PPP coursera final project

Page 1

Public‐Private Partnerships (PPP): How can PPPs help deliver better services? Coursera Online Course Final Project Point of Comparison

participants

Investor

BOT Airports

ID

4

Reference

El Alamein Airport

Marsa Alam Airport

International Airport Company (IAC)

EMAK Marsa Alam for Management and Operation of Airports

subsidiary of Kato Group, was established to bid for the tender of Al Alamien international airport. It got the tender with a 50 year BOT concession, extendable to 99 years.

subsidiary of El Kharafi Group for development, was established to bid for the tender of Marsa Alam international Airport. It got the tender with 40 years BOT concession, it is a part of EMAk Marsa Alam Group which is responsible for development in Marsa Alam in different aspects (Airport Operation, Construction,Touirsm and Real Estate Development)

Al Alamein International Airport Brochure, International Airport Company, 2006

Consultant Designer

5

Contractors

6

BOT Contract Duration

Main Contractor

Kato Group for Contracting Nile Company for Contracting and Roads

Dr. Ahmed Abd El-Warith Consultants, Al Alamein airport feasibility study, 1998

7

Reference

Reference

Time Schedule

Contract

Performed

4 years

Construction Period

15 years

Period after which the project can start to profit and benefit from the Egyptian government revenue

11 years

Period after which the project can start to profit and benefit from the Egyptian government revenue

31 years

Concession Period

25 years

Concession Period

Total BOT Contract

40 Years

Total BOT Contract

construction 1998

1st phase 2002

.1999 ‫ لعام‬53 ‫ و عدد‬1998 ‫ لعام‬264 ‫ عدد‬،‫ ملحق الوقائع المصرية‬،(BOT) ‫عقد منح التزام و إنشاء و تشغيل مطار مرسى علم الدولى بنظام‬

2nd phase 2015

3rd phase 2028

Dr. Ahmed Abd El-Warith Consultants, Al Alamein feasibility study, 1998

construction 2001

9

Reference

Time Schedule Graph

P.M.P. Services, Marsa Alam Airport Feasibility study, 1996

Construction Period

Dr. Ahmed Abd El-Warith Consultants, Al Alamein airport feasibility study, 1998

9

1st phase 2005

3rd phase NA

Estimated study cost 120 Million LE

Dr. Ahmed Abd El-Warith Consultants, Al Alamein feasibility study, 1998

Airport Cost

1st phase 2001

2nd phase 2009

3rd phase NA

Marsa Alam Airport succeeded to start the operation of the airport in first phase few months earlier than scheduled. It also succeeded to start the second phase 4 years before the time scheduled for this phase

initial cost estimated 80 Million LE

Estimated study cost 120 Million LE

Construction Cost

12

cost of construction 300 Million LE

total cost NA

P.M.P. Services, Marsa Alam Airport Feasibility study, 1996

Construction Cost

170 Million LE

320 Million LE

Meeting with Eng. Hamdi Abd El Azim, General Manager of Al Alamein Airport, April 2010

Meeting with Eng. Abd El Aal El Zarie, Deputy Manager of Marsa Alam Airport, April 2010

Airport Cost Estimated‐Marsa Alam

Comment

Comment

350

160 300

140

initial cost of Airport was near the estimated cost of the project which was increased due to the additional projects related to the airport. Performed cost was increased by 40 million LE and was Late 4 years

120

Airport Cost Graph

13

100 80 60 40 20 0 intial Cost

Reference

Project Finance Financial Study

Comment

total cost NA

180

Performed Porject Cost

40 % Self Financing

15

Flight Revenues

Advertisements

Airlines Companies

Free Duty Market

Traveling Agencies

VIP Center

Passengers

Ghazala Bay Resort

Advertisements

Airlines Companies

Parking spots

Local Integrated Market

Cafeteria

Free Duty Market

Traveling Agencies

Advertisement

Cargo Village

Agriculture land

VIP Center

Passengers

industrial & commercial park

Exchange House

Advertisement

Status

include storage, refrigeration, warehousing center

Postponed

Diving Training Center

Training diving center equipped with latest tech.

2nd Phase Constructed

Postponed

Harbor Yacht Club

it accommodate 1000 yachts with different scales

2nd Phase Constructed

Postponed

International Conference Center

Conference Center opposite to Port Ghalib under construction

constructed

P.M.P. Services, Marsa Alam Airport Feasibility study, 1996

2500

25000

50000

Hotel capacity (by room) Est.

250

1200

NA

Hotel capacity (by room) Per.

Year

2005

2010

2015

9363

17428

31041

10156

27946

NA

Estimated/Performed Hotel Capacity‐ Marsa Alam

Comment

Performed

Estimated 50000

hotels and resorts along the north coast is extremely under estimated hotel capacity for Al Alamein

40000 25000

20000

1200 Y/2010

Water desalination, Sewage treatment plant, central, medical center, stores, sporting club for residents of region

EMAK Marsa Alam Airport Company, International Marsa Alam Airport Brochure, October 2005

50000

Not Performed Yet Y/2015

45000 40000 35000 30000 25000 20000 15000 10000 5000 0

Comment

Performed Not Performed yet

27946

10156

Hotels and resorts around the airport along the north coast is expected to reach to 17428 room in 2010

31041

it will be doubled during the period from 2010 to 2015

17428

9363 Y/2005

Meeting with Eng. Hamdi Abd El Azim, General Manager of Al Alamein Airport, April 2010

Y/2010

Y/2015

Tourism Development Authorities, Ministry of Tourism, Report on Tourism in Red Sea, December 2009

Dr. Ahmed Abd El-Warith Consultants, Al Alamein feasibility study, 1998

19

Port Ghalib Marina

Hotel capacity (by room) Est.

250 Y/2005

Cafeteria

Status

Hotel capacity (by room) Per.

2500

Gas Station

2nd Phase Constructed

2015

0

Related projects

Project Description

2010

10000

Parking Projects

30,000 sq. m contains 3 hotels with total cost 200 million

2005

60000

Flight Revenues

Related project

Canceled due to 4 hotels and resort located near the airport location in range of Service Facilities Dabaa Plant

Estimated/Performed Hotel Capacity‐ Al Alamein

Airport Traffic Estimated

Arrival and Departure Halls

P.M.P. Services, Marsa Alam Airport Feasibility study, 1996

1st Phase Constructed

Estimated

60% Loans

Cargo Village

Year

30000

Performed Porject Cost

Related projects

Dr. Ahmed Abd El-Warith Consultants, Al Alamein feasibility study, 1998

Reference

Estimated Project cost

Parking spots

Meeting with Eng. Hamdi Abd El Azim, General Manager of Al Alamein Airport, April 2010

18

intial Cost

Parking Projects

total area 25km2 geared towards export Industrial & Commercial to western markets 16 park 16 km2, perform additional export to Organic agriculture land are European markets

Hotels And resort

Hotel Rooms Graph

0

40 % Self Financing

Project Description

Cargo Village

17

50

P.M.P. Services, Marsa Alam Airport Feasibility study, 1996

1st Move pick on North Coast, 19 km from airport with 2500 room

Related project

No. of Hotel Rooms

100

60% Loans

Dr. Ahmed Abd El-Warith Consultants, Al Alamein feasibility study, 1998

Reference

150

Project Finance

Exchange House

Related Projects to Airport Facility

200

prepared by the researcher

Dr. Ahmed Abd El-Warith Consultants, Al Alamein feasibility study, 1998

Arrival and Departure Halls

Initial Cost of the airport was significantly small. The estimated cost of project increased due to the additional development projects related to the airport project. Performed cost was increased by 20 million LE and was before schedule by 4 months.

250

Project Finance

14

Reference

Fiscal Revenue

Estimated Project cost

prepared by the researcher

Reference

Related Projects

3rd phase 2026

prepared by the researcher

Airport Cost Estimated‐Al Alamein

Hotel Rooms To be served

construction 1998

Al Alamein Airport was delayed in start of construction phase due to problems concerning land acquisition with ECAA. It was ended in 2001 and started to construct the airport

initial cost estimated 72 Million LE

11

Reference

Feasibility study

2nd phase 2013

Meeting with Eng. Abd El Aal El Zarie, Deputy Manager of Marsa Alam Airport, April 2010

prepared by the researcher

Reference

BOT Agreement

1st phase 2002

10

Reference

Performed

construction 1998

.1999 ‫ لعام‬53 ‫ و عدد‬1998 ‫ لعام‬264 ‫ عدد‬،‫ ملحق الوقائع المصرية‬،(BOT) ‫عقد منح التزام و إنشاء و تشغيل مطار مرسى علم الدولى بنظام‬

2nd phase NA

Meeting with Eng. Hamdi Abd El Azim, General Manager of Al Alamein Airport, April 2010

Comment

Estimated

Netherlands Airports Consultants (NACO) Egyptian Consultants Group (ECG) Main Contractor Nile Company for Contracting and Roads Roads and runways Arab Contractors Interior Contractor

4 years

50 Years

Estimated

EMAK Marsa Alam Airport Company, International Marsa Alam Airport Brochure, October 2005

A.C.C

Roads and runways Reference

Arch. Walid Elshmay Teacher Assistant At German University in Cairo Egypt

BOT Airports Evaluation

EMAK Marsa Alam Airport Company, International Marsa Alam Airport Brochure, October 2005

Year

Flights Estimated

Flights Performed

Status

Year

2002

195

0

-195

2002

Flights Estimated 840

Flights Performed

2006

474

277

-197

2007

3750

4891

1141

2015

975

NA

NA

2010

9370

11054

1684

1235

Status 395


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.