Velimir Manjulov Portfolio 2023

Page 1

Dodger Stadium Renovation& Stadium Improvements, Los Angeles CA | D’AIQ Architects | 2019-20
Dodger Stadium Renovation& Stadium Improvements, Los Angeles CA | D’AIQ Architects | 2019-20
LEFT AND RIGHT FIELD PAVILION RECONSTRUCTION WITH NEW CENTERFIELD PLAZA
Dodger Stadium Renovation& Stadium Improvements, Los Angeles CA | D’AIQ Architects | 2019-20
NEW ELEVATORS AND BRIDGES
RENOVATIONS
NEW BATTER’S EYE PAVILION
PAVILION
CREATION OF CENTERFIELD PLAZA
NEW SPORT BARS NEW FOOD AND RETAIL CONCESSIONS Dodger Stadium Renovation& Stadium Improvements, Los Angeles CA | D’AIQ Architects | 2019-20
Dodger Stadium Renovation& Stadium Improvements, Los Angeles CA | D’AIQ Architects | 2019-20
UP UP UP UP LAB SINK Eyewash 171 STOR 171 STOR 135E ELEC F-MICRO BENCHTOPCUSTOM FE FE MOUNTING BRACKET FE FE PSM Chiller SLM MIT Biomimetric Robotics Laboratory, MechE, Building 3, Cambridge MA | D’AIQ Architects | 2021-22 FIRST FLOOR
MEZZANINE
KILLIAN COURT
MIT Biomimetric Robotics Laboratory, MechE, Building 3, Cambridge MA | D’AIQ Architects | 2021-22
1 ENTRY 2 SEATING 3 BAR 4 GRILL 5 KITCHEN 6 STORAGE 7 RESTROOM N UP FLOOR PLAN 1 2 2 3 4 5 6 7 7 Yakitori Totto, Somerville, MA | Japanese Restaurant | D’AIQ Architects | 2021
Terrace House, Gloucester, MA | Vacation House | Butz + Klug Architects | 2018 59' 60' 50' 59' 58' 57' 56' 55' 54' 53' 52' 51' 61' 58' 50' 57' 56' 55' 54' 52' 53' 60' 50' 53' 55' R W/D 3'-0" 1 2 3 Y1 X1 X2 X3 X4 C A B D Bed Room 01 Bath 02 Hall 03 Hall 04 Vestibule 05 Kitchen 06 Dining/Living 07 Main Floor Plan Scale: 1/4" = 1'-0" A4.03 A4.05 A4.06 A4.08 1 A4.09 A4.04 A4.06 TOS 49' 6" 49' 0" 51' 0" 50' 6" 50' 0" 49' 6" 49' 8" 50' 4" 48' 6" 48' 0" 51' 0" 51' 6" WD Deck New Boulder Locations Existing Boulder Retaining Wall New Boulder Location New Boulder Location New Boulder Location NOTE: Relocated Boulders to be selected from Boulders currently stored on Site

LEARNING LAB/GALLERY

STUDY SPACE

LOUNGE/CIRCULATION

EXISTING

Lincoln School STEM Hub for Girls, Lincoln, RI | Teaching | LLB Architects | 2018
151 Exchange Street, Pawtucket, Rhode Island | Renovation & Restoration | Project Designer with LLB Architects, Pawtucket, RI | 2017-18 1 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 A B R2.1 R2.2 R2.3 R2.4 R2.7 R2.5 R2.6 DRVEWAYUP LINE OF PARKING DECK ABOVE BLACKSTONE RIVER RAISED PLANTER BED EXISTING RETAINING WALL LINE OF PEDESTRIAN BRIDGE ABOVE PARKNGSPAC S 847 SF 895 SF 1,116 SF 1,062 SF 1,106 SF 568 SF 585 SF 1 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 A B LW3.1 R3.1 R3.2 R3.3 B3.1 O EN TO BELOW DRVEWAYDOWN EXCHA NGE STREET EXCHANGECOURT SITE TRANSFORMER LINE OF RETAINING WALL BELOW PARKING DECK PEDESTRIAN BRIDGE TRASH/RECYLE ENCLOSURE 9 P RKING SPACES 2 COMPACT 3,879 SF 2,034 SF 2,051 SF 1,819 SF 847 SF UNIT R1.1 UNIT R1.2 UNIT R1.4 UNIT R1.6 UNIT R1.5 UNIT TYPE UNIT R1.3 UNIT NUMBER ONE BEDROOM ONE BEDROOM ONE BEDROOM ONE BEDROOM STUDIO ONE BEDROOM ONE BEDROOM STUDIO UNIT TYPE OVERALL COUNT COURTYARD LEVEL UNITS UNIT R2.1 UNIT R2.2 UNIT R2.4 UNIT R2.7 UNIT R2.5 UNIT TYPE UNIT R2.3 UNIT NUMBER ONE BEDROOM ONE BEDROOM TWO BEDROOM ONE BEDROOM ONE BEDROOM ONE BEDROOM ONE BEDROOM TWO BEDROOM UNIT TYPE OVERALL COUNT UNIT R2.6 ONE BEDROOM UNIT R3.1 UNIT R3.2 UNIT LW3.1 UNITB3.1 UNIT TYPE UNIT R3.3 UNIT NUMBER TWO BEDROOM TWO BEDROOM TWO BEDROOM LIVE WORK BUSINESS TWO BEDROOM UNIT TYPE OVERALL COUNT STREET & SKY LEVEL UNITS STREET LEVEL STREET LEVEL PARKING SITE LEVEL PARKING COMPACT PARKING COUNT COURTYARD LEVEL PARKING REGULAR SPACE 16 PARKING TYPE OVERALL COUNT COMPACT SPACE2 STUDIO UNIT ONE BEDROOM UNIT OVERALL UNIT TYPE OVERALL UNIT COUNT TWO BEDROOM UNIT LIVE WORK UNIT1 BUSINESS TOTAL OVERALL COUNT RESIDENTIAL UNITS 16 UNIT TOTAL = 18 PARKING TOTAL = 18 RIVER LEVEL UNITS 1 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 A B R1.1 R1.2 R1.3 R1.4 R1.5 R1.6 STORAGE R1.3 BALCONY BLACKSTONE RIVER R1.2 BALCONY R1.1 BALCONY R1.4 BALCONY R1.5 BALCONYR1.6 BALCONY 553 SF 678 SF 691 SF 686 SF 432 SF 715 SF 1 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 A B R3.3 UPPER R3.2 UPPER R3.1 UPPER LW3.1 UPPER COURTYARD VIEW WITH PAWTUCKET CITY HALL IN BACKGROUND COURTYARD LEVEL FLOOR PLAN STREET LEVEL FLOOR PLAN RIVER LEVEL FLOOR PLAN SKY LEVEL FLOOR PLAN Fuller & Son Jewelry Findings, Pawtucket, RI | Multifamily residential | LLB Architects | 2017-18
Worcester Sports Center,
| LLB Architects | 2017-18 UP UP UP--LOADING C CC C NO PARKING FIRE LANE NO PARKING FIRE LANEFIRELANE ARKING 0 470 SB/DH(FND) (2 OFFSET) H H 0 RCP 10 RCP 0 9 M D S G G E E D H D FUTURE RESTAURANT RINK MAINTENANCE ROOM LOCKER ROOM ELEV. MACHINE RM. COFFEE SHOP RINK DECK FUTURE TENANT LOCKER ROOM 14 LOCKER ROOM 13 LOCKER ROOM LOCKER ROOM OFFICE WOMEN'S RR PRO SHARP LOBBY VESTIBULE RINK MGR. CONCESSIONS RINK DECK LOCKER ROOM LOCKER ROOM LOCKER ROOM LOCKER ROOM TLT TLT TLT BENCH PENALTY 2B BENCH 2A PENALTY 2A BENCH 1A PENALTY 1A PENALTY 1B BENCH 1B UP DN DN DN DN BOOSTER ROOM RESTAURANT OPEN TO BELOW OPEN TO BELOW SEATING SECTION 740 PPL. SEATING SECTION 340 PPL. OPEN TO BELOW BELOW HOCKEY SKILLS PHYSICAL THERAPY WOMEN'S RR 1RR SEATING RINK1 VENDING Worcester Sports Center | Worcester, Massachusetts | Project Designer with LLB Architects, Pawtucket, RI | 2017-18 FIRST FLOOR MEZZANINE UP UP UP--LOADING C CC C NO PARKING FIRE LANE NO PARKING FIRE LANEFIRELANE ARKING 0 470 SB/DH(FND) (2 OFFSET) H H 10 RCP 0 RCP 0 9 M D S S G G E D H D FUTURE RESTAURANT RINK MAINTENANCE ROOM STORAGE ELECTRICAL DATA LOCKER ROOM JANITOR FIRE SERVICE ELEV. MACHINE RM. COFFEE SHOP RINK DECK FUTURE TENANT LOCKER ROOM 14 LOCKER ROOM 13 CONCESSIONS PREP ELEVATOR LOCKER ROOM 12 LOCKER ROOM 11 OFFICE WOMEN'S PRO SHARP LOBBY VESTIBULE RINK MGR. RINK DECK LOCKER ROOM LOCKER ROOM LOCKER ROOM LOCKER ROOM TLT TLT./SHWR. TLT TLT BENCH 2B PENALTY BENCH 2A PENALTY 2A BENCH PENALTY 1A PENALTY 1B BENCH UP DN DN DN DN BOOSTER ROOM RESTAURANT OPEN BELOW OPEN TO BELOW SEATING SECTION 740 PPL. SEATING SECTION 340 PPL. OPEN TO BELOW BELOW HOCKEY SKILLS PHYSICAL THERAPY WOMEN'S RR RR 1RR SEATING RINK1 VENDING Worcester Sports Center | Worcester, Massachusetts | Project Designer with LLB Architects, Pawtucket, RI | 2017-18
Worcester MA
LOCKER ROOM LOCKER ROOM 034 036 LOCKER ROOM LOCKER ROOM LOCKER ROOM LOCKER ROOM LOCKER ROOM LOCKER ROOM LOCKER ROOM LOCKER ROOM 012 INDOOR SOCCER 035 TLT 011 PRO SHOP 042 STORAGE 046 RINK DECK RESTROOM 059 TIME KEEPER 055 FIRE PUMP ROOM 088 NUTRITION TENANT ROOM WHWH
Essex Sports Center | Middleton, Massachusetts | Project Designer with LLB Architects, Pawtucket, RI | 2016 Essex Sports Center, Middletown, MA | Sport Center| LLB Architects | 2016 FIRST FLOOR
DN DN DN DN DN DN DN UP RESTAURANT 135A VESTIBULE 114 PREMIER RINK BELOW RECREATIONAL RINK BELOW HOCKEY SKILLS 139 CONCESSIONS (DUNKIN DONUTS) 111 CHILDREN'S FEC 127 PRO SHOP 118 CONCESSIONS (YOGURT) 112 OFFICE 133 CONFERENCE ROOM 131 MECH ROOM 142 STUDIO RINK BELOW OFFICE 134 OFFICE 128 OFFICE 129 OFFICE 130 RINK MANAGER 120 LOBBY 115 OPEN TO BELOW DATA CLOSET 121 FAMILY RESTROOM 125 WOMEN'S ROOM 124 MEN'S ROOM 122 ELEV. 1E1 HALL MATCHLINE CONCOURSE 109 PRO SHOP 117 CORRIDOR 113B CORRIDOR 113A STRENGTH & CONDITIONING 138 MEN'S ROOM 106 WOMEN'S ROOM 105 STAIR 2 1S2 CONCESSIONS 107 MEZZANINE 101 MAIN STAIR LOBBY 110 JC 123 SUITE 132 CORRIDOR 126 STAIR 1 1S1 PRO SHOP 116 OFFICE 119 STAIR 1S3 CENTER OF RINK CLOSET 119A MEZZANINE 102 New England Sports Village - Premier Skating Facility | Attleboro, Massachusetts | Project Designer with LLB Architects, Pawtucket, RI | 2016 UP UP X20 X19 000A 058 X17 0S2A X18 Attleboro, Massachusetts | Project Designer with LLB Architects, Pawtucket, RI | 2016 UP UP UP X12 X20 X19 000A 058 X13 X17 0S2A 002C X18 UPPER LEVEL LOWER LEVEL New England Sports Village Premier Skating Facility | Attleboro, MA | LLB Architects | 2016
James Jeffords Hall – Plant Sciences Building, University of Vermont, Burlington, VT | Ellenzweig 2007-08 FIRST FLOOR
James Jeffords Hall – Plant Sciences Building, University of Vermont, Burlington, VT | Ellenzweig 2007-08
James Jeffords Hall – Plant Sciences Building, University of Vermont, Burlington, VT | Ellenzweig | 2007-08
Marina Bay Sands Integrated Resort, Singapore | Safdie Architects | 2006-07
(LEVEL 30)
HIGH
15) LOBBY LEVEL
HIGH (LEVEL
Marina Bay Sands Integrated Resort, Singapore | Safdie Architects | 2006-07
Marina Bay Sands Integrated Resort, Singapore | Safdie Architects | 2006-07
Marina Bay Sands Integrated Resort, Singapore | Safdie Architects | 2006-07

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.