Saturday, 10th November 2018 – to – Friday 16th November 2018 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below are noteworthy road works of which the Traffic and Road Safety Section has been informed. Details are supplied as per information received by 16:00 hrs. on the preceding Thursday. Emergency road works cannot be forecast. » #

New Entry Update

Estimate of Potential Disruption: *** major ** medium * minor

ROAD CLOSURES

» Section 75 of the Roads Act, 1993 Temporary Closure of Gort na Mona Drive, Cornelscourt, Dublin 18 Dún Laoghaire Rathdown County Council has made an order to temporarily close Gort Na Mona Drive from the junction of Kerrymount Rise and the junction of Cornelscourt Hill Road from 09.00 a.m. to 5.00 p.m. from Tuesday 20th November, 2018 to Wednesday 21st November, 2018 inclusive, in order to facilitate a gas connection. A Traffic Management Plan will be in operation and local access will be maintained.

ROADWORKS / LANE RESTRICTIONS

»

Bird Avenue, Clonskeagh *

Minor water main repair works are planned to commence in the week commencing 12th November 2018 on Bird Avenue, Clonskeagh, near the junction with ‘the Maples’. The works are expected to finish before 1st December 2018. Works will involve the excavation and reinstatement of the (Northern) footpath near the junction with ‘the Maples’. Page 1 of 5


There may be minor disruptions to road traffic between the hours 10.00 -16.00, particularly during periods when materials are being delivered to, and removed from site. A Traffic Management Plan will be in place.

»

South Park, off Clonkeen Road **

Road works to install a gas main will take place from Monday 12th November to Friday 16th November between 10.00 am – 4.00pm. A Stop / Go Traffic Management Plan will be in place.

»

Cabinteely Way, Clonkeen Road **

Road works to install a gas main will take place on Saturday 10th November between 8.00am - 8.00 pm. Traffic lights will be switched off and a Stop / Go Traffic Management Plan will be in place.

»

Monkstown Avenue **

Road works to install a gas main at 95 Monkstown Avenue will take place on Friday 16th November between 10.00 am to 4.00 pm. Local diversion of traffic will be in place.

»

Glencarrick, Glenamuck Road South **

Road works to install a gas main will take place on Saturday 10th November between 9.00am – 5.00pm. A Stop/Go traffic management system will be in place.

»

Sweetman’s Avenue, Blackrock ***

Road restoration and associated works will recommence on Saturday, 10th November 2018 until Friday, 16th November 2018 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation for the duration of the works.

Page 2 of 5


Stillorgan Road - at the junction with Greenfield Road *** To facilitate the installation of a new bus stop on the Stillorgan Road at the junction with Greenfield Road. Intermittent closures of the bus lane will occur to facilitate construction works from Monday 22nd October to Friday 30th November, 2018 between 10:00 and 16:00 hrs. A Traffic Management Plan will be in place.

Fosters Avenue - junction of Fosters Avenue and North Avenue ** New island construction works will commence on Monday, 5th November 2018 until Friday, 30th November 2018 between 10:00 and 16:00 hrs. A Stop / Go Traffic Management Plan will be in place.

Beech Hill Road, Clonskeagh – from entrance to Smurfit Kappa ** Excavation works to install a two-way duct will commence on Monday, 5th November 2018 until Friday, 30th November between 10:00 and 16:00 hrs. A Stop / Go Traffic Management Plan will be in operation.

Thornfield Road, Blackrock ** Water main rehabilitation works will commence on Monday, 5th November 2018 until Tuesday, 18th December 2018 between 10:00 and 16:00 hrs. A Stop / Go Traffic Management Plan will be in operation.

#

Lower Kilmacud Road *** at the junctions of South Avenue and Upper Kilmacud Road

Upgrade of existing junctions commenced on Monday, 3rd September 2018. Permanent Traffic Management is in place until the end of November. Any lane restrictions required will be in place from 10:00 to 16:00 hrs. daily.

Page 3 of 5


Monkstown Road – Road Closure (As Required) *** Road/Footpath Restoration and associated works will continue until Friday, 23rd November 2018 between 08:00 and 19:00 hrs. A Traffic Management Plan and signed detours will be in operation and local access will be maintained.

N11 – Northbound between Knocksinna and Westminster Junctions ** Public lighting column and lantern upgrade works will continue until Friday, 23rd November 2018. Work will be carried out between the hours of 10:00 - 16:00 hrs. and 19:30 – Midnight (if required). A Traffic Management Plan will be in operation for the duration of the work.

N11 – Southbound between Knocksinna and Westminster Junctions ** Public lighting column and lantern upgrade works will continue until Friday, 23rd November 2018. Work will be carried out between the hours of 10:00 - 16:00 and 19:30 – Midnight (if required). A Traffic Management Plan will be in operation for the duration of the work.

Newtownpark Avenue, Blackrock *** Road surface and footpath restoration works (Phase 1) will continue until Friday, 16th November 2018 between 10:00 and 16:00 hrs. A Traffic Management Plan will be in operation and local access will be maintained.

Windsor Terrace – Dún Laoghaire Baths Redevelopment *** Construction commenced on the redevelopment of the Baths site on Monday, 23rd April 2018. Construction is programmed to be completed by Q1 2020. During October and November, the core of the pier construction will be completed. Works to the shelter will commence. Demolition will be completed and internal construction of the building will commence. There should be no Traffic Management restrictions on Windsor Terrace with the exception of the delivery of materials, which will be short term and between 10:00 and 16:00 hrs. Monday – Friday.

Page 4 of 5


Belarmine, Stepaside ** Gas main installation works commenced on Wednesday, 3rd October 2018 for 6 weeks between 09:30 and 16:30 hrs. A Stop / Go Traffic Management Plan will be in place.

Public Lighting Lantern and Bracket Upgrade Works ** Public lighting lantern and bracket upgrade works will take place on: 1. Glenageary Road Lower 2. Deansgrange Road 3. Blackthorn Drive 4. Pearse Park-Estate 5. Clonskeagh Road 6. Leopardstown Road 7. Kilmacud Road Lower 8. Cornelscourt Hill 9. Avoca Ave 10. Monkstown Ring Road 11. Stradbrook Road 12. Sandyford Road These works will continue until Friday, 21st December 2018. A Stop / Go Traffic Management Plan will be in operation as required. Al Read Electrical Ltd. dlr

Phil Read Brian McGuire

087 252 6589 086 607 4090

M50/M11 - Northbound/Southbound Information on planned road works along the M50 can be found at: http://m50concession.com/operation-maintenance/planned-road-works/