Selected Works
SF Tenderloin Library UC Berkeley Architecture 100A Instructor : Ling Fan
Tsung Pao Wang Architecture Portfolio
page. 2- 4
SF SoMA Food Hall UC Berkeley Architecture 100B Instructor : Keith Plymale
page. 5-8
The Truth, Alley UC Berkeley Architecture 100D Instructor : Keith Plymale
page. 9-11
Innotek Design Academy of Arts Interior Design IAD620 Instructor : Suzan Swabacker
page. 12-14
Mixed-Use Development Design Academy of Arts Interior Design IAD610 Instructor : Brook Yeagle
ParkPlaceDesign Academy of Arts Interior Design IAD620 Instructor : Brook Yeagle
page. 15
page. 16-18
The SF Tenderloin Library was formed based on an examination of manipulating curves that allow morphed spaces where users find it easy and intuitive to maneuver through. Two sets of curves were initially stuidied through section drawings and further amalgamated into a solid. The solid was then abstracted from the given cuboid. The product of such strategy created a void that inherits the initial spacial qualities. By exploiting architectural elements such as bookshelf, computer labs, lightwells and circulatory pathways allows the architecture to guide users through the space.
In the following page, a series of models was being explored through substracting volumes from an existing solid in order to create voids which intersect with one another. An investigation was further carried out to scrutinized usable, inhabitable spaces.
UC Berkeley Architecture 100B Good Food Project
Precedent Study A precedent study of “The Saving Bank� located in Denmark, Middelfart, was carried out initially in order to understand the morphology behind facade’s architectural forms and functions. These functions consist of thermal control, air circulation and glazing system.
Conceptual Diagram Crosswind and gales in San Francisco were observed during the initial site visits. These elements supplemented the idea behind the initial design and transformed into a conceptual diagram. The diagram determines the formation and functions of the building.
The Good Food project
The Good Food project is a study that explores the intergration of folio-dynamic between building facade system. The building took on the form of the previous conceptual diagram and the facade further plays an essential role which serves functions such as thermal control, air circualtion, and the glazing system.
RESEARCH
EDUCATION
GALLERY
GARDEN
FOOD HALL AUDITORIUM
FOOD HALL
FOOD HALL
UC Berkeley Architecture 100B Good Food Project
Through analysis of the urban fabric of East Oakland, and the grain of the city, The True Food Restaurant incorporates and embraces the notion of the alleyway. The Alley, throughout inner cities are traditionally viewed as residual, and informal spaces for people within the community to gather. More recently, Alleys have been transformed by artists into areas of interest and modern galleries. Taking the notion of this modern Alley, the design of the True Food Alley Restaurant weaves the idea of alleys and shipping containers. This was formulated to sequentially educate people in the community on the importance of food. The process of making food, is just as much as an art as any painting or mural. By emphasizing the food making process as an art in the alley, the people in the community are presented with an innovative architecture that solves and influences people to be more conscientious about what they eat.
6.
Index 1. Kitchen 3.
2.Ordering Counter 3.Drive Through 1.
4.Indoor Dining 5. Parking 6.Employees Parking convection
oven
convection
oven
7. Indoor Dining 1
11.
8. Indoor Dining 2
9.
2.
9.Learning Kitchen
10. 4.
10.Grow Room 11.Employees Resting Area 12.Out Door Dining
8. 7.
5.
12.
International Blvd
Academy of Arts IAD620 INNOTEK
NOTE
DN
1 A9.01.2
PT3
S
E/S
S
CONC
CONCEALED ELECTRICAL RACEWAY IN WALL
111
CONCEALED ELECTRICAL RACEWAY IN WALL
(E)CONCRETE WALL
S
AG
WC5
PT3
MEN
S
WC4
1 A9.03
AB
PT3
TILE2
WC6
UP
FURNITURE FINISHING PLAN SCALE: 1/4” = 1’-0”
1
505 2ND ST.
MFG.MOHAWK NO.4351-19976 FINISH.COASTAL PATH III COLOR.DEEP LAGOON
CTP4
MFG.MOHAWK NO.0834-129734 FINISH.TEXTURAL CONTRAST COLOR.OLYMPIA
TILE1
MFG.BUILD.INC NO.CS521212P6 FINISH.PORCELAIN COLOR.BRAZILIAN GREEN
TILE2
MFG.BUILD.INC NO.CS5712121P6 FINISH.PORCELAIN COLOR.ENGLISH GRAY
OUT - APPROX, 1/6”
MFG. GREEN BUILDING SUPPLY NO.TC-II FINISH.7-COAT ALUMINUM OXIDE/POLYURETHANE
WD
MFG. QUILRETE NO.1249-50 FINISH. COLOR.
-ALL METAL SURFACES TO BE PAINTED SHALL FIRST BE PRIMED WITH METAL PRIMER AND FINISHED WITH SEMI-GLOSS OIL-BASE PAINT. CONC
-FINISH COAT MUST NOT SHOW BRUSH MARKS.
4 STORIES
-PAINT MANUFACTURE IS SPECIFIED AS GIVEN PAINTS. SUBSTITUTIONS ALLOWED ARE BENJAMIN MOORE AND SERWIN-WILLIAMS.
HORIZONTAL SURFACES
-PREFERRED METHOD OF PAINT APPLICATION IS BY SPRAY APPLICATION
ROOM KEY
NOTES
344
4
COMPUTER LAB
277
3
103
KITCHEN/RESTING
246
3
104
JANITOR CLOSET
20
1
105
CEO OFFICE
196
2
106
WORK STATIONS
261
3
BOBBY WANG SEMESTER PROJECT
HALL WAY NOT INCLUDED (CHECK SEPARATION LINE)
COPY ROOM
152
2
108
MEN RESTROOM
141
N/A
109
WOMEN RESTROOM
143
N/A
110
CONFERENCE ROOM
374
111
HALL WAY
685
RECEPTIONS/WAITING
101
HALL WAY NOT INCLUDED (CHECK SEPARATION LINE)
EGRESS PLAN
4
PROJECT NUMBER: ISSUE DATE: 17TH MAY 2018 AUTHOR: BOBBY WANG CHECKED BY: SUZAN SWABACKER
A0.01
7 29 TOTAL
WALLS NORTH
WD
102
COMPUTER LAB
CPT-1
SEE NOTES
103
KITCHEN/RESTING
TILE-1
PT1/S
104
JANITOR CLOSET
CONC
EAST
SOUTH
WEST
HEIGHT
SEE NOTES
PT2/S
PT2/S
9’-7” AFF
SEE NOTES
CEO OFFICE
WD
106
WORK STATIONS
CPT-2
107
COPY ROOM
CPT-3
WC5 PT3/E
SEE NOTES
WC1 PT1/E
WC1 PT1/E
PT2/S
MEN RESTROOM
TILE-2
WC4 PT3/S
109
WOMEN RESTROOM
TILE-2
WC4 PT3/S
110
CONFERENCE ROOM
CPT-4
111
HALL WAY
WD
SEE PLAN
WC5 PT3/E
WC5 PT3/E
WC4 PT3/S
CEILING MATERIAL/FINISH
NOTES
10’-4” AFF
2X2 ACOUSTIC TILE
WC6
9’-7” AFF
ACOUSTICAL CEILING
10’-4” AFF
2X2 ACOUSTIC TILE
WC1 PT1/E
10’-4” AFF
2X2 ACOUSTIC TILE
PT2/S
9’-7” AFF
ACOUSTICAL CEILING
WC5 PT3/E
10’-4” AFF
2X2 ACOUSTIC TILE
WC4 PT3/S
WC4 PT3/S
9’-0” AFF
ACOUSTICAL CEILING
WC4 PT3/S
WC4 PT3/S
WC4 PT3/S
9’-0” AFF
ACOUSTICAL CEILING
WC3 PT1/S
WC3 PT1/S
WC3 PT1/S
10’-4” AFF
2X2 ACOUSTIC TILE
SEE PLAN
SEE PLAN
SEE PLAN
10’-4” AFF
ACOUSTICAL CEILING
MFG.CUSTOM WOOD NO.GINGER ON ALDER FINISH.CONVERSION VARNISH COLOR.DARK BROWN
WD
ACOUSTICAL CEILING
PT1/E
PT1/E WC2 WC6
WC6 PT1/E
105
108
N
FLOOR
NAME
MFG. M.C.MANZO NO.#859823 FINISH.CONCRETE COLOR.GREY
CONC
WALL COVERING
WC1
MFG. HOMEDEPOT NO.#EKB-02-109 FINISH. UNFINISHED COLOR. WHITE
WC4
MFG. WMT NO.81420377 FINISH.SLATE COLOR. MONTAUK BLACK
WC2
MFG. TRIKES NO.ACS-19 FINISH.FUSION BONDED COLOR. CLEAR SKY
WC5
MFG. TRIKES NO.ACS-34 FINISH.FUSION BONDED COLOR. GRANITE
WC3
MFG. MDC NO.ZINTRA®1/8” FINISH. POLYESTER COLOR. SNOW
WC6
MFG. TILE GENERATION NO.99268448 FINISH.PORCELAIN COLOR. WHITE
BOBBY WANG SEMESTER PROJECT
FURNITURE FINISHING PLAN PROJECT NUMBER: ISSUE DATE: 17TH MAY 2018 AUTHOR: BOBBY WANG CHECKED BY: SUZAN SWABACKER N
NOTE
9’- 4” 5/8" THICK PANELS (N) CEILING
-THE WESTERN AND SOUTHERN SIDES HAVE NO WINDOWS.
404 BRYANT ST
-ALL ITEMS TO BE REMOVED (R) ARE TO BE DISPOSED OF UNDER THE SUPERVISION OF THE GC.
(E)CONCRETE WALL
-AT BASEMENT,DEMOLISH ALL REDUNDANT HVAC EQUIPMENT, INCLUDING FURNACES,PIPING, DUCTWORK,RADIANT PANELS, AND WALL AS SHOWN. REMOVE AND REPLACE BOILER AND HOT WATER HEATER.
PLUMBING SHAFT WITH COLD
(E)FUSE PANEL
-DEMOLISH AND CAP REDUNDANT PLUMBING IN WALL OR FLOOR CAVITIES THAT HAVE BEEN OPENED FOR CONSTRUCTION, IF REQUIRED.
(E)ELEV.
REMOVE AND REPLACE (E) BATHROOMS REMOVE WALLS, CEILING AND FLOOR AND LIGHTS PROTECT STACK MISS PLUMBING WHICH REMAINS
-ANY (E) LEAD-PAINTED MATERIALS ARE TO BE IDENTIFIED AND REMOVED IN COMPLIANCE WITH ALL REGULATIONS.
(E)STAIR A UP
-DEMOLISH AND REMOVE ALL (E) FLOOR SURFACES IN NEW CONSTRUCTION AREA. ALL FLOOR SURFACES ARE TO BE CLEANED AND PREPPED WHERE NEW MATERIAL IS TO BE INSTALLED.
CABINETS
PROPERTY LINE
REMOVED FOR THE REPLACEMENT OF BOILER AND HW
UP
PLUMBING SHAFT WITH COLD & HOT
Existing Second Floor / Interior Demolition Plan SCALE: 1/4” = 1’-0”
MAIN
WITH COLD & HOT WATER SUPPLY MAIN
B
1.1
BOILER
LINES & SOIL STACK
BASEMENT PARTIAL PLAN (E) SCALE: 1/4” = 1’-0”
CW HW
CW HW
HW
(E)MECHANICAL ROOM STAIR
MODIFY(E) DUCT AND CONNECT TO (N) BOILER AND HOT WATER HEATER
B
3’-4”
1’-9” 2’-3”
10’-10”
2’- 8
6’-5”
1’-8”
9'-6”
MOCKA NAVA DINING TABLE
4’-11” 1’-6”
1’-6”
EAMES UPHOLSTERED PLASTIC CHAIR | VIRTA |
1’-6”
KITCHEN WEST ELEVATION SCALE: 1/2” = 1’-0”
BOILER
GFI @3’-6” AFF DISH WASHER
4” BASEBOARD VINYL OR WOOD
Vertical Shafts To Remain
HENG XING HX-801B
HENG XING HX-801B (E) COLUMN- NEW PAINT
Non-Structural Partitions To Be Removed
(N) GYPSUM BOARD- PAINTED
HENG XING HX-801B
1" OVERHANG (CONCRETE)
LED STRIP UNDER CABINET
TOEKICK
RAMU GOLD WORK STATION
BOBBY WANG SEMESTER PROJECT
Overhead Beam
EXISTING/DEMO 2ND FLOOR PLAN
Neighbor Wall HW
BASEMENT PARTIAL PLAN (NEW) SCALE: 1/4” = 1’-0”
(E) BEAM
(E) COLUMN
GLASS TILE
Walls To Be Reinstalled 1.2
DUPLEX OUTLET 1’-3”
(N) WOOD CABINET OVER DINING TABLE
BREAKER
Old Boiler And HW Will Be Removed And Replaced With New Boiler And HW
5/8" THICK PANEL (N) CEILINGS
-COORDINATE EXTENT OF WALL DEMOLITION WITH NEW WALL LOCATIONS. SEE FLOOR PLAN. ALIGN NEW WALLS WITH (E).
Structure Bearing Walls Columns To Remain PLUMBING SHAFT
LINES & SOIL STACK
ROOM STAIR
AB
(E) GYPSUM BOARD - NEW PAINT
UP
BREAKER (E)MECHANICAL
RECEPTION NORTH ELEVATION SCALE: 1/2” = 1’-0”
AA
-NO WORK AT EXT WALLS EXCEPT ELECTRIC AND PAINT
WALLS REINSTALLED AFTER NEW BOILER AND HW REPLACEMENT
WATER SUPPLY
Old Boiler And HW Will Be Removed And Replaced With New Boiler And HW
DUPLEX OUTLET BEHIND FRIDGE PANASONIC COUNTER-TOP MICROWAVE OVEN BLACK - NN-SU676B
1’-6”
(REPLACE WITH NEW 1HR WALL, 4’ DOOR AND 1HR CEILING) PROPERTY LINE
PROPERTY LINE
1
CEILING AND WALL WILL BE TEMPORARILY REMOVED FOR THE REPLACEMENT OF BOILER AND HW BOILER AND HW REPLACED CEILING AND WALL WILL BE TEMPORARILY
PROTECT
DURHAM PILLOW BACK SOFA
1-5/8” SPACING
5’ - 11”
-GC TO VERIFY LOAD-BEARING STATUS OF (E) CONSTRUCTION TO BE DEMOLISHED BEFORE PROCEEDING WITH DEMOLITION.((SEE STRUC)
505 2ND ST. 4 STORIES
RELOCATE TO ADJOINING ROOM
3’ - 11”
1’-4”
MEN
DN
WOMEN
3” SPACING
3’ - 8”
7’- 0”
& SOIL STACK
DN
2’-5”
B UP
1" overhang
3’-4 1/2”
& HOT WATER SUPPLY LINES
10’-10 1/2”
(E)STAIR
WWW.ARCHW.COM/555 925-771 4896
LG LSR100 SMART FRIDGE
(N) SITTING SHELF
3’-6”
2 STORIES
GFI @3’-6” AFF
3’-6”
REMOVE AND REPLACE CEILING AND LIGHTS
CONCEALED ELECTRICAL RACEWAY IN WALL
SONNEMAN PENDANT LIGHT
2’-6”
CONCEALED ELECTRICAL RACEWAY IN WALL
WWW.ARCHW.COM/555 925-771 4896
2’- 10”
(E) WALL TO REMAIN
CEILING MOUNTED LIGHT
5/8" THICK PANELS (N) CEILING POWER
6’-9”
-ALL DEMOLITION WORK TO BE CONDUCTED IN SUCH A MANNER AS TO PROTECT ADJACENT PROPERTIES, INCLUDING, ALL WALLS, SURFACES, AND AREAS THAT ARE TO REMAIN INTACT DURING CONSTRUCTION. ALL EXISTING (E) SURFACES THAT ARE TO REMAIN INTACT DURING CONSTRUCTION WILL BE PATCHED AND REPAIRED AS NEEDED IF DAMAGED,
500 SECOND STREET SAN FRANCISCO, CA 925-771-4489 INNOTEKDESIGN@GMAIL.COM
-BASEMENT WALLS MODIFICATION SHOWN BELOW, REFER TO THE TWO PLANS AT THE BOTTOM OF THIS SHEET. (NOTE: BEFORE AND AFTER)
INNOTEK DESIGN
BEAMS 1'-4 1/2" D, TYP.
-WALLS NEAR STAIRS ARE ALL FIRE-RAT ED WALLS
HEADROOM 10’-7 1/2”
20"x20" ART3D ARCHITECTURAL 3D WALL PANELS
3’- 5”
19.7” X 19.7” WALL PANEL
1’-4”
(E)RADIATORS (TYP)
2’-6”
(E)STANDPIPES
A9.02 SCALE: 1/4”=1’
SCALE: 1/4”=1’
500 SECOND STREET SAN FRANCISCO, CA 925-771-4489 INNOTEKDESIGN@GMAIL.COM
BASE ON 100SF/OCCUPANT
102
107
CTP3
-ALL WOOD SURFACES ARE TO BE PRIMED WITH OIL-BASED PRIMER AND FINISHED W/OIL - BASE SEMI-GLOSS PAINT.
SECOND FLOOR / EGRESS PLAN SCALE: 1/4” = 1’-0”
RECEPTIONS/WAITING
PT2
(E)STAIR
-CONTRACTOR TO REVIEW DETAIL SHEETS, FINISH PLANS, AND ELEVATIONS FOR PAINTED SURFACES.
AREA (SF)
CTP2
S
-GROUT TO BE SUPPLIED & INSTALLED BY G.C. TILES TO BE INSTALLED WITH CONSISTENT GROUT WIDTH THROUGH GROUT JOINT WIDTH.
WINDOWS OPENINGS NOT PERMITTED
101
NEW FIRE RATED MAGNETIC HOLD OPE DOOR
NOTE
PROPERTY LINE
NAME
MFG.MOHAWK NO.4662-20603 FINISH.SUPERB IMAGE COLOR.BLUE SUEDE MFG.MOHAWK NO.4873-29221 FINISH.ECT III COLOR.WAVECREST
A
CONC
A
ROOM KEY
(E)ELEV.
CABINET ON TOP OF KITCHEN COUNTER 4 A9.01.2
CTP1
101 (E)FUSE PANEL
A6.01
CPT3
PT3
E TILE2
WD
107
108
DN
WC4
CONC
S
AC
CONC
109 WOMEN
A6.01
A6.02
DN
PT1
1 A9.01.2
B UP
1 A9.01.2
CONC (E)STAIR
(E)STAIR
A6.01
1
MFG. ACE LATEX. IMPERIAL-GRAY COLOR.WHITE NUMBER.71-B
WWW.ARCHW.COM/555 925-771 4896
FLOOR
3 A9.01.2
PT2
& SOIL STACK
MFG. ACE LATEX. IMPERIAL-GRAY COLOR.WHITE NUMBER.71-A
E/S
CPT1
UP
NEW FIRE RATED MAGNETIC HOLD OPE DOOR
500 SECOND STREET SAN FRANCISCO, CA 925-771-4489 INNOTEKDESIGN@GMAIL.COM
(E)ELEV.
AB
INNOTEK DESIGN
AC
(E)FUSE PANEL
103 CABINETS ON TOP OF KITCHEN COUNTER
MEN
Exit Direction
AA
107
108
101
A6.01
109
A6.01
DN
102
INNOTEK DESIGN
BEAMS 1'-4 1/2" D, TYP.
105
AF
Structure Bearing Walls / Columns
& HOT WATER SUPPLY LINES
MFG. ACE LATEX. SEMI-GLOSS COLOR.NIGHT TRAIN NUMBER.36-B
PT2
WC2
WD CPT2
A6.02
PROPERTY LINE
E PT1
PT2
AE
WINDOWS OPENINGS NOT PERMITTED
106 S
AD A6.01
S PT2 PLUMBING SHAFT WITH COLD
MFG. ACE LATEX. EGGSHELL COLOR.NIGHT-TRAIN NUMBER.36-A
PT1
110
AH
A6.02
111
CONCEALED ELECTRICAL RACEWAY IN WALL
Neighbor Walls
AG
CPT4
AF
A6.02
AE
102
(E)CONCRETE WALL
A6.02
WC3
WD
E
WC1
SEMI-GLOSS MFG. ACE LATEX. SEMI-GLOSS COLOR.WHITE NUMBER.11-B
E/S
PT2
A6.02
AH
A6.02
CONCEALED ELECTRICAL RACEWAY IN WALL
WOMEN
PT1
CONC
AD
& SOIL STACK
B
WWW.ARCHW.COM/555 925-771 4896
S PT2
A6.01
(E)STAIR
UP
S
MFG. ACE LATEX. EGGSHELL COLOR.WHITE NUMBER.11-A
PT1
A6.02
106
110
& HOT WATER SUPPLY LINES
PT1
-THE TOTAL FLOOR AREA IS 3350 SF, MINUS THE STAIRS AND ELEVATOR, THE NET AREA IS 3000 SF, THEREFORE THE TOTAL FLOOR OCCUPANCY AROUND 30 PEOPLE.
105
PLUMBING SHAFT WITH COLD
E
500 SECOND STREET SAN FRANCISCO, CA 925-771-4489 INNOTEKDESIGN@GMAIL.COM
- PROP.LINE WALLS ARE RESTRICTED FROM THE ADDITION OF NEW WINDOWS
104
BEAMS 1'-4 1/2" D, TYP.
-THE OCCUPANCY GROUP IS "B" (OFFICE)
EGGSHELL
WD
104
1 A9.01.2
(E)STANDPIPES
PAINT FINISH
(E)STANDPIPES
-THE BUILDING REQUIRES A SPRINKLER PER TABLE 504.4 FIRE RATINGS ARE NOT REQUIRED FOR INTERIOR WALLS
INNOTEK DESIGN
-THIS BUILDING IS TYPE III-B CONSTRUCTION. THE EXTERIOR WALLS ARE NON-COMBUSTIBLE AND THE INTERIOR WALLS ARE NON-RATED.
N
PROJECT NUMBER: ISSUE DATE: 17TH MAY 2018 AUTHOR: BOBBY WANG CHECKED BY: SUZAN SWABACKER
A1.01 SCALE: 1/4”=1’
PANASONIC COUNTERTOP MICROWAVE OVEN BLACK - NN-SU676B 1’-3”
4’-8”
(N) WOOD CABINET
MOCKA NAVA DINING TABLE
RAMU GOLD WORK STATION RAMU GOLD WORK STATION
EAMES UPHOLSTERED PlLASTIC CHAIR | VIRTA | 2’-10”
1’-6”
1’-6”
2’-0”
BOBBY WANG SEMESTER PROJECT
4’-10”
5/8"
INTERIOR ELEVATION
AC
KITCHEN SOUTH ELEVATION SCALE: 1/2” = 1’-0”
AD
WORK STATION WEST ELEVATION SCALE: 1/2” = 1’-0”
PROJECT NUMBER: ISSUE DATE: 17TH MAY 2018 AUTHOR: BOBBY WANG CHECKED BY: SUZAN SWABACKER
A6.01 SCALE: 1/2”=1’
0’- 4”
5/8" NEW WINDOW SHADES TO BE INSTALLED
NEW WINDOW SHADES TO BE INSTALLED
CUSTOM 1X HARDWOOD STRIP, 4” WIDE WITH 3/8”X1/4” RABBETED EDGES
1” ACOUSTIC LAYER
(E) BRICK NO WORK TYP
EDGE OF NEW TILE
WWW.ARCHW.COM/555 925-771 4896
3/8”
WWW.ARCHW.COM/555 925-771 4896
(E) WINDOW TYW
STEEL STUD TYP
(E) WINDOW TYP
1” ACOUSTIC LAYER EXISTING CARPET AND PAD
RAMU GOLD WORK STATION
CEO OFFICE NORTH ELEVATION SCALE: 1/2 ” = 1’-0”
AE
4’-6”
2’-8”
AF
RAMU GOLD WORK STATION
RAMU GOLD WORK STATION
3’-7”
2’-6”
2’-6”
3’-9”
3’-3”
COMPUTER LAB NORTH ELEVATION SCALE: 1/2” = 1’-0”
3/4“ MIN AIR SPACE
3/4” MIN AIR SPACE
500 SECOND STREET SAN FRANCISCO, CA 925-771-4489 INNOTEKDESIGN@GMAIL.COM
HENG XING HX-801B
5’-9”
INNOTEK DESIGN
CORINTHIA DESK LUCA SCACCHETTI
ROXBURY FABRIC SLIPPER CHAIR
HARDWOOD STRIP BEDDED IN CONSTRUCTION ADHESIVE
HENG XING HX-801B
TRANSITION STRIP WHEN TILES MEET CARPET SCALE: 12” = 1’-0”
2 MOLDED FIBERGLASS LAYER ACOUSTICAL CORE
RESIN HARDENED EDGE
3-1/2”BATT INSULATION
PAINTED TEXTURED FINISH
1 ACOUSTIC WALL DETAIL
3/4” ADJUSTABLE PLYWOOD SHELEVES
BLOCKING AS REQUIRED
SCALE: 1’ = 1- 1/2”
MOLD/ MILDEW RESISTANT GYP BD.
500 SECOND STREET SAN FRANCISCO, CA 925-771-4489 INNOTEKDESIGN@GMAIL.COM
HENG XING HX-801B
2’-10”
2’-5”
3’-7 “
HENG XING HX-801B
EXISTING CONCRETE SUBSTRATE
INNOTEK DESIGN
(E) BRICK NO WORK TYP
INSULATIONS 3/4” OAK PANEL DOOR 5/8" 3/4” PLYWOOD BACK CONCEALED HINGES
HANGER WIRE
BLOCKING AS REQUIRED 3/4” PLYWOOD BACK
5/8" THICK PANELS USG GRID LOAD TRANSFER BRACKET
2’-0”
GRAY CERAMIC TILE 12” X 24”
CONCRETE TILE
COMPRESSION TRIM
HANGER WIRE
LIGHT FIXTURE
USG DRYWALL SUSPENSION SYSTEM
2’-1”
3’-9”
COMPRESSION TRIM
ADA COMPLIANT HARDWARE DRAWING GLIDES
4”
BLOCKING AS REQUIRED
GRID CLIP
3/4” PLYWOOD BACK
3’-1”
GFI@ 3’-6”AFF.
3’-7”
3’-0”
SS W/BACKING IN WALL
CALLAHAM-HICKS CHAIR
3/4” ADJUSTABLE PLYWOOD SHELEVES
TOTO CLAYTON® PEDESTAL LACATORY WRAP PIPE
1’-4”
5’-3”
BOBBY WANG SEMESTER PROJECT
BOBBY WANG SEMESTER PROJECT CALIBRE OFFICE FUNITURE- CS278
5’-0”
WOMEN’S RESTROOM EAST ELEVATION SCALE: 1/2” = 1’-0”
MEETING ROOM NORTH ELEVATION SCALE: 1/2” = 1’-0”
AH
2 1/8” (E) BRICK FINISH
INTERIOR ELEVATION
12’-3”
PROJECT NUMBER: ISSUE DATE: 17TH MAY 2018 AUTHOR: BOBBY WANG CHECKED BY: SUZAN SWABACKER
3
3/4” PLYWOOD BASE AND FRAME
LIGHT COVE SECTION DETAIL SCALE: 1’= 1-1/2”
A6.02
2X WOOD BASE WITH COVE
3’-0”
WOOD STUD
A9.01.2
LIGHT COVE SECTION DETAIL SCALE: 1’= 1-1/2”
4
SCALE: 1/2”=1’
DETAIL DRAWINGS PROJECT NUMBER: ISSUE DATE: 17TH MAY 2018 AUTHOR: BOBBY WANG CHECKED BY: SUZAN SWABACKER
SCALE: AS PER DRAWING INDICATED
3’-0” 2’-0”
12-GAUGE HANGER WIRE (PLACED NEAR ENDS OF TEES)
5/8” TERAGREN WOOD FLOOR 60” CLEAR WHEEL TURNING AREA 1” GYPCRETE FOR ACOUSTIC PURPOSE
& HOT WATER SUPPLY LINES
REMOVE (E) WOOD 1” FLOOR SHEATHING
& SOIL STACK
WWW.ARCHW.COM/555 925-771 4896
SINK TOP MARBLE
5/8” PLY.WD
1/2”
3’-0”
4”
5’-0”
M-12 WALL MOLDING (BACK-TO-BACK)
8”
TYPE FOR ROOM
ROOM KEY 101
KITCHEN/RESTING
104
JANITOR CLOSET
105
CEO OFFICE
106
WORK STATIONS
105
CEO OFFICE
107
106
COPY ROOM
WORK STATIONS
107
COPY ROOM
108
MEN RESTROOM
109
WOMEN RESTROOM
110
CONFERENCE ROOM
111
HALL WAY
102
COMPUTER LAB
103
KITCHEN/RESTING
104
JANITOR CLOSET
108
CEILING ACOUSTIC DETAIL SCALE: 12” = 1’-0”
1
NAME
MEN RESTROOM
109
WOMEN RESTROOM
110
CONFERENCE ROOM
111
HALL WAY
HARDWOOD FLOOR DETAIL
2
SUB-FLOOR
TYP FOR ROOM
RECEPTIONS/WAITING
COMPUTER LAB
103
SCALE: 1’ = 1- 1/2”
WOOD STUD
1/4” CUT AROUND PERIMETER
3’-0”
3’-0”
-SINK SHALL BE WALL MOUNTED. -SINK SHALL HAVE AN OVERFLOW. -SINK SHALL BE AT 4” CENTER SET. -SINK SHALL BE SLOAN MODEL SS-3_03
60” CLEAR WHEEL TURNING AREA
60” CLEAR WHEEL TURNING AREA
2’-0”
2
4’-5”
1 ADA MEN & WOMEN BATHROOM
BOTTOM OF MIRROR AND DISPENSING CONTROL/ OPENING OF ACCESSORIES AND DISPENSER OPERATING MECHANISMS.
2” BATT INSULATION
WALL CONSTRUCTION CONCRETE PRIVACY SKIRT, PER APPROVED PRODUCTS AND MATERIALS LIST, SELECTED BY OWNER.
4’-6”
Air space
(E) FLOOR JOISTS
(E) FLOOR JOISTS
1/8” RUBBER MAT 1’-0”
GENIE CLIP
TM
A.D.A SINK DETAIL SCALE: 1’ = 1- 1/2”
SCALE: 1’ = 1- 1/2”
NEW POUR-IN GYPCRETE WITH SKRAFFINO APPLIED
EXPENDED METAL LATH SCREW DOWN AT 6” CENTER
BOTTOM PLATE
Resilient CHANNEL OPTION
NOTE -SINK SHALL BE MADE OF VITREOUS CHINA.
3’-7”
NAME RECEPTIONS/WAITING
102
3’-0”
3’-0”
101
500 SECOND STREET SAN FRANCISCO, CA 925-771-4489 INNOTEKDESIGN@GMAIL.COM
INNOTEK DESIGN
ROOM KEY
3’-0”
500 SECOND STREET SAN FRANCISCO, CA 925-771-4489 INNOTEKDESIGN@GMAIL.COM
(E) RIM JOIST 1”
(E) DOUBLE TOP PLATE
WWW.ARCHW.COM/555 925-771 4896
COUNTER TOP PLYWOOD
SINK TOP MARBLE
INNOTEK DESIGN
(E) FLOOR JOISTS
REMOVE (E) 3/4” PLY.WD
TOTO CLAYTON® PEDESTAL LACATORY
SINK TOP MARBLE
3’-0”
4”
(E) FLOOR JOISTS
4’-0”
8.63”
BOTTOM PLATE 1/2” SHEETROCK
60” CLEAR WHEEL TURNING AREA
PLUMBING SHAFT WITH COLD
12.25”
AG
3’-1”
3’-1”
3/4” OAK DOOR & DRAWER
INSULATION AS INDICATED ON PLANS
TOTO CLAYTON® PEDESTAL LACATORY
Acoustic tile
MOLD/ MILDEW RESISTANT GYP BD.
18.25”
NOTE 1/4” RESILIENT FIRE-RATED ACOUSTICAL CAULKING
(E) RIM JOIST
JANITOR CLOSET
CEO OFFICE
105
CEO OFFICE
WORK STATIONS
106
WORK STATIONS
107
COPY ROOM
107
COPY ROOM
108
MEN RESTROOM
108
109
WOMEN RESTROOM
109
WOMEN RESTROOM
110
CONFERENCE ROOM
110
CONFERENCE ROOM
111
HALL WAY
111
HALL WAY
2X2 ACOUSTIC TILES SCALE: 1’ = 1- 1/2”
4
TYP FOR ROOM
NOTE
MEN RESTROOM
-ADDRESS SCREW-HEAD AND SEAM
WRAP PIPE
-PRIME WOOD FOR OUT GASSING BUBBLE PREVENTION -SEE FURNITURE FINISH PLAN FOR CARPET FINISHING
CONCRETE FLOORING DETAIL (NEW SKRAFFINO) SCALE: 1’ = 1- 1/2”
BOBBY WANG SEMESTER PROJECT
8”
DETAIL DRAWINGS
6” 2’-0”
PROJECT NUMBER: ISSUE DATE: 17TH MAY 2018 AUTHOR: BOBBY WANG CHECKED BY: SUZAN SWABACKER
A9.01.1 SCALE: 1/4”=1’
BOBBY WANG SEMESTER PROJECT
BLOCKING AS REQUIRED FOR SINK/ COUNTER TOP SUPPORT
EGRESS PLAN
SINGLE BOTTOM PLATE AS REQUIRED
9”
KITCHEN/RESTING
104
34”
COMPUTER LAB
103
27”
NAME RECEPTIONS/WAITING
102
3’-1”
101
JANITOR CLOSET
1’-5”
ROOM KEY
KITCHEN/RESTING
104 106
-SINK SHALL BE WALL MOUNTED. -SINK SHALL HAVE AN OVERFLOW. -SINK SHALL BE AT 4” CENTER SET. -SINK SHALL BE SLOAN MODEL SS-3_03
TYP FOR ROOM
COMPUTER LAB
103 105
3
NAME RECEPTIONS/WAITING
102
2’-1”
101
-SINK SHALL BE MADE OF VITREOUS CHINA.
3/4'' PLYWOOD WITH PLASTIC LAMINATE FINISH OPTIONS TO OWNER, OWNER TO SELECT.
(E) DOUBLE TOP PLATE
(E) DOUBLE TOP PLATE
7/8” 25Ga DRAY-WALL FURRING CHANNEL
ROOM KEY
BACKPLASH
SS W/BACKING IN WALL
(E) RIM JOIST
3
ADA TOILET DETAIL SCALE: 1’ = 1- 1/2”
BLOCKING AS REQUIRED KNEE AND TOE CLEARANCE REQUIRED-BENEATH THE SINK
4
A.D.A SINK DETAIL SCALE: 1’ = 1- 1/2”
PROJECT NUMBER: ISSUE DATE: 17TH MAY 2018 AUTHOR: BOBBY WANG CHECKED BY: SUZAN SWABACKER
A9.03 SCALE: 1/2”=1’
Academy of Arts IAD611 SUMMARY THE MAIN PURPOSE FOR THIS PROJECT IS TO DESIGN A COMMUNITY CENTER FOR THE REFUGEES. ONE OF THE FEW CHALLENGES WE FACED WAS TO PROVIDE A SENSE OF BELONGING TO THE USERS. AS A RESULT, THE COLOR AND MATERIAL SELECTIONS ARE MAINLY BASED ON NATURE MATERIAL AND COLOR SUCH AS GRAY, WHITE, BEIGE AEGEAN BLUE. THE CORE PROGRAMS THAT THE WHOLE PROJECT IS SURROUNDED BY ARE THE CAFE LOCATED AT THE FIRST FLOOR AND THE ROOF GARDEN. THE CAFE, LOCATED IN THE CENTER OF THE FIRST LEVEL IS CONNECTIED WITH THE RECEPTION HALL, ENCOURAGING USER TO EXPLORE THE SPACE ON THE OTHER SIDE OF THE CAFE. ALSO, THERE ALL A MINI LIBRARY LOCATED WITHIN THE RECEPTION HALL. THE PURPOSE OF THIS SPACE IS TO CREATE A DIRECT CONNECTION WITH THE CAFE, CREATING MORE OPPORTUNITY FOR THE USER IN THE CAFE TO EXPERIENCE THE SPACE. THE SECOND FLOOR CONSIST THREE CLASSROOM AND THREE OFFICE SPACE, WRAPPING THE CENTER PROGRAM WHICH IS THE OPEN SPACE COMPUTER LAB, THIS COMPUTER LAP IS ALSO LOCATED BENEATH THE SKYLIGHT OPEN TO THE ROOF GARDEN ON THE THIRD FLOOR, AS A RESULT, THERE WILL BE ABUNDANT DAY LIGHT WITHIN THE SPACE AND THE LOUVER WRAPPED AROUND THE LIGHTWEIGHT WILL ALSO PROVIDE SOME PRIVACY FOR THE USER BELOW. THIS PROJECT’S GOAL IS TO CREATE A SENSE OF SERENITY FOR THE REFUGEES AS SUCH ELEMENT WILL BE THE MOST ESSENTIAL QUITTER FOR THE PROJECT TO WORK. THE PROGRAMS ARE INTERTWINED BY THE CIRCULATION, PROVIDING MORE OPPORTUNITIES FOR THE USERS TO INTERACT WITH EACH OTHER .
WWW.ARCHW.COM/555 925-771 4896
ROOM 2
ROOM
CLOSET
CLOSET
PRIVATE OFFICE
PRIVATE OFFICE
WAITING AREA
ELEVATOR
PUBLIC COMPUTER ACCESS AREA
BATHROOM STAIR
RESIDENTIAL
LIVING ROOM
UP
PRIVATE CONSULTATION ROOM
KITCHEN
DISCUSSION ROOM ELEVATOR UP
FRIDGE
CLASS ROOM 2
DW BLW UP
KITCHEN
OVEN BLW STOVE
NE 60TH AVENUE AND NE HOLLAIDAY STREET PORTLAND, OR 97213 925-771-4489 PNMCS@GMAIL.COM
LAUNDRY ROOM
PACIFIC NORTHWEST MULTICULTURAL COMMUNITY SERVICE (PNMCS)
STACKING DRYER WASHER
CLOSET
ROOM 3
WOMEN’S RESTROOM BATHROOM
LIVING ROOM
MEN’S RESTROOM ROOM 3
DINING LAUNDRY ROOM
CLASS ROOM 3
CLOSET CLOSET
CLOSET STAIR B
ROOM
JANITOR CLOSET
MECHANICAL ROOM
BOBBY WANG SEMESTER PROJECT
ROOM 2
FLOOR PLAN PROJECT NUMBER: ISUUE DATE: AUTHOR: CHECKED BY:
A105
SCALE: 1/32”=1’
WWW.ARCHW.COM/555 925-771 4896 OUTDOOR SEATING AREA
ROOM 2
ROOM
ELEVATOR
LIVING ROOM
CAFE
BATHROOM STAIR
RESIDENTIAL
ENTRANCE/EXIT
LAUNDRY ROOM
DINING
STOVE OVEN BLW
UP
DW BLW
RECEPTION
KITCHEN
FRIDGE
ELEVATOR
47”
UP
NE 60TH AVENUE AND NE HOLLAIDAY STREET PORTLAND, OR 97213 925-771-4489 PNMCS@GMAIL.COM
ENTRANCE/EXIT STACKING DRYER WASHER
PACIFIC NORTHWEST MULTICULTURAL COMMUNITY SERVICE (PNMCS)
CLOSET
CLOSET
CLOSET
KITCHEN
UP
WOMEN’S RESTROOM BATHROOM
COMMUNITY ROOM
CAFE EXIT WOODEN LOUVER OVERHEAD
LIVING ROOM MEN’S RESTROOM
ROOM 3
DINING LAUNDRY ROOM
CLOSET CLOSET
CLOSET STAIR B
UP ROOM
ROOM 2
JANITOR ROOM
MECHANICAL ROOM
BOBBY WANG SEMESTER PROJECT
FLOOR PLAN PROJECT NUMBER: ISUUE DATE: AUTHOR: CHECKED BY:
A106
SCALE: 1/32”=1’
ParkPlaceDesign Maxwell Residential
ParkPlaceDesign Pacific Bay Dental
ParkPlaceDesign Sethi Residential