2 Fair/Store

864 m2

3 Hotels And Tempoprary Housing 4 Entry Group & Infocenter

42 447 m2

5 Penguin Park

5 500 m2

6 Aviary

16 500 m2

7 Oceanarium

5 456 m2

8 Monkey House

2 193 m2

9 Pavilion for animals

6 337 m2

10 Aviaries for cold time

6 461 m2

Recreational & Entertainment

13

6

9

11

3

11

12

2 16

16 2 15 4

11

10

10

17 750 m2

11 Restaurants & Cafes

8 845 m2

12 Beach Club & SPA

2 041 m2 815 m2

13 Boat Pier

11

18 825 m2 3 971 m2

Animal Buildings

7

1,81 ha

14 Water Park

3 600 m2

15 ะกhildren recreation & leisure

1 028 m2

16 Amusement

1 421 m2

17 Technical Facilities

17 462 m2

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com GSPublisherVersion 0.0.100.100

22


BOYUKSHOR RECREATIONAL PARK PROJECT

CENTRAL SQUARE BOYUKSHOR RECREATIONAL PARK

GSPublisherVersion 0.0.100.23

augerandswan.com | maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

23


BOYUKSHOR TECHNOPOLIS

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

24


MASTER PLAN BOYUKSHOR TECHNOPOLIS

50 100 1000 м

50

100 250

50

100

500 м

250

500 м

250

500 м

1000 м

50

100

250

500 м

50

100

250

500 м

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

25 50

100ì

250 ì

500 ì

25


WHAT IS A MODERN INDUSTRIAL PARK?

Technopolis "Boyukshor"

WHAT IS A MODERN INDUSTRIAL PARK? BOYUKSHOR TECHNOPOLIS ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÏÀÐÊ "ÁÎÞÊ-ØÎÐ"

TITLE TITLE TITLE TITLE TITLE ÇÎÍÈÍà Ó×ÀÑÒÎÊ

ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

142 ÃÀ XIX-XX Centuries: Industrial Area Within a City's Limits

subtite subtitle XXІ Century: What Kind of Industrial Zone We Need?

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

subtite subtitle ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ

ÏÐÀÂÎÑËÀÂÍÎÅ È ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ

legend Õ ÃÀlorem ipsum, 1.5 ãà

lorem ipsum ÍÅÔÒÅÕÐÀÍÈËÈÙÅ

ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß lorem ipsum ÑÅÒÜ

lorem ipsum

-ØÎÐ TITLE

lorem ipsum Õ ÃÀ

lorem ipsum, 1.5 ãà ÆÈËÜЁ lorem ipsum

lorem ipsum lorem ipsum Õ ÃÀ

lorem ipsum

lorem ipsum ÎÔÈÑÛ R&D lorem ipsum lorem ipsum

ÑÒÀÄÈÎÍ

Baku Has Been Successfully Implementing a Plan of Moving Old Industrial Plants Away from City In just a century and a half manufacturing has significantly changed due to industrial robots. Since much fewer employees are needed today, logistics have become the focal point of planning industrial parks.

Õ ÃÀlorem ipsum ÈÍÄÓÑÒÐÈß

Urbanisation processes are transforming cities all over the New types of products are being designed by thousands of world. Human habitats keep expanding; human capital is experts to later get produced by robots in millions of becoming the main means of achieving added value. copies. Development and production of high technology is steadily replacing old-fashioned forms of technology. dendroplan / park boyukshore

In other words, industrial plants are no longer what modern cities evolve around. So what is this industrial park supposed to be like in the 21st century?

02. 40 maksymkotsiuba.com ISSUU.COM/VLODCO_ZOTOV buro-o.com GSPublisherVersion 0.0.100.100

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

27


PROTOTYPES OF INDUSTRIAL PARKS AROUND THE WORLD PROTOTYPES OF INDUSTRIAL PARKS AROUNDTechnopolis THE WORLD "Boyukshor" BOYUKSHOR TECHNOPOLIS ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÏÀÐÊ "ÁÎÞÊ-ØÎÐ" South Korea, Busan Korea, Daejeon TITLE TITLE TITLESouth TITLE TITLE

South Korea, Gwangju ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

Gwangju Innopolis

Busan Innopolis

In the City

In the City

subtite subtitle ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ

1 870 ha

1 410 ha

Ó×ÀÑÒÎÊ

ÇÎÍÈÍÃ

Innopolis subtite subtitle 142 ÃÀDaedeok In the City

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

7 040 ha

UAE, Dubai

RSA, Port Elizabeth

Dubai Investments Park

Goega Industrial Park

26 km from City

20 km from City

2 300 ha

11 500 ha

8% ÏÐÀÂÎÑËÀÂÍÎÅ È ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ

34%

30%

legend Õ ÃÀlorem ipsum, 1.5 га

Industry

57%

51%

lorem ipsum ÍÅÔÒÅÕÐÀÍÈËÈÙÅ

41%

-ØÎÐ TITLE

ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß lorem ipsum ÑÅÒÜ

55%

R&D Offices

14%

39%

35%

lorem ipsum lorem ipsum, 1.5 га ÆÈËÜЁ lorem ipsum

15% Research & Development in Shipbuilding

Optics Nanotechnology Research and development Recycling

lorem ipsum

12%

lorem ipsum

Research & Development Education Industry lorem ipsum Defense Industry ÎÔÈÑÛ Õ ÃÀ

lorem ipsum

R&D

lorem ipsum lorem ipsum

ÑÒÀÄÈÎÍ

Õ ÃÀlorem ipsum

The functions of modern industrial parks are manifold. Some are focused on manufacturing, others are mainly engaged in research and development, aiming to create new products for further robotic production. The proportion of functions of industrial parks depends on their access to logistic infrastructure, sales market, availability of resources and human capital.

High-Tech Industry High-Tech Research & Development

Commerce Logistics Auto Industry Education Metallurgy Energetics Chemical Industry Aeronautics Port

ÈÍÄÓÑÒÐÈß

dendroplan / park boyukshore maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

02. 40 maksymkotsiuba.com ISSUU.COM/VLODCO_ZOTOV buro-o.com GSPublisherVersion 0.0.100.100

4%

Õ ÃÀ

26% Other Functions

80%

lorem ipsum

28

3


SITE ACCESSIBILITY Technopolis "Boyukshor"

SITE ACCESSIBILITY

to Sumqayit & Balaxani Industrial Parks

BOYUKSHOR TECHNOPOLIS ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÏÀÐÊ "ÁÎÞÊ-ØÎÐ"

TITLE TITLE TITLE TITLE TITLE ÇÎÍÈÍà Ó×ÀÑÒÎÊ

ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

142 ÃÀ

subtite subtitle

Oil Fields

Landfill

subtite subtitle

Power Plant

ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum eu fugiat nulla pariatur. Excepteur sint Oil dolore Polluted occaecat cupidatat non proident, sunt in culpa qui Territory officia deserunt mollit anim id est laborum.

Sabunchi

Сеmetery

ÏÐÀÂÎÑËÀÂÍÎÅ È ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ

legend to Airport

Õ ÃÀlorem ipsum, 1.5 га

lorem ipsum ÍÅÔÒÅÕÐÀÍÈËÈÙÅ

Boyukshor Lake

Oil Tanks

ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß lorem ipsum ÑÅÒÜ

lorem ipsum

-ØÎÐ TITLE

lorem ipsum Õ ÃÀ

lorem ipsum, 1.5 га ÆÈËÜЁ lorem ipsum

lorem ipsum

Stadium

lorem ipsum

M

Õ ÃÀ

lorem ipsum

to Darnagul Metro Station

lorem ipsum ÎÔÈÑÛ R&D lorem ipsum lorem ipsum

ÑÒÀÄÈÎÍ

Õ ÃÀlorem ipsum to Keshla Fright Station ÈÍÄÓÑÒÐÈß

dendroplan / park boyukshore

to City Centre & Koroglu Metro Station

Territory is located on the north part of the Boyukshor lake, between the Olympic stadium and Balaxani industrial park which is currently under construction. Eco-friendly waste recycling technologies will be implemented after the completion of the construction works. Territory is connected to the Keshia station by the road. There are two metro stations nearby with different lines. Ring road to be built in the nearest future on the north part of territory. However the territory has no direct acсess to the sea port and to the major railway.

Site Area

140,00 ha

02. 40

6 maksymkotsiuba.com ISSUU.COM/VLODCO_ZOTOV buro-o.com maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

GSPublisherVersion 0.0.100.100

29


Technopolis "Boyukshor"

PRODUCT

ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÏÀÐÊ "ÁÎÞÊ-ØÎÐ"

TITLE TITLE TITLE TITLE TITLE ÇÎÍÈÍà Ó×ÀÑÒÎÊ

ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

ØÎÐ TLE

142 ÃÀ Good Transport Links The area is well-connected with highways leading to the airport and to the railroad, as well as with Balaxan industrial park and the nearby power subtite subtitle plant. ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ

At the same time, the lack of a direct railroad link or port will restrict the volume of of mass production and increase the cost of transportation. Availability of Human Capital Darnagul Metro Station connects the Park with Baku’s technical ÏÐÀÂÎÑËÀÂÍÎÅ È ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ universities’ campuses. Balaxan village is also located nearby.

BOYUKSHOR TECHNOPOLIS

subtite subtitle

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et Potentialdolore for hi-tech production. magnaeco-friendly aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

R&D Technopolis Conducts research and development of products from concept to technical implementation stage. The campus combines offices, production labs and residential areas with a fully funcitonal urban environment including public spaces and social infrastructure.

Industrial parks of this kind are thriving in the U.S., in Asia, in the Near East and in other developed countries.

Qualified experts who can produce quality ideas. Affordable workforce legendfrom nearby Balaxan village. Õ ÃÀlorem ipsum, 1.5 ãà

Purified Boyukshor ÍÅÔÒÅDe-polluting and cleaning Boyukshor ÕÐÀÍÈËÈÙÅ lake and its natural surroundings can completely change the citizens’ perception of this place. However, the nearby waste recycling plant and landfull still need to be reframed in public perception as an eco-friendly establishment.

Creating a network of canals to provide clean water to the Industrial Park and to purify Boyukshor can be a good starting point for the reframing campaign.

lorem ipsum

Eco-friendly ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß production; loremclimate ipsum regulation via ÑÅÒÜ and pools.

freshwater canals

lorem ipsum lorem ipsum Õ ÃÀ

lorem ipsum, 1.5 ãà ÆÈËÜЁ lorem ipsum

lorem ipsum

Close to Recreational Zones The Industrial Park is well-located within the city limites near the Olympic Stadium and the pedestrian waterfront, boasting great views and possibilities for sports and recreation.

lorem ipsum ÃÀ Good infrastructureÕ and opportunities for work and recreation make the lorem ipsum place highly attractive for the market.

lorem ipsum ÎÔÈÑÛ R&D lorem ipsum lorem ipsum

ÑÒÀÄÈÎÍ

Õ ÃÀlorem ipsum ÈÍÄÓÑÒÐÈß

dendroplan / park boyukshore

!

The world is changing at such a pace that realistic planning for even 30 years ahead is no longer possible. The key to success for today’s cities and governments is the ability to reveal and employ the potential of their territories, turning problematic aspects into advantages and creating a flexible environment for local business to meet modern day economic challenges.

02. 40

4 maksymkotsiuba.com ISSUU.COM/VLODCO_ZOTOV buro-o.com

PublisherVersion 0.0.100.100

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

30


OVERALL VIEW OF TERRITORY BOYUKSHOR TECHNOPOLIS

augerandswan.com | maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

31


FUNCTIONAL FUNCTIONAL ZONING ZONING FUNCTIONAL ZONING TechnopolisTechnopolis "Boyukshor""Boyukshor" BOYUKSHOR TECHNOPOLIS Oil Fields

Oil Fields

ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÏÀÐÊ "ÁÎÞÊ-ØÎÐ" ÏÀÐÊ "ÁÎÞÊ-ØÎÐ" ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

TITLE TITLE TITLE TITLE TITLE TITLE TITLETITLE TITLE TITLE ÇÎÍÈÍà ÇÎÍÈÍà Ó×ÀÑÒÎÊ Ó×ÀÑÒÎÊ

ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

Landfill

subtite subtitle subtite subtitle 142 ÃÀ 142 ÃÀ

Landfill

Power Plant

Power Plant

ß

Sabunchi Sabunchi Lorem ipsumLorem dolor ipsum sit amet, dolor consectetur sit amet, adipiscing consectetur adipiscing elit, sed do eiusmod elit, sed do tempor eiusmod incididunt temporutincididunt labore et ut labore et dolore magna dolore aliqua. magna Ut enim aliqua. ad Ut minim enimveniam, ad minim veniam, quis nostrudquis exercitation nostrud exercitation ullamco laboris ullamco nisi laboris ut nisiСеmetery ut aliquip ex eaaliquip commodo ex eaconsequat. commodoDuis consequat. aute irure Duis aute irure dolor in reprehenderit dolor in reprehenderit in voluptate invelit voluptate esse cilvelit esse cillum dolore eu lumfugiat dolore nulla eu pariatur. fugiat nulla Excepteur pariatur.sint Excepteur sint occaecat cupidatat occaecat noncupidatat proident,non sunt proident, in culpasunt qui in culpa qui officia deserunt officia mollit deserunt anim idmollit est laborum. anim id est laborum.

subtite subtitle subtite subtitle ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ

Сеmetery

Oil Tanks

Oil Tanks

Boyukshor Boyukshor Lake Lake ÏÐÀÂÎÑËÀÂÍÎÅ È ÏÐÀÂÎÑËÀÂÍÎÅ ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ È ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ

legend legend 1.5 гаipsum, 1.5 га Õ ÃÀlorem ipsum, Õ ÃÀlorem lorem ipsumlorem ipsum

ÍÅÔÒÅÕÐÀÍÈËÈÙÅ

ÍÅÔÒÅÕÐÀÍÈËÈÙÅ

ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß lorem ipsum lorem ipsum ÑÅÒÜ ÑÅÒÜ Stadium

Stadium

lorem ipsumlorem ipsum

-ØÎÐ ÐÎ ÁÎÞÊ-ØÎÐ TITE ITLE SUBTITLE

lorem ipsumlorem ipsum Õ ÃÀ

Õ ÃÀ

lorem ipsum,lorem 1.5 гаipsum, 1.5 га ÆÈËÜЁ ÆÈËÜЁ lorem ipsum lorem ipsum

lorem ipsumlorem ipsum lorem ipsumlorem ipsum Õ ÃÀ

Õ ÃÀ lorem ipsum lorem ipsum

Total Floor Total Area of Floor Buildings Area of Buildings

1 147 370 m 1 2147 370 m2

lorem ipsum lorem ipsum ÎÔÈÑÛ ÎÔÈÑÛ R&D R&D lorem ipsumlorem ipsum

15,09%

15,09%

ÑÒÀÄÈÎÍ

ÑÒÀÄÈÎÍ

46,10%

46,10%

lorem ipsumlorem7,6 ipsum %

7,6%

13,25%

13,25%

Õ ÃÀlorem ipsum Õ ÃÀlorem ipsum ÈÍÄÓÑÒÐÈß ÈÍÄÓÑÒÐÈß

Industry

Industry

R&D Offices

R&D Offices

dendroplan dendroplan / park boyukshore / park boyukshore Residential Residential Commerce Commerce

02. 40 02. 40

9 maksymkotsiuba.com maksymkotsiuba.com ISSUU.COM/VLODCO_ZOTOV ISSUU.COM/VLODCO_ZOTOV buro-o.com buro-o.com

GSPublisherVersion 0.0.100.100 GSPublisherVersion 0.0.100.100

Total Floor Total Area of Floor Buildings Area of Buildings 1 147 370 m 1 2147 370 m2 Industry Industry 203 074 m2203 074 m2 Оffices, Research University Offices) 440 m2620 440 m2 Оffices,Labs, Research Labs, (R&D University (R&D 620 Offices) Residential Residential 102 260 m2102 260 m2 16 446 m2 16 446 m2 Hotel and Conference Hall Hotel and Conference Hall Kindergarten and Schooland School 17 748 m2 17 748 m2 Kindergarten Culture Culture 9 129 m2 9 129 m2 178 273 m2178 273 m2 Commerce Commerce

9

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

32


Power Plant

ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÏÀÐÊ "ÁÎÞÊ-ØÎÐ"

TITLE TITLE TITLE TITLE TITLE ÇÎÍÈÍà Ó×ÀÑÒÎÊ

ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

142 ÃÀ

Industrial areas are attached to low-value territory and highways

Сеmetery

subtite subtitle Industrial Area

FUNCTIONAL ZONING PRINCIPLES FUNCTIONAL ZONING PRINCIPLES BOYUKSHOR TECHNOPOLIS Technopolis "Boyukshor"

Oil Fields

Power Plant

Lorem"ÁÎÞÊ-ØÎÐ" ipsum dolor sit amet, consectetur adipiscing ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÏÀÐÊ

TITLE TITLE TITLE TITLEutTITLE elit,Ó×ÀÑÒÎÊ sed do eiusmod tempor incididunt labore et ÇÎÍÈÍÃ

ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

dolore magna aliqua. Ut enim ad minim veniam, subtitelaboris subtitle quis nostrud exercitation ullamco nisi ut Сеmetery aliquip ex ea commodo consequat. Duis Culture aute irure& Waterfront Housing, dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

142 ÃÀ

subtite subtitle ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ

Housing, cultural objects, kindergarten & school are oriented to lake waterfront

ÏÐÀÂÎÑËÀÂÍÎÅ È ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ

legend

subtite subtitle ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ

Housing, cultural objects, kindergarten & school are oriented to lake waterfront

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ealorem commodo consequat. aute irure& Waterfront ipsum, 1.5Housing, га Duis Culture Õ ÃÀ dolor in reprehenderit in voluptate velit esse cillorem lum dolore eu fugiatipsum nulla pariatur. Excepteur sint ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß occaecat cupidatat non proident, sunt in culpa qui lorem ipsum ÑÅÒÜ officia deserunt mollit anim id est laborum.

Boyukshor Lake

ÍÅÔÒÅÕÐÀÍÈËÈÙÅ

lorem ipsum

ÎÐ LE

lorem ipsum

ÏÐÀÂÎÑËÀÂÍÎÅ È ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ

lorem ipsum, 1.5 га

Õ ÃÀlorem ipsum, 1.5 га ÆÈËÜЁ

ÎÞÊ-ØÎÐ SUBTITLE

R&D campus cooperates with existing Baku scientific institutions and acts as a buffer between housing and industry

There iszoning a buffer withblends business and parts educational facilities, Functional softly different of the park into research offices and labs between the industrial and the one another without hard borders.

lorem ipsum

lorem ipsum

lorem ipsum ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß lorem ipsum ÑÅÒÜ

ÍÅÔÒÅÕÐÀÍÈËÈÙÅ

R&D Park

lorem ipsum Õ ÃÀ

lorem ipsum

lorem ipsum

lorem ipsum

lorem ipsum ÎÔÈÑÛ

lorem ipsum, 1.5 га

lorem ipsum ÆÈËÜЁ

lorem ipsum

ÑÒÀÄÈÎÍ

Õ ÃÀlorem loremipsum ipsum Õ ÃÀ

lorem ipsum

ÈÍÄÓÑÒÐÈß

lorem ipsum ÎÔÈÑÛ R&D lorem ipsum

dendroplan / park boyukshore

lorem ipsum

ÑÒÀÄÈÎÍ

02. 40

Õ ÃÀlorem ipsum

maksymkotsiuba.com ÈÍÄÓÑÒÐÈßISSUU.COM/VLODCO_ZOTOV buro-o.com

herVersion 0.0.100.100

dendroplan / park boyukshore

R&D Park

1 147 370 m2

There is a buffer with business and educational facilities, Industry research offices and labs between the industrial and the 203 074 m2 residential Оffices,zone. Research Labs, University (R&D Offices) 620 440 m2

Residential Hotel and Conference Hall Kindergarten and School Total Floor Area of Buildings Culture Industry Commerce

Оffices, Research Labs, University (R&D Offices) Residential Hotel and Conference Hall Kindergarten and School Culture Commerce

102 260 m2 16 446 m2 17 748 m2 1 147 370 m2 9 129 m2 203 074 m2 178 273 m2 2 620 440 m 102 260 m2 16 446 m2 17 748 m2 9 129 m2 178 273 m2

10

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

02. 40 maksymkotsiuba.com ISSUU.COM/VLODCO_ZOTOV buro-o.com GSPublisherVersion 0.0.100.100

The industrial block will be located in a less valuable part with good access to major roads.

Total Floor Area of Buildings

R&D

R&D campus cooperates with existing Baku scientific institutions and acts as a buffer between housing and industry

residential zone.

The most valuable part of the park along the waterfront is designated for the residential block.

Õ ÃÀ

lorem loremipsum ipsum

The industrial block will be located in a less valuable part with good access to major roads. The most valuable part of the park along the waterfront is designated for the residential block.

Õ ÃÀ legend

Boyukshor Lake

Functional zoning softly blends different parts of the park into one another without hard borders.

10 33


RESEARCH & DEVELOPMENT PARK BOYUKSHOR TECHNOPOLIS

augerandswan.com | maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

34


Core

Kindergarten Power Plant

ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÏÀÐÊ "ÁÎÞÊ-ØÎÐ"

TITLE TITLE TITLE TITLE TITLE ÇÎÍÈÍà Ó×ÀÑÒÎÊ

ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

R&D Core

Industry

142 ÃÀ Oil Fields

DEVELOPMENT DEVELOPMENTPHASING PHASING

Technopolis "Boyukshor" BOYUKSHOR TECHNOPOLIS

Ñåmetery

Power Plant

ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÏÀÐÊ "ÁÎÞÊ-ØÎÐ"

Lorem ipsum dolor sitTITLE amet, consectetur TITLE TITLE TITLEadipiscing TITLE ÇÎÍÈÍà Ó×ÀÑÒÎÊ

ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

subtite subtitle

Boyukshor Lake

ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ

University

Industry Power Plant

ÏÐÀÂÎÑËÀÂÍÎÅ È ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ

subtite subtitle ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ

Boyukshor Lake

UniversityÍÅÔÒÅ-Industry ÕÐÀÍÈËÈÙÅ

Power Plant

ØÎÐ LE

-ØÎÐ TITLE

Boyukshor Lake

Housing Commerce School & Kindergarten

Phase One

subtite subtitle

Õ ÃÀ legend

Boyukshor Lake

ÍÅÔÒÅÕÐÀÍÈËÈÙÅ

Housing

Culture

Waterfront

142 ÃÀ

lorem ipsum

ÏÐÀÂÎÑËÀÂÍÎÅ È ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ

Industry

elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enimsubtite ad minimsubtitle veniam, Ñåmetery quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure Phase Two dolor in reprehenderit in voluptate velit esse cilOil lum Fields dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quislegend nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure Phase Two ãà ÃÀlorem ipsum,in1.5 dolor in Õ reprehenderit voluptate velit esse cilÑåmetery Oil lum Fields dolore eu fugiat nulla pariatur. Excepteur sint lorem ipsum ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß occaecat cupidatat non proident, sunt in culpa qui lorem ipsum ÑÅÒÜ officia deserunt mollit anim id est laborum. lorem ipsum

Further Development Power Plant

lorem ipsum, 1.5 ãà Õ ÃÀlorem ipsum, 1.5 ãà ÆÈËÜЁ lorem ipsum Ñåmetery lorem ipsum lorem ipsum ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß lorem ipsum ÑÅÒÜ lorem ipsum Oil Fields Õ ÃÀ lorem ipsum lorem ipsum lorem ipsum lorem Õ ÃÀ ipsum ÎÔÈÑÛ R & D lorem ipsum, 1.5 ãà lorem ipsum

Phase Three

ÆÈËÜЁ lorem ipsum

lorem ipsum lorem ipsum lorem ipsum

ÑÒÀÄÈÎÍ

Õ ÃÀ

Industry

Housing

Culture

Waterfront

Boyukshor Lake

Further Development

Phase Three

lorem ipsum

Ñåmetery Oil Fields Õ ÃÀ ÈÍÄÓÑÒÐÈß

lorem ipsum

lorem ipsum ÎÔÈÑÛ R&D

Power Plant

dendroplan lorem ipsum / park boyukshore lorem ipsum

ÑÒÀÄÈÎÍ

02. 40

Õ ÃÀlorem ipsum maksymkotsiuba.com ISSUU.COM/VLODCO_ZOTOV buro-o.com Boyukshor Lake

Ñåmetery

ÈÍÄÓÑÒÐÈß

ublisherVersion 0.0.100.100

dendroplan / park boyukshore

We suggest starting the area development with creating the inner business, industrial blocks and the recreational zones along the waterfront. This will allow to employ and demonstrate the new potential of the old territories. The most valuable part of the land for residential area should be set aside until the last stage. This will allow to adjust its functions if necessary as the park evolves and new conditions emerge. We suggest the areaprove development with creating the Should the reststarting of the project itself successful, inner business, industrial blocks and the recreational apartments can be sold with higher prices because of thezones along vibe the waterfront. This will allow to employ and demonstrate positive of the place. the new potential of the old territories. The most valuable part of the land for residential area should be set aside until the last stage. This will allow to adjust its functions if necessary as the park evolves and new conditions emerge. Total Floor Area of Buildings 1 147 370 m2 Should the rest of the project prove itself successful, 203 074 m2 Industry apartments can be sold with higher prices because of the 2 Offices 620 440 m positive vibe of the place. Residential 102 260 m2 Hotel and Conference Hall 16 446 m2 Kindergarten and School 17 748 m2 Culture 9 129 m2 Total Floor Area of Buildings 1 147 370 2m2 Commerce 178 273 m 2 203 074 m Industry Offices 620 440 m2 Residential 102 260 m2 12 Hotel and Conference Hall 16 446 m2 Kindergarten and School 17 748 m2 Culture 9 129 m2 Commerce 273 m2 maksymkotsiuba.com | issuu.com/vlodco_zotov178 | buro-o.com

35

02. 40

12 maksymkotsiuba.com ISSUU.COM/VLODCO_ZOTOV buro-o.com


MOBILITY PLAN MOBILITY PLAN Technopolis "Boyukshor" BOYUKSHOR TECHNOPOLIS

Public Transport

ÈÍÄÓÑÒÐÈÀËÜÍÛÉ ÏÀÐÊ "ÁÎÞÊ-ØÎÐ"

ÇÀÂÎÄ ÔÀÑÀÄÍÛÕ ÑÈÑÒÅÌ

TITLE TITLE TITLE TITLE TITLE ÇÎÍÈÍà Ó×ÀÑÒÎÊ

142 ÃÀ

Cargo Transport

Private Transport

subtite subtitle

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

subtite subtitle ÄÅÐÅÂÍß ÁÀËÀÕÀÍÈ

ÏÐÀÂÎÑËÀÂÍÎÅ È ÀÐÌßÍÑÊÎÅ ÊËÀÄÁÈÙÅ

Cargo transport routes are separated from housing and campus by legend factories, entrances are located on the outer border of the territory

Public transport connects the area with the nearest tube stations: Darnagul and Koroglu

Well-developed road network provides an easy access to any building in all directions

Õ ÃÀlorem ipsum, 1.5 га

lorem ipsum ÍÅÔÒÅÕÐÀÍÈËÈÙÅ

ÓËÈ×ÍÎ-ÄÎÐÎÆÍÀß lorem ipsum ÑÅÒÜ

Pedestrian Plan

ÎÞÊ-ØÎÐ SUBTITLE

lorem ipsum

Bike Lanes

lorem ipsum Õ ÃÀ

lorem ipsum, 1.5 га ÆÈËÜЁ lorem ipsum

lorem ipsum lorem ipsum Õ ÃÀ

lorem ipsum

lorem ipsum ÎÔÈÑÛ R&D lorem ipsum lorem ipsum

ÑÒÀÄÈÎÍ

Õ ÃÀlorem ipsum ÈÍÄÓÑÒÐÈß

Density of the core, quallity of the enviroment and well-developed infrastructure encourages pedestrian movement

Four percent or Technopolis area are bike lanes, which are suitable not dendroplan / park boyukshore only for the bike, but also for the segways

02. 40

13 maksymkotsiuba.com ISSUU.COM/VLODCO_ZOTOV buro-o.com

GSPublisherVersion 0.0.100.100

Road network allows separating and regularizing the flow of pedestrians, bicycles, segways, cargo and passenger transport as well as a comfortable transfer, access, unloading and parking throughout the territory.

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

36


ะกULTURAL CENTER ON THE WATERFRONT BOYUKSHOR TECHNOPOLIS

augerandswan.com | maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

37


BOYUKSHOR RESIDENTIAL DISTRICT

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

38


FOREWORD BOYUKSHOR RESIDENTIAL DISTRICT

A GREEN BOYUKSHOR Our vision is formed by the evident urbanization processes taking place on the Absheron Peninsula and affecting the Greater Baku region. The rates at which these processes spread allow to assume that most of the Boyukshor Lake district can be absorbed by the city by the end of the construction works. The area is near the lake and within relatively easy reach from the Olympic Stadium, from Baku center, from the airport, from two Metro lines and from Absheron’s North Coast that is already a popular recreational zone. These factors allow to assume that the area has good potential for future development.

Interviews with city dwellers and real estate agents show that it will not be enough to de-pollute the territory for people to change their attitude. Therefore it’s important to create an environment transformation concept that can compete with the stereotypical perception of this land as ‘dirty’ and show people that it has potential and value.

So far the district is viewed as a very polluted one, and there is a local tradition of choosing residential districts near family. Both factors can slow down the development at this point.

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

39


MASTER PLAN BOYUKSHOR RESIDENTIAL DISTRICT

50 100 1000 м

50

100 250

50

100

500 м

250

500 м

250

500 м

1000 м

50

100

250

500 м

50

100

250

500 м

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

25 50

100ì

250 ì

500 ì

40


ENVIRONMENT RENEWAL BOYUKSHOR RESIDENTIALRENEWAL DISTRICT PROJECT ENVIRONMENT BOYUKSHOR RESIDENTIAL DISTRICT

A SAFE AND COMFORTABLE ENVIRONMENT FOR BOTH DRIVERS AND PEDESTRIANS. Good vehicle infrastructure makes residential districts accessible from the roads and includes plenty of parking spaces. Dividing pedestrian and car traffic zones makes the place comfortable and safe for children and elderly people. It can revive the Baku community’s tradition of vibrant street life. Narrow streets in the residential districts and buildings that aren’t too tall will ensure street safety, provide enough shadow to protect pedestrians from the sun and allow the residents to feel in control of the spaces beyond their backyard.

$

NEW BOYUKSHOR

PEOPLE-FRIENDLY BOYUKSHOR

- a new attitude towards the district - better quality of life and better real estate prices on every project stage - a varied mixed-use environment for all categories of people

- a European format of zoning where pedestrians and drivers don’t mix - public green spaces - active ground floor use for shopping and business outlets - low buildings - underground parking lots - new points of attraction such as a boating pier, a kid’s club, Formula 1 Powerboat facilities, outdoor public swimming pool

SAFE BOYUKSHOR

AFFORDABLE BOYUKSHOR

- splitting pedestrian and motorized traffic - traditional block structure - vibrant street life so residents feel they are in control - courtyards with underground parking lots - full infrastructure solutions for kids - designated pedestrian walkways and cycling paths

- residences for all categories - good proximity between home and work - various types of residences - good connection with various destinations within Greater Baku as well as with major international communication hubs

t

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

42 GSPublisherEngine 0.0.100.100


STREET VIEW BOYUKSHOR RESIDENTIAL DISTRICT

augerandswan.com | maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

43


FREE-STANDING BUILDINGS

LOCAL DWELLING MORPHOLOGY LOCAL DWELLING TYPOLOGY BOYUKSHOR RESIDENTIAL DISTRICT PROJECT BOYUKSHOR RESIDENTIAL DISTRICT

BALAHANI VILLAGE

SEMI-OPEN BLOCKS

20th CENTURY BUILDING PATTERN

PERIMETRTERS BLOCKS

HISTORICAL URBAN BLOCKS

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

44 GSPublisherEngine 0.0.100.100


OVERALL VIEW OF TERRITORY BOYUKSHOR RESIDENTIAL DISTRICT

augerandswan.com | maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

45


ZONING ZONINGPLAN PLAN BOYUKSHOR RESIDENTIAL DISTRICTDISTRICT PROJECT BOYUKSHOR RESIDENTIAL

Residential area College, school, kindergarten Commercial & office areas Green promenades & recreation areas Manufacture area Facilities

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

46 GSPublisherEngine 0.0.100.100


MOBILITY PLAN MOBILITY PLAN

BOYUKSHOR RESIDENTIAL DISTRICT

BOYUKSHOR RESIDENTIAL DISTRICT PROJECT Road Network

Public Transport

4

1

2 3

major city road

local street

district street

driveway

1

gateways

roadway

accessibility radius

bus stop Greenery

Bike Lanes

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

47 GSPublisherEngine 0.0.100.100


STAGES STAGES OF OF DEVELOPMENT DEVELOPMENT

STAGE 2

STAGE 1

BOYUKSHOR RESIDENTIAL DISTRICT PROJECT BOYUKSHOR RESIDENTIAL DISTRICT local center

first kindergarten and school

economy class housing

affordable housing

industrial facilities boulevard annex

college

STAGE 3

STAGE 4

school

business class housing Residential area College, school, kindergarten District center Manufacture area Recreation spaces

business class housing waterfront expansion

maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

48


DISTRICT CENTER VIEW BOYUKSHOR RESIDENTIAL DISTRICT

augerandswan.com | maksymkotsiuba.com | issuu.com/vlodco_zotov | buro-o.com

49


THANK YOU

Maria Andriyenko Olena Danylenko Serhiy Ferley Anton Gerasymovych Dmytro Gurin

Lilit Hakopyan Andriy Helenyk Viktor Herasymenko Maksym Kotsiuba Marianna Krivoruchko

Anton Oliynyk Maria Pakhomova Daria Podoltseva Lina Polianskaya Tavifa Ponomarenko

maksymkotsiuba.com | issuu.com/vlodco_zotov/ | buro-o.com

Egor Shtefan Irina Sheptuha Anna Vasilyeva Daria Voitenko Vlodco Zotov


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.