DL RCC
TRA FFI C
N EW S
Saturday 3rd September 2016 – to – Friday 9th September 2016 A public service provided by the Transportation & Water Services Department of Dún Laoghaire-Rathdown County Council. Listed below are noteworthy road works of which the Traffic and Road Safety Section has been informed. Details are supplied as per information received by 16:00 hrs on the preceding Thursday. Emergency road works cannot be forecast. » #
New Entry Update
Estimate of Potential Disruption: *** major ** medium * minor
PROPOSED ROAD CLOSURES
Section 75 of the Roads Act, 1993 Temporary Closure of Johnstown Road, Cabinteely Dún Laoghaire-Rathdown County Council has received an application from Clonmel Enterprises to temporarily close Johnstown Road between the junctions with the N11 and the Old Bray Road, Cabinteely. The closure is to take place from 19.30 to 06.00 hrs. each night from: Monday, 19th September to Thursday, 22nd September 2016. The purpose of the proposed closure is to facilitate road works as part of the N11Johnstown Road junction improvement scheme. Pedestrian access will be maintained at all times. The proposed diversion route will be via the Old Bray Road and onto the N11 at the junction with Clonkeen Road and vice versa. A Traffic Management Plan will be in place and the diversion will be clearly signposted. Any interested party may lodge an objection online at www.dlrcoco.ie or in writing to the Senior Engineer, Traffic Section, County Hall, Marine Road, Dún Laoghaire not later than noon on Tuesday, 13th September 2016.
Page 1 of 6
ROAD CLOSURES
Section 75 of the Roads Act 1993 Temporary Closure of Tivoli Terrace South, Dún Laoghaire (Night works) Dún Laoghaire-Rathdown County Council Traffic Section has approved the temporary closure of Tivoli Terrace South, Dún Laoghaire from its Junction with York Road to its Junction with Tivoli Terrace East from: Wednesday, 17th August 2016 to Friday, 21st October 2016 inclusive, in order to facilitate road restoration and associated works as part of Dún LaoghaireRathdown County Council’s Road Restoration Programme 2016. A Traffic Management Plan with diversion routes will be in operation and local access will be maintained for the full duration of the works.
Section 75 of the Roads Act 1993 Temporary Closure of Commons Road, Loughlinstown Dún Laoghaire-Rathdown County Council Traffic Section has approved the temporary closure of Commons Road, Loughlinstown from its Junction with N11 to its Junction with Shanganagh Road from: Wednesday, 10th August 2016 to Friday, 16th September 2016 inclusive, in order to facilitate road restoration and associated works as part of Dún Laoghaire Rathdown-County Council’s Road Restoration Programme 2016 A Traffic Management Plan with diversion routes will be in operation and local access will be maintained for the full duration of the works. Commons Road will be closed from its junction with the N11 to Shanganagh Road with a signed detour put in place. There will be no access to Commons Road from the N11 and Local access will be maintained from Shanganagh Road ONLY for the duration of the works. Traffic approaching from the N11 will be diverted via Loughlinstown Roundabout, Dublin Road, and Shanganagh Road. On street parking within the works area will be restricted, however, local access will be maintained at all times for residents. Works will be undertaken during the hours of 08:00 and 18:00 hrs.
Page 2 of 6
ROADWORKS / LANE RESTRICTIONS
»
Booterstown Avenue, Blackrock **
ESB overhead lines installation works will take place on Sunday, 4th September 2016 between 07:00 and 13:00 hrs. A Stop / Go Traffic Management Plan will be in operation.
»
Brighton Road, Foxrock **
Bituminous footpath repair will commence on Monday, 5th September 2016 until Friday, 9th September 2016 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
»
Westminster Road, Foxrock **
Concrete footpath repairs will commence on Monday, 2nd September 2016 until Friday, 9th September 2016 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
»
Cross Avenue, Blackrock *
Ground Investigation works will take place from Monday, 5th September 2016 until Friday, 9th September 2016 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
»
Dorney Court, Shankill *
Road patching repair works will commence on Monday, 5th September 2016 until Friday, 16th September 2016 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
»
Rock Road, Blackrock *
There will be road sweeping and gully cleaning on the Rock Road from Newtownpark Avenue to Tara Towers Northbound and Southbound this Saturday and Sunday 3rd and 4th September 2016 starting at 07:00 and finishing at 15:00 hrs. Traffic Management and slow moving crash cushion vehicle will be in operation at this location and times. Page 3 of 6
#
Gortnamona / St. Bridget’s Park, Cabinteely ***
Road resurfacing works will continue until Friday, 9th September 2016 between 08:00 and 18:00 hrs. Severe restrictions will be in place and temporary road closure. A Traffic Management Plan will be in operation. VMS Signs will be used for information purposes.
#
Allen Park Road/Drive, Stillorgan **
Road resurfacing works will continue until Friday, 9th September 2016 between 08:00 and 18:00 hrs. Severe restrictions will be in place and temporary road closure. A Traffic Management Plan will be in operation. VMS Signs will be used for information purposes.
#
N11 / Johnstown Road Junction **
Works to facilitate the upgrade of the junction of Stillorgan Road / Johnstown Road junction will take place from the end of May 2016 to the end of October 2016. Various traffic restrictions will apply over the duration of the scheme and night works are due to commence soon. The outbound bus lane on the N11 is currently closed approaching the junction and works are ongoing along Johnstown Road and on the N11 approaching the junction. A Traffic Management Plan will be in operation for the duration of the works.
#
Marley Grange Estate, Rathfarnham *
Footpath restoration works will continue until Friday, 9th September 2016 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
#
Balally Estate, Dundrum *
Road reinstatement works will continue until Friday, 9th September 2016 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
Page 4 of 6
Bird Avenue, Churchtown / Dundrum / Clonskeagh *** Footpath and road reconstruction works plus drainage and ducting works will take place from Monday, 15th August 2016 until end of November 2016 between 08:00 and 19:00 hrs. Severe traffic disruption is expected. Stop / Go Traffic Management Plan will be in operation.
The Rise, Mount Merrion ** Kerb and bituminous footpath works will commence on Wednesday, 17th August 2016 until Friday, 9th September 2016 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
Sallyglen Road, Sallynoggin ** The scheme to implement ‘New Bus Routings – Sallyglen Road’ started on site on Friday 12th August 2016 for a period of six weeks. Every attempt will be made to keep disruption at a minimum throughout the duration of the works, and a Traffic Management Plan will be in operation. The use of Stop / Go Traffic Management will be intermittently required throughout the works.
Public Lighting Lantern and Bracket Upgrade Works ** Public lighting lantern and bracket upgrade works will take place on: 1. 2. 3. 4. 5.
Goatstown Road Crofton Road Wyckham way Mount Anville Road Roebuck Road
These works will continue until Friday, 25th November 2016. A Stop / Go Traffic Management Plan will be in operation as required.
Convent Road, Blackrock ** KN Network Services will be carrying out footpath widening works on Convent Road, Blackrock from its junction with Carysfort Avenue to Carysfort National School Entrance. Works will be carried out from Monday, 18th July 2016 between 08:00 and 18:00 hrs. for 8 weeks. A Traffic Management Plan will be in operation. Page 5 of 6
Broadford Estate, Ballinteer * Footpath restoration works will commence on Wednesday, 24th August 2016 until Friday, 23rd September 2016 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
Fairlawns, Dalkey * Road /Footpath restoration works will commence on Monday, 29th August 2016 until Monday, 3rd October 2016 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
Hillside and Dalkey Park, Dalkey * Road /Footpath restoration works will commence on Monday, 29th August 2016 until Monday, 3rd October 2016 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
Irish Water * Irish Water meter installation works will continue next week. A Traffic Management Plan will be in operation. Further information on planned Irish Water works may be obtained from Irish Water
1890 278 278
M50/M11 - Northbound/Southbound Information on planned road works along the M50 can be found at: http://m50concession.com/operation-maintenance/planned-road-works/
End
Page 6 of 6