Saturday, 18th February 2017 – to – Friday, 24th February 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below are noteworthy road works of which the Traffic and Road Safety Section has been informed. Details are supplied as per information received by 16:00 hrs on the preceding Thursday. Emergency road works cannot be forecast. » #
New Entry Update
Estimate of Potential Disruption: *** major ** medium * minor
ROADWORKS / LANE RESTRICTIONS
» »
New Entry: Newtownpark Avenue, Blackrock ***
(Nightworks)
GPR survey works will be undertaken on Newtownpark Avenue from its junction with Newtown Park to its junction with Stradbrook Road commencing from Monday, 20 th February 2017 until Friday, 24th February 2017 between 19:00 and 06:00 hrs. An approved Traffic Management Plan will be in operation for the duration of the works.
»
Glenageary Road Upper adjacent to Gowrie Park ***
Site investigation road works will take place from 6th to 10th March 2017 for ESB Networks. A traffic management plan will be in place for the duration of the works including a traffic lights switch-off and Stop/Go arrangement.
»
R118 / Wyattville Dual Carriageway, Cherrywood ***
The delivery of the Cherrywood Strategic Development Zone will involve significant construction works over the next 18 months in the Cherrywood area. The first phase of infrastructure provision for the Cherrywood Strategic Development Zone will be delivered by JCL the joint venture between John Cradock Ltd. /Jons Civil Engineering. Page 1 of 4
Major road works are expected to begin on the Wyattville Dual Carriageway between M50 Junction 16 and the N11 at Cherrywood, on 9th February 2017 for the remainder of the year. The primary focus of this phase of the infrastructure works is the upgrade of the Wyattville Roundabout to a signalised junction, and upgrade of Tullyvale Road, involving road construction, road drainage, public lighting, provision of utilities, etc. Traffic restrictions will be in place for the duration and delays can be expected. It is intended to retain two lanes of traffic inbound and outbound. Please note that Pay and Display parking on Tullyvale Road will cease permanently from 1st February 2017, however, Pay and Display parking is available adjacent to the Brides Glen Luas stop, on Cherrywood Avenue Extension. Project Liaison Officer RPS/dlr
»
Louise Farrell Shane Fanning
087 241 0767 086 609 3707
Bird Avenue, Clonskeagh **
Drainage investigation works and CCTV surveys will commence on Monday, 20th February 2017 until Friday 24th February 2017 between 10:00 and 16:00 hours. A Traffic Management Plan will be in operation.
»
Mount Carmel Avenue (Rosemount) *
Footpath restoration works will commence on Monday, 20th February 2017 until Friday, 3rd March 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
»
Merville Road and Allen Park, Stillorgan *
Footpath renewal works will commence on Monday, 20th February until Friday, 24th February 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
#
Update:
#
N11 Stillorgan Road, Stillorgan ** VMS Installation [variable message signs] near Commons Road - 2 sides of road, Stillorgan Grove outbound, past Galloping Green inbound, past Stillorgan Park Road inbound, Frascati Road inbound (near Sweetman’s Avenue)
Works will continue to create foundations and install VMS at various locations from Monday, 20th February 2017 until Friday, 24th February 2017 between 10:00 and 16:00 hrs. A Traffic Management Plan will be in operation. Page 2 of 4
#
Marlay Court / Broadford Road, Ballinteer **
Footpath and tactile pavement renewal works will continue until Friday, 24th February 2017 between 08:00 and 17:00 hrs. A Traffic Management Plan will be in operation.
# Shanganagh Road, Shankill ** (from Bloomfield Court Texaco Station towards Beechfield Manor) Footpath restoration works will continue until Friday, 24th February 2017 between 10:00 and 16:00 hrs. A Stop / Go Traffic Management Plan will be in operation.
#
Pearse Villas, Sallynoggin *
Snagging works will continue until Friday, 24th February 2017 between 08:00 and 18:00 hrs. An approved Traffic Management Plan will be in operation for the duration of the works.
#
Gledswood Avenue, Clonskeagh *
Kerb and footpath repairs will continue until Friday, 24th February 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
Mount Anville Road, Goatstown ** Works will begin on Mount Anville Road to facilitate the installation of a water main between Goatstown Road junction and Mount Anville Park, on Monday 30th January 2017 for a period of two months. Lane restrictions may be in place between the hours of 10:00 and 16:00 hours. A Traffic Management Plan will be in operation.
Pottery Road ** Construction of a new wall on the east side of Pottery Road opposite the entrance to DĂşn Laoghaire Industrial Estate (opposite Lidl) will commence on Thursday, 26th January 2017 and continue until the end of February 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation. Page 3 of 4
Annaville Avenue, Blackrock ** Footpath and road restoration works are due to commence on Annaville Avenue during the week commencing Monday, 6th February 2017 for duration of three weeks between 10:00 and 16:00 hrs. A Traffic Management Plan will be in operation.
Public Lighting Lantern and Bracket Upgrade Works ** Public lighting lantern and bracket upgrade works will take place on: 1. 2. 3. 4. 5. 6.
Drummartin Link Road Kilmacud Road Upper Goatstown Road Rock Road Enniskerry Road Frascati Road
These works will continue until Friday, 31st March 2017. A Stop / Go Traffic Management Plan will be in operation as required.
Desmond Avenue, DĂşn Laoghaire * Public realm improvement works will continue until Friday, 24th February 2017 between 09:00 and 17:00 hrs. There will be parking and access restrictions on Desmond Avenue during this period. A Traffic Management Plan will be in operation.
M50/M11 - Northbound/Southbound Information on planned road works along the M50 can be found at: http://m50concession.com/operation-maintenance/planned-road-works/