Portfolio sample 2015

Page 1

Hennu Kjisik THE POWER OF ARCHITECTURE Towards better hospital buildi

Portfolio sample 1. Master Thesis Theory support

To have a better treatment, people always have to go to the large general hospitals far away from where they live. This creates hospitals crowding, long waiting time and also high energy consumption by commuting... ... My master thesis suggests to set up a more decentralized healthcare system in the future. Health Centre will function more like community hospital. Also with the information technic developing, patients will get treatment anywhere with the same quality.

2. Projects at Chalmers

The chosen health care system, the institutional part of the competition task (accounted for in more detail in BOX 18 and Fig. 193), addressed the conflicting requirements expressed in the programme (concurrent demands for larger and smaller units) by general upscaling and General Hospitals concentration of specialised care services in Emergency Centre one “Main Asclepieion” while providing six

local “Mini Asclepieions” in order to satisfy the growing demands for small scale facilities located at short distances from peoples’ homes. The latter is reminiscent of the “nearby care” system developed in Skåne, southern Sweden, and other similar recent developments referred to in earlier chapters.

Planning of Östersund Hospital

New Health Centre at Eklandagatan

Healthcare system today Patients have to go to the large general hospitals to take proper treatments. And 18% of carbon emission from hospitals is caused by transportation, this is mainly creates by the long distance commuting to the hospitals.

New hospital main entry is designed as an open space, and integrated with urban structure. My task is part of the concept design and all the model making and 3D rendering.

A

transportation 18%

Dentistry

A

Hospital carbon emissions

Health Centre

New extension

Future healthcare system The health centres today should be given more functions and work as community hospitals in the future.

Health centre

Central hospital

reference from Harris - Kjisik, competition entry "Fair Care - Care Fair".

Design Proposal

wards

wards court yard

treatment aisle

akut aisle Section A - A

Design of Library at Frihamnen Fig. 193

Ek

lan

da

ga

tan

n

ata

arg

ralt

Gib

Location: Frihamnen, Göteborg, Sweden

228 Regional healthcare facilities in Gothenburg

This design includes two phases, we firstly make urban design to set up the connection over Göta river; then choose the southern pier of Frihamnen to design a new library with flood preventing perspective.

gatan

Eklanda

District boundary Hospitals Health centres

Skin

llag

ku Frid n

argatan

Eklandagatan 80-82 Plot area: 2100 sqm

ata

Acute centres

Gibralt

The city of Gothenburg has been divided as ten districts, and the medical facilities of different levels could reach all parts of the city. So Gothenburg is very suitable to apply a decentralized healthcare system. I have chosen the site at Eklandagatan 80-82, which is located at the boundry between the city and residential villas. It has a huge contrast from both sides of the design plot. My idea is to connect the two parts together and make this health centre a more public space.

Urban Intervention Structure Fouth Level +13.200

Third Level

Major connection Shared Space Functional-Units Path Inner backbone

+8.700

Second Level +4.200

Ground Level +0.000

treatment out-patient common area circulation staff in-patient support

Underground Level +0.000 acute flow in-patient out-patient goods flow

Landscape Reconstruction of the ground


3. Projects of Bachelor This project is to transform an abandoned military factory into an information centre of Chongqing University, China. We achieved Excellent Work Prize in 2011 Autodesk Revit Sustainable Architectural competition. (60 had been selected out of 403 candidates)

Chongqing Information Centre Design

4. Practical Projects

concept development

Renovation of National Library of China

Total gross area: 27 822 ㎡ Six floors above ground: 21 313 ㎡ My task: building up digital 3D model with Sketchup for discussion and making adjustment based on the feedback; also taking part of diagraming and AutoCAD drawings.

main entrance

water pool

Site area: 72.25 ha Total gross area: 435 190 ㎡ My task: urban design with one supervisor, contribute part of concept and build up the whole 3D digital model. Individual design of architecture units. Commercial and residential cabins, and also tourist centre, but stop at construction drawings. This project has three phases, the first one is under construction now.

The Art Education Centre of Wuhan University

? This design has been chosen as one of the best graduation projects to take part in the competition in Moscow, Russia, 2013. The concept is to transform the empty square into an active living space, where all kinds of art educations and activities meet up.

5. Hand Drawings

总体规划设计

Village Planning with style of Shang Dynasty


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.