DL RCC
TRA FFI C
N EW S
Saturday, 30th September 2017 – to – Friday, 6th October 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below are noteworthy road works of which the Traffic and Road Safety Section has been informed. Details are supplied as per information received by 16:00 hrs. on the preceding Thursday. Emergency road works cannot be forecast. » #
New Entry Update
Estimate of Potential Disruption: *** major ** medium * minor
PROPOSED ROAD CLOSURE
»
Section 75, Roads Act 1993 Temporary Closure of Roadways to Facilitate the Airtricity Dublin City Marathon 2017
Dún Laoghaire-Rathdown County Council intends to make an order authorizing the temporary closure of the following roads: Sunday 29th October 2017
From
To
CLONSKEAGH ROAD ROEBUCK ROAD FOSTER’S AVENUE STILLORGAN ROAD (R138 Dual Carriageway), North from the junction with Foster’s Avenue and via the UCD Flyover to the County Boundary
09.00 09.00 09.00
17.00 17.00 17.00
09.00
17.00
Local diversion routes will be in place. Any interested parties may lodge an objection in writing with the Senior Engineer, Traffic Section, County Hall, Marine Road, Dún Laoghaire not later than noon on: Monday 9th of October 2017 or email traffic@dlrcoco.ie
Page 1 of 7
ROAD CLOSURES
Section 75 of the Roads Act 1993 Extension to Temporary Closure of Kelly’s Avenue, Dún Laoghaire Dún Laoghaire-Rathdown County Council has received an application from John Sisk and Sons (Holdings) Ltd), Wilton Works, Naas Road, Dublin 22 to extend the period of temporary closure of Kelly’s Avenue, Dún Laoghaire from its junction with George’s Place to its junction with Crofton Road to through traffic from Monday 16th October, 2017 to Friday 10th November, 2017. The purpose of the closure is to make a new drainage connection for the new Rapid Delivery housing development at George’s Place, Dún Laoghaire. A Traffic Management Plan will be in place and the diversion routes will be clearly signposted. Local Access will be maintained at all times.
Section 75 of the Roads Act 1993 Extension to Temporary Closure at The Mews, Sallynoggin Park Dún Laoghaire Rathdown County Council proposes to extend the temporary closure of Sallynoggin Park at the new Housing Development “The Mews” from 15th September 2017 to 6th October 2017 inclusive, in order to facilitate drainage connections and associated works adjacent to 49 Sallynoggin Park. A Traffic Management Plan with diversion routes will be in operation and local access will be maintained for the full duration of the works.
ROADWORKS / LANE RESTRICTIONS
»
New Entry:
»
Monkstown Road, Monkstown **
Single lane traffic will be in operation on Monkstown Road between 10:00 and 16:00 hrs. from Monday, 2nd October 2017 until Friday, 1st December 2017 to facilitate the installation of a new water main. A Traffic Management Plan will be in operation.
»
Mapas Avenue, Dalkey **
Footpath restoration works will commence on Monday, 2nd October 2017 until Friday, 20th October 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation. Page 2 of 7
»
Ulverton Road, Dalkey **
Footpath restoration works will commence on Monday, 2nd October 2017 until Wednesday, 4th October 2017 between 08:30 and 17:00 hrs. A Stop / Go Traffic Management Plan will be in operation.
»
Link Road off UCD Southbound Slip Lane local to Cranford Court **
Road crossing and column installation works will commence on Monday, 2nd October 2017 until Friday, 13th October 2017. A Traffic Management Plan will be in operation.
»
Kingston and Grangefield Estates, Ballinteer *
Footpath and cycle track improvement and associate works will commence on Monday, 2nd October 2017 until Friday, 20th October 2017 between 10:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
#
Killiney Hill Road, Killiney **
Snagging works will continue on Killiney Hill Road until Friday, 6th October 2017 between 8:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
#
Saval Park Gardens, Dalkey **
Snagging works will commence on Monday, 2nd October 2017 until Friday, 6th October 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
#
Avondale Crescent, Killiney **
Footpath restoration works will continue until Friday, 6th October 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
Page 3 of 7
#
North Avenue, Blackrock **
Road and footpath restoration works will continue until Friday, 6th October 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
#
Stillorgan Laneways *
Civil works and laneway upgrade works will continue until Friday, 6th October 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
R118 / Wyattville Dual Carriageway, Cherrywood **** The delivery of the Cherrywood Strategic Development Zone will involve significant construction works over the next 8 months in the Cherrywood area. The first phase of infrastructure provision for the Cherrywood Strategic Development Zone will be delivered by JCL the joint venture between John Cradock Ltd. / Jons Civil Engineering. Major road works began on the Wyattville Dual Carriageway between M50 Junction 16 and the N11 at Cherrywood, on 9th February 2017 and will continue for the remainder of the year. The primary focus of this phase of the infrastructure works is the upgrade of the Wyattville Roundabout to a signalised junction, and upgrade of Tullyvale Road, involving road construction, road drainage, public lighting, provision of utilities, etc. Traffic restrictions will be in place for the duration and delays can be expected. It is intended to retain two lanes of traffic inbound and outbound. Please note that Pay and Display parking on Tullyvale Road will cease permanently from 1st February 2017, however, Pay and Display parking is available adjacent to the Brides Glen Luas stop, on Cherrywood Avenue Extension. From the 24th April 2017, traffic shall be reduced to 1 lane in both directions on the R118 Wyattville Link Rd between the N11 and M50 from 10am and 4pm daily. This is to facilitate the installation of new service crossings across the R118 Wyattville Link Road in multiple locations. From the 24th April 2017, it is also intended to install barriers to the median of the R118 Wyattville Link Rd (between the M50 and Cherrywood Roundabout) to facilitate works in the median.
Page 4 of 7
Wyattville Road Pedestrian and Cycle Scheme *** Work commenced on the Wyattville Road Pedestrian and Cycle Scheme on Monday, 8th May 2017 between 08.00 and 18.00 hrs. Monday to Friday. The scheme involves the upgrade of Wyattville Road between Wyattville Close and Churchview Road and is expected to continue until May 2018. A Traffic Management Plan will be in operation for the duration of the works.
Frascati Shopping Centre Extension *** Right Turn into Shopping Centre from City Centre - Closed Straight Ahead into Shopping Centre from Rock Hill - Closed In order to facilitate the on-going extension works at Frascati Shopping Centre the existing right turn lane, on the outbound carriageway from the City Centre and the existing straight ahead movement from Rock Hill into Frascati Shopping Centre will be closed temporarily. The temporary closures of the right hand turning lane and straight ahead movement from Rock Hill are to facilitate the on-going construction process for the new underground car park. A one-way traffic management system will be implemented on site to facilitate the works. Car park attendants will be deployed at peak times within the shopping centre to ensure that shopping centre traffic operates smoothly during the period of the development works. A Traffic Management Plan will be in operation for the duration of the works. Diversions will be in place to direct traffic towards the shopping centre entrance at the end of George’s Avenue.
Monkstown Village Improvement Scheme *** Work commenced on the Monkstown Village Improvement Scheme on Monday, 24th April 2017 between 08.00 and 18.00 hrs. - Monday to Friday. Works affecting two-way traffic through the Village are restricted between 10:00 and 16:00 hours. The current phase of works is along the south side of Carrickbrennan Road up to Goggins Pub. From Wednesday, 16th August at 8am the area in front of the Church of Ireland will be made two-way and Clifton Avenue will be made one-way towards Seapoint Avenue. This is in line with the final design of the scheme. A Traffic Management Plan will be in operation and information relating to the scheme will be available at: www.dlrcoco.ie/monkstown
Page 5 of 7
Ballinteer Road, Dundrum *** Stone wall construction, bank formation and tree removal between Lynwood and Ailsbury Lawns will commence on Monday, 18th September 2017 until Friday, 27th October 2017 between 10:00 and 16:30 hrs. A Traffic Management Plan will be in operation.
Seafield Road, Blackrock ** Road and footpath reconstruction works will be carried out from Monday, 2nd October 2017 until Friday, 27th October 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
Mount Carmel Avenue and Eden Park Road, Goatstown ** Ramp reconstruction works will be carried out from Monday, 2nd October 2017 until Friday, 6th October 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
Stillorgan Village Centre, Stillorgan (Kilmacud Road Lower and Old Dublin Road) ** Construction of a traffic island on the Dublin Road and installation of new road markings on Old Dublin Road and Kilmacud Road Lower, Stillorgan, (adjacent to Stillorgan Shopping Centre) will commence on Tuesday, 19th September 2017 until Monday, 2nd October 2017 between 10:00 and 16:00 hrs. and between 19:00 and 23:00 hrs. A Traffic Management Plan will be in operation.
Glenageary Road Upper (adjacent to Gowrie Park / St Kevin’s Villas) ** (Night works)
ESB cabling and jointing works will commence on Monday, 18th September 2017 until Friday, 6th October 2017 between 00:00 and 23:59 hrs. The works will be in place for 24hrs/day for a period of 12 days. A Traffic Management Plan will be in operation.
Page 6 of 7
Cherrywood Estate ** Road restoration works will commence on Wednesday, 20th September 2017 until Friday, 13th October 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation during the works.
Barton Road East, Rathfarnham ** Road reconstruction works will commence on Monday, 11th September 2017 until Saturday, 21st October 2017 between 10:00 and 16:30 hrs. A Traffic Management Plan will be in operation.
Public Lighting Lantern and Bracket Upgrade Works ** Public lighting lantern and bracket upgrade works will take place on: 1. Drummartin Link Road 2. Kilmacud Road Upper 3. Sandyford Road 4. Deansgrange Road 5. Clonkeen Road 6. Blackthorn Drive 7. Kill Lane/Avenue 8. Enniskerry Road 9. Clonskeagh Road 10. Leopardstown Road 11. Frascati Road These works will continue until Friday, 22nd December 2017. A Stop / Go Traffic Management Plan will be in operation as required.
Wedgewood Estate, Sandyford * Footpath restoration works commenced on Thursday, 21st September 2017 until Friday, 13th October 2017 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation.
M50/M11 - Northbound/Southbound Information on planned road works along the M50 can be found at: http://m50concession.com/operation-maintenance/planned-road-works/
End Page 7 of 7