studios in the flowerbed Wei Lin 1300 Crossing Place, Apt 3721 Austin , Tx 78741 520.490.9503 brianzoom@utexas.edu
cantilever design
ply rocker
door handle
material 1.00
installation
research studio
research
Periscopic Diversity Individual project,
12 weeks
studio
eden pavilion
Land Art Museum 2008 Spring
EXTERIOR ENTRANCE: Identity to Fredericksburg is important, as is access to and from for pedestrian and vehicular traffic. Entrance is on highest ground. View to land art fields is framed. Perimeter exposure to highway and to public is controlled. Sound is buffered when needed (where motherboard bldg is not). Land buffer at edge is potential land art zone.
Endotracheal Intubation
Austin Central Station for High Speed Train
Time-based Activity
Endotracheal intubation: Medical procedure in which a tube is placed into the windpipe (trachea), through the mouth or the nose.
24:00
ER
R
4
ACCESSIBILITY
N SETOITAL
MEMO Rundberg
Farwest Transit
Farwest Loop
MOPA
WIND Northcross Shopping Center
EXPO
H
SOUT RMMA
Seton Med. 38th Guadalupe
Capital of Texas
R4000 FT
AUST STATI
ST.
A ER
M TORIU AUDI
IN
AUSTPARK ST.
rt
M.
GIVEN PARK
SAN MARCOS
R4000 FT
COMMERCIAL
COMMERCIAL
COMMERCIAL
COMMERCIAL
Windsor
Rive
Hotel
rco
Cesar
n
Sa
Chave
Ma
Residence
z
MON
RF
D
E ST.
ELMO
DWAR WOO
ESON BURL
5th St.
M RT
STOR
Time-based Flow
BERG AIRPO
NEY STASS
Springdale
Kyoto Tower
Red
Interstate 35 (Underground)
EXPRESS TO DALLAS SAN ANTONIO
LIS TOPO
ROE
WHIT BEN
R4000 FT
City Hall
r
00:00
s
6th St.
RT AIRPOBLVD
MLK
Jr
SHOR
MON
00:00
OLTO RD EDWAUNIV.
H
SOUTITAL HOSP DAVID
Opera
Mopac
City Hall
Dean Keeton
R4000 FT
Santa Maria Novella
Long Center
Campanile di Giotto Tofukuji Temple
Palais Royal
Pease Park Galleria degli Uffizi
Musee du Louvre
Santa Croce
Blanton Museum (University of Texas)
Exposition
Musee Picasso
Oakwood Cemetry
24:00 MLK Givens Park
Seoul Tower
PARIS
KYOTO
FIRENZE
AUSTIN
24:00
Duncan Park
4th St.
W. Lynn Austin Music Hall Amtrak
Downtown
Airport Blvd.
Consuming
STATION BACKUP
Robert M. Jr
OFFICE
HOTEL
Monroe Montopolis
Waco
Dallas
Hillsboro
97.39 miles
Oltorf
224
4.32
224
29.13 min 2.40 2.4
±1280
±1280
1280
150 224
224
5.07
0 224
6.27 6.27
224 34.88 min 22.34
0
224
224
St. David South Austin Hospital
96.16 min (= 1h 40 min)
+ 5 min (for waiting)
79.65 min (= 1h 20 min; Non-stop Dallas to San Antonio)
18:00
9.27
2.4
224
0 St. Elmo
7.94
Woodward
6.27
MIX USED
Burleson
+ 5 min (for waiting)
(= 1h 50 min) 2HOURS TRIP!!! Stassney
Supposed Maximum Speed of Train = 224 mph
HOTEL
Austin-Bergstorm Airport
Radia for curves = 7.63 mile (for 224 mph + 2” tilt; but decelerating for safety) Error Span = ±11 min (10 % safety + noise variables)
OFFICE
12:00
06:00 06:00
ter Rail
y
Trinit
00:00
6th St.
Commu
4th St.
r
Red
Rive
1 kph = 0.621371192 mph 1 km = 0.621371192 mile 10 km = 6.21371192 mile 1 mile = 5280 feet
s
BAND FOR IMPLOSIVE DEVELOPMENT
CBD Sightseeing + Entertaining
Hotel Residence Commercial+Retail Office Convention Center Religion Public Service Cultural Station Related
Zoning minus View Corrdor
MIX USED
CBD (no limit) DMU (120 ft) Commercial+Office (60 ft) Multi-Family (50 ft) Single-Family (35 ft) TOD (varied height) Station Related
OFFICE
OFFICE
Green Space + Possible Parking
Interstate 35 (Underground)
Green Space Possible Parking Spots
n
Sa
Chave
z
Ma
Wa
PRIORITIZED AREA OF DEVELOPMENT
Cesar
RESIDENCE
RELATIVE HIGH DENSED + DEVELOPED AREA
x 2 (Round Trip) - Each Time Gap is controllable under the safe following distance between two trains
MIX USED
462 x 17 = 7854 (San Antonio ↔ Dallas) ± 462 (San Antonio ↔ Austin) ± 462 (Austin ↔ Waco) ± 462 (Austin ↔ Dallas) ± 462 (Waco ↔ Dallas)
Religion
00:00
rco
Capacity related to Frequency of Trips 1st class 39 x 2 + 2nd class 48 x 8 = 462 seats for each train
Building Use
TOD - Station
Rush-hour Congestion
Ben White
224 32.15 min
6.27 6.27
45.25 (Non-stop)
Total (hr+min)
Rush-hour Congestion
Sightseeing Resting
12:00
St. Edwards Univ.
±1280
150
224
2.4
RESIDENCE
224
6.27
MIX USED
±1280
B
±1280
A
0
150 0
18:00
86.24 miles
257.82 miles
Time (min)
PUBLIC SERVICE
Auditorium Shore
Austin
San Marcos
74.19 miles
1280
Acceleration Deceleration
Velocity (mph)
RESIDENCE
Huston College
Austin Station
Butler Park
Lamar Plaza Shopping Center
South AustinPark
San Antonio
Accelaration (vph)
Public Transportation
Residence R2,000 ft
Proposed Expected Connection
Proposed Green Space
Expected Connection R1,000 ft
Visitor Accomodation
1,500 Parking Lots
ARTERY/TENTACLE (4) (Michael Heizer, James Turell, Robert Smithson, and Walter De Maria art wings) The 4 aortic/arterial art wings branch off of the main body of the motherboard/brain/hearth. This portion of the journey is indoors with controlled and specific viewports to the exterior, finally culminating on a viewport which frames the coinciding land art zone. Program: This space will serve as the permanent exhibition gallery space as well as circulation/egress. North light is important and will be controlled on the roof plane through expanded metal sheathing over glass. Activities: stimulate, provoke, watch art, communicate.
Butler Park
Auditorium Shore
DIGITS/PERISCOPE (4) The terminus of the vein path is the land | art periscope. The form of the periscope will vary with the landscape conditions that it serves. The final culmination will be a platform with directional/static views onto the coinciding land art zone. CAPILARIES (8+) Capillary paths branch out from the digit/periscope tower. These are made by the user after the land art is in place. Capillary paths are to be close-looped and are to feed into the periscope. Each land art zone therefore is experienced in a singular or isolated manner and reset/repositioned at the motherboard.
37| Periscopic Diversity
SEOUL
HSR LINE SUGGESTION
ller
Concorde
Navasota
Namdaemun Gate
table of contents
austin cap-metro train station
06:00
4th St.
Robe
E
LAMA PING SHOP
R8000 FT
University of Texas at Austin
PARK
PLAZ R CENT
Univ. Hills
Tx Health Service
Higashihonganji Higashitama mizucho Temple
IN ON
NTOW
DOW
MUSI
ER BUTL
Hancock
R8000 FT
R4000 FT
R8000 FT
ON EGE
HUST COLL N
AUSTHALL C
AMTR
S
OODTRY OAKW CEME
RESS CONG IN
AK
LYNN WEST
Cameron
Highland Mall Austin Memo. Park
1
Ninseiji
R8000 FT
SPRIN
TONUM
DUNC
SITIO
Crestview
1
2
Shijumiya Palace R8000 FT
Chonmyo Shrine
ter Rail
N
DEAN KEETO BLAN MUSE
AN PARK
183 Lamar
4
4
3
Basilique du Sacre Coeur
Changduk Palace
HIGH
GUAD
E PEAS PARK
Anderson
3
2
2
4 Montmartre
Kyungbok Palace
12:00
Retail
6th St.
Commu
y
Trinit
E GDAL
18:00
Commuter Rail Passenger Retail
Office
06:00
UNIV.
A RMM
LAND MALL
ALUP
HOSP C
SOR
2
4
1
3
DV POTENTIALITY DV SUPPORT
HILLS
CAME
VIEW TH CE HEAL TX SERVI E
OCK HANC
N
3
URBAN ECOLOGY
RON
LAMA 183
CREST IN AUSTPARK RIAL
1
1
2
N.C RSON PINGER SHOPCENT ANDE
Arboretum
2(3)
2
3
1
CONGETION (less)
AIRPORT
1
3
4
CONNECTIVITY
ESTSIT
FARW TRAN
Lamar Braker
AIRPORT
4(2)
Residence Resting
HSR Passenger
Retail
Hotel
R
ller
3(4)
Hotel Entertaining
Resting
BERG RUND
B’ B
AIRPORT
AIRPORT
BUDGET (w/ AP Line)
Hotel
Convention Center
BRAK
LAMA
ARBO
FARWEST LOOP Braker
12:00
ER
ER BRAK
KRAM
M RETU Kramer
Wa
AIN DOM Domain
Navasota
URBAN NETWORK
A’ A
URBAN NETWORK
URBAN NETWORK
18:00
ROUNDROCK
RBAN LINES
URBAN NETWORK
SITE PLAN
REGIONAL PLANNING
SUBU
solar sunflower by IH-35
24:00
N
DEVELOPMENT STRATEGIES
MOTHERBOARD/HEARTH The motherboard holds all functions but temporary and permanent art collections. It is the access to and from the facility, the monitoring, infrastructural capitol of the art grounds. Activities: enter/exit, inform/learn, rest, path-making/starting, eat, drink, meet, discuss, gather, socialize, sun screen, sun glasses, preparation. Program: [central lobby, café, restaurant, kitchen, museum shop], [meeting rooms (2), offices for curators and administrators (5)], [classrooms (3), education administrative offices (4)], restrooms, auditorium for lectures/performances, mechanical, storage/maintenance (for museum interior and exterior grounds crew, garbage room/collector, transformer, chillers, loading.) Spatial Requirements: Café/restaurant: connection to outdoor/art grounds. Museum shop: connection to entrance. Education/Administration: enjoy a view to exterior, privacy from public spaces. Auditorium: pre-function space should have connection to entrance (either in direct adjacency or in legible path to and from) pre-function space should have view. Auditorium could have view and be a viewport to the art.
Music Hall Downtown
Existing Bus Lines Proposed Bus Line Proposed Train Lines High Speed Railway
Traffic Flow
15TH CONGRESS
Traffice Peak Intersection Flow from Station
11TH LAVACA 5TH, 6TH LAMAR 10TH i35
5TH COLORADO
Passing through TOD 1ST LAVACA
landart museum
7TH I35 1ST TRINITY 1ST RED RIVER 1ST I35
Disconnection
Congress
Austin Station
ace academy
Tower study
cantilever design academic individual project in university of texas structure design studio 2007
interation 1 interation 1 interation 2 interation 2 weight: 18 pounds
total load: 978 pounds
weight: 18 pounds
total load: 978 pounds
ply rocker academic individual project in university of texas wood design studio 2008
We decided that a door handle which is a tactile would be the object of investigation during the exercise. The goal for the door handle is for a seemless intergration into the door, as well as a tectonic expression.
door handle academic individual project in university of texas industrial design studio 2008
human muscle: cross section of thigh
FRAMES human growth frame 3 dimentional skeletal muscle
architecture
braiding clothing smooth muscle
Toyo Ito Taichung Metropolitan Opera House
Emerging Materials and Technology
FRAMES
cardiac muscle
research studio academic individual project in university of texas vertical design studio 2008
ISSUES
- Guatemala is located in a prime location for tropical storms.
ARCHITECTURAL RESPONSE
- soft woods such as pine are not adequate for building because of the high rate of rot, and insects.
- Develop a method of preserving wood *pressurized treatment *chemical baths *using natural minerals (tung oil) *using natural resistant woods -evole a new prototype of building that uses natural materials.
-Insects currently live and bread in the huts of the local people, thus causing disease and epidemic.
-find and research a new response to using more efficient fuels for cooking.
-Currently over 50% of the people living in Guatemala are using wood as the primary fuel for cooking fires.
-Since pine are so abundant in Guatemala deforestation had become a threat to the forest that still exists. -Growth of population has causes more people to move out into the country and more land is needed to grow food for the gowring population.
3.9 million hectacres of forest 37% of total land is forest cover 51.9% of forest land is protected
2% of forest land is loss each year to deforestation
-have the building generate energy through wind energy.
-Malaria rates are high. In 1995, there were 23,608 new cases. WORLD NATURE CONSERVANCY MISSION
classroom
LOCATIONS AROUND THE WORLD
The mission of The Nature Conservancy is to preserve the plants, animals, and natural communities that represent the diversity of life on Earth by protecting the lands and waters they need to survive -protecting 117 million acres around the world
- 30 species of pine (second most of any central america country)
-selecting the areas it seeks to preserve based on analysis of what is needed to ensure the preservation of the local plants, animals, and ecosystems
- pine is used for fuel to cook fires
-Working to defeat deforestation in Guatemala water
biology earth
800 sq ft
botany
WOOD
- on occasions have worked with ecotourism to raise awareness and education of the landscape. GOALS
-volcanic activity have provided excellent soil for pine.
-used by artisans to make cheap furniture -undervalued material - theory of the Mayan people planted and harvested the pines for fuel. -”ocote” is a product used for kindling
. 575,000 m3 total volume of wood production however 875,000 m3 are illegally harvested every year 78% HARD WOOD
-mohagony
11.8%
-spanish cedar
2.9% 2.9%
-palo de maría
-to be a multiage classroom that can be used by the local children to learn about their home -designated areas of concentration, (water exhibit, biology, botany) -have connection with the landscape by integrating outdoor spaces with learning environment. -have the architecture give a new perspective of the land
-goal to have minimal impact on site -to be a self-sufficient school -for the building to be a learning tool - use natural ventilation, and sunlight to full advantage.
of wood exports
SOFT WOOD
of mohagony
of spanish cedar of santa maria
-Caribbean pine -Cupressus lusitanica Mill -Juniperus comitana Mart
-West Indian birch
-J. standleyi Steyerm
-Rosewood
-Abies guatemalensis Rehder
--Caribbean walnut
4.4%
-Pinus ayacahuite Ehren
-Ziricote
-P. montezumae Lamb
-cypress
-P. oocarpa Schiede etc...
23.2 million dollars of revenue per year
wood frame sample of wood lamination heat bending. Baked wood for one hour at 400 o F
- Hemicellulose make up 40% of tree composition.
- bending wood requires for heat either through steam of pressure.
- By heating the wood to 200 C all the hemicellulose of the wood will evaporate.
- Steam will not be a solution since the goal is to eliminate the water in the wood, thus baking the wood is the only other treatment .
- Thus leaving no food for insects and fungus. - Cellulose is still left over in the wood. - Wood needs to be heated to 200 C for 24-36hrs - By heating the wood to this temperature the wood looses the ability to retain water, thus avoding rot in the wood.
fabric skin
- Dry wood laminations of veneer cut from a 4x4 pine. - After heating wood had gained memory of mold and there was virtually no spring back.
floor floor structure
Circulation
floor composite wood structure
- This wood treatment does not require toxic chemicals. concrete foundation
duted intointo three three stories. stories. TheThe youngest youngest age age group group is located is located at the at the highest highest portion portion of the of the site,site, ddand retaining retaining walls walls helphelp shaping shaping courtyards, courtyards, which which are seen are seen an extension an extension of classrooms of classrooms to to he n the second second level. level. TheThe views views to the to the outside outside are filtered are filtered by aby screen a screen system system withwith eacheach memmemngle. . TheThe children children on this on this levellevel are also are also taking taking advantage advantage of aof strip a strip of atrium of atrium space. space. WithWith se- seor dgeedge is pushed is pushed backback andand shares shares partpart of the of the library library program. program. TheThe oldest oldest age age group group occuoccuy cony goesgoes all the all the wayway along along the the building building andand looks looks intointo the the city,city, offering offering them them a sense a sense of of
Based on age levels children are distributed into three stories. The youngest age group is located at the highest portion of the site, where the classrooms sink into the ground and retaining walls help shaping courtyards, which are seen an extension of classrooms to the exterior. The middle age group rests on the second level. The views to the outside are filtered by a screen system with each member at a different but gradiant changing angle. The children on this level are also taking advantage of a strip of atrium space. With several study carrel sticking out, the corridor edge is pushed back and shares part of the library program. The oldest age group occupies the top level, where a east-facing balcony goes all the way along the building and looks into the city, offering them a sense of broader engagement into the society.
9
15
10 1
12
classroom plan 13 2
2
1
7 B1
9
15
12
6
7 10
15 1
12
7 12 13
11 18
3
ace academy
13
B2
2
6
ail
academic collaborative project in university of texas
17
4
6
2
9 8
5
2
7
11
6
10
7
10
17 1
11
9
5
11
2
16
technology communication studio 1 2009
18 9
6
16
1
4
10
6
4
5
9 B3
10
4
5
17
11
9
7
14
16
10 17
2
6
6 6 11
9
5
11
1 2 3 4
Copper casted aluminum sun screen 10 W14 beam/ girder wall section W4 column Concand metal deck
10
of classroom wing louver system
A
Balcony detail 1
16
8
9 3
Interior view towards southwest corner
8 3
4
14 14
17
14
9 9
4
8
9
8 8 3 3
3
Interior view towards southwest corner
8
Interior view towards southwest corner
3
8 8
4
17
3 3
4
6
6
4 4
14
C
6
4 4
14
17 17
6
C
16
16
6 6 14 14
11
6 6
C
10
11
16 16
20
11 11
10
20
roof edge detail 12 1
D Skylight
detail
E
20
The auditrium is serving both the school( multipurpose classroom) and the public( theater). The building is designed as a series of non-vertial wall wrapping a catwalk structure thats defining the center of the room. Appearing as rising up from the earth, the roughness of concrete forms a shape contrast with the elegantness of the classroom wing
Auditorium wall section
2
10
1 Steel angle 2 Insulated glass 3 Tapered insulation 4 Roof deck 5 Wood floor 6 W18 beam/girder 7 Fabric wrapped ceiling pannels 8 Roof membrane 9 Skylight 10 Wood folding doors 11 10x10 box column 12 Fluorescent fixture 13 Concrete paver on casting bed 14 Steel cap 15 Steel plate
D 15
13
wall section of auditorium
Auditorium wall section auditorium
roof slab
metal deck
roof beams
11 11
20 20
12
20 20
D
Skylight detail 12 12 1 1
Skylight detail
5
The auditrium is serving both the school( multipurpose classroom) and the public( theater). The building is designed as a series of non-vertial wall wrapping a catwalk structure thats defining the center of the room. detail Appearing as rising up from the earth, the roughness of concrete forms a shape contrast with the elegantness entrance C Entrance detail of the classroom wing The auditrium is serving both the school( multipurpose classroom) and the public( theater). The building is designed as a series of non-vertial wall wrapping a catwalk structure thats defining the center of the room. Appearing as rising up from the earth, the roughness of concrete forms a shape contrast with the elegantness of the classroom wing
Exploded axonometric diagram of construction Auditorium wall section
20
Based on age levels children are distributed into three stories. The youngest age group is located at the highest portion of the site, where the class1 rooms sink into the ground E Roof edge detail and retaining walls help shaping courtyards, which are seen an extension of classE Roof edge detail rooms to the exterior. The middle age 1 Steel angle group rests on theglasssecond level. The 2 Insulated 3 Tapered insulation Roof deck views to the 45outside are filtered by a Wood floor 6 W18 beam/girder screen system with each member at 7 Fabric wrapped ceiling pannels 10 2 8 Roof membrane 9 Skylight a different but gradiant changing an10 Wood folding doors 11 10x10 box column gle. The children on this level are also 12 Fluorescent fixture 13 Concrete paver on casting bed taking advantage 14 Steel cap of a strip of atrium 15 Steel plate space. With several study carrel sticking out, the corridor edge is pushed back and shares part of the library program. The oldest age group occupies 5 the top level, where a east-facing balcony goes all the way along the building and looks into the city, offering them a sense of broader engagement C Entrance detail into the society. 10 10
Roof edge detail
2 2
wall
13
15
13 13
15 15
10 10
1 1 Steel Steel angle angle 2 2 Insulated Insulated glass glass 3 3 Tapered Tapered insulation insulation 4 4 Roof Roof deck deck 5 5 Wood Wood floor floor 6 6 W18 W18 beam/girder beam/girder 7 7 Fabric Fabric wrapped wrapped ceiling ceiling pannels pannels 8 8 Roof Roof membrane membrane 9 9 Skylight Skylight 10 10 Wood Wood folding folding doors doors 11 11 10x10 10x10 box box column column 12 12 Fluorescent Fluorescent fixture fixture 13 13 Concrete Concrete paver paver on on casting casting bed bed 14 14 Steel Steel cap cap 15 15 Steel Steel plate plate
5 5
Exploded axonometric diagram of construction
explode axonmetric diagram of structure
C
Entrance detail
Exploded axonometric diagram of construction skylight detail
12 14
12
8
9 3
1
8
4
3
17 4
6 14 6 16 11
10
11
20 20
3
12 1
Skylight detail
E
2
13
15
10
Roof edge detail
1 Steel angle 2 Insulated glass 3 Tapered insulation 4 Roof deck 5 Wood floor 6 W18 beam/girder 7 Fabric wrapped ceiling pannels 8 Roof membrane 9 Skylight 10 Wood folding doors 11 10x10 box column 12 Fluorescent fixture 13 Concrete paver on casting bed 14 Steel cap 15 Steel plate
25| Gradational Education
D
2 6
5
9 4
SECTION 7 LOOKING WEST
Scale: 1/8�=1-0�
8
10
11 1
entrance detail 5
C
Entrance detail
Section looking west site section
G
Furniture arrangement of the library is in accordance with the postion of the staircase. libraryas is inrailings accordanceand with the postion of theis staircase. Manyinto times the furniture is used Besides as ManyFurniture times arrangement furniture ofistheused the library merged atrium. railings and the library is merged into the atrium. Besides the use for bearing the staircase, the density of cables changes the according use fortobearing staircase, density of cables changes according to the distance the distancethe to the actual library the program. to the actual library program.
3
1
1 1
3 3
1
2 2
2
3
3
1 2
2
5 7
7 7
5 5
7
5
6
6 6
5
6
6 8
7
8 8
8
8
H
Detail of skylightH Detail H Detail of of skylight skylight H Detail of skylight H Detail of skylight
section of stairs
3 Roof membrane 5 Steel barrier 7 Maple tread 8 Stringer
Wall section of atrium looking north
3 Roof 3 Roof membrane membrane 3 Roof membrane 5 5 Steel barrier barrier 3 Steel Roof membrane 5 Steel barrier 7 7 Maple treadtread 5 Maple Steel barrier 7 Maple tread 8 Stringer 8 Stringer 8 Stringer 7 Maple tread 8 Stringer
4
4 4
4
4
Wall section of
7
Interior view towards skylight
5
5 5 5
G1
Detail of stair
wall section of atrium
G1G1 Detail Detail of of stair stair G1 Detail of stair detail of stairs G1 Detail of stair
Section of stair looking east
F
E
E
G1
Model showing entry sequence of building
section of stairs
F
Detail of railing
8
8 8 8
8
7 7 5
7 6
7 6 6 6
6
seafood street
hilton hotel, double tree hotel& yacht club
Xiangshan-Song Lan Shan is graced by its natural beauty of undulating mountains and unobstructed views to the open sea. We are always in connection to water. The essence is to submit to nature where by the architectural features are nestled within the natural surroundings. Mimicking the tranquility of the ebb and flow of the sea, water features like reflection ponds are brought into the site, while waterfalls gracefully flow from the site towards the sea. Elements from vernacular architecture are instilled, as a reminder of the local roots, and then contrasted with contemporary ideas of modern architecture to create unique experiences throughout the site.
spa
ningbo xiangshan resort hotel collaborative project in Gensler masterplan phase 2010
site plan
Xiangshan Resort Hotel will be a world-class year-round tourist resort destination, drawing people with its serene natural setting, exclusive amenities and inspiring architecture. It is set along the 4km coastline of Song Lan Shan, with natural bays and coves connecting the majestic mountains to the open sea.
imax cinema
facia
vertical mullions
horizontal mullions
fins
glazing
curtainwall structure
structure of imax area division rule: zones of grid system building structure
section of imax area overall building structure
overall structure
division rule: glazing division
structure plus imax area
division rule: columns not on grid
metal skin
PLAN DETAIL - WALL TYPE "T6" T6墙型平面节点
接线盒 JB C
参 见
F RE
A4
PL
1300 (西塔 WT)
1100 (北塔 NT)
B
300
A
180 铝合金窗台板 AN
B
1500 (西塔 WT)
1419 (北塔 NT)
PARTIAL ELEVATION - WALL TYPE "T1" T1墙型局部立面 GRID 1600 (西塔 WT) A1 1 : 20
GRID PARTIAL SECTION - WALL TYPE "T1" T1墙型局部剖面 1 : 20 PARTIAL UNFOLD ELEVATION - WALL TYPE "T2" T2墙型局部展开立面 A1 楼板完成面 B
1333 (北塔 NT)
A4 B
彩釉玻璃翼(位置长度参见 放大立面) FRITTED 180 GLASS FIN (REFER TO ENLARGED ELEVATION FOR LENTHES AND POSITIONS)
180 180
FFL 180 300
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
GRID 300 A
A
A4 ISSUED / REVISED
1980 @ND'
1300 (西塔 WT)
1100 (北塔 NT) 1500 (西塔 WT)
1333 (北塔 NT)
2100
A1 20 PARTIAL1 :SECTION - WALL TYPE "T2" T2墙型局部剖面 50% DETAILED DESIGN 2011.08 PARTIAL PARTIAL SECTION - WALL TYPE - WALL "T1" 1857 @NC' ELEVATION 2051 @NC'TYPE "T1" GRID T1墙型局部剖面 T1墙型局部立面 A1 1 : 20 1 : 20 PARTIAL UNFOLD GRIDELEVATION - WALL TYPE "T3" T3墙型局部展开立面
DATE
50%初步设计 - 建筑部分
50% DETAILED DESIGN ARCHITECTURE
A-556
GRID
2176 @ND'
TOWER DETAILS
开启扇 楼板完成面
FFL
楼板完成面
FFL
B
500 WINDOW 300 FIN
玻璃翼 A
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC. B
ISSUED / REVISED DATE
50% DETAILED DESIGN 2011.08
GRID A
50% DETAILED DESIGN ARCHITECTURE
300
1300 (西塔 WT)
1100 (北塔 NT)
GRID
300
C
GRID
180
88
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
1100MIN 556 @ND' 300 FIN 500 WINDOW 518 @NC' PARTIAL PARTIAL SECTION ELEVATION - WALL TYPE - WALL "T1"TYPE "T1" 2253 @W1' 2439 @W1' 玻璃翼 开启扇
T1墙型局部剖面 T1 墙型局部立面GRID 2108 @W2' 2293 @W2' A4 1 :A1 GRID 20 1 : 20 50%初步设计 - 建筑部分 PARTIAL SECTION - WALL TYPE "T3" 塔楼放大详图 墙型局部剖面 ENLARGEDT3 TOWER DRAWINGS PARTIAL UNFOLD ELEVATION - WALL TYPE "T4" A4 1 : 20 T4墙型局部展开立面 A-451 A1 1 : 20
.8
W1'
楼板完成面
楼板完成面 180
1100
2°
1500 (西塔 WT)
1333 (北塔 NT)
GRID
88 .6
F
7°
E
E
A-551
FFL
FFL D
D D
C
C
180
楼板完成面 FFL
B
FFL
B
开启窗
ISSUED / REVISED DATE
50% DETAILED DESIGN A
2011.08
A
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
ISSUED / REVISED
DATE
50% DETAILED DESIGN
300 1300 (西塔 WT)
2011.08
1100 (北塔 NT)
50%初步设计 - 建筑部分
50% DETAILED DESIGN ARCHITECTURE
1274
300
180
1274 @WA'
GRID 794 (西塔 WT) 1588 GRID (西塔 WT)
1181 @ND'
763 (北塔 NT) 1525 (北塔 NT)
GRID PARTIAL PARTIAL SECTION ELEVATION -627 WALL - WALL "T1" TYPE "T1" 1100MIN @W1' TYPE 塔楼放大详图 ENLARGED TOWER T1墙型局部剖面 T1DRAWINGS 墙型局部立面582 @W2' A4 A1 : 20 GRID PARTIAL - WALL TYPE "T5" 1 : 20 1ELEVATION A-451 T5墙型局部立面 50% DETAILED A1 DESIGN ARCHITECTURE PARTIAL SECTION - WALL TYPE "T4" 1 : 20 50%初步设计 - 建筑部分 T4墙型局部剖面 塔楼放大详图 A4 ENLARGED TOWER DRAWINGS 1 : 20
楼板完成面 FFL
180
楼板完成面 FFL
B
180
B
1500 (西塔 WT)
1333 (北塔 NT)
A
A
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
A-453
180
ISSUED / REVISED DATE
50% DETAILED DESIGN
ISSUED / REVISED
DATE
50% DETAILED DESIGN
2011.08
2011.08
50% DETAILED DESIGN ARCHITECTURE
50%初步设计 - 建筑部分
50% DETAILED DESIGN ARCHITECTURE
224 (北塔 2300 (北塔 NT) NT)
300
1300 (西塔 WT) 1500 (西塔 WT)
1100 (北塔 NT) GRID 256 (西塔 2700 (西塔 WT) WT) 1333 (北塔 NT) 1798 (西塔 WT)
GRID GRID PARTIAL SECTION - WALL TYPE "T1"TYPE "T1" PARTIAL ELEVATION - WALL 塔楼放大详图 ENLARGED TOWER DRAWINGS T1墙型局部剖面 T1墙型局部立面 A4 1 SECTION A1 1 : 20 - WALL PARTIAL TYPETYPE "T5" "T6" PARTIAL - WALL : 20ELEVATION 50%初步设计 - 建筑部分 A-451 T5 墙型局部剖面 T6 墙型局部立面 塔楼放大详图 A4ENLARGED A11 : 201TOWER : 20 DRAWINGS
300
A
楼板完成面 B
FFL
楼板完成面
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
FFL
B
ISSUED / REVISED
GRID A DETAILED DESIGN 50%
1707 (北塔 NT)
GRID
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
A-454
180
ISSUED / REVISED
DATE
50% DETAILED DESIGN
DATE
2011.08
1300 (西塔 WT) 2011.08
1500 (西塔 WT) 300 1300 (西塔 WT)
1333 (北塔 NT) 1433 (北塔 NT)
1100 (北塔 NT) 1333 (北塔 NT) GRID 2951MIN (西塔 WT)
180
300
1100 (北塔 NT) PARTIAL PARTIAL SECTION ELEVATION - WALL - WALL TYPETYPE "T1" "T1" 塔楼放大详图 ENLARGED DRAWINGS GRID T1墙型局部剖面 T1TOWER 墙型局部立面 A4 SECTION A11 : 201 : 20 - WALL TYPE "T6" PARTIAL 50% DETAILED DESIGN A-451 ARCHITECTURE T6墙型局部剖面 PARTIAL ELEVATION - WALL TYPE "T1A" 50%初步设计 - 建筑部分 A4T1A 1墙型局部立面 : 20 塔楼放大详图 A1 1 :ENLARGED TOWER DRAWINGS 20
楼板完成面
楼板完成面 FFL
1500 (西塔 WT)
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
A4
FFL
D
C
B
180 180
260
50%初步设计 - 建筑部分
50% DETAILED DESIGN ARCHITECTURE
2637MIN (北塔 NT) 1300 (西塔 WT)
1 : 20
ISSUED / REVISED DATE
50% DETAILED DESIGN 2011.08
A
1300 (西塔 WT)
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
1100 (北塔 NT)PARTIAL PARTIAL ELEVATION - WALL TYPE - WALL TYPE "T1""T1" 塔楼放大详图SECTION 50% DETAILED DESIGN ARCHITECTUREENLARGED TOWER DRAWINGS 50%初步设计 - 建筑部分
GRID T1墙型局部剖面 墙型局部立面 T1 A1 A4 20 塔楼放大详图11: :20 A-451 TOWER-DRAWINGS PARTIALENLARGED SECTION WALL TYPE "T1A" T1A墙型局部剖面
A-455
ISSUED / REVISED DATE
50% DETAILED DESIGN 2011.08
GRID 1300 (西塔 WT)
1100 (北塔 NT)
GRID
300
楼板完成面
1500
GRID
T1墙型局部平面 墙型局部平面((北塔) 西塔) T1 NA E1 11: :2020 E4 PARTIAL PLAN - WALL TYPE "T1A"(NT) T1A墙型局部阴影盒平面(北塔)
FFL
楼板完成面 FFL
FFL
1500 (西塔 WT)
1333 (北塔 NT)
50%初步设计 - 建筑部分
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
1333 PARTIALPLAN PLAN--WALL WALL1433 TYPE"T1"(NT) "T1"(WT) PARTIAL TYPE
500 WINDOW
开启窗
E4
楼板完成面 FFL
180
ISSUED / REVISED DATE
50% DETAILED DESIGN 2011.08
GRID
50% DETAILED DESIGN ARCHITECTURE
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
塔楼放大详图
ENLARGED TOWER DRAWINGS
8
300 ISSUED / REVISED DATE
50% DETAILED DESIGN 2011.08
PARTIAL塔楼放大详图 SECTION - WALL TYPE "T1" 50% DETAILED DESIGN ARCHITECTURE ENLARGED TOWER DRAWINGS T1墙型局部剖面 50%初步设计 - 建筑部分 A4 1 : 20
A-451
1100
7 4
1200
RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
7
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
GRID
PARTIAL PLAN - WALL TYPE "T1"(NT) T1墙型局部平面(北塔)
JINHUIHAI INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 佛山市金海汇投资有限公司 F 86 757 28783111 OWNER: www.dp-plaza.com JINHUIHAI INVESTMENTS, LTD CONSULTANTS (BEIJING) CO., LTD 1F Foshan Media Center SHENZHEN BRANCH Foshan 528315 6009 Shennan Avenue T 86 757 28783333 Shenzhen 518040 F 86 757 28783111 T 86 755 3391 2955 www.dp-plaza.com F 86 755 3391 2956
佛山市金海汇投资有限公司 OWNER:
GRID
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
1333 .
10
1 : 20
ARCHITECTURAL DESIGN & CHINA TEAM ENGINEERING RESEARCH INSTITUTE OF CONSULTANTS (BEIJING) CO., LTD GUANGDONG PROVINCE SHENZHEN BRANCH 6009 Shennan Avenue 97 Liuhua Road Shenzhen 518040 Guangzhou 510010 广东省建筑设计研究院 卓展工程顾问(北京)有限公司深圳分公司 T 86 20 86662933 T 86 755 3391 2955 CONSULTANT: CONSULTANT: 86 755 3391 2956 F 86 20 86677463 CHINA TEAM ENGINEERING ARCHITECTURAL DESIGNF &
广东省建筑设计研究院 CONSULTANT:
1300
36
CALLISON LLC.
楼板完成面
CALLISON LLC.
GRID
1100
300 150
1200
260 190 1100
1250
1200
1200
9
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
1200
9
4500
1 : 20
6
3300
开启窗 开启窗
150 300 JINHUIHAI ARCHITECTURAL DESIGN & CHINA TEAM ENGINEERING INVESTMENTS, LTD RESEARCH INSTITUTE OF CONSULTANTS (BEIJING) CO., LTD 1F Foshan Media Center GUANGDONG PROVINCE SHENZHEN BRANCH Foshan 528315 广东省建筑设计研究院 佛山市金海汇投资有限公司 卓展工程顾问(北京)有限公司深圳分公司 6009 Shennan Avenue 97 Liuhua Road T 86 757 28783333 OWNER: Shenzhen CONSULTANT: 518040 GuangzhouCONSULTANT: 510010 JINHUIHAI CHINA TEAM ENGINEERING F 86 757 28783111 ARCHITECTURAL DESIGNT&86 755 3391 T 86 20 86662933 2955 INVESTMENTS, LTD CONSULTANTS (BEIJING) CO.,www.dp-plaza.com LTD RESEARCH INSTITUTE OF 2956 F 86 20 86677463 F 86 755 3391 CALLISON LLC. 1F Foshan Media Center SHENZHEN BRANCH GUANGDONG PROVINCE 1420 Fifth Avenue #2400 Foshan 528315 6009 Shennan Avenue 97 Liuhua Road Seattle, Washington 98101-2343 T 86 757 28783333 Shenzhen 518040 Guangzhou 510010 T 206 623 4646 F 86 757 28783111 T 86 20 86662933 T 86 755 3391 2955 F 206 623 4625 www.dp-plaza.com F 86 20 86677463 F 86 755 3391 2956
FFL
1333
2 5
1200
E
8
PROJECT # 209720.01
300 150
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
8
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
E4
5
PROJECT # 209720.01 佛山东平新城交通枢纽中心项目
GRID 佛山市金海汇投资有限公司 OWNER:
F 4
DONGPING NEW CITY METRO CENTER PROJECT 200 FOSHAN,P.R CHINA
1500 .
GRID
1
4500
500 WINDOW 500 WINDOW
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
1300
1100
IN
7
3300
楼板完成面
广东省建筑设计研究院 CONSULTANT:
190 260
1100
1100
10
4500
FFL
1200
GRID
7
3300
楼板完成面 1200
4
3300
LED检修门 LED CONTROL ACCESS PANEL
CALLISON LLC.
1200
GRID
4500
3300
4500
4500
12.57°
2637MIN
10
佛山东平新城交通枢纽中心项目
1500 PLAN 1300 PARTIAL PARTIAL PLAN - WALL TYPE TYPE "T1"(NT) "T1"(WT) ND ' - WALL T1墙型局部平面 T1墙型局部平面 (北塔) (西塔) E4 E1 PARTIAL PLAN WALL TYPE W4 "T6"(NT) 1 : 201 -: 20 T6墙型局部平面 (北塔)TYPE "T1A"(WT) PARTIAL PLAN - WALL E4T1A1墙型局部阴影盒平面 (西塔) : 20 E1 1 : 20
3
1200
4500
GRID
260 190
3300
1200
1500
6
1200
C
1200
224
9
1200
C
1333
6
3300
D
3
200
LED检修门 LED CONTROL ACCESS PANEL
1707
9
PROJECT # 209720.01
D
开启窗
2
DONGPING NEW CITY PROJECT # 209720.01 METRO CENTER PROJECT FOSHAN,P.R CHINA
500 WINDOW500 WINDOW
5
佛山东平新城交通枢纽中心项目 200
FFL
8
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
E
开启窗
5
200 佛山东平新城交通枢纽中心项目
1500
3300
2
1200
679M
JINHUIHAI ARCHITECTURAL DESIGN & CHINA TEAM ENGINEERING INVESTMENTS, LTD RESEARCH INSTITUTE OF CONSULTANTS (BEIJING) CO., 150 LTD 300 1F Foshan Media Center GUANGDONG PROVINCE SHENZHEN BRANCH 1420 Fifth Avenue #2400 Foshan 528315 6009 Shennan Avenue 97 Liuhua Road Seattle, Washington 98101-2343 T 86 757 28783333 佛山市金海汇投资有限公司 Guangzhou 510010 广东省建筑设计研究院 Shenzhen 518040 卓展工程顾问(北京)有限公司深圳分公司 T 206 623 4646 CONSULTANT: CONSULTANT: F 86 757 28783111 OWNER: T 86 755 3391 2955 T 86 20 86662933 F 206 623 4625 www.dp-plaza.com JINHUIHAI ARCHITECTURAL DESIGN & CHINA TEAM ENGINEERING F 86 755 3391 2956 F 86 20 86677463 INVESTMENTS, LTD CONSULTANTS (BEIJING) CO., LTD RESEARCH INSTITUTE OF CALLISON LLC. 1F Foshan Media Center SHENZHEN BRANCH GUANGDONG PROVINCE 1420 Fifth Avenue #2400 Foshan 528315 6009 Shennan Avenue 97 Liuhua Road Seattle, Washington 98101-2343 T 86 757 28783333 Shenzhen 518040 Guangzhou 510010 T 206 623 4646 F 86 757 28783111 T 86 20 86662933 T 86 755 3391 2955 206 623 4625 F www.dp-plaza.com F 86 20 86677463 F 86 755 3391 2956
8
3300
F
4 1
1200
N1'
3300
E
7
200
10
1926 .
GRID GRID
佛山市金海汇投资有限公司 OWNER:
GRID 4
1200
楼板完成面
190 260
1300
10
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
F
2600 .
1
1200
FFL
1200
1926 .
WG'
广东省建筑设计研究院 CONSULTANT:
300
1100
7
CALLISON LLC.
3300
楼板完成面 1200
00 °
3
PROJECT # 209720.01
C
GRID
1200
1200 1200
11811798
4500
4500
GRID
3300
4500
1200
256 763
9 6
METRO CENTER PROJECT FOSHAN,P.R CHINA
C
开启窗
9
200
D
1333 500 WINDOW
IN 3
佛山东平新城交通枢纽中心项目 DONGPING NEW CITY 200
D
6
PROJECT # 209720.01
FFL
522M 2
1200
PARTIAL PLAN -PLAN WALL- TYPE PARTIAL WALL "T1"(NT) TYPE "T1"(WT) ND' W1' T1墙型局部平面 (北塔)(西塔) T1墙型局部平面 E4 1 PLAN E1 1-: WALL PARTIAL TYPE "T5"(NT) PARTIAL TYPE "T6"(WT) : 20 PLAN 20- WALL T5墙型局部平面 (北塔 ) ) T6墙型局部平面 (西塔 E4E11 : 201 : 20
1525 .
5
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
楼板完成面
8
佛山东平新城交通枢纽中心项目
E
开启窗
2
3300
GRID 1588
,
10
1200
500 WINDOW
3300 3300
1500 8
900 1200
E
3300
.
5
200
F
1200
N8'
1
69 .
4 1
PROJECT # 209720.01
GRID
200
W2'
4
NEW CITY 200 METRO CENTER PROJECT FOSHAN,P.R CHINA
F
佛山市金海汇投资有限公司 OWNER:
7
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
GRID
7
PROJECT # DONGPING 209720.01
1200
WA'
广东省建筑设计研究院 CONSULTANT:
10
JINHUIHAI ARCHITECTURAL DESIGN & CHINA TEAM ENGINEERING INVESTMENTS, LTD RESEARCH INSTITUTE OF CONSULTANTS (BEIJING) CO.,2951MIN LTD CALLISON LLC. 1F Foshan Media Center SHENZHEN BRANCH GUANGDONG PROVINCE 1420 Fifth Avenue #2400 Foshan 528315 6009 Shennan Avenue 97 Liuhua Road 广东省建筑设计研究院 佛山市金海汇投资有限公司 卓展工程顾问(北京)有限公司深圳分公司 Seattle, Washington 98101-2343 T 86 757 28783333 Shenzhen 518040 Guangzhou 510010 69 . OWNER: CONSULTANT: CONSULTANT: T 206 623 4646 F 86 757 28783111 0 0° T 86 20 86662933 T 86 755 JINHUIHAI ARCHITECTURAL DESIGN & 3391 2955 CHINA TEAM ENGINEERING F 206 623 4625 www.dp-plaza.com 86 755 3391 CONSULTANTS 2956 F 86 20 86677463 F OF INVESTMENTS, LTD RESEARCH INSTITUTE (BEIJING) CO., LTD CALLISON LLC. 1F Foshan Media Center GUANGDONG PROVINCE SHENZHEN BRANCH 1420 Fifth Avenue #2400 Foshan 528315 6009 Shennan Avenue 97 Liuhua Road Seattle, Washington 98101-2343 T 86 757 28783333 Shenzhen 518040 Guangzhou 510010 T 206 623 4646 F 86 757 28783111 T 86 20 86662933 T 86 755 3391 2955 F 206 623 4625 www.dp-plaza.com 2300 F 86 20 86677463 F 86 755 3391 2956500
3
佛山东平新城交通枢纽中心项目
FFL
3300
楼板完成面
1200
1300
3
DONGPING NEW CITY 200CENTER PROJECT METRO FOSHAN,P.R CHINA
395
9
佛山东平新城交通枢纽中心项目
1200
6 6
1200
9
4500
GRID 794
3300
1100
5
3300
开启窗
2
1200
1200
2
1200
4500
5
3300
8
4500
500 WINDOW1333
200
500 WINDOW
2700 ,
8
1200
F
JINHUIHAI INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
4
500
2011.08
1200
DATE
4500
GRID
1
3300
10
4
200
3
佛山市金海汇投资有限公司 OWNER:
1
155
GRID
佛山市金海汇投资有限公司 OWNER:
ISSUED / REVISED
7
1200
1500
582
50% DETAILED DESIGN
10
1200
GRID
7
1200
0°
3
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
6
JINHUIHAI CHINA TEAM ENGINEERING ARCHITECTURAL DESIGN & INVESTMENTS, LTD CONSULTANTS (BEIJING) CO., LTD RESEARCH INSTITUTE OF 1F Foshan Media Center SHENZHEN BRANCH GUANGDONG PROVINCE 1420 Fifth Avenue #2400 Foshan 528315 6009 Shennan Avenue 97 Liuhua Road Seattle, Washington 98101-2343 广东省建筑设计研究院 卓展工程顾问(北京)有限公司深圳分公司 T 86 757 28783333 Shenzhen 518040 Guangzhou 510010 CONSULTANT: CONSULTANT: T 206 623 4646 佛山东平新城交通枢纽中心项目 F 86 757 28783111 T 86 20 86662933 T 86 755 3391 2955 ARCHITECTURAL DESIGN & CHINA TEAM ENGINEERING 206 623 4625 PROJECT # 209720.01 www.dp-plaza.com 200 86 755 3391 2956 DONGPING NEW CITY F F 86 20 86677463 F RESEARCH INSTITUTE OF CONSULTANTS (BEIJING) CO., LTD CALLISON LLC. 200 CENTER PROJECT METRO GUANGDONG PROVINCE SHENZHEN BRANCH 1420 Fifth Avenue #2400 FOSHAN,P.R CHINA 6009 Shennan Avenue 97 Liuhua Road Seattle, Washington 98101-2343 Shenzhen 518040 Guangzhou 510010 T 206 623 4646 T 86 755 3391 2955 T 86 20 86662933 PROJECT # 209720.01 F 206 623 4625 F 86 755 3391 2956 F 86 20 86677463
9
1200
.5 6
PROJECT # 209720.01
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
CALLISON LLC.
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
广东省建筑设计研究院 CONSULTANT:
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
10
广东省建筑设计研究院 CONSULTANT:
97 9
佛山东平新城交通枢纽中心项目
50%初步设计 - 建筑部分
TOWER DETAILS
塔楼节点详图
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., LTD SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 518040 T 86 755 3391 2955 F 86 755 3391 2956
50% DETAILED DESIGN ARCHITECTURE
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
200
300
3300
2
JINHUIHAI INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
佛山市金海汇投资有限公司 OWNER:
2011.08
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
8
DATE
CALLISON LLC.
开启窗
2
1300
建筑完成面 FINISH FLOOR LINE
1200
500 WINDOW 1333
1200
开启窗
50 (北塔 NT)
100 (西塔 WT)
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
4500
1100
1100 (西塔 WT)
1:2
522 MIN518
1 5
3300
1200
F
JINHUIHAI 1100 INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
佛山市金海汇投资有限公司 OWNER:
5
ISSUED / REVISED
50% DETAILED DESIGN
1200
C
8
1200
627
200
1200
C
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., LTD SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 5180408 8 T 86 755 3391 2955.8 2 F 86 755 3391 2956 °
500 WINDOW
1200
E
1100 (西塔 WT)
PROJECT # 209720.01
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
佛山东平新城交通枢纽中心项目
10
佛山东平新城交通枢纽中心项目
C
4500
FFL
E
WINDOW 300 50%FIN DETAILED DESIGN PARTIAL PARTIAL PLAN -PLAN WALL- TYPE WALL"T1"(NT) TYPE 500 "T1"(WT) PARTIAL PLAN PLAN - WALL- WALL TYPE TYPE "T1"(NT) "T1"(WT) W1' PARTIAL ARCHITECTURE 91 开启扇 玻璃翼 300 FIN 500 WINDOW T1墙型局部平面 300 FIN 500 WINDOW T1墙型局部平面 T1墙型局部平面 (北塔)(西塔) (北塔)(西塔) 2051 .3 1857T1墙型局部平面 3° 50%初步设计 - 建筑部分 . E4 1 :E1 E1 2293 玻璃翼 开启扇 玻璃翼 开启扇E4PARTIAL 2439 2253 2108 20 1 : 20 1 : 20 1PLAN : 20 - WALL TYPE "T5"(WT) 塔楼节点详图 . . T5墙型局部平面(西塔) PARTIAL PLAN @NC'- WALL TYPE "T3" TOWER DETAILS E1 1 : 20PLAN @W2'- WALL TYPE "T4" T3墙型沿轴线 局部平面 PARTIALNC' PLAN @W1'- WALL TYPE "T4" PARTIAL E4 1 : 20 T4墙型沿轴线W1'局部平面 T4墙型沿轴线W2'局部平面 楼板完成面 E1 1 : 20 E4 1 : 20
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
7
4500
1200
GRID
4500 3300
楼板完成面
1200
F
1
3300
2011.08 D
广东省建筑设计研究院 CONSULTANT:
TOWER DETAILS
1200
DATE
NC'
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
FLOOR DETAIL - WALL TYPE "T1" T2墙型层间节点
200
ISSUED / REVISED
50% DETAILED DESIGN
GRID ND'
CALLISON LLC.
6
4
1200
塔楼节点详图
GRID
4
3300
PARTIALPARTIAL PLAN - WALL PLAN TYPE - WALL"T1"(NT) TYPE "T1"(WT)500 WINDOW 300 FIN 8° .1 DETAIL - WALL TYPE "T1" FLOOR 91 1980 开启扇 玻璃翼 T1墙型局部平面 T1 墙型局部平面 (北塔) (西塔) 2176 . E4 T2 E1 墙型层间节点 1 : 20 1 : 20 500 WINDOW 1419 PLAN @ND'- WALL开启扇 TYPE "T3" A4 PARTIAL 1:2 GRID T3墙型沿轴线ND'局部平面 E1 20 PARTIAL1 :PLAN - WALL TYPE "T2"(NT) 楼板完成面 T2墙型局部平面(北塔) FFL 0°
7
200
C
.8
9
1200
D
89
200 1300
E
200
D
GRID
10
900
D
3300
FFL 1 : 20
0° 1500
8°
塔楼节点详图
1200
E
.5
3
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
97
6
200
E4 0°
开启窗
3
200
E
.8 5
1650
89
500 WINDOW 1333
开启窗
9
3300
GRID 500 WINDOW
2
PROJECT # 209720.01
90 ND'
.1
F
91
F 5
1200
楼板完成面 4 2
556
GRID 8
1200
W1' 1
8
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
D 4
1650 佛山东平新城交通枢纽中心项目
PARTIAL PLAN - WALL TYPE "T1"(NT) 开启扇 GRID (北塔) T1墙型局部平面 PARTIAL PLAN - WALL TYPE "T2"(WT) 1 : 20 T2墙型局部平面(西塔) E1 1 : 20 1
1200
室外 EXTERIOR
1200
10 7
4500
3
3300
180 铝合金窗台板
1200 # 209720.01 PROJECT
180 铝合金窗台板
1200
300
3300
PARTIAL PLAN - WALL TYPE "T1"(WT) T1墙型局部平面(西塔) E1 1 : 201600GRID 500 WINDOW 8°
90
1200
.7
10
4500
GRID
160
1200
89
JINHUIHAI INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
50%初步设计 - 建筑部分
93°
A
TO
50% DETAILED DESIGN ARCHITECTURE
69.
GRID
面 1500
佛山市金海汇投资有限公司 OWNER:
300
93°
1333 (北塔 NT)
ER
R207300
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
A4
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., LTD SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 518040 T 86 755 3391 2955 F 86 755 3391 2956
180 铝合金窗台板
FOSHAN,P.R CHINA
仿不锈钢铝合金扣板 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH)
69.
1500 (西塔 WT)
平 3
3300
E4 6
4500
E
26
3300
开启窗
7
A-551
200
PARTIAL PLAN - WALL TYPE "T1"(WT) T1墙型局部平面(西塔) 9
1200 (西塔标准层 WEST TOWER TYPICAL FLOOR)
FE
R
参 TO
CALLISON LLC.
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
PROJECT # 209720.01
S
面 AN
平 PL
见
广东省建筑设计研究院 CONSULTANT:
10 100
CALLISON LLC.
20
参 TO
S
面 AN
平 PL
见
JINHUIHAI INVESTMENTS, LTD 1F Foshan Media Center Foshan 528315 T 86 757 28783333 F 86 757 28783111 www.dp-plaza.com
佛山市金海汇投资有限公司 OWNER:
广东省建筑设计研究院 CONSULTANT:
50 (北塔 NT)
100 (西塔 WT)
10 100
楼板边缘 SLAB EDGE
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., LTD SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 518040 T 86 755 3391 2955 F 86 755 3391 2956
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
200
1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 F 206 623 4625
楼板边缘 SLAB EDGE
25
1200 (西塔标准层 WEST TOWER TYPICAL FLOOR) 1000 (北塔标准层 NORTH TOWER TYPICAL FLOOR)
ARCHITECTURAL DESIGN & RESEARCH INSTITUTE OF GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
50 (北塔 NT)
100 (西塔 WT)
DONGPING NEW CITY METRO CENTER PROJECT FOSHAN,P.R CHINA
佛山东平新城交通枢纽中心项目
1000 (北塔标准层 NORTH TOWER TYPICAL FLOOR) 1100 (西塔 WT)
ISSUED / REVISED
1200
C
ALUMINIUM SILL EXTENSION
JINHUIHAI INVESTMENTS, LTD LTD 1F Foshan Media Center 广东省建筑设计研究院 Foshan 528315 CONSULTANT: T 86 757 28783333 ARCHITECTURAL DESIGN & F 86 757 28783111 RESEARCH INSTITUTE OF www.dp-plaza.com GUANGDONG PROVINCE 97 Liuhua Road Guangzhou 510010 T 86 20 86662933 F 86 20 86677463
300
佛山市金海汇投资有限公司 OWNER:
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 518040 T 86 755 3391 2955 3391 2956 CALLISON LLC. F 86 755 1420 Fifth Avenue #2400 Seattle, Washington 98101-2343 T 206 623 4646 1100 F 206 623 4625
50% DETAILED DESIGN
1200
开启窗
6
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
1:2
89 .8 ARCHITECTURAL DESIGN & 0° RESEARCH INSTITUTE OF CALLISON LLC. GUANGDONG PROVINCE 1420 Fifth Avenue #2400 97 Liuhua Road Seattle, Washington 98101-2343 佛山东平新城交通枢纽中心项目 Guangzhou 510010 T 206 623 4646 T 86 DONGPING NEW CITY 20 86662933 F 206 623 4625 F 86 20 86677463 METRO CENTER PROJECT
200
PROJECT # 209720.01
室外 1 : 20 EXTERIOR 1333 2
广东省建筑设计研究院 CONSULTANT:
F
679MIN
20
20
200
500 WINDOW
20
160 DETAIL - WALL TYPE 180"T1" 铝合金窗台板 FLOOR ALUMINIUM SILL EXTENSION T2墙型层间节点
DONGPING NEW CITY 200 METRO CENTER PROJECT FOSHAN,P.R CHINA
8° .7 89 500 WINDOWE 2
90
佛山东平新城交通枢纽中心项目
GRID 1
1200
20 5
3300
F
板 窗台 ION 合金 TENS GRID 180 铝 LL EX M SI INIU ALUM 9
200
20
1
200
4
1200
ALUMINIUM SILL EXTENSION
1300
室外 EXTERIOR
3300 4500
26
楼板边缘 SLAB EDGE
RE
300
300
PARTIAL ELEVATION - WALL TYPE "T1" T1墙型局部立面
180 铝合金窗台板
1200
ALUMINIUM SILL EXTENSION
1200
B
西塔中区标准层平面图 1200 (西塔标准层 WEST TOWER TYPICAL FLOOR)
West Tower300Mid-Zone Typical Floor Plan 1000 (北塔标准层 NORTH TOWER TYPICAL FLOOR)
ALUMINIUM SILL EXTENSION
1200
4500
160 8
楼板边缘 SLAB EDGE
F
3300
300
5
1200
3
90
10
20
1:2
1200
20
PLAN DETAIL - WALL TYPE "T5" T5墙型平面节点 楼板边缘 SLAB EDGE
10
35
180 铝合金窗台板
3300
300
1100
F
88
200
开启窗
90
100
90
T2墙型平面节点
1200
1500
160
1200
2
8
1200
8
4500
26
楼板边缘 楼板边缘 SLAB SLAB EDGE EDGE
7
3300
仿不锈钢铝合金扣板 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH) 160
8°
40 S
面
7
.7
10
26
3300
500 130WINDOW
4
89
室外 EXTERIOR AN
平
6
100
6
R207300 建筑完成面 FINISH FLOOR LINE
2198 .
1 : 20 SHADOWBOX PLAN DETAIL - WALL TYPE "T4" T4墙型阴影盒平面节点
A1
20 PL
见
20
180 铝合金窗台板
13.50°
A
ALUMINIUM SILL EXTENSION
160
7°
300 20
ALUMINIUM SILL EXTENSION PLAN DETAIL - WALL TYPE "T2"
1200
楼板边缘 A1 1 : 2 SLAB EDGE 130 160
100
E1
10
参
仿不锈钢铝合金扣槽 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH) TO
1:2
90
R
仿不锈钢铝合金扣板 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH) 200MIN-400MAX
200
D
10
仿不锈钢铝合金扣槽 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH)
300
200
CHINA TEAM ENGINEERING CONSULTANTS (BEIJING) CO., LTD SHENZHEN BRANCH 6009 Shennan Avenue Shenzhen 518040 T 86 755 3391 2955 F 86 755 3391 2956
20
卓展工程顾问(北京)有限公司深圳分公司 CONSULTANT:
9
2198 .
不锈钢连接件,竖向间距参见放大 立面图 STAINLESS STEEL PLATE,REFER TO ENLARGED ELEVATION FOR VERTICAL SPACING 3
1200
可拆卸仿不锈钢铝合金扣板 REMOVABLE ALUMINIUM PANEL (SIMULATED STAINLESS STEEL FINISH) 26
200
FE
PLAN室外 DETAIL - WALL TYPE "T1" EXTERIOR T1墙型平面节点
1200
彩釉夹胶玻璃 FRITTED500 LAMINATED GLASS RE
45
1300
25
35
1:2
A4
3300
E
25
5
26
1200
仿不锈钢铝合金构件 ALUMINIUM EXTRUSION (SIMULATED STAINLESS STEEL FINISH)
室外 EXTERIOR
8
.6
ALUMINIUM SILL EXTENSION 50
R
R207300
7
88
B
0°闪辉器 .0 90 BALLAST
建筑完成面 FINISH FLOOR LINE 26
3°
88 接线盒 JB
4500
线路向上转入上方横梁中 线路向下转入连接件下方线槽中 WIREWIRE TURNTURN UP HERE THETO THE DOWN TO HERE HORIZONTAL ABOVE PLATE RACEWAY MULION BELOW STEEL 1
1200
LED灯管,亮度最高 A1 LINEAR LED FIXTURE,BRIGHTEST1 : 2
PLAN DETAIL - WALL TYPE "T1" T1墙型平面节点
90
6
.3
90
室外 EXTERIOR
3300
镇流器 BALLAST
12
25
FE
E
91
90
180 铝合金窗台板
2100
A
F
0° .8
B
1:2
200
上方横梁 HORIZONTAL MULION ABOVE
1200
A
D1
N
LED灯管,亮度低于幕墙系统6 LINEAR LED FIXTURE,LESS BRIGHTER THAN CURTAIN SYSTEM 6 5
PL A
D
25
不锈钢连接件,竖向间距参见放大 立面图 STAINLESS STEEL PLATE,REFER TO ENLARGED ELEVATION FOR VERTICAL SPACING B
35
可拆卸仿不锈钢铝合金扣板 REMOVABLE ALUMINIUM PANEL (SIMULATED STAINLESS STEEL FINISH)
20
40
35
仿不锈钢铝合金构件 ALUMINIUM EXTRUSION (SIMULATED STAINLESS STEEL FINISH) 40
160
边缘 楼板 EDGE SLAB
curtainwall detail
300
1100
D
彩釉夹胶玻璃 FRITTED LAMINATED GLASS
5
89
40 350
2
4
2100
彩釉玻璃 FRITTED GLASS
楼板边缘 SLAB EDGE
RE
25
12
JINHUIHAI INVESTMEN 1F Foshan Medi Foshan 52831 T 86 757 2878 F 86 757 2878 www.dp-plaza.c
佛山市金海汇投资 OWNER:
室外 EXTERIOR
1100
C
接线盒 JB
26
8°
20
T2墙型平面节点
350 PLAN DETAIL - WALL TYPE "T2"
TO
E 4
200MIN-400MAX
.7
仿不锈钢铝合金扣板 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH) C
3
89
C
镇流器 BALLAST
100
3
50
E
ER
F
LED灯管,亮度不宜影响相邻住宅 D1 1 :NOT LINEAR LED FIXTURE,SHOULD 2 BE TOO BRIGHT TO AFFECT THE ADJACENT RESIDENTIAL TOWERS 线路向下转入连接件下方线槽中 WIRE TURN DOWN HERE TO THE RACEWAY BELOW STEEL PLATE
90
D
平面
1102 ,92 tsuguA
参见
2 4
REF
A
100
F
50
1
ALUMINIUM SILL EXTENSION
B
S
化深筑建计设初扩 12
室外 EXTERIOR
AN
8
PL
3
90 50
PLAN DETAIL - WALL TYPE "T1" T1墙型平面节点
88
A1
300
TO
8
D1
180 铝合金窗台板
10
20 20
面
25
R
2
D
90
仿不锈钢铝合金扣槽 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH)
平
1
160
FE
30
35
C
见
A
30
90
300
RE
2011 20
E
参
design development phase 1:2
S
1
45
AN
A-A 剖面图
室外 EXTERIOR
PL
collaborative project in callison PLAN DETAIL - WALL TYPE "T2" T2墙型平面节点 TO
B
26 2
面
35
彩釉夹胶玻璃 FRITTED LAMINATED GLASS
1
R
foshan dongping plaza facade design ALUMINIUM SILL EXTENSION
平
一案方 160
FE
A1
26
见
elevation& curtainwall plan
45
200MIN-400MAX
RE
35
室外 EXTERIOR
参
A
40 S
室外 EXTERIOR
AN
D1
20
PL
二案方
35
TO
20 面
25
R
D
平
FE
仿不锈钢铝合金扣槽 ALUMINIUM CAP(SIMULATED STAINLESS STEEL FINISH)
见
RE
II tower noitpO
300
45
参
I noitpO
90
F
10
180
C
300
DATE 2011.08
180
A-551
10 85
9 69
10 107
GRID
1333
GRID
楼板完成面 FFL
楼板完成面 FFL
1300 (西塔 WT)
1100 (北塔 NT)
GRID 50% DETAILED
ISSUED / RE
50%初步设计 - 建筑部分
50% DETAILED DESIGN ARCHITECTURE
A-456
COPYRIGHT c 2011 CALLIS 塔楼放
50%初步
50% DE ARCHIT
COPYRIGHT c 2011 CALLISON ARCHITECTURE, LLC.
A-4
ENLARG
GRID
ALUMINUM PANEL
STEEL BAR
CONCRETE WALL 750
ZIGZAG CURTAIN PANEL INTERIOR
1500
1500
1500
1500
1500
1500
1500
LIGHT BOX 4500
方案二 构件式玻璃幕墙(设检修通道) SCHEME II STICK CURTAIN WALL WITH CATWALK
VERTICAL CANOPY CANOPY LOWER EDGE
plan of podium curtain wall and advertisement light box
EXTERIOR
CANOPY UPPER EDGE
方案二 构件式玻璃幕墙(设检修通道) 方案二 构件式玻璃幕墙(设检修通道) 方案二 构件式玻璃幕墙(设检修通道)
方案二 构件式玻璃幕墙(设检修通道)
II STICK CURTAIN WALL WITH CATWALK SCHEME II STICK CURTAIN WALL WITH CATWALK SCHEME II STICK CURTAIN SCHEME WALL WITH II STICK CATWALK CURTAIN WALLSCHEME WITH CATWALK
TYPICAL ENLARGED PLAN OF PODIUM CURTAIN SYSTEM TYPE II SCHEME III UNITIZED CURTAIN WALL
GRID
GRID
GRIDGRID
wall
GRID
GRID GRID
GRID GRID
GRID
GRID
aluminun panel GRID
GRID
GRID
GRID
GRID
zigzag curtain panel
GRID GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID
GRID
750
钢构架 STEEL BAR 天桥 CATWALK
4500
4500
广告灯箱 LIGHT BOX 竖向折板雨棚 VERTICAL CANOPY 室外 高处雨棚边缘 EXTERIOR CANOPY UPPER EDGE
裙房幕墙系统二_典型放大平面 方案二 构件式玻璃幕墙(设检修通道) TYPICAL ENLARGED PLAN OF PODIUM CURTAIN SYSTEM TYPE II 现浇墙体 SCHEME II STICK CURTAIN WALL
GRID
GRID
750
CONCRETE WALL
4500
广告灯箱 LIGHT BOX 竖向折板雨棚 VERTICAL CANOPY 低处雨棚边缘 高处雨棚边缘 CANOPYEDGE LOWER EDGE CANOPY UPPER
8100
钢构架 STEEL BAR 天桥 CATWALK
现浇墙体 铝背板 CONCRETE PANEL WALL ALUMINUM 构件式锯齿玻璃幕墙 ZIGZAG CURTAIN PANEL
钢构架 STEEL BAR 室内 天桥 INTERIOR CATWALK
City
铝背板 ALUMINUM PANEL 构件式锯齿玻璃幕墙 ZIGZAG CURTAIN PANEL
广告灯箱 LIGHT BOX
室内 INTERIOR
CityCity City
elevation and竖向折板雨棚 wall section of podium curtain wall and advertisement light box VERTICAL CANOPY 高处雨棚边缘 室外 低处雨棚边缘 CANOPYLOWER UPPEREDGE EDGE EXTERIOR CANOPY
室外 EXTERIOR
低处雨棚边缘 CANOPY LOWER EDGE
佛山市东平广场项目
佛山市东平广场项目
Foshan Dongping Plaza Project Foshan Dongping Plaza Project
Foshan Dongping Plaza Project
佛山市东平广场项目
Foshan Dongping Plaza Project
室外 EXTERIOR
裙房幕墙系统二_典型放大平面 裙房幕墙系统二_典型放大平面 裙房幕墙系统二_典型放大平面 方案二 构件式玻璃幕墙(设检修通道) 方案二 构件式玻璃幕墙(设检修通道) 方案二 构件式玻璃幕墙(设检修通道) TYPICAL ENLARGED PLAN OF TYPICAL ENLARGED PLAN OF TYPICAL ENLARGED PLAN OF PODIUM CURTAIN SYSTEM TYPEPODIUM II CURTAIN SYSTEM TYPE II PODIUM CURTAIN SYSTEM TYPE II 铝背板II STICK CURTAIN WALL SCHEME II STICK CURTAIN WALL SCHEME SCHEME II STICK CURTAIN WALL
ALUMINUM PANEL 构件式锯齿玻璃幕墙 ZIGZAG CURTAIN PANEL
室内 INTERIOR 2000 500
广告灯箱 LIGHT BOX 竖向折板雨棚 VERTICAL CANOPY 高处雨棚边缘 CANOPY UPPER EDGE
钢构架 铝背板 WALL STEEL BAR ALUMINUM PANEL 构件式锯齿玻璃幕墙 天桥室内 INTERIOR ZIGZAG CURTAIN PANELCATWALK
佛山市东平广场项目 GRID
GRID
GRID
钢构架 现浇墙体 STEEL BAR CONCRETE 天桥 CATWALK
2000 500
GRID
现浇墙体 CONCRETE WALL 室内 INTERIOR
2000 500
GRID
50% DD _Design Refinement August 29, 2011
低处雨棚边缘 CANOPY LOWER EDGE
GRID
GRID
铝背板 ALUMINUM PANEL 构件式锯齿玻璃幕墙 ZIGZAG CURTAIN PANEL
GRID
8100
8100
2000 500
广告灯箱 LIGHT BOX 竖向折板雨棚 VERTICAL CANOPY 高处雨棚边缘 CANOPY UPPER EDGE
GRID GRID
GRID
8100
SCHEME II STICK CURTAIN WALL WITH CATWALK
2000 500
扩初设计建筑深化
筑深化
GRID GRID构件式玻璃幕墙(设检修通道) GRID GRID 方案二
8100
现浇墙体 CONCRETE WALL
esign Refinement 011
GRID GRID
750
GRID
GRID
4500
GRID
GRID
750
columns
4500
GRID
750
GRID GRID
低处雨棚边缘 CANOPY LOWER EDGE
室外 EXTERIOR
佛山市东平广场项目 Foshan Dongping Plaza Project
裙房幕墙系统二_典型放大平面 方案二 构件式玻璃幕墙(设检修通道) TYPICAL ENLARGED PLAN OF PODIUM CURTAIN SYSTEM TYPE II SCHEME II STICK CURTAIN WALL
GRID
GRID
GRID
GRID
GRID
8100 GRID
GRID
750
现浇墙体 CONCRETE WALL
广告灯箱 LIGHT BOX 竖向折板雨棚 VERTICAL CANOPY 高处雨棚边缘 CANOPY UPPER EDGE
钢构架 STEEL BAR 天桥 CATWALK
铝背板 ALUMINUM PANEL 构件式锯齿玻璃幕墙 ZIGZAG CURTAIN PANEL
室内 INTERIOR 2000 500
4500
GRID
低处雨棚边缘 CANOPY LOWER EDGE
室外 EXTERIOR
佛山市东平广场项目 Foshan Dongping Plaza Project
elevation of podium in panorama
裙房幕墙系统二_典型放大平面 方案二 构件式玻璃幕墙(设检修通道) TYPICAL ENLARGED PLAN OF PODIUM CURTAIN SYSTEM TYPE II SCHEME II STICK CURTAIN WALL
City
City
columns
slabs &escalators
interior walls
building facades western sunken plaza
eastern plaza
qingdao china resource center southwestern sunken plaza
The concept design of the elevations is trying to catch the essence of the giant waves The layering and folding of the curtain walls on the facades can be read as the architectural interpretation of the shape and dynamics of the waves. The juxtaposition of the curtain walls and the stone cladding, which by literal meaning stands for the mountain and the sea, sets this CRC project apart from others.
north entrance
collaborative project in callison design development phase
columns
slabs &escalators
interior walls
2011
building facades
CONCEPT DIAGRAM
D.S. ENTRY
eastern sunken plaza plan CONCEPT DIAGRAM
TOWER LOBBY FLOOR PLAN LG
出图专用章 DRAWING SEAL
CONCEPT DIAGRAM
注册人员章 SEAL OF REGISTRY STAFF
审
定
APPROVED BY
审
核
AUDITED BY
工程主持 PROJECT DIRECTOR
专业负责 DISCIPLINE RESPONSED BY
校
对
CHECKED BY
设
计
DESIGNED BY
会 建
签
筑
栏
SIGNATURE
电
气
ARCHITECTURE
ELECTRIC
结
暖
构
STRUCTURE
通
HVAC
给 排 水 WATER S & D
建设单位
CLIENT
华润置地(山东)有限公司
工程名称
PROJECT
图
TITLE
青岛华润中心项目 名
塔楼门厅地面层平面 办公楼平面图 TOWER LOBBY FLOOR PLAN OFFICE FLOOR PLANS 工程编号
210092.03
PROJECT NO.
阶
段 S
比
U
T
A
T
例
版
专
扩初
S
业 E
1 : 150
SCALE
号
图
N I L
号
DRAWING NO.
日
EDITION
期
DATE
建筑
P I C
S I D
A-131 A-151 2011.10.12
青岛腾远设计事务所有限公司 QINGDAO TENGYUAN DESIGN INSTITUTE CO. LTD. 建筑行业甲级 A137010885 规划编制乙级 102B05
设计证书编号
中国
. 青岛
景园设计乙级 A237010882 市政行业丙级 A237010882
.香港西路 22号
合作设计单位:
CALLISON LLC. www.callison.com
wall section of eastern sunken plaza
合作设计单位:
广州容柏生建筑结构设计事务所 RBS Architectural
Engineering Design Associates Structural Design, Class A (License Number): A144020809
建筑工程结构专业设计甲级 证书编号
2
TOWER LOBBY ELEVATION
地址:广州市东风西路140号东方金融大厦507室
Add: Rm 507, Dongfang Finance Bldg., 140 Dongfeng West Rd. Guangzhou P.R.C. 邮政编码(Postal Code):510170 电话(Tel):(86)020-81087767 81087233 传真(Fax):(86)020-81087592 电子信箱(E-mail):GZ@GZRBS.com
合作设计单位:
LOBBY SPACE PERSPECTIVE
section of tower lobbies& eastern sunken plaza
explode axonmetric diagram of different floors
penhouse
penhouse exploded
section of s.a. tower roof garden shear wall
penhouse mep between-unit partition
in-unit partition
l32-33
air conditioning system
louvers
s.a. tower typical floor plan
s.a. tower typical floor plan glazing l8-31
s.a. tower section
exploded axonmetric diagram of different floors crown
mep
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
出图专用章
本图纸须经各相关部门批准后方可使用 不得量取图纸尺寸施工,如有任何不详 事宜,请在施工前与设计师会商
定
审
核
本图纸须经各相关部门批准后方可使用 不得量取图纸尺寸施工,如有任何不详 事宜,请在施工前与设计师会商
l38-39
注册人员章 审
本图纸须经各相关部门批准后方可使用 不得量取图纸尺寸施工,如有任何不详 事宜,请在施工前与设计师会商
工程主持 专业负责 校 设
对 计
会
签
栏
建
筑
电
气
结
构
暖
通
给 排 水
建设单位
墙身剖面-办公大堂 WALL SECTION - OFFICE LOBBY
大堂 VATION - OFFICE LOBBY
wall section of office tower lobby 1 : 50
墙身剖面-办公大堂 WALL SECTION - OFFICE LOBBY
华润置地(山东)有限公司
工程名称
1 : 50
青岛华润中心项目 图
名
平面PARTIAL PLAN - ROOF PARAPET
工程编号
平面阶 段 专 业 扩初 建筑 PARTIAL PLAN - ROOF PARAPET 比 例 图 号 1 : 50
1 : 50
版
号
1 : 50
A-461
日
期
2011.12.19
平面PARTIAL PLAN - ROOF PARAPET 1 : 50
平面PARTIAL PLAN合作设计单位: - ROOF PARAPET
l37
1 : 50
合作设计单位:
出图专用章
出图专用章
注册人员章
平面-入口 PARTIAL PLAN - ENTRANCE
雨棚 N - ENTRANCE CANOPY
1 : 50
合作设计单位:
审
定
审
核 出图专用章
工程主持 专业负责
平面PARTIAL PLAN - ROOF PARAPET
会
工程主持 建 筑 专业负责 工程名称 结 构 校 对 给 排 水 设 计
1 : 50
1 : 50
对 计 定
注册人员章
平面PARTIAL PLAN - ROOF PARAPET 平面PARTIAL PLAN - ROOF PARAPET
校 设 审
会 签 栏 审 核 建 筑 电 气 工程主持 结 构 暖 通 专业负责 注册人员章 给 排 水 校 对 审 定 建设单位 设 计 审 核 华润置地(山东)有限公司
1 : 50
平面PARTIAL PLAN - ROOF PARAPET
墙身立面PARTIAL ELEVATION - ROOF PARAPET
l35
1 : 50
1 : 50
签
栏 电 暖
气 通
青岛华润中心项目
建设单位 会 签 栏 图 名 华润置地(山东)有限公司 建
筑
电
气
结
构
暖
通
墙身剖面WALL SECTION - ROOF PARAPET
工程名称
给 排 水 工程编号
建设单位 阶 段 比
图
版
例
青岛华润中心项目 专 业
扩初
华润置地(山东)有限公司
名
1 : 50
号
图
日
号
期
工程名称
段
图 比 版
1 : 50
2011.12.19
青岛华润中心项目
工程编号 阶
建筑 A-455
名 例
扩初 1 : 50
号
合作设计单位:
专
业
图
号
日
期
专
业
建筑 A-455 2011.12.19
工程编号 阶
段
比
例
版
号
扩初 1 : 50
图
号
日
期
建筑 A-455 2011.12.19
合作设计单位: 合作设计单位:
office tower section
l8-9
detail rendering of tower parapet l12
plans of tower parapet l27 refuge floor
合作设计单位:
合作设计单位:
平面PARTIAL PLAN - ROOF PARAPET
墙身立面PARTIAL ELEVATION - ROOF PARAPET
1 : 50
1 : 50
平面PARTIAL PLAN - ROOF PARAPET
墙身立面PARTIAL ELEVATION - ROOF PARAPET
1 : 50
1 : 50
平面PARTIAL PLAN - ROOF PARAPET
墙身立面PARTIAL ELEVATION - ROOF PARAPET
1 : 50
1 : 50
墙身剖面WALL SECTION - ROOF PARAPET
合作设计单位: 合作设计单位:
1 : 50
墙身剖面WALL SECTION - ROOF PARAPET
合作设计单位:
1 : 50
墙身剖面WALL SECTION - ROOF PARAPET
合作设计单位:
1 : 50
l31
墙身立面 墙身立面 -
PARTIAL ELEVATION - MECHANICAL LEVELfloor curtain wall PARTIAL - MECHANICAL LEVEL wall section& elevation ofELEVATION office tower crown& typical 1 : 50
1 : 50
墙身剖面 墙身剖面 WALL SECTION - MECHANICAL WALL SECTION - MECHANICAL LEVELLEVEL 1 : 50
1 : 50
墙身立面 墙身立面 -办公 PARTIA PARTIAL ELEV 1 : 50
1 : 50
colorway 2002-2007
-
villa 44| Geometric Abstract Equipoise
individual project in SCUT 2004
View from southeast
elementary school individual project in SCUT 2004
Obturating architectural body
Ordinary classrooms Traversable architectural body Special classrooms& teachers’ offices
Section
Inner courtyard
OuterInner courtyard
52| Circle and Square
51| Circle and Square
South elevation Section
View towards inner courtyard
North elevation
e
Third floor plan
SCUT scientific center individual project in SCUT 2004
ultiplicity
The intricated nature of surrounding environment sheds fews positive effects on the site, which results in the museum being design as an introsive one. On one hand, it serves as a confronting response to the environment as well as correspondence to its essense, on the other hand, the consistence can be achieved by regulating form, structure and space of the architecture.
East elevation
62| Game of Light in Multiplicity
North elevation
The intricated nature of surrounding environment sheds fews positive effects on the site, which results in the museum being design as an introsive one. On one hand, it serves as a confronting response to the environment as well as correspondence to its essense, on the other hand, the consistence can be achieved by regulating form, structure and space of the architecture.
y
east East elevation
West elevation
2005
1 2 3 4 5 6
Lobby Atrium hallway Gallery Temporary exhibition room Reception
7 Temporary exhibition storage 8 Repairment 9 Recording 10 Specimen 11 Photography 12 Appraisal
13 14 15 16 17 18
Fire control Buffering Administration Exhibition facilities storage Flowerbed Bar
North elevation
Section looking north
North elevation
Section looking north
Formation of site
1 2 2 2 2 2 2 2 2 2 2 3 3 3 3
First floor plan Arial view from northeast
Arial view from northeast
Formation of site
57| Game of Light in Multiplicity
Site patten
57| Game of Light in Multiplicity
West elevation
individual project in SCUT
59| Game of Light in Multiplicity
museum of folk art
62| Game of Light in Multiplicity
Site patten
Formation of exhibition 1 Subsidary exhibition rooms
Formation of exhibition 1 Secondary Subsidary exhibitionroutes rooms Secondary routes
Transitional space Exhibition space
Exhibition space
Service area Service area
Formation of exhibition 1
of function Formation of exhibition 1Formation Formation of function
Section looking east
East elevation East elevation
First floor plan
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
West elevation
Changing room Process Booking office Projection Lounge Simultaneous interpretation Auditorium Big exhibition room Storage Exhibition facilities storage Open storage Open-shelf storage Collector’s storage Open to below Small exhibition
Second floor plan
62| Game of Light in Multiplicity
Core Core routesroutes
Transitional space
59| Game of Light in Multiplicity
Main exhibition rooms
Main exhibition rooms
61| Game of Light in Multiplicity
1| Game of Light in Multiplicity
1 2 3 4 5 6
sketches 2002-2007
shenzhen university technology center
ningbo xiangshan resort hotel
shanghai venke shopping center
效果图
效果图
Renderings
Renderings
studio foshan dongping plaza facade design 佛山市东平广场项目
扩初设计建筑深化
City
Foshan Dongping Plaza Project
50% DD _Design Refinement August 29, 2011
office
Geometric Abstract Equipoise Individual Project,
The Construction of Red, Yellow and Blue by Mondrian in 1930 is one of his magnum opuses of geometric and abstract style. 7 different rectangles are controled by the third set of black lines to form a concise structure. All constructive factors of his work are elaborated and arranged in appropriate positions, in pursuit of absolute equipose. The skillfully division and combination draw out a rhythmic vision from the plan, and in turn his principle of geometric abstracism. By way of the basic elements of painting, including beeline and right angle( horizontal and vertial lines), tricolors( red, yellow and blue) and three non-pigments( white grey and black), the power creating nature and the nature itself are symbolized by the finite designs.
8 weeks
Villa
43| Geometric Abstract Equipoise
villa
Roof plan
We’ve been trying to tranform the reality in our imagination into structures under the control of rationality, so that the same structures can be recognized in the consequent “definite” natural reality and nature can be appreceived by way of formative vision. Despite its capricious mutation, nature invariably functions by absolute formative laws on the whole . --------Schoen-maekers
table of contents
View from southeast
44| Geometric Abstract Equipoise
artworks
2003 Fall
shanghai center constructure site
elementary school
Fourth floor plan
scientific building 1 2 3 4 5 6 7 8 9
Grand stairs platform Restroom Big computer classroom Preparation Shoe changing Resting platform Research Open to below
Fourth floor plan
Section looking west
Game of Light in Multiplicity Individual Project,
55| Grand Stairs
55| Grand Stairs
Section looking east
The intricated nature of surrounding environment sheds fews positive effects on the site, which results in the museum being design as an introsive one. On one hand, it serves as a confronting response to the environment as well as correspondence to its essense, on the other hand, the consistence can be achieved by regulating form, structure and space of the architecture.
West elevation
Arial view from southeast
8 weeks
Museum of folk Customs 2005 Fall
musuem of folk art Game of Light in Multiplicity
Game of Light in Multiplicity
Site patten
works in the stony forest Wei Lin 1300 Crossing Place, Apt 3721 Austin , Tx 78741 520.490.9503 brianzoom@utexas.edu